Oracle Cloud Project Management Assessment-2
Oracle Cloud Project Management Assessment-2
Oracle Cloud Project Management Assessment-2
Schedule audit tasks in your project timeframe for the team to conduct audit
5. Oracle Identity Cloud Service has been designed to meet the needs of
organizations in a number of typical use-case scenarios. Which of the
following use cases is applicable?
(0/1) Points
All of the above
Allowing both On-Premise and Cloud resources to be secured from a single
set of controls
Customer-facing extranet requirements
Employee-facing intranet requirements
Mobile access (providing sign-on for native or browser-based apps)
Incorrect. Please review Cloud Security
5. What is the Welcome E-mail that Oracle sends to its Cloud Customers?
(1/1) Points
It’s a declaration sent to Customer administrator informing that Oracle is
about to start the provisioning.
It has important list of action the Cloud admin should do.
It’s a declaration sent to Customer administrator informing that Oracle has
initiated the provisioning of instances
It’s a declaration sent to Customer administrator informing that Oracle has
completed provisioning and the instance is ready to be used.
It’s a declaration sent to Customer administrator informing that Oracle has
received the Order from the Sales Manager.
Correct!
6. The role profile that includes responsibility of managing the Oracle Cloud
Service applications, creating additional MyService users, setting up security
profiles, adding other users or distribution lists to receive notifications is
called as -
(0/1) Points
Identity Domain Administrator
Application Administrator
MOS Administrator
Service Cloud Administrator
Account Administrator
Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.
9. When a Customer subscribes to Fusion SaaS ERP and HCM, Oracle will
provision the following as standard:
(0/1) Points
1 unified Production Environment, 1 unified Stage Environment and 1 for
Payroll; Total 3
1 Production Environment for Fin, 1 HCM Production and 1 Fin and 1 HCM as
Stage Environments; Total of 4
1 unified Production Environment and 1 unified Stage Environment; Total 2
3. Your Customer Project has the following in Scope – ERP Cloud, lift and
shift of legacy On-Premise Seibel CRM to OCI, Custom Build Mobile
Applications and integration between ERP Cloud and Seibel CRM using OIC
(Oracle Integration Cloud). What implementation approaches apply for this
scope?
(1/1) Points
ERP Cloud – Solution, Driven OIC and OCI - Requirement Driven, Mobile
apps - Agile
Waterfall Requirement driven will fit to the entire scope
ERP Cloud and Mobile apps - Solution Driven OIC and OCI - Requirement
Driven
ERP Cloud, OIC and OCI -Requirement Driven, Mobile apps - Agile
ERP Cloud and OIC - Solution Driven, OCI - Requirement Driven, Mobile
apps - Agile
Correct!
7. You are assigned to a Project where the scope of work is EPM - Enterprise
Performance Management and Oracle Analytics Cloud. What would be the
implementation approach?
(0/1) Points
Solution Driven – As there are standard processes that may be adopted for
EPM and Analytics
EPM - Requirement Driven Approach and Analytics Cloud Solution Driven
EPM - Solution Driven Approach and Analytics Cloud -Requirement Driven
Agile approach – As it includes Custom development
Requirement Driven – As EPM and analytics are Business and Data
requirements driven
Incorrect. Please review Implementation Approach for Solution in Scope to find the correct
answer.
11. To avoid any delays during the UAT, it’s advised that the partner team
runs the testing scenario in a lab in-front of the Customer. Customer may
practice using the application during Training or after Go live. Is this a Best
Practice?
(0/1) Points
True
False
Incorrect. Please review Continuous Testing Strategy and Plan to find the correct answer.
12. Oracle Identity Cloud Service has been designed to meet the needs of
organizations in a number of typical use-case scenarios. Which of the
following use cases is applicable?
(1/1) Points
All of the above
Employee-facing intranet requirements
Customer-facing extranet requirements
Mobile access (providing sign-on for native or browser-based apps)
Allowing both On-Premise and Cloud resources to be secured from a single
set of controls
Correct!
14. During your implementation, to manage the password policy what you
should do? Select the TWO appropriate answers:
(Choose all correct answers)
(0/1) Points
Fusion password policy is flexible enough to adopt to Customer security
needs.
You can raise an SR to change the password policy to match Customer
security
You need to raise an SR, to activate the password policy
You should work with Customer to follow their password policy and ignore
the Fusion application password policy.
