Webinar on Road Slope and Bridge Repair

PROTECTION WORKS
COURSE OUTLINE
I. Slope Protection with Foundation supported by Piles
II. Gabion Mattress
III. Slope Patching
IV. Nylon Fiber Gabion

2
Repair of Bridge Expansion Joint and Bridge Bearing

SLOPE PROTECTION WITH


FOUNDATION SUPPORTED
BY PILES

Protection Works

3
SLOPE PROTECTION WITH FOUNDATION
SUPPORTED BY PILES

❑ Slope protection around the


abutment is often damaged due
to scouring, rapid river flow, or
improper construction, as shown
in the photo.

❑ Repair method for the slope


protection involves provision of
appropriate foundation at its
base. Broken Slope Protection

4
SLOPE PROTECTION WITH FOUNDATION SUPPORTED BY PILES

APPLICATION CRITERIA

❑ Appropriate type will be selected from among slope protection works such
as stone masonry, grouted riprap and concrete masonry. The foundation
should be a concrete base with wooden pile as shown in figure below .
The wooden pile is normally driven to a minimum depth of 2.0 m. The
foundation is usually placed at 1.0 m level below the river bed.

FOUNDATION ON PILE FOR SLOPE PROTECTION WORKS


SLOPE PROTECTION WITH FOUNDATION SUPPORTED BY PILES

WORK SEQUENCE

1. Excavation of Scoured Area

2. Placing Concrete Foundation

6
SLOPE PROTECTION WITH FOUNDATION SUPPORTED BY PILES

WORK SEQUENCE

3. Compaction of Gravel Filling

4. Placing Masonry

5. Installation of Gabion Mattress and Backfill

7
SLOPE PROTECTION WITH FOUNDATION SUPPORTED BY PILES

REQUIRED MATERIAL

❑ Gabion Mattress
❑ Rock Fill
❑ Wooden Pile
❑ Concrete with minimum steel reinforcements
❑ Filter Fabric Sheet (under gabion mattress)
❑ Backfill Materials
❑ Sand bag as cofferdam, when necessary

REQUIRED TOOLS/EQUIPMENT

❑ Vibratory compactor
❑ Backhoe

8
SLOPE PROTECTION WITH FOUNDATION SUPPORTED BY PILES

SPECIFICATION

MATERIAL REQUIREMENT

All materials required for the gabion mattress are in accordance with
DPWH Standard Specifications contained in Item 505-Grouted Riprap,
Item 506-Stone Masonry and Item-510-Concrete Slope protection.

CONSTRUCTION REQUIREMENT

Construction requirements for the slope protection are in accordance


with relevant provisions in the DPWH Standard Specifications
contained in Item 505-Grouted Riprap, Item 506-Stone Masonry and
Item-510-Concrete Slope protection.

9
SLOPE PROTECTION WITH FOUNDATION SUPPORTED BY PILES

METHOD OF MEASUREMENT

The works shall be measured for in accordance with relevant provisions


in the DPWH Standard Specifications contained in Item 505-Grouted
Riprap, Item 506-Stone Masonry and Item-510-Concrete Slope
protection.

BASIS OF PAYMENT

The quantity measured as prescribed above, shall be paid in


accordance with relevant provisions of the DPWH Standard
Specifications contained in Item 505-Grouted Riprap, Item 506-Stone
Masonry and Item-510-Concrete Slope protection.

10
Repair of Bridge Expansion Joint and Bridge Bearing

GABION MATTRESS

Protection Works

11
GABION MATTRESS

❑ Local scouring around the pier


often occurs due to strong
stream flow, weak riverbed
materials and type of foundation
as shown in photo.

❑ Protection against local scouring


is intended to eliminate or
minimize future damage to the
bridge substructure. Local Scouring around Pier

12
GABION MATTRESS

APPLICATION CRITERIA

❑ The scoured area need to be


excavated to a minimum 1.0 m
depth for the gabion mattress
installation. A filter fabric sheet should
be laid under the mattress. From
either edge of the pier shaft, the
extending width of the upper mattress
is ideally twice the estimated scour
depth while three times for the lower
Application Requirement for
mattress, as shown in figure. Standard Gabion Mattress

13
GABION MATTRESS
WORK SEQUENCE

1. Excavation of Scoured Area 3. Installation of Gabions

2. Filter Fabric Sheet Placing 4. Backfilling

14
GABION MATTRESS

REQUIRED MATERIAL

❑ Gabion Mattress
❑ Rock Fill
❑ Filter Fabric Sheet
❑ Backfill Materials

REQUIRED TOOLS/EQUIPMENT

❑ Vibratory Compactor

15
GABION MATTRESS

SPECIFICATION

MATERIAL REQUIREMENT

All materials required for the gabion mattress are in accordance with
the DPWH Standard Specifications, Item 511-Gabions and Mattresses.

