Precast Pile Driving Record: Jabtan Kerja Raya SARAWAK
Precast Pile Driving Record: Jabtan Kerja Raya SARAWAK
Precast Pile Driving Record: Jabtan Kerja Raya SARAWAK
Penetration No. of Hammer Penetration No. of Hammer Penetration No. of Hammer Penetration No. of Hammer Drop
(m) Blows Drop (m) (m) Blows Drop (m) (m) Blows Drop (m) (m) Blows (m)
Remarks:- Set :
Signature :
Pile Details
Nominal diameter : 0
6
Borehole Data
7
15
Reinforcement Data
16
Remarks :
* select as appropriate
QC-13c
Pile Details
Pile Reference No. :
Depth (m) Soil Description
Nominal Diameter : mm
0
Date/Time Started :
Date/Time Completed :
1
Plant/Equipment
Type of drill rig :
2
Type of bit (dia.) :
7
Reinforcement Data
9
Grouting Data
Date grouted :
Water/Cement 10
ratio :
Type of
additive used :
Remarks :
Ratio per 50kg
of cement :
Bags of cement :
* select as appropriate
QC-13d
Contractor / Turnkey Contractor *:
Project :
Piling Details
Set Criteria :
* select as appropriate
QC-14
Contractor / Turnkey Contractor *: Project :
Chainage / Stockpile /
Material Tested For : Source* : Test No. : FI/
*
EI/
63 50 37.5 28 20 14 10
Aggregate Size (mm) to to to to to to to Total
50 37.5 28 20 14 10 6.3 (g)
Thickness Gauges (width of Slot) (mm) 33.9 26.3 19.7 14.4 10.2 7.2 4.9
(0.6 times the mean sieve)
Length Gauges (width of Slot) (mm) 101.7 78.8 59 43.2 30.6 21.6 14.7
(1.8 times the mean sieve)
Remarks :
Tested By : Signature :
( )
Date : / / Date : / /
* Select as appropriate
QC-15
Contractor / Turnkey Contractor *: Project :
Chainage / Stockpile /
Material Tested For : Source * : Test No. : ACV/
Specimen No. 1 2
Remarks :
Tested By : Signature :
( )
Name :
Witnessed By : Laboratory Technician
( )
Date : / / Date : / /
* Select as appropriate
# Weight shall be same as for Specimen No. 1
QC-16
Diameter of Strand :
Remarks :
1. Name
( ) Laboratory Technician
Date : / /
2.
( )
* Select as appropriate
QC-18
Contractor / Turnkey Contractor *: Project :
Location :
* Select as appropriate
QC-19
Contractor / Turnkey Contractor *: Project :
Test Temperature ( °C )
Specification
Requirement
1 2 3 4 5 Average
Specimen No. a (for Job Mix Formulae /
for Laying Mix:)*
Bitumen Content
b
( % by Total Wt. Of Mix)
Specimen Height (mm) c
Specific Gravity : g
Bulk d/f
Max. Theoretical h
Voids 100 - i - j k
(%)
Filled with 100 x i /j m -
Bitumen
Air Voids in Total Mix 100 - 100g/h n -
Stability (kg) Correction Factor
o
(as per table)
Remarks :
1. Signature :
( )
Name :
Laboratory Technician
2.
( ) Date : / /
* Select as appropriate
QC-20
Time of Temperature °C
Order of
Truck Registration No. Remarks
Arrival
Arrival Laying T1 T2 T3
Signature : Signature :
Name : Name :
Clerk of Works Engineer / Quality Assurance Engineer *
* select as appropriate
QC-21
Contractor / Turnkey Contractor *: Project :
Gradation
Analysis Bitumen Voids Filled Air Voids in Flow Value Stability Stiffness
Date of Test &
Content with Bitumen Mix F S S/F Remarks
Test No.
(O.K. / Not O.K.)* (%) (%) (%) (mm) (kg) (kg/mm)
SPECIFICATIONS :-
Signature :
as per Tolerance :
Wearing Course 75 - 85 3.0 - 5.0 > 2.0 > 500 > 250
Tolerances (±)0.2%. Ref.
