TANKED BASEMENT

100mm thick conc. (1:3:6) protective wall

20mm thick asphalt tanking

6000 250mm thick solid conc. block wall


1200
15mm thick waterproof plaster
1000
12mmØm.s step iron @ 600mm c/c

50mm deep recess on machine bed

9000

Sectional Plan A -A

Gauge 32 G.M.S flashing

400 x 50mm cypress timber coping

10 10mm thick asphalt DPC

250 - NB 15mm thick plaster to plinth

- Rock commences 900mm Ground level

Below ground level 100mm thick conc. Protect wall

- Structural wall constructed 20mm thick asphalt tanking

first

4500 - veg soil ave150mm thick 12mmØm.s step iron @ 600mm c/c

250mm thick solid conc. block wall

15mm thick plaster

20mm thick c/s paving

B.R.C ref No A144

1000 200mm thick V.R.C machine bed

50 Recess on machine bed

300 300 30mm thick asphalt tanking

100 300 Asphalt angle fillet

150 100mm thick plain conc. Bed

150 Hardcore bed

300 100 300 8200 300 100 300

Section B-B
destruction of termite nests as
TANKED BASEMENT I
described
(all provisional)
to measure
- Clear site
- Exc veg soil
exc veg soil
- Exc pit
depth 150mm
- Plac & stru
L W
- Exc rock
9000 6000
- h/core
2/1000 2000 2000
- sinking
1100 8000
- v.r.c
- plaster
- asphalt 11.00 exc veg soil av 150mm dp
- d.p.c 8.00 from gl cart and depo 10m
- steps from exc
- coping
- adja
pit
150
clear site A
L W 4350
9000 6000
all 2/2000 4000 4000 400 B
13000
10000

13.00 clear site of all the bushes A


10.00 undergrowth shrubs and burn L W D
11000 8000 4350
B 11.00
L W D 8.00
9600 6600 4750 1.35 exc basement pit 3.0 – 4.5m
9.60 dp from strip lev
A 6.60
not exc 1.5 0.15 &
1.5 – 3m = 1.5
3.00 – 4.5m = 1.35 rfs
B
3.0 – 4.5m = 0.15 9.60 ditto 4.5 – 6.0mm the last two
4.5 – 6.0m = 0.25 6.60
0.25
11.00 exc basement pit ne 1.5m dp
8.00 from stripped lev P/S
1.50 I allow for keeping exc free
& from gen water

rfs &

allow for all necessary p/s

11.00 ditto 1.5 – 3.0m the last two


8.00 rock
1.50 900

3600

400
11.00 ave width
8.00 2/ ½ / 300 300
3.60 extra over excavation for 100
400
9.60 excavating in rock
L
6.60
9000
0.40
6000
2/ 15000
30000
h/core
-4/100 400
9.60 h/core fill 300mm in two
29600
6.60 layers
29.60 form sinking in h/c av 150 x
& 400mm wide

lev and blind h/c to receive (300² + 150²) ½ = 335


conc
2/ 29.60 labour in packing h/c to slope
& ave 335mm long

treat h/c with approved insect


side 29.60 ddt
0.40 h/c a.b.d
0.15

sinking

150 plain conc


9.60 plain conc (1:3:6) in base pit
300 100 300 6.60
0.10
29.60 extra over plain conc for protective wall
thickening underside total L
250mm dp and 400mm wide 9000
6000
2/ 15000
30000
v.r.c
-4/100 400
L W 29600
W
9000 6000
4500
2/100 protc wall 200 200
250 gl
2/20 asphalt 40 40
8760 5760 30
4720

29.60 plain conc (1:3:6) basement


50
4.72 wall 100mm thick
1000
L W D
1200 1000 50

8.76 2/ 9.00
vrc (1:2:4) in basement pit
5.76 4.72 sawn fwk to vertical sides of
0.20 2/ 6.00 wall
4.72

1.20
ddt
1.00
ditto
0.05
W
block wall 4500
L +250 gl
9000 6000 -30 aspht
2/120 pro wall+aspht 240 240 -200 vrc
8760 5760 4520
5760
2/14520
water proof plaster 15mm
29040 27.04
thick to the wall (1:3) c/s
-4/250 b/wall 1000 4.52
mortar
28040

W
4750
230 vrc +
h/aspht paving
4520 8260
5260
28.04 solid conc 250mm thick block

4.50 wall bed and jointed with


recess
(1:3) c/s mortar
L
1200
plaster
1000
L 2/ 2200
9000 6000 4400
100 W
20 50
250 8.26
2/ 370
5.26
740 740 740 20mm thick c/s (1:3) paving
8260 4.40
5260 on conc bed (ms)
0.05
5260
2/13520
27040
29.04 20mm vertical asphalt in 2
2/ plaster to plinth 4.72 coats on block wall (m.s)

2/ 9.00 15mm thick plaster to plinth


0.30 (1:3) c/s mortar
6.00 angle fillet m
0.30 & 29040
½ / 4/20 girth 40
29080
pre and app 3 coats
bituminous paint to plastered
20 x 20mm max asphalt angle
plinth 29.20
filet in 2 coats

asphalt m²
boxing to form recession conc
state thickness whether I
bed (ms) av 1200 x 1000 x
horizontal No. of coats and
50mm deep
background

9.00 30mm horizontal asphalt on


6.00 conc bed (ms) in 2 coats 8.76
b.r.c mesh A142…kg/m²
5.76
vertical
L
9000 6000
-2/100 prot wall 200 200
-2/20 girth 40 40
8760 5760
1.20
5760 ddt
2/ 14520 1.00
ditto
29040
28.52 10mm asphalt dpc L assume conc
0.37 400 x 175mm precast conc
coping twice weathered and
steps twice throated and bedded in
No of steps 1:3 c/s mortar
600 4520
7.5 = 8
8–1=7
150 backfill
100
75
D
2/175 350
150
500 1m
7/
1 12mmØ ms step iron av 9000
500mm long and twice bent 6000
2/ 15000
and built into block wall
30000
4/1000 4000
34000

timber coping 34.00


ddt
28.52 400 x 150mm av cypress 4.50
rfs
timber coping twice 1.00
weathered
&

&
add
backfill
32mm gms flashing two bent
and fixed to timber coping
9.00
6.00 vrc (1:2:4) in susp slab
assume susp slab

to measure
- vrc slab
2/ - fwk
2/ 9.00 - plaster
6.00 - screed
sawn fwk to edge of susp slab
75 – 150mm high

8.26 sawn fwk to soffits of susp


5.26 slab 3.0 – 4.5m high
(measuring height in stages of
1.5m)

&

12mm thick c/s plaster to


soffit of susp slab