16
GABION MATTRESS

METHOD OF MEASUREMENT

The works for this repair works shall be measured is in accordance with
DPWH Standard Specifications, Item 511-Gabions and Mattresses.

BASIS OF PAYMENT

The quantity, measured as prescribed above, shall be paid in


accordance with DPWH Standard Specifications, Item 511-Gabions
and Mattresses.

17
Repair of Bridge Expansion Joint and Bridge Bearing

SLOPE PATCHING

Protection Works

18
SLOPE PATCHING
❑ Slope patching is an effective method that can be adopted to
repair the limited damages on the masonry, during the early
stage of visible defects.

❑ The area to be removed shall extend to a minimum of 500 mm


around the perimeter of the damaged section.

❑ The protection bed


should be excavated to a
depth of 600 mm from
masonry surface, as
shown in Figure 10-3.

19
SLOPE PATCHING

❑ New masonry patched into the excavated portion shall consist of


300 mm gravel filling and 300 mm masonry material as shown
in Figure 10-4.

20
SLOPE PATCHING
WORK SEQUENCE

1. Removal of Damaged Protection 3. Patching Masonry

2. Compaction of Gravel Filling

21
SLOPE PATCHING

REQUIRED MATERIAL

❑ Masonry materials (Refer to DPWH Standard Specifications)

❑ Crushed Stone

REQUIRED TOOLS/EQUIPMENT

❑ Vibratory Compactor

22
SLOPE PATCHING

SPECIFICATION

MATERIAL REQUIREMENT

All materials required for the slope protection shall be in accordance


with DPWH Standard Specifications, Item 505-Grouted Riprap, Item
506-Stone Masonry and Item-510-Concrete Slope Protection.

CONSTRUCTION REQUIREMENT

Construction requirements for the slope protection shall be in


accordance with DPWH Standard Specifications, Item 505-Grouted
Riprap, Item 506-Stone Masonry and Item-510-Concrete Slope
Protection.

23
SLOPE PATCHING

METHOD OF MEASUREMENT

The works shall be measured in accordance with DPWH Standard


Specifications, Item 505-Grouted Riprap, Item 506-Stone Masonry and
Item-510-Concrete Slope Protection.

BASIS OF PAYMENT

The quantity, measured as prescribed above, shall be paid in


accordance with DPWH Standard Specification Item 505-Grouted
Riprap, Item 506-Stone Masonry and Item-510-Concrete Slope
Protection.

24
Repair of Bridge Expansion Joint and Bridge Bearing

NYLON FIBER GABION

Protection Works

25
NYLON FIBER GABION

❑ Gabion Mattress shall be applied


for this defect as standard repair
method. But if river bed shape is
complicated, it is very difficult to
put Gabion Mattress. In this
case, Nylon Fiber Gabion shall
be adopted as appropriate
selection for installation of anti-
scouring protection. Thus,
protection against local scouring
is intended to eliminate or
Local Scouring Around Pier
minimize future damage to the
bridge substructure.

26
NYLON FIBER GABION
APPLICATION CRITERIA

Nylon Fiber Gabion is used for prevention of scour on pier foundation and other
underwater structures. It consists of a bag body formed by knitted fabric made
of nylon. The bag is filled with boulders or stones which are also used for
conventional box-type zinc-coated wire gabions. The nylon fiber gabion is
flexible and conforms to the shape where it is placed. The nylon netting allows
water passage through bag body ensuring that pressure of flowing water does
not affect the bag and keeping the scour prevention materials (boulders) from
being carried or swept away by the water.

27

APPLICATION REQUIREMENT FOR NYLON FIBER GABION


NYLON FIBER GABION
WORK SEQUENCE
1. Place Boulders into Nylon 3. Place Nylon Fiber Gabion
Fiber Gabion Bag Using Back Hoe

2. Transport to Scoured Area

28
NYLON FIBER GABION

REQUIRED MATERIAL

❑ Nylon Fiber Gabion


❑ Gabion Mattress
❑ Rock Fill (Boulders)
❑ Backfill Materials

REQUIRED TOOLS/EQUIPMENT

❑ Backhoe or Crane

29
NYLON FIBER GABION

SPECIFICATION - MATERIAL REQUIREMENT

SPECIFICATION OF NYLON FIBER GABION BAG

30
NYLON FIBER GABION

METHOD OF MEASUREMENT

The works for this repair works shall be measured in accordance with
DPWH Standard Specifications, Item 511-Gabions and Mattresses.

BASIS OF PAYMENT

The quantity, measured as prescribed above, shall be paid in


accordance with DPWH Standard Specifications, Item 511-Gabions
and Mattresses.

31
Thank You!