Saudi Aramco Inspection Checklist: Pump Alignment Record Sheet SATR-G-2004 30-Apr-13 Mech

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4
At a glance
Powered by AI
The document discusses procedures for inspecting and aligning pumps according to Saudi Aramco engineering standards.

The inspection checklist is used to record measurements taken during pump alignment to ensure the alignment values meet specifications.

The checklist lists 3 common methods for measuring pump alignment: using dial indicators, a laser beam, or rim and face dial indicators. It also specifies measurements that must be recorded.

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Pump Alignment Record Sheet SATR-G-2004 30-Apr-13 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Expand Dhahran Residential Community Project - Package - 4 B1-10-01382-0006 CRCC


EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

A. METHOD OF ALIGNMENT USED: 1- Reverse Rim Dail Indicator 2- Laser Beam 3- Rim & Face Dail Indicator

Measured values shall be recorded in the appropriate spaces provided below:

1) Dimensional Record 2) D.B.S.E.Distance Between Shaft Ends Soft foot Check


A Required **
B
C Actual
D

3) Final Alignment Values


Vertical
Required** Actual

Angular
Offset Reading Noted at: Feet Shaft
Horizontal Foot 1
Required** Actual Foot 2
Angular Foot 3
Offset Foot 4

**Denotes values specified by the Manufacturer


REMARKS:
Allignment results are acceptable and in accordance with Saudi Aramco Engineering Standards and contractural requirements.

REFERENCE DOCUMENTS:
1. SAES-G-005 Centrifugal Pumps 28 July 2009
2. API 686 - Recommended Practices for Machinery Installation and Installation Design (Second Edition, December 2009)
3. Manufacturer's Data Sheet and Instructions

Contractor / Third-Party Saudi Aramco


PMT Representative
Technician Performing Activity*
Name, Title, Department, Activity Performed Successfully and Results are Acceptable: T&I Witnessed QC Record Reviewed Work Verified
Company, Initials and Name, Initials and Date:
Date:
QC Inspector PID Representative
Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


BER

RACTOR

CC
PLANT NO.

/ MCC NO.

TRAVEL TIME
USE ONLY
ORK PERMIT REQUIRED?

il Indicator

Shaft

s.

Work Verified

Work Verified
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED
Work Verified

S N = NO F = FAILED