You cannot change Passwords
Incorrect. Please review Cloud Security
19. Which of the following Integration tools provides seamless batch and real
time data movement among Cloud and on-premise data sources,
maintaining data consistency along with fault tolerance and resiliency?
(0/1) Points
Oracle Integration Cloud
SOA Cloud Service
API Platform Cloud Service
Managed File Transfer Cloud Service
Data Integration Cloud Service
Incorrect. Please review Implementation Approach for Cloud Integrations to find the correct
answer.
20. Your Project scope includes creating APIs by leveraging Oracle’s Apiary
Platform. What are the key planning considerations in this context?
(1/1) Points
Create a Strategy - Include both Business and technology stakeholders to
align Business goals with the best approach
Leverage existing investments like SOA, Integrations, App Dev and Micro-
services efforts may help to jump start API initiatives
Build the Project team and the resources, select technologies, select
vendors, and start Project
All of the Above
Identify target audience, usage, design Mock API and reflect/amend contract
agreements
Correct!
21. Your Customer in the media industry requires streaming integration with
zero down-time, high availability, real time replication and data
synchronisation. What Integration tool is best used for this scenario?
(0/1) Points
Oracle Integration Cloud
Oracle Data Integration Platform Cloud Governance
Oracle Data Integration Platform Cloud Enterprise
Oracle Data Integration Platform Cloud Standard
Oracle Golden Gate Cloud Services
Incorrect. Please review Implementation Approach for Cloud Integrations to find the correct
answer.
22. You can optimise Implementation timelines for ERP, SCM and WMS
Cloud Integrations by leveraging -
(0/1) Points
Prebuilt Adapters
Integration Extensions
ERP Connectivity Packages
Integration Recipes
REST and SOAP APIs to build adapters
Incorrect. Please review Implementation Approach for Cloud Integrations to find the correct
answer.
26. In a joint Enterprise Architecture review with your Project Architect, you
identify that the Customer Departments seldom share Customers or
Suppliers. Departmental transactions are unique to individual Business Units
with independent Business Processes and little Data Standards. What is this
Operating Model classified as?
(0/1) Points
Unification
Coordination
Replication
Standardization
Diversification
Incorrect. Please review Cloud Architecture Envisioning and Planning to find the correct
answer.
27. Enterprise Business Analysis and Architecture processes continuously
refine an organization’s:
(1/1) Points
Business Strategies and Requirements
Internal and external Compliance and Regulatory requirements
Cloud Strategy and Roadmap
Future-State Architecture
All of the Above
Correct!
28. A Customer’s Project scope includes Cloud ERP, HCM, and Payroll along
with Oracle Integration Cloud (OIC) and modernisation of Custom developed
applications to native Cloud apps in 8 Countries. What is the MINIMUM
number of Cloud Instances recommended as a Best Practice guidance for
this scope? (Note that - ERP, HCM and Payroll are SaaS applications
available on a Single Instance.)
(0/1) Points
SaaS – 2 Environments (TEST, PROD), OIC and Custom Development are
hosted on same instance – 2 (TEST, PROD)
SaaS – 2 Environments (TEST, PROD), OIC – 2 (TEST, PROD) and Custom
Development – 2 (TEST, PROD)
SaaS – 2 Environments (TEST, PROD), OIC – 3 (DEV, TEST, PROD) and
Custom Development – 3 (DEV, TEST, PROD)
SaaS – 3 Environments (DEV, TEST, PROD) to allow Payroll Parallel Run
tests, OIC – 2 (DEV, TEST, PROD) and Custom Development – 2 (DEV,
TEST, PROD)
SaaS – 2 Environments (TEST, PROD), OIC – 4 (Dev1, Dev2, TEST, PROD)
and Custom Development – 4 (Dev1, Dev2, TEST, PROD) to test ERP and
HCM Modules independently.
Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.
29. What is the unique name for Cloud Environment called? (Note that User
authentication and authorisation for access to Services is defined and
controlled at this level)
(0/1) Points
Cloud Portal
Data Centre Regions
Identity Domain
Service Instance
Cloud Console
Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.
31. A Customer would like to know how to set Project cost control plans
through the Budgeting Feature available in OCI. How can you set up
budgets?
