18.9 ITP SUB BASE Rev01

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

CLIENT: ENGINEER: CONTRACTOR:

CONTRACT TITLE: Leveling And Roads In Oud Al Muteena 2 ITP Ref.NO.ITP/R931/CV/0004


CLIENT: ROADS & TRANSPORT AUTHORITY Rev.:00
CONSULTANT: AECOM Date: 22-Sep-2015
ITP FOR SUB BASE AND PRIME COAT
Nature of Inspection Inspection Authority
H - Hold Point S - Surveillance 1-Originator 2-QA/QC
W - Witness Point R - Record Review 3-Cons 4-Third party

Item Specefication Form of Record / Inspection


Activity Description Inspection and Test Activity Acceptance Criteria Frequency
No. Reference Verification Document
1 2 3 4

1 Pre-Construction Activities

1.1 Approval of Method statement Submit to the Engineer Approval from Employer. Before Work Approval form _ R H _

1.2 Approval of Shop Drawings. Submit to the Engineer Approval from Employer. Before Work Approved Shopdrawing. _ R H _
Comply with
1.3 Material Approval Submit to the Engineer Before Work Material Approval form. _ R H _
Specification.
2 Main Activities

Verify the level and slopes surface not damaged, as per approved
2.1 Previous sub grade layer Vol 2, Part- 2,section 2 Visual inspection _ R S
free off any cracks cross section

Grading,
Plasticity Index,
shall comply with
Material testing for aggregate Maximum Dry Density, One sample every Material Inspection
2.2 Vol 2, Part- 2,section 2 requirements _ S H R
sub base CBR and Loss by 3,000 cu.m. Request
section 3/6.2 &4
Abrasion.

Three in-situ
Density test shall be
2.3 Spreading and compaction FDT Vol 2, Part- 2,section 2 not lessthan 98% of MDD made every 1,500 Test report _ R H R
sq.m. or as directed
by the Engineer

QA/QC
QCF-09 NCTC-DC-QC-002 REV0 Page 1 of 2
CLIENT: ENGINEER: CONTRACTOR:

CONTRACT TITLE: Leveling And Roads In Oud Al Muteena 2 ITP Ref.NO.ITP/R931/CV/0004


CLIENT: ROADS & TRANSPORT AUTHORITY Rev.:00
CONSULTANT: AECOM Date: 22-Sep-2015
ITP FOR SUB BASE AND PRIME COAT
Nature of Inspection Inspection Authority
H - Hold Point S - Surveillance 1-Originator 2-QA/QC
W - Witness Point R - Record Review 3-Cons 4-Third party

Item Specefication Form of Record / Inspection


Activity Description Inspection and Test Activity Acceptance Criteria Frequency
No. Reference Verification Document
1 2 3 4

Grading Plasticity Index, Sand


as per table in section One sample every Material Inspection
2.4 Aggregate road base Equivalent, Maximum Dry Density, Vol 2, Part- 2,section 2 _ S H R
3/8.2 and 3/8.3 1,000 cu.m. Request
C.B.R. and Loss by Abrasion.

Three in-situ
Density tests shall
be made per
2.5 Spreading and compaction FDT Vol 2, Part- 2,section 2 Test report _ R H R
unit (900 sq. m) of
aggregate roadbase
laid
The surface to be primed
shall be uniformly
smooth and firm and true
2.6 Prime coat spray Surface preparation Vol 2, Part- 2,section 2 to each section Inspection request R H R
the grades and cross-
sections shown on the
drawings
not less than 0.7 litres
One sample shall
per square
be tested every 5
2.7 Application rate Vol 2, Part- 2,section 2 metre and not more than Test report R H R
tonnes or part
1.5 litres per square
thereof
metre.

QA/QC
QCF-09 NCTC-DC-QC-002 REV0 Page 2 of 2