AP-203 Building Construction - Iii - Lecture-01
AP-203 Building Construction - Iii - Lecture-01
AP-203 Building Construction - Iii - Lecture-01
2020
WELCOME
DEAR CLASS-2RD YR
BOYS & GIRLS
RCC STRUCTURE for modern architecture
ONLINE
DISCUSSION
26.VIII.2020
STUDENTS @ VAKA 2RD YEAR -AUG-2020
message of encouragement
#COVID-19
BE GRATEFUL
HEALTH CARE WORKERS ARE SAVING LIVES.
SOCIAL STIGMA
STOP
Information corner
Physical distancing Protect yourself and others
Wash your hands frequently, always with soap and water for at least 20 seconds
Remember to not touch your face
Do not share cups, eating utensils, food or drinks with others
Ask questions, educate yourself and get information from reliable sources ROTATE YOUR PHONE/SCREEN
VASTUKALA ACADEMY
COLLEGE OF ARCHITECTURE B.ARCH – II YEAR
SEM 3 (BATCH-B)-2020-21
AP-202 BUILDING CONSTRUCTION-II
TOPICAL OUTLINE
STUDENTS:NOTE TAKING,DRAWINGS,SKETCHES,REPORTS,ONLINE PPT,
VEDIO,ONLINEPLATEFORM,INSTAGRAM,WHATSAPP.
To describe construction details of various
components of a small single-storied building.
SKETCHES
Cantilevered construction in RCC such as canopies and projections.
& SHEETS
(CONSTRUCTIONS DETAILS)
LAYOUTS DETAILS
26.VIII.2020 GENERAL LAYOUT
layout and details as per design/Brief
OVERVIEW
LAYOUT PLANS,FOUNDATION EXCAVATION ,GRID ,SECTION AND ELEVATION
(1:50 OR TBD)
CONNECTION AT VARIOUS LEVELS DETAILS (1:20 OR TBD)
ELNARGING DETAILS OF VARIOUS LEVELS
(1:1 OR 1:2)
Step by Step Construction Work
(column layout including Basement & Terrace, RCC columns landing detail etc)
Precap...
Plinth D.P.C
Walls & columns
Floors Beams
Roofs & slabs
Lintels
Doors & Window
Chajjas & Parapet
Steps & Stairs
Cupboard & Shelves etc
The construction site must be cleaned before the work is executed. This work
involves the removal of roots of trees, and levelling ground area.
After the foundation work is done ground beam formwork preparation is started and poured
with concrete. Over the plinth beam, masonry work is started. And space between foundation
and plinth beam filled with soil.
Individual footings connected by a plinth beam. Note that the footings have been cast on top of beds of plain
cement concrete (PCC), which has been done to create a level, firm base for the footing.
Superstructure – Column:
The superstructure is the portion above the plinth level of the building. The main component of
the superstructure is a column and beam. The columns are built up to slab level and the frame
for further construction is prepared.
The lintel is constructed on the door and window to support the masonry work over it. After this
further masonry work is done.
Floor Slab or Roof Structure:
Then the formwork is started to construct slab resting on the column and beam. Over slab
formwork, slab reinforcement is placed as per slab detailed drawing.
After that door window frames are fixed at their specified position given in drawing.
As we know that buildings are constructed with a clean finish in which electrical
and plumbing work is not visible. They are installed in the walls and slabs such that they are
concealed and not visible after the finishing work is done. The point and pipe end left out such
that later they can be finished with the electric fitting and plumbing fixtures.
On top of the slab, waterproofing is done to prevent any leakage in the slab
Internal Finishing:
Internal walls are plaster with smooth finish and flooring is done with tiles. Later on, the walls
are painted or textured.
By following the above step, almost construction work is completed and then after furniture work
is started. Side by side, electrical fitting, switchboard, and plumbing fittings are complete in the
bathrooms and kitchen areas too.
SUMMARY ONLY
GROUP PRESENTATIONS ON A1 SHEET (594X841)MM COLOUR
S.NO GROUP NO TOPIC
1 GROUP NO 1 FORMWORK
2 GROUP NO 2 FOUNDATIONS
3 GROUP NO 3 WATERPROOFING
6 GROUP NO 6 FLOORING
9 GROUP NO 9 BASEMENT
to be continued……..
FUN CORNER @ FROM INTERNET
OVER TO YOU…..
THE END
Any Questions?
Thank you for your attention
Cheers!
THANK YOU
on behalf of STUDIO TEAM 2 YR
confession with books
Contact me at: Dear forgotten books
Sorry that I abandoned you for long and I hope you forgive me for leaving you dusty. its turns
mail me armohdshoeb2010@gmail.com
out. now we are made for each other.
Or call me 9582020020
voice message, Text message, Video call -The lazy reader
म ा र
HOLD FOR 30 MINUTES….