Name :
given in Table Table - 4.11 of
4.11 of SSRW SSRW for
Binder Course 65 - 80 3.0 - 7.0 > 2.0 > 450 > 225
for Laying Mix Laying Mix
* select as appropriate
QC-22a
Contractor / Turnkey Contractor *:
Project :
Visual Examination
Remark :
1 Signature :
( )
Name :
2 (Laboratory Technician)
( ) Date : / /
* select as appropriate
QC-22b
GRADATION ANALYSIS
B. S. Sieve Mass Retained % % Specification Limits # /
(mm) (gm) Retained Passing (by weight) Variance Allowed **
37.5
28 Notes :
20 # TRIAL MIX :-
14 Refer Table 4.8 (revised) for limits.
10
5
3.35 ** LAYING MIX :-
1.18
Refer Table 4.11 for allowed
0.425 Permissable Variation from the
0.15 Job Mix Formulae.
0.075
Pan
90
Percentage Passing (%)
80
70
60
50
40
30
20
10
0
0.0 0.1 1 10 100
Particle Size (mm)
Tested By : Signature :
( )
Name :
Laboratory Technician
Witnessed By :
( ) Date : / /
* Select as appropriate
QC23
mm O.K. / Not O.K.* % O.K. / Not O.K.* O.K. / Not O.K.* W1 W2 W 3=(W 1 - W 2) SGS = (W 1/ W 3) SGm (SGs/SGm) x 100
SPECIFICATION : Requirement on Compacted Density - Wearing Course - 98% to 100% Marshall Density
- Binder Course - 95% to 100% Marshall Density
Remarks :
1. ; 2. Name :
( ) ( ) Laboratory Technician
Date : / /
* select as appropriate
QC-24a
SETTLEMENT RECORDS
Signature : Signature :
Name : Name :
for (Contractor) for Engineer / Q.A.E *
QC-24b
SETTLEMENT RECORDS
(a) (b) (c) (d) (e) (f) (g) (h)
READING
Reduced Level of R.L. of Top of Height of R.L of Original Settlement
R.L. of Top of Cummulative
Original Grgound Fill Settlement Ground (at Depth of Fill druing the
Settlement Gauge Settlement Remarks
(Initial) (at present) Gauge Rod present) period
NO. DATE
(m) (m) (m) (m) (m) (m) (m) (m)
(c-d) (b-e) (e-a)
1. 0.00 0.00
2.
3.
4.
etc.
Checked By ; Verified by ;
Signature : Signature :
Name : Name :
for (Contractor) RE/ ARE/ QAE/ COW
* select as appropriate
QC-25
Volume of
Pressure Testing
Date Time Water Added Observation
(Bar) Officer
(Litres)
Signature : ………………………………………………………………
Name : …………………………………………………………………..
Designation : ………………………………………………………….
Date : …………………………………………………………………….
QC-26
Project:
___________________________________________________________________________
___________________________________________________________________________
*Please attach additional document(s) for further clarification, if necessary.
_____________ ___ _________________ ___________________
Contractor C.O.W./Assistant R.E. Resident Engineer
Date:____________ Date:____________ Date:____________
QC-27
Contractor: Project:
Contract no.
PIPELINE CHLORINATION TEST
Pipe length: Date:
Diameter: mm
Remarks:
Signature: Signature:
Name: Name:
( ) ( )
QC-28
PROJECT:
FLUSHING OF PIPELINE
Results:
*Notes: Flushing is considered satisfactory if / when the water in the glass, which is tapped
from the washout is visibly clear when it is being shone through a beam of bright light.
Colour and turbidity to be specified.
Signature:__________________ Signature:__________________
Designation:_________________ Designation:_________________
Signature:__________________ Signature:__________________
Designation:_________________ Designation:_________________
INTERNAL FINISHES
I. FLOORS
A. General 1) Finishing
Requirements
• No stain marks Visual
• Consistent colour tone Visual
4) Hollowness/Delamination
• No hollow sound when tapped Tapping rod
with a hard object
• No sign of delamination Visual
5) Jointing
• Consistent skirting thickness Visual
and no visible gap between
wall & skirting
• Edge to be straight and aligned Spirit level
and steel rule
1
QUALITY CONTROL CHECKLIST FOR ARCHITECTURAL WORKS (Continued) QC-29
FLOORS
C. Tiled Floor 1) Finishes
• Joints are aligned with skirting Visual and
and wall tiles Caliper
• Joints are aligned between tiles Visual
and consistent size Visual
• Consistent and neat marking
• Lippage between two tiles Caliper
E. Carpet 1) Finishes
• Surface should be stretched Spirit level
and even and steel rule
• Joints should not be visible Visual
• All edges should be properly Visual
anchored
2
QUALITY CONTROL CHECKLIST FOR ARCHITECTURAL WORKS (Continued) QC-29
Assessment
Item Element Standards Check (√)
Tool
3) Hollowness/Delamination
• No hollow sound when Tapping rod
tapped with a hard object
