UCU - Ymana - MAJ - Capa Plan
UCU - Ymana - MAJ - Capa Plan
UCU - Ymana - MAJ - Capa Plan
Department of Health
FOOD AND DRUG ADMINISTRATION
Filinvest Corporate City
Alabang, City of Muntinlupa
RFO/CO:_____________________
OTHERS
Completion or Response
Deficiency Corrective Action /Preventive Inspector(‘s)
Description of deficiency Evidence of compliance proposed completion accepted
number Actions (CAPA) Comment(s)
(2) (4) date dd/mm/yyyy (Yes / No)
(1) (3) (5) (6)
(7)
CA: Replace the ceiling fan with
Pharmacy temperature
air conditioner. Waiting for the delivery of
1 during the time of inspection 11/18/2021
PA: Ensure proper ventilation to the air conditioner.
is 35C
maintaing the quality of products
Hygrometer - Expired CA: Renew the Calibration
1 See attached file 11/20/2021
Calibration Certificate certificate
CA: Provide pallets for the stock Waiting for the pallets to
1 Stock room has no pallets 11/18/2021
room. arrive
Date:
Noted by: Name and Signature Team Leader/Supervisor