AMIGOS CO.LTD.

CAPITAL INVESTMENT REQUISITION


No. DATE: 03-Dec-03

CATEGORY: OPERATION ADMINISTRATION

LOCATION: DX YARD X PT OFFICE

GROUP CODE NAME: I.T. equipment: Computers, modem & UPS GROUP CODE No. B06-6102

ITEM DESCRIPTION OF ASSET ASSET CODE No. VALUE (USD)


AcerPower ST (P/N: AC.PST00.003IE): 10 Sets 2,000
Intel® Pentium® 4 2.4GHz (supporting Intel® Hyper-Threading technology for
processor speeds at 3.06GHz or above)
512KB L2 cache
533MHz Front Side Bus (FSB)
256MB DDR (Double Data Rate) SDRAM PC2100, 2DIMM slots
40GB ATA-100 Hard Disk Drive (HDD), (NTFS partition required)
Integrated VGA, 4X AGP slots
Embedded AC'97 CODEC
3.5'' 1.44MB Floppy Disk Drive (FDD)
I/O expansion:
3 PCI (PCI 2.2)
I/O interface:
4 USB 2.0 ports
PS/2 keyboard port
PS/2 mouse port
RJ-45 port
Parallel port
Serial port
VGA port
Headphone and Microphone jack
Line-in jack
Line-out/ speaker jack
Tower form factor: 195(W) x 395(H) x 380(D) mm
Acer Keyboard and Mouse
Microsoft Windows XP Professional Edition preloaded
Monitor:
Acer Flat Display 17" -

BUDGETED (Y/N): BUDGET AMOUNT: 2,000 USD

TOTAL COST OF INVESTMENT: 2,000 USD EXPECTED DATE:


ESTIMATED LIFE: (No. of years)
DEPRECIATION RATE: % P.A (with straight line method)

NEED OF INVESTMENT: ORIGINAL X REPLACEMENT

EXPANSION UPGRADING

MODE OF INVESTMENT: PURCHASE X CONSTRUCTION MAJOR REPAIR

ESTIMATED REPAYMENT (RECOVERY THROUGH PROJECT) OF INVESTMENT ON PAY BACK PERIOD


PERIOD (Utility period) RECOVERY AMOUNT % RECOVERY PROJECT No.

PROPOSED BY APPROVED BY SIGNATURE DATE FOR A/C DEPT. ONLY


Name: General Manager P.O No.
Signature: Finance Manager SRV No.
Date: Managing Director Vendor Inv.#
Distribution: GM / FM / PROC. / ACCTS