1 Electrical
2 Electrical
3 Electrical
4 Electrical
5 Electrical
6 Electrical
7 Electrical
8 Electrical
9 Electrical
10 Electrical
11 Civil
12 Project Management
13 Electrical
14 Electrical
15 Electrical
16 Electrical
17 Electrical
18 Electrical
20 Electrical
21 Electrical
22 Electrical
23 Electrical
24 Fire
25 Electrical
26 Electrical
27 Electrical
28 Electrical
29 Electrical
30 Electrical
31 Electrical
32 Civil
33 Civil
34 Project Management
35 Electrical
36 Electrical
37 Electrical
38 Electrical
39 Fire
40 Fire
41 Electrical
42 Project Management
43 Project Management
The methodology and all the equipment for electrical partial discharge
5 (PD) detection and/or acoustic detection methods, including that
mentioned in the specification else-where.
The ladders and walkways shall be provided wherever necessary for
6 access to the equipment. A portable ladder with adjustable height may
also be supplied for access to the equipment.
c) Any other alarm necessary to indicate deterioration of the gas
7
insulating system
13 The disconnecting switches shall be provided with rating plates and shall
be accessible for inspection.
16 The rated induced current and voltage for earth switches for
electrostatic and electromagnetic coupling shall be as IEC 62271-102.
20 OUTDOOR BUSHINGS
The successful bidder shall be fully responsible for complete insulation
21
co-ordination of switchyard including GIS.
The surge arrester shall be of heavy-duty station class and gapless
22 (Metal oxide) type without any series or shunt gaps.
23 PARTIAL DISCHARGE MONITORING SYSTEM & DEW POINT METER
24 Online Partial Discharge Monitoring System
29 Each module will have its own Identification & rating plate.
36 Lightning arrestor
3- Ø 220 kV, 3150 A, 50 kA-3 sec, metal enclosed SF6 Gas Insulated
Switchgear - Line bay Module including Main Bus bars -comprising
(A)Circuit breaker
(B)Current transformer 1500-800-400/1A, 5C ( no. of cores as per TS) -1
no for each phase
(C)Line side Disconnector with one maintenance earthing switch
38 (D)High speed/Fast Acting Earthing switch
(E)Bus Disconnector with Earthing switch (Bus side common earthing
switch for two bus) (F)Bus Disconnector without Earthing switch
(G) SF6 Gas Insulated Bus Duct (GIB) from respective GIS bay module up
to the GIS wall (indoor).
(H)LCC Panel(All other items as per technical specification)
(I) Bus-bar- Double Bus Arrangement, 3150A,50kA/3sec
220 kV, 2500A, Transformer Feeder (220/33 kV Trafo. 220 kV Side)
50 KA-3 sec, metal enclosed SF6 Gas Insulated Switchgear - Transformer
bay Module including Main Bus bars -comprising of
(A)Circuit breaker with CSD
(B)Current transformer 800-400/1A, 5 core ( no. of cores as per TS) -1 no
for each phase (C)Transformer side Disconnector with one maintenance
39 earthing switch
(D) High speed/fast Acting Earthing switch
(E)Bus Disconnector with Earthing switch (Bus side common earthing
switch for two bus)
(F) Bus Disconnector without Earthing Switch
(G)SF6 Gas Insulated Bus Duct (GIB) from respective GIS bay module up
to the wall. (H)LCC Panel (All other items as per technical specification)
(I) Busbar-double Bus arrangement 3150A,50kA/3sec
3 Thermal overload
Fire Fighting
4
5
HVAC System
1
O&M
1
2
Testing & Maintenance Equipments such as SF6 Gas filling & evacuating
plant (DILO), Press Machine, Dew Point meter, SF6 Gas Leak Detector,
SF6 Gas Analyser, 220/33KV GIS Voltage Sensor, Automatic Relay Testing
1 Kit, Auto Capacitance & Tan Delta Test Kit, Thermovision System,
Prestige Electronic make Breaker Time Intrval Kit Model TIM-10 (3
Poles), Supreme make 0-100KV Motoriesed cum manual operated Oil
Testing Kit.
2 Please provide us soil test report
We understand we will be handed over levelled incumburcance free
3 land. Land development not required.
