18.9 ITP SUB BASE Rev01
18.9 ITP SUB BASE Rev01
18.9 ITP SUB BASE Rev01
1 Pre-Construction Activities
1.1 Approval of Method statement Submit to the Engineer Approval from Employer. Before Work Approval form _ R H _
1.2 Approval of Shop Drawings. Submit to the Engineer Approval from Employer. Before Work Approved Shopdrawing. _ R H _
Comply with
1.3 Material Approval Submit to the Engineer Before Work Material Approval form. _ R H _
Specification.
2 Main Activities
Verify the level and slopes surface not damaged, as per approved
2.1 Previous sub grade layer Vol 2, Part- 2,section 2 Visual inspection _ R S
free off any cracks cross section
Grading,
Plasticity Index,
shall comply with
Material testing for aggregate Maximum Dry Density, One sample every Material Inspection
2.2 Vol 2, Part- 2,section 2 requirements _ S H R
sub base CBR and Loss by 3,000 cu.m. Request
section 3/6.2 &4
Abrasion.
Three in-situ
Density test shall be
2.3 Spreading and compaction FDT Vol 2, Part- 2,section 2 not lessthan 98% of MDD made every 1,500 Test report _ R H R
sq.m. or as directed
by the Engineer
QA/QC
QCF-09 NCTC-DC-QC-002 REV0 Page 1 of 2
CLIENT: ENGINEER: CONTRACTOR:
Three in-situ
Density tests shall
be made per
2.5 Spreading and compaction FDT Vol 2, Part- 2,section 2 Test report _ R H R
unit (900 sq. m) of
aggregate roadbase
laid
The surface to be primed
shall be uniformly
smooth and firm and true
2.6 Prime coat spray Surface preparation Vol 2, Part- 2,section 2 to each section Inspection request R H R
the grades and cross-
sections shown on the
drawings
not less than 0.7 litres
One sample shall
per square
be tested every 5
2.7 Application rate Vol 2, Part- 2,section 2 metre and not more than Test report R H R
tonnes or part
1.5 litres per square
thereof
metre.
QA/QC
QCF-09 NCTC-DC-QC-002 REV0 Page 2 of 2