(1/1) Points
Budget can be set at a Compartment level along with alert rule for a % value
ONLY
Budget can be set at a Subnet level along with Budget alert rule for a $
value ONLY
Budget can be set at a Network level along with Budget alert rule for a % or
$ value.
Budget can be set at a Tenancy level along with Budget alert rule for a % or
$ value.
Budget can be set at a Compartment level along with Budget alert rule for a
% or $ value.
Correct!
32. The Fusion Cloud Project you are managing is going Live in 5 weeks’
time. You realised that the P2T refresh immediately following Go-Live is
missing in your plan. What is the latest point of time to request the refresh
so that your activities align with Best Practice recommendation?
(1/1) Points
Latest three weeks in advance avoiding Black-Out periods
2 weeks before Go-Live
No need to schedule any P2T. You may do it after Go-Live.
No need to schedule in advance, just escalate to Oracle whenever a refresh
is required
Maximum four weeks in advance and it can be rescheduled any time prior to
the refresh date.
Correct!
33. Your Cloud Projects scope includes Fusion ERP, HCM, Sales Cloud, Taleo
Recruit, Service Cloud (RightNow) and Field Service. How many
environments are provisioned as Standard?
(0/1) Points
9 (4 Prod/4/Test/1 Dev)
8 (4 Prod/ 4 Test)
6 (3 prod/ 3 test)
10 (4 Prod/3 Test/3 Dev)
11 (4 Prod/4/Test/3 Dev)
Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.
35. The best approach to monitor OCI workloads costs for a Project is to
leverage:
(0/1) Points
Avoid using compartments
Build Subnets
Tagging feature
None of the above
Group each workload under one Policy
Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.
36. A Customer is planning for a SaaS Cloud Project and is assessing the
situation if they require any Additional Test Environments (ATE). What are
the key considerations that influence the number of additional test
environments?
(1/1) Points
Additional environments for Payroll Parallel Runs
All of the above
Project lifecycle stage: initial implementation vs. subsequent rollouts
Projects requiring orchestrated integration testing with Legacy systems with
equivalent DEV, TEST and PROD environments
Organization size and complexity of Project scope (geographies, technology,
timezones etc.)
Correct!
Align corporate vision, mission, objectives and KPIs of the organization with
employee goals
Identify Customer Change agents and Cloud champion(s) from Business and
IT to drive the technology and process Change
Correct!
41. Oracle provides built in Data Sheets for each module within Fusion to
simplify the data loading activity
(1/1) Points
False
True
Correct!
42. Your Customer would like their Data Migration Go-Live completed in the
shortest possible time; over the weekend following a quick Data Verification
round and Sign-Off. They have allowed time for One Data Migration Dry Run
before Go-Live Cut-Over. The Data Migration Approach adopted here is -
(0/1) Points
Big Bang Data Migration Strategy
Transformative Data Migration Strategy
Trickle Data Migration Strategy
Autonomous Data Migration Strategy
Phased Data Migration Strategy
Incorrect. Please review Data Management and Migration Plan to find the correct answer.
43. In a Cloud application Implementation, what Data Volumes testing is
recommended across the Project Phases?
(0/1) Points
Sample data for CRP1, up to 60% in CPR2, Full Data volume (100%) in UAT
Data volume (100%), Full in Production
10% Test data for CRP1, up to 60% in CPR2, Full Data volume (100%) in
UAT, Full Data volume (100%) in Production
Sample data for CRP1, up to 60% in CPR2, Partial Data in UAT, Full Data
volume (100%) in Production
Sample data for CRP1, up to 40% in CPR2, 80% in UAT, Full Data volume
(100%) in Production
Master data for CRP1, up to 60% in CPR2, Full Data volume (100%) in UAT,
Full Data volume (100%) in Production
Incorrect. Please review Data Management and Migration Plan to find the correct answer.
44. The tool(s) that may be used to migrate data into Oracle SaaS Cloud
is/are -
(0/1) Points
All of the above
ADF Desktop Integrator
ODI Cloud Services
File based (e.g. FBDI)
WebServices (REST and Public APIs)
Incorrect. Please review Data Management and Migration Plan to find the correct answer.
45. You are assigned as the PM of a new win Oracle Cloud Project. As part of
the Bid to Delivery transition, which of the following needs prioritising over
other activities to ensure alignment between Sales & Delivery?
