Section X-X: Fakhri A. Hasamwala & Associates
Section X-X: Fakhri A. Hasamwala & Associates
Section X-X: Fakhri A. Hasamwala & Associates
PB1 C12
C11
2750 1950 1950 2 16 2 16
S4 S5 S6
200 700 125THK. 700 700 125THK. 700 200 600
125THK. 600 200
PB3
PB7
PB4
PB6
PB5
3950
S1 S2 S3 2 16
PB3
(200 X2850) PB4 PB5 PB6
(200 X 2850) (200 X 2850) (200 X 2850) PB7
T10 @150c/c (200 X 2850) T10 @150c/c
C15 C16 T10 @150c/c
T8 @200c/c T10 @150c/c T10 @150c/c T8 @200c/c
PB2
BOTTOM PLAN FOR O.H.TANK T10 @150c/c T8 @200c/c T8 @200c/c T10 @150c/c
T8 @300c/c
T10 @150c/c
T8 @300c/c
T8 @300c/c
PB1 C12
T8 @300c/c
C11 S1 S2 S3 150X150
175THK. 175THK. 175THK. HAUNCH
PB3
PB7
3 16 4 16 3 16
PB4
PB6
PB5
S4 S5 S6
C15 C16
PB2
TOP PLAN FOR O.H.TANK ØAS PER ARCH,
125 125
1T8 1T8
X X
2 T 12
H
(TOP & BOTTOM)
230
SLAB SCHEDULE 500
500
DISTRIBUTION/ 4 T 12 4 T 12
SLAB NO. DEPTH MAIN STEEL/SHORT SPAN STEEL REMARKS EXTRA
LONG SPAN STEEL EXTRA
S1 175 T10 @90 C/C (ALT.BAR BENT UP) T8 @175 C/C. (DIST.) ONE WAY SECTION X-X
S2,S3 175 T10 @150 C/C (ALT.BAR BENT UP) T8 @175 C/C. (DIST.) ONE WAY "H" AS PER ARCH & SERVICES DWG.
S4 125 T8 @135 C/C (ALT.BAR BENT UP) T8 @225 C/C. (DIST.) ONE WAY
S5,6 125 T8 @ 200 C/C (ALT.BAR BENT UP) T8 @225 C/C. (DIST.) ONE WAY
NOTES :-
1) READ THIS DWG. WITH THE RELEVANT ARCHITECTURAL DWG.
2) USE MIX M30 CONCRETE & Fe 500 STEEL UNLESS OTHERWISE SPECIFIED.
3) T INDICATES HIGH TENSILE RIBBED TOR STEEL.
BEAM SCHEDULE (M30:Fe500) 4) ALL THE MATERIAL LIKE CEMENT,STEEL,SAND,AGRREGATES MUST CONFIRM TO IS CODES.
5) ALL THE WORK SHALL BE CARRIED OUT UNDER SUPERVISION OF LICENSED SITE SUPERVISOR
SIZE TOP REINFORCEMENT SHEAR STIRRUPS ONLY PERIODICALLY CONCRETE CUBE RESULT OF SAME SHALL BE FORWARDED TO
BEAM BOTTOM CONSULTANT FROM TIME TO TIME.
REMARKS 6) OUR RESPONSIBILITY SHALL REMAIN LIMITED TO SAFE AND SOUND STRUCTURAL DESIGN
NUMBERS STEEL MID
B D LEFT SPAN RIGHT LEFT MID SPAN RIGHT AS TRANSMITTED BY THIS DRAWING AND WE SHALL NOT REMAIN RESPONSIBLE FOR
a) SAFETY OF OLD STRUCTURE DURING DEMOLITION.
2L-T10@150 C/C 2L-T10@150 C/C 2L-T10@150 C/C
PB1,PB2 200 2850 + 3-T25 2-T16 2-T16 2-T16 REFER DETAIL REFER DETAIL REFER DETAIL PARADI BEAM b) SAFETY OF ANY ADJOINING BUILDING / PERSONS STAYING IN ADJOINING
1-T20 BUILDING / PERSONS & PROPERTIES ON ADJOINING ROADS.
PB3,PB5,PB6,PB7 2L-T10@150 C/C 2L-T10@150 C/C 2L-T10@150 C/C c) SAFETY OF CONSTRUCTION WORKER / ANY PERSONNEL AT WORK SITE DURING CONSTRUCTION.
200 2850 3-T16 2-T16 2-T16 2-T16 REFER DETAIL REFER DETAIL REFER DETAIL PARADI BEAM
d) CORRECTNESS / SAFETY OF ANY TEMPORARY STRUCTURE, SCAFFOLDING, SHUTTERING,
2L-T10@150 C/C 2L-T10@150 C/C 2L-T10@150 C/C
PB4 200 2850 + 2-T16 2-T16 2-T16 2-T16 REFER DETAIL REFER DETAIL REFER DETAIL PARADI BEAM CENTERING ERECTED @ SITE AND ANY INJURY TO ANY PERSONNEL ARISING OUT OF THEIR ACCIDENTS.
2-T16 e) ACCIDENT OCCURING DUE TO PREMATURE DESHUTTERING FAULTY / SUBSTANDARD CONSTRUCTION
MATERIAL OR WORKMANSHIP / FAULTY CONSTRUCTION PROCEDURE.
f) ANY ACCIDENT OCCURING DUE TO CONSTRUCTION OF ELEMENTS OF BUILINGS NOT DESIGN BY US.
7) ALL THE REINFORCEMENT SHALL BE CHECKED BY US BEFORE CONCRETING.SUPERVISION WILL BE
PROVIDED TO THE EXTENT OF VARIFICATION OF REINFORCEMENT ON SITE BUT RESPONSIBILITY
REGARDING CORRECT & SOUND CONSTRUCTION SHALL SAFELY REST WITH CONTRACTORS/BUILDER