V. Drainage Offshore Installation: Offshore Platform Drain Schematic
V. Drainage Offshore Installation: Offshore Platform Drain Schematic
V. Drainage Offshore Installation: Offshore Platform Drain Schematic
CLEAN
MACHINERY, ENGINES WATER DRAINS
OD2
TO LP VENTS TO
PRESSURE FLARE ATMOSPHERE
PROCESS
EQUIPMENT Flame
MAIN
DECK
arresters
( OD1)
OD1 OD2
DRIP PAN DECK ( 0D2)
SLOPE
Segregation CD
CLOSED DRAINS
Open / Closed
CLASSIFIED DRAINS SLOPE
MIN
MIN
1m
1m
0.2m
NOTE 2
MIN
OIL
WATER
TO LP PROCESS
Back to CELLAR DECK
the Process
FLARE ARRESTERS
NOTES : TO CLASSIFIED
DRAINS HEADER B ELOW
1: drain inlet s permanent ly submerged CELLAR DECK
in wat er. minimum dif f erent ial height
bet ween header drain out let and pump suct ion: 2m
2: t ype of normal out let and overf low
depends on t ank design.
SEA NOTE 1
3: lines and connect ions f or maint enance
are not indicat ed:t hey shall be blinded
of f during normal operat ion.
DISPOSAL
4: no int erconnect ion ( even f or maint enance) TUB E
. bet ween closed and open drain piping
. bet ween classif ied and unclassif ied open drains
CLEAN WATER
Hazardous DRAINS
Decks OD3
Non Hazardous
decks
VENT TO
ATMOSPHERE
TEST VENTS TO
SEPARATOR ATMOSPHERE
OD1 FLAME
MAIN ARRESTER
DECK OD2
DRIP PAN DECK
FLAME
ARRESTER
OVER
Segregation CLOSED DRAIN
FLOW
OPEN DRAIN Flame
OVER
Open / Closed CELLAR DECK
DRUM DRUM FLOW
arresters
200m m
200m m
200m m
200m m
MIN
MIN
MIN
MIN
FROM DECK
DRAINS
B OAT B OAT
LANDING LANDING
B ELOW
CELLAR DECK
Recuperation
NOTES :
by boat
1 - DRAIN HEADER OUTLETS PERMANENTLY
SUB MERGED IN WATER.
Oil
Oil and Gas Process
Water Oil or
Wellhead Condensate
Storage
Workshop
Warehouse Office area
Paved Tank bottom
Skid base plates Drip trays areas
Cellar Bund
OD I CD OD I PW OD II OD I OD II OD II OD I OD III
CD CLOSED DRAINS TO LP PROCESS (or o/w drains treatment), VIA FLASH DRUM (Closed Drain Drum)
OD OPEN DRAINS
OD I : PERMANENTLY OIL CONTAMINATED WATER OILY WATER DRAINS TREATMENT PUBLIC WATER