(1/1) Points
Start compiling the Project Management Plan and agree Project approach
with the Customer
Don’t hesitate to re-engage the sales or management team to reset
expectations.
Validate Cloud services subscribed, establish the Project infrastructure and
collaborative environment
Understand Client’s objectives and Business strategies
Review the contract and scope of work internally first and then with the
Client so that there is a common understanding of the scope, timelines, cost
and terms and conditions
Correct!
46. As part of their overall Vision, an organization has decided to modernize
their platforms by moving to the Cloud and provide world Class HR
experience to their employees through improved efficiency, reduced
employee efforts and reduction of cost. What measurable objective may be
listed as the Project Objectives and KPI for this Project?
(0/1) Points
Improved Employee Experience and Reduction of Cost
Increase Employee Satisfaction survey and self- service rate.
Implement Oracle Recruitment Cloud to Streamline the Offer generation
processing time to less than 5 days
Move from 3 HR fragmented platforms to 1 to streamline operations
Streamline offering process and Provide self- service access to employee
data
Incorrect. Please review Transitioning Aligning Business Goals and Cloud Project Objectives to
find the correct answer.
47. A Telco Operator has been Live with Oracle CX Services for over six
months. When a new product launch was requested, the delivery turn-
around from IT department was more than three months, which is way too
much for the Marketing department. What could have gone wrong during the
implementation that may have resulted in this situation?
(1/1) Points
Misalignment between IT and Business KPIs. Business KPIs were set without
taking into consideration the Time to Market T2M KPI of telco services to be
developed by IT
Oracle products are not addressing all the Customer requirements and need
more commitment from Oracle to address some of the ER-s
IT team is complaining that due to Cloud security they are not able to take
back-up to build analytical reports
Marketing team has promotion bundles to be configured in addition to other
enhancements and the IT team is not able to deliver them on Time
Customer Service team is complaining on the lack of a 360degree integrated
view of Customer which should be accessible to the Customer Service
Advisors
Correct!
48. Which of the following Post Go-Live handover activities form part of your
‘Train the Trainer’ and ‘Transition’ activities for Customer IT team in a Cloud
Project?
(1/1) Points
Technical overview on the application customizations, integrations and
analytical reporting tools along with respective documentation
Cloud Operations and Security review; hands on set up documentation for
the OCI/PaaS/SaaS applications
Functional flows overview and configuration walkthroughs
Orientation to data Conversion tools and processes
All of the above
Correct!
49. Your Customer asks for off-the-shelf trainings available as the Partner
team is set to disengage Post Go-Live. What option best fits a Cloud
deployment and on-going learning requirement, when a Partner is not
around?
(1/1) Points
Incorporate End user training in your scope of work and create custom
videos and user guides
A role based customized training based on job impact assessment handed
over by the Partner during Go-Live Transition
A training plan without integrating Change Management activities
Developing a training plan, enrolling for Oracle Learning Subscription
provided by Oracle University to complement Partner trainings
Build a ‘Train the Trainer’ team to handle the change resistance and improve
adoption
Correct!
50. Almost all of the Project Management Plan depicted processes and
components have a higher INTENSITY of engagement in the Cloud Delivery
Framework except for:
(1/1) Points
Scope Management
Issue Management
Procurement Management
Change Management
Environments Management
Correct!
51. You are preparing the Project governance structure for a multi-pillar
complex Project. Who should you include in the governance structure? Select
the THREE appropriate answers
(Choose all correct answers)
(0/1) Points
Business Sponsors as they are funding the Project
Oracle Stakeholders since there is a dependency for the services provided
52. You are scoping for a SaaS Cloud Project. The Customer has subscribed
for Oracle Enterprise Resource Planning Cloud for 30 users. What would be
the FIRST most critical SCOPING ACTIVITY to look into:
(0/1) Points
The processes in scope for implementation.
The quantified features and functionalities to put boundaries in scope
Chart of Account Structure and the Set of Books for Financials
The exact list of modules in scope as part of the Oracle Enterprise Resource
Planning Cloud bundle
All of the above
Incorrect. Please review Project Management Plan and Delivery Approach to find the correct
answer.
55. The User Role that can create, share analyses and dashboards in OAC is
known as
(1/1) Points
BI Service Administrator
BI Data Model Author
BI Content Author
DV Content Author
BI Consumer
Correct!
