TIE‐IN CO‐ORDINATE
SR.NO TIE‐IN NO. DESCRIPTION P & ID NO. LINE NO. TIE‐IN SIZE PIPING CLASS RATING FLANGE FACING REMARKS
UTM PLANT
in "Meter" in "Meter"
PIPING TIE‐IN FOR EXISTING CRYO PLANT
N
LPG FROM KM500 TO EXISITNG CRYO
8 TP‐3102 LPG‐EXT‐US‐110130‐01‐BA‐00‐061 6"‐HL‐022024‐B2CS 6" B2CS 300# RF E
PLANT LPG STORAGE AREA
EL
From existing Condensate storage (TK‐ N
9 TP‐3234 1031) TO New Condensate storage LPG‐EXT‐US‐110130‐01‐BA‐00‐064 8"‐HL‐032034‐B2CS 8" B2CS 300# RF E
Tank (032‐T‐001) EL
Fuel gas to New condensate N
10 TP‐3235 LPG‐EXT‐US‐110130‐01‐BA‐00‐064 6"‐GF‐054056‐A2CS 6"/2" A2CS 150# RF E
storage tank EL
N
Condensate Line from Existing P‐1631/
11 TP‐3236 LPG‐EXT‐US‐110130‐01‐BA‐00‐065 10"‐HL‐032030‐A2CS 10" A2CS 150# RF E
1632/1633 to New truck loading Line
EL
N
IA Line from Existing Cryo plant TO
12 TP‐5102 141‐051‐PC‐PID‐0071‐004 3"‐AI‐051073‐A1GLV (A1CS) 3" A1CS 150# RF E
Development Area
EL
N
Utility water Line from Existing Cryo
13 TP‐141056‐01 141‐056‐PC‐PID‐0001‐003 4"‐WU‐056028‐A2CS 4" A2CS 150# RF E
plant TO Development Area
EL
N
Domestic water Line from Existing Cryo
14 TP‐141057‐03 141‐057‐PC‐PID‐0088‐003 2"‐WU‐057020‐A1GLV 2" A1GLV 150# RF E
plant TO Development Area
EL
N
Existing LPG Truck Loading Bay Cold
15 TP‐xxxx XXXXX XXXXX X" X" X" X" E
Vent Line Modification
EL
N
From existing Cryo Plant LP Startup
16 TP‐xxxx XXXXX 4"‐HG‐121237‐A2CS 4" A2CS 150# RF E
Fuel Gas Line
EL
From existing PW Degasser to N
17 TP‐6002 LPG‐EXT‐US‐110130‐01‐BA‐00‐105 6"‐WP‐060099‐A4CSN 6" A4CSN 150# RF E
KM 500 PW Treatment EL
N
18 TP‐5907 FW FROM EXISTING CRYO PLANT 141‐100‐TS‐PID‐0002‐005 16"‐WF‐059058‐A0HDPEUG 16"/X" A0HDPEUG 150# RF E
EL
N
19 TP‐5908 FW FROM EXISTING CRYO PLANT 141‐100‐TS‐PID‐0002‐005 16"‐WF‐059059‐A0HDPEUG 16"/X" A0HDPEUG 150# RF E
EL