BILL of QUANTITY

Expected Scope of Works : EPCC ADHI Requisition Ref. No : FTP-MEC-RFQ-002


Work Package Name : PORTABLE METHANOL INJECTION PACKAGE Revision : 0
Area : LAHAT - SOUTH SUMATRA Vendor's Quotation Reference No : VENDOR TO FILL UP
Vendor Name : VENDOR TO FILL UP

Unit Rate Amount


No Description Specification Units Qty Portion Portion Remarks (if any)
Foreign [USD] Local [IDR] Foreign [USD] Local [IDR]

1 Design and Engineering As per Attachment-#1 Scope of Work and Supply


1.1 Basic Inputs/Engineering Lot 1 - -
1.2 Detailed Engineering and Design Lot 1 - -

2 Supply & Fabrication Works


*Applicable for imported and local items

2.1 Portable Methanol Injection Package Set 1 - -


Tag Number : ARN-51-ZZZ-520

2.1.1 Mechanical Set 1


2.1.1.1 Methanol Injection Tank Quantity : 1 unit
Tag Number : ARN-51-MBJ-125 Standard : ASME Sect VIII Div 1
Dimension : VTA
Capacity : 65 ft3
Orientation : Vertical vessel
Design Temperature : 150°F
Design Pressure : Full of liquid + 0.1 psig
Operating Temperature : AMB
Operating Pressure : VTA
Material : SA 240-316L
Accessories : Shall be included

2.1.1.2 Methanol Injection Pump Quantity : 1 unit


Tag Number : ARN-51-PZZ-342 Type : Motor driven controlled volume
Standard : API 675
Capacity (normal/rated) : 8.7 / 9.6 GPM
Discharge Pressure (max.) : 1800 psig
Head : VTA
Material :
Cylinder / Case : SS 316
Diaphgram : PTFE

2.1.2 Electrical As per Attachment-#1 Scope of Work and Supply Lot 1


*All required equipment/material inside the package

2.1.3 Instrument & Control As per Attachment-#1 Scope of Work and Supply Lot 1
*All required equipment/material inside the package

2.1.4 Piping Lot 1


2.1.4.1 Injection Quill Quantity : 1 unit
Tag Number : ARG-20-IQ-1503 Injection Fluid : Methanol
Piping Class : 30CS1 (API 3000)
Size of Mating Flange : 2 1/16 inch
End Connection : RTJ Flange to API 3000
Size of Pipe Header : 3 1/8 inch
Schedule of Header : TBA
Rating : API 3000
Dimension outer pipe to Flange
Face : TBA
Pressure Design : 2220 psig
Temperature Design : 185 degF
Material : A 182 F316L
Detail specification refers to datasheet
Unit Rate Amount
No Description Specification Units Qty Portion Portion Remarks (if any)
Foreign [USD] Local [IDR] Foreign [USD] Local [IDR]
Unit Rate Amount
No Description Specification Units Qty Portion Portion Remarks (if any)
Foreign [USD] Local [IDR] Foreign [USD] Local [IDR]

2.1.4.2 Injection Quill Quantity : 1 unit


Tag Number : NWR-20-IQ-1505 Injection Fluid : Methanol
Piping Class : 30CS1 (API 3000)
Size of Mating Flange : 2 1/16 inch
End Connection : RTJ Flange to API 3000
Size of Pipe Header : 3 1/8 inch
Schedule of Header : TBA
Rating : API 3000
Dimension outer pipe to Flange
: TBA
Face
Pressure Design : 2220 psig
Temperature Design : 185 degF
Material : A 182 F316L
Detail specification refers to datasheet

2.1.4.3 All other piping connection and accessories


*All required equipment/material inside the package

3 Transportation and Shipment from Factory to Near Lot 1 - -


Port [CIF] including Marine Insurance
*Applicable for imported items only

4 Transportation from Port to Site including Land Lot 1 - -


Transportation Insurance
*Applicable for imported items only and Vendor who offer with
DAP or DDP conditions in accordance with INCOTERM 2010

5 Transportation from Local Factory to Site including Land Lot 1 - -


Transportation Insurance
*Applicable for local items only

6 Taxes and Import Duty related to importing process Lot 1 - -


*Applicable for imported items only and Vendor who offer with
DAP or DDP conditions in accordance with INCOTERM 2010

7 Unloading and Storage Temporary at Site Lot 1 - -


*Unloading and installation at site for equipment and material supply

8 Installation Lot 1 - -
*Installation at site for all material supply

9 Testing and Commissioning Lot 1 - -


*Supervision at site for testing, and commissioning

Spare Parts and Consumbales for Installation, Pre- comissioning,


10 Lot 1 - -
and Comissioning Start-up
*List of spare parts/consumbales for each equipment shall be attached

11 Recommended Spare Parts for 2 Years Operation Lot 1 - -


*List of spare parts/consumbales for each equipment shall be attached

12 Factory Acceptance Test (FAT) Lot 1 - -


*FAT for max. 5 person include transportation and meal allowance

13 Training for Operator Lot 1 - -

14 Certification from Related Local Government Lot 1 - -

TOTAL INCLUDING INCOME TAXES, EXCLUDING LOCAL VAT in


accordance with Indonesian Government Regulation ….......................... ….......................... ….......................... …..........................
Unit Rate Amount
No Description Specification Units Qty Portion Portion Remarks (if any)
Foreign [USD] Local [IDR] Foreign [USD] Local [IDR]

Note :
All other expenses are considered to have been included in above mentioned items