Project Work Plan and Budget Matrix

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

ANNEX 9 Project Work Plan and Budget Matrix

Project Title: PRAY


__PROJECT to “Prioritize Reading for the Advancement of the Youth”___________

Problem Statement:
The PHIL-IRI result shows that there are many learners whose reading ability didn’t
match to the grade level they are in.

Project Objective Statement:


To accelerate the growth of students not yet meeting grade ‐level expectations by
reducing the frustration readers belonging key stage three which is the Junior High as well
as the key stage Four; the Senior High.

Root Cause:
__Poor reading habit, lack of reading materials, lack of teacher’s follow-up, weak
implementation of the remediation, poor stakeholders’ engagement, poor reading
center_________________________________

Project Work Plan and Budget Matrix

Budge
Date of
Budge t Date of
Activity Output Implement Person Responsible
t Sourc Monitoring
ation
e
Intensify the
implementation Improved and
of the widened skill of the
remediation such learners in terms of School Head, School Twice
as E-BASA, (Oral Language, Reading annually
Jan 2022 MOOE
Lakbay-Basa, Phonological Coordinator, (Every
to , PTA,
One Call/Chat Awareness, Phonics, Teacher- advisers, April and
December Dona-
Away. Catch a Fluency, Vocabulary, Parents, Identified October)
2024 tions
Word, Read/Spell Comprehension) Learners,
First Before you Selected students for stakeholders
Enter, Reading contests outside
Month, Buwan ng school
Wika
Thrice
Reproduce 1:1
Jan 2022 School Head, School annually
learner-material Allocated 1:1 learner-
to Reading (Every
ratio during the material ratio on the
December Coordinator, Novembe,
conduct of Phil- conduct of PHIL- IRI
2024 Teacher- advisers April, June
IRI
)
Enhance the Twice
Reading Center MOOE annually
Procured reading School Head, School
by filling up the January , PTA, (Every
materials, board Reading
necessary 2022 Dona- April and
games and Coordinator, ADAS
materials needed tions October)
inside
School Head, School Twice
Establish the
Reading annually
Community Functional Community MOOE
Coordinator, (Every
Reading Hub with Reading Hub and January , PTA,
Teacher- advisers, April and
stakeholders as active reading 2022 Dona-
Parents, Identified October)
reading volunteers tions
Learners,
volunteers
stakeholders
School Head, School Twice
Reading annually
Implement the MOOE
Coordinator, (Every
School-Business MOA, active operation January , PTA,
Teacher- advisers, April and
Establishment of the target activities 2022 Dona-
Parents, Identified October)
Partnership tions
Learners,
stakeholders
ANNEX 9 Project Work Plan and Budget Matrix

Note: Please record also the date of monitoring per project


Please attach this form to the AIP template

Project Team:

CHARLYN J. BONGHANOY ADMONDRO S. OLAVIDES NOVA RHEA GAY M. TUSOY


Team Leader School Head AA II

MARJUN B. RODRIGUEZ IRENE S. ANDALES RUPERTO C. VIDAL


Filipino Coordinator English Teacher School Ground Coordinator

LOVELY JOY L. GARCIA ESMYLA R. BAHALLA MARY HEART M. DEVIBAR


Grade 9-Adviser Grade 9-Adviser Grade 10-Adviser

EVANGELINE O. MIRANDA NOE C. GARCIA PEIRCE IAN C. VILLAVITO


Grade 12-Adviser School DRRM Coor. Grade 10-Adviser

JESSELLY C. VALES MARIFEL L. CRODUA CHARISSE P. VIDENA


Grade 7-Adviser Grade 9-Adviser SHS Coor
.