56. The Mobile App tool that anticipates questions and delivers appropriate
information to users through self-learning is -
(0/1) Points
Oracle Mobile Hub
Oracle Tap
Oracle Data Visualizer
Oracle Day by Day
Oracle Synopsis
Incorrect. Please review Implementation Appraoch for Reporting and Business Analytics to find
the correct answer.
57. Your Customer would like to conduct a ‘What-if’ analysis for their Trade
Promotions, using the Volumes, Channels, Marketing Pools, Customer Spend
as drivers - for different dimensions including Product, Promotion type etc. in
order to generate a Trade Spend Model. What reporting tool may be used to
meet this requirement?
(0/1) Points
Essbase Business Modelling
Business Intelligence Reporting
Operational Reporting
Enterprise Performance Reporting
None of the above
Incorrect. Please review Implementation Appraoch for Reporting and Business Analytics to find
the correct answer.
58. Which of the following Data sources can Analytics Cloud work on?
(0/1) Points
Autonomous Data Warehouse Cloud
Oracle Database Cloud
On-Premises Databases
All of the above
Exadata Cloud
Incorrect. Please review Implementation Appraoch for Reporting and Business Analytics to find
the correct answer.
59. Your Customer has some advanced requirements for analytics - voice
and chatbots, Data enrichment and Natural Language. What analytics type is
this referred to as?
(0/1) Points
Centralized Analytics
Strategy Analytics
Governed Analytics
Self - Service Analytics
Augmented Analytics
Incorrect. Please review Implementation Appraoch for Reporting and Business Analytics to find
the correct answer.
60. For a 3 years' Cloud subscription service, which of the following prove a
successful Cloud Implementation from the Customer's perspective?
(0/1) Points
Project finished on Time - on Budget
Customer success story with a reference
Customer celebrated the Go-Live event and is planning to renew in a few
years’ time.
The Customer has realized the benefits & value of their Cloud investment
All of the above
Incorrect. Please review Introduction to Cloud Project Management and Delivery Framework to
find the correct answer.
61. You are assigned as a Project Manager for your first Cloud Project. An
experienced counterpart within your organization is available to provide
advice. What would be the best approach to leverage the experience?
(0/1) Points
Check for sample Project plans templates, accelerators and tools
Review the Updated Projects repository, assets, and closure reports of the
Closed Project. Establish the relevance to your Project. Accordingly, set up a
meeting with the PM to leverage appropriate experience.
Have a meeting with him to discuss the lessons learned from his experience
of Cloud
Ensure all the competent consultants who delivered these Projects are
assigned to the Project
Review the Oracle Cloud Services in scope and familiarize with the products
Incorrect. Please review Introduction to Cloud Project Management and Delivery Framework to
find the correct answer.
62. The Partner Cloud Project Manager should be typically responsible for:
(0/1) Points
The entire Delivery of the Project transitioning from Sales to Delivery up to
Go-Live
Oversee Cloud architecture and solution design
Manage Change
Manage resources
Manage Cloud Environments
Incorrect. Please review Introduction to Cloud Project Management and Delivery Framework to
find the correct answer.
63. The best approach to get the expected attention for a Service Request is
to open all the SRs at Highest Severity Severity 1 and 24/7
(0/1) Points
False
True
Incorrect. Please review Cloud Risk Management to find the correct answer.
64. As a Project Manager you are planning for a SaaS Cloud Project and
would like to understand risks related to the services that have a
dependency on Oracle; specifically relating to cloning and enabling certain
services like VPN and SSO. Which of the following gives you more
information in this regard?
(0/1) Points
Cloud Patching Cycles
Cloud Provisioning Processes
Cloud Service Contracts
Cloud Service Entitlements
Cloud Support Services
Incorrect. Please review Cloud Risk Management to find the correct answer.
65. As you approach Go-Live, you encounter an unexpected issue with the
application. You’ve raised an SR with Support as Sev 2, however you are not
getting the expected response – what is the next step as per the Support
Process?
(1/1) Points
Update the SR every 4 hours
Postpone the Go-Live and inform the Customer to speak to Oracle Sales
account Manager.
Call Oracle Sales Account Manager and ask him to escalate the issue.
Call the regional support Hub, request an escalation and a Manager call
back.
Correct!