• No sign of delamination Visual
3
QUALITY CONTROL CHECKLIST FOR ARCHITECTURAL WORKS (Continued) QC-29
Assessment
Item Element Standards Check (√)
Tool
INTERNAL WALLS
D. Painting 1) Finishes
Surfaces are evenly painted Visual
• Good opacity, no patchiness Visual
resulted from touch up work
• Surface should be free from Visual and
peeling, blister, chalkiness (No physical
discolouration and fading)
4
QUALITY CONTROL CHECKLIST FOR ARCHITECTURAL WORKS (Continued) QC-29
Assessment
Item Element Standards Check (√)
Tool
III. CEILING
A. General
1) Finishing Visual
Requirements
• No stain marks Visual
• Consistent colour tone Visual
• No patchy surface Visual
4) Roughness Visual
• No rough surface Visual
5) Jointing Visual
• Consistent, aligned and neat Visual
5
QUALITY CONTROL CHECKLIST FOR ARCHITECTURAL WORKS (Continued) QC-29
Assessment
Item Element Standards Check (√)
Tool
CEILING
C. False Ceiling/ Grid • Alignment of rails should be Visual
System visually straight
• Chipped/cracked surfaces or Visual
corners should not be
detected
• Gap between ceiling and Visual
wall should not be detected
• Panels should not warp and Visual
laid neatly into grids
• No sign of corrosion Visual
6
QUALITY CONTROL CHECKLIST FOR ARCHITECTURAL WORKS (Continued) QC-29
Assessment
Item Element Standards Check (√)
Tool
4) Functionality
• Ease in opening and closing Physical
• No squeaky sound during Physical
opening and closing of the
door
• Lockset should be functional Physical
7
QUALITY CONTROL CHECKLIST FOR ARCHITECTURAL WORKS (Continued) QC-29
Assessment
Item Element Standards Check (√)
Tool
DOOR & WINDOW & FIXTURES (INTERNAL)
5) Accessories Defects
• Accessories with good fit and Visual
no stains
• No sign of corrosion Visual
• No missing or defective Visual
accessories
8
QUALITY CONTROL CHECKLIST FOR ARCHITECTURAL WORKS (Continued) QC-29
Assessment
Item Element Standards Check (√)
Tool
5) Accessories defects
• Lock sets with good fit and Visual
aligned
• No sign of corrosion Visual
• No missing or defective Visual
accessories
4) Functionality
• Function, secured and safe Visual and
physical
9
QUALITY CONTROL CHECKLIST FOR ARCHITECTURAL WORKS (Continued) QC-29
Assessment
Item Element Standards Check (√)
Tool
10
QUALITY CONTROL CHECKLIST FOR ARCHITECTURAL WORKS (Continued) QC-29
Assessment
Item Element Standards Check (√)
Tool
V. ROOF
A. General
1) Finishing
Requirements
• No stain marks Visual
• Good paint works Visual
5) Chockage/ Ponding
• No sign of chockage / Visual
ponding
6) Construction
• No sign of leaking Visual
• Proper dressing for any Visual
protrusion
• Neat and secured Visual
installation of fixtures
11
QUALITY CONTROL CHECKLIST FOR ARCHITECTURAL WORKS (Continued) QC-29
Assessment
Item Element Standards Check (√)
Tool
ROOF
C. Pitched Roof • No leaking Visual
• No rust or stains Visual
• Good painting to roof Visual
structural members
• Roof tiles in alignment Visual
• Openings to be sealed to Visual
prevent pest invasion
• Consistent colour tone Visual
• Proper dressing for any Visual
protrusion
12
QUALITY CONTROL CHECKLIST FOR ARCHITECTURAL WORKS (Continued) QC-29
EXTERNAL FINISHES
VI EXTERNAL WALLS
A. General 1) Finishing
Requirements
• No stain mark Visual
• Consistent colour tone and Visual
good paintwork
3) Roughness
• Not wavy and not patchy Visual
13
QUALITY CONTROL CHECKLIST FOR ARCHITECTURAL WORKS (Continued) QC-29
Assessment
Item Element Standards Check (√)
Tool
EXTERNAL WALLS
F. Architectural • Finished texture and colour to Visual
Coating be uniform
• No paint drips and other stains Visual
H. Fixtures
(External)
External fixtures
such as signage,
emergency
lightings, railings,
unit nos plate, lift
fittings, letter box,
lightings, etc.
General Requirements
1) Joints and gaps
• Consistent joint width & neat Visual
joint.
• No visible gap Visual
14
QUALITY CONTROL CHECKLIST FOR ARCHITECTURAL WORKS (Continued) QC-29
Assessment
Item Element Standards Check (√)
Tool
EXTERNAL WALLS
4) Functionality
• Function, secured and safe Visual and
physical
5) Accessory Defect
• No missing accessory Visual
• No sign of corrosion Visual
• No visible damage / defect Visual
15
QUALITY CONTROL CHECKLIST FOR ARCHITECTURAL WORKS (Concluded) QC-29
Assessment
Item Element Standards Check (√)
Tool
16