66. Your Customer has raised a concern and Risk regarding Constraints on
Security testing for SaaS Products. Which of the following would provide
further information on standard security testing coverage as part of the
Service, that you may point to the Customer to address their concerns?
(0/1) Points
Cloud Services Hosting and Delivery Policies
Oracle Advanced Customer Services Contracts
Oracle Moat Services
Cloud Services and Service Descriptions
Cloud Support Service agreements
Incorrect. Please review Cloud Risk Management to find the correct answer.
67. For a Cloud Project to be successful in the longer run, the Sustainment
Plan and Adoption Strategy should include the following:
(1/1) Points
A detailed Customer Support plan with detailed SLAs to address issues
through tracking tools and ensure Customer satisfaction
Focus on Business value realization and value assessment with periodical
Business review workshops
Ensure that KPIs set at the beginning of the Project are met at the end of
the Project and the Customer realized the benefit for their investments
Oracle provides the needful Customer support for the Cloud services
subscribed through MOS - My Oracle Support and Cloud Portal; A reference
to this should be enough.
Proactive and reactive Customer engagement to address issues, help
Customer realize value and progressively update solution to adopt new
features and Best Practices
Correct!
69. You have successfully delivered a Cloud Project, finishing the final hand-
over activities following a period of post Go-Live support. Your final Business
as Usual handover checklist should include all of the following items EXCEPT:
(0/1) Points
Ensure the Customer Cloud admin understands the Cloud Portal activities to
schedule Refresh and sizing of the environments
Ensure the Customer can use the Cloud console to monitor the integration
dashboard and set up notifications
Monitor the OCI Universal Credits Overage, Usage, set limits and Tags
Ensure the Customer understands the Updates cycles and the agile testing
required during the 2 weeks period between TEST and PROD
The configuration workbooks and other Project phase deliverables sign-off
certificates stored in Customer Project Repository
Incorrect. Please review Sustainment Plan and Adoption Strategy to find the correct answer.
70. You are engaged in a CX project with Sales Cloud, Service Cloud, CPQ,
Field Service (TOA) in Scope and want to use the Modern Business Processes
(MBP) as a basis of your information gathering workshops and map activity
level Business Processes. What challenges might you encounter in leveraging
the assets?
(0/1) Points
The MBP diagrams are only at Level 2 and some features are spread across
different applications
Information gathering can happen regardless of the available MBPs provided
the requirements are not in conflict with the company’s overall mission and
objectives
Some of the CX Cloud Services don’t have Level 3 Process diagrams
published yet – so not all areas have assets that may be re-used.
MBPs are only applicable for Fusion products. They include the base
functionality complemented by analytics ONLY.
None of the above
Incorrect. Please review Implementation Approach for SaaS Applications to find the correct
answer.
71. A University SaaS Cloud Transformation Project has Oracle ERP,
Procurement, HCM (including Payroll) and Student Cloud in scope. The
Customer IT Team have detailed Business Process diagrams from existing
On-Premise systems but are open any improvements and count on you for
Project Approach advise. What SaaS Application Implementation approach
would you suggest?
(1/1) Points
As the Customer is open to improvements and new methods, follow a Show
& Tell approach for the entire Project based on the modern best practices
and the Level 3 diagrams as applicable.
Show and Tell approach won`t work for any of the processes in scope
Leverage their existing Process Maps, follow an “ASK & DO” approach to
identify Gaps and use PaaS to extend applications.
Leverage their existing Process Maps, map them to the SaaS Standard
Application flows for solution design and identify gaps. Engage C-Level
stakeholders for Change Management
Correct!
72. One of your PM colleagues informs you that the Oracle Modern Best
Practices are just a marketing tool to use in presales. He suggests
conducting an activity level Business Process diagramming exercise (from
scratch) to capture Customer requirements. Which of the following is
recommended approach as guided by Oracle?
(1/1) Points
MBPs are L2/L3 diagrams which can be used to deliver ANY process in the
Project why invent the wheel
No, MBP is not just marketing tool, you can leverage existing Level 3 (Visio)
diagrams in MOS through iterative and incremental approach during
implementation
Ensure conducting a fit/gap analysis of Business Processes and carry out 3
iterations of detailed diagramming to fully capture the Business Process
activities
Proceed with the detailed mapping approach, as MBPs may only be used in
the Sales cycle.
Correct!
74. Which TWO of the following do NOT apply for Microservices deployment
architecture?
(Choose all correct answers)
(0/1) Points
The deployment doesn’t affect the microservices deployed in other
containers.
Microservices must be containerized
The deployment affects the microservices deployed in other containers.
They are managed through a docker
They must be deployed on Virtual Machines
Incorrect. Please review Implementation Approach: Cloud Applications and Extensions
Development in DevOps to find the correct answer.
76. Which of the following is NOT a feature of the Oracle Cloud Developer
Service?
(1/1) Points
Agile and Sprint Planning
Code Versioning and Repositories
Continuous Integration Engine
Task tracking System
Project Cost Control and Management
Correct!
77. Your Customers asks if Oracle Developer Cloud Services has agile Project
management tools. Which of the following is correct?
(1/1) Points
No - Agile Project management is handled externally on Project plans
Yes - you can set up sprints, teams boards within ODCS
Correct!
79. Which of the following is not a Security trusted component for Oracle
Cloud Environment?
(1/1) Points
Data encryption
Client and end-point protection
Customer isolation
High Availability
Correct!
81. The Continuous integration server that can be used to monitor changes
in the source control system and runs a variety of builds is known as:
(0/1) Points
Git
Hudson
Maven
Eclipse
Selenium
Incorrect. Please review Implementation Approach: Cloud Applications and Extensions
Development in DevOps to find the correct answer.
82. The tool that manages, issues, releases source code, wikis, and snippets
is called:
(1/1) Points
Selenium
Maven
Eclipse
Git
Hudson
Correct!
83. In a Move and Improve Project we consider the subject workload mostly
as a “black box”. Which of the follow statements describes this accurately?
(1/1) Points
We use the black colour to tag these workloads in the respective architecture
diagrams
We do not consider any changes of the functionality encapsulated in the
target workload, so that the end-users will experience no changes in their
nature of their work. Any improvements may just be to the wrapping so as
to improve the Quality of Service
All the above
The target workloads are boxed into VMs or Containers, so they run on
improved environment
Correct!
85. You are about to start the BUILD phase of a Move and Improve to OCI
Project and want to ensure all the key considerations are taken care of.
Which TWO of the following should be considered?
(Choose all correct answers)
(0/1) Points
Revise Cloud Service consumption plan
Design the target architecture
Identify and Size the deployment environments with the correct Cloud
services
Configure application logic/data approach to transfer to Cloud
Incorrect. Please review Implementation Approach for OCI Move and Improve to find the
correct answer.
86. Select the TWO knowledge components that are relevant to an IMPROVE
extension of a MOVE Project
(Choose all correct answers)
(0/1) Points
Oracle Autonomous fundamentals
Oracle Management Cloud
All of the above
Location and Connectivity
Multi-Cloud and OCI
Incorrect. Please review Implementation Approach for OCI Move and Improve to find the
correct answer.
87. What is the difference between “Lift and Shift” and “Move and Improve”
Journey to Cloud?
(1/1) Points
Lift and Shift is for IT personas whereas Move and Improve is for Business
personas
Lift and shift is only for non-Production Environments while Move and
Improve is for Production Environments
They are both different Marketing terms for the same kind of Projects
Lift and Shift is pure (OS-based) move of an existing workload whereas
Move and Improve Project looks into optimizing the workload operation
across its lifecycle, and therefore has a wider scope.
Correct!
88. You are managing a Move and Improve Project of a bespoke application
developed on WebLogic Server and Oracle Database. The heavily
transactional On-Premise System runs on Windows Servers and has variable
workloads across the week. As it is a core system, there is a lot of demand
for database administration to keep the lights-on. Which of the following
options serve as a Best Practice improvement solution to meet the
Customer’s needs in an efficient way?
(0/1) Points
Integrate with Oracle Management Cloud Service to monitor the application
90. What are the TWO initial things to consider when you decide to migrate
a legacy application to Cloud
(Choose all correct answers)
(0/1) Points
Assess the Business need
Provision the Cloud resources and install the application package
Discard the old legacy application and adopt a new and modern Cloud based
application offering the same functionalities
Perform analysis to verify the Cloud compatibility and estimate migration
effort
Incorrect. Please review Implementation Approach for OCI Move and Improve to find the
correct answer.