The closing coil shall operate satisfactorily at all values of control supply
5
voltage between 80-110% of the rated voltage.
For 33 kV incomer:
7 Tripping time : 60-70 ms (Including Relay Time)
Closing Time : < 80 ms.
The current transformer shall further have the dynamic and short time
ratings at least equal to those specified for the associated switchgear
10 and shall safely withstand the thermal and mechanical stress produced
by maximum fault currents specified when mounted inside the
switchgear for circuit breaker modules.
14 End termination required for cables should be touch proof type, EURO
mould.
In case these type tests are conducted earlier than seven years, all the
type tests as per the
15 relevant standards shall be carried out by the successful bidder in the
presence of purchaser’s
representative at free of cost before commencement of supply.
The inspection may be carried out by the purchaser at any stage of
manufacture. The
16 successful Tenderer shall grant free access to the purchaser's
representative/s at a reasonable
notice when the work is in progress.
1 Geotechnical Investigation
Survey data
2 OWNER will supply preliminary survey data for planning purpose.
3.1.2.1 The required grading for the switchyard area shall be done by
3 CONTRACTOR.
3.1.3.1 Minimum 2.5 m high fencing above the toe wall shall be
4 provided around switch yard and
as specified in other sections of the specification.
5 33kV Building
6 Boundary Wall
7 Approach Road
8 Internal Roads
9 Drainage System
16 Site office
17 Hinderance Register
18 Working Hours
Queries of the Contractors
Unable to open Check Lists and Formats PDF document. Please resend.
We presume that MSEDCL Tariff metering bay along with bus isolator (CTs & PTs) shall be
provided before 2 Nos. of transformer bays.
We also understand that Bus PTs shall be provided for transformer bays if MSEDCL Tariff
metering bay is provided.
We propose to provide GIS LAs for incomer bays as AIS type LA for Phase 2 will come at
later stage.
We have considered 0.2S & PS class CTs as per MSETCL requirement for incomer bays.
5P10 class CT is not considered.
We have considered space provision for 3 bays (extension for phase 2) after transformer
bays.
We recommend to provide additional core & protection for cable differential relay (87C)
for outgoings to data centre buildings. Please confirm.
We request you not to change physical location of outgoing feeders from Phase 1 to
Phase 2. e.g. DC-13 & Station Transformer (Feeder no. 3 & 4) kept next to each other in
Phase 1 changed to (Feeder no. 1 & 6) in Phase 2 with 4 feeders between them. It would
be difficult to reroute cables with increased length in Phase 2.
We have understand power release, load sanction & scheme approval from MSETCL in
already available. Please confirm.
We have not considered 220 kV Cables, termination kits at both ends, link boxes, sheath
bonding cable, earth continuity conductor, clamps and associated EHV cable accessories
and sand filling & civil works related to 220 kV cable as this are part of other package.
Please confirm regarding scope of supplying loose line differential relay at remote end
substation. We will be retrofitting relay in existing CRP. Separate CRP in not considered.
Required cables, accessories is considered in scope of work. We presume that aux supply
will be made available by MSETCL.
Please confirm SAS integration of the loose supplied relay at remote end substation.
We have considered separate relay for 50 LBB for incomer & bus coupler bays as per
MSETCL requirement..
We understand that control & protection are mounted on 33 kV GIS. Separate standalone
C&R panels are not required.
We have considered soil resistivity of 10 ohm meter for bid purpose. Successful
contractor will do earth resistivity measurement at site. Any deletion / addition of
material due to change in actual resistivity value, will be mitigated by RFI / mutual
discussion.
We understand that LILO work along with cables in other package. Hence, we have
excluded tower earthing and associated accessories & work from scope of work.
We recommend to provide separate battery, charger, DCDB & associated system for 220
kV & 33 kV system for data centre reliability and operation purpose.
We have considered communicable type fire fighting system. RS 485 port available for
integrating with main data centre fire control room. Connectivity is excluded from scope
of work.
We presume that Station Transformer will have cable box on both sides hence 33 kV Horn
Gap Fuse shall not be applicable.
We presume that separate SCADA system shall be provided for MSETCL & NTT. Please
confirm.
We have consider FOTE system at remote substation at AKP & Bapgaon. Please confirm.
We presume that aux supply will be made available at remote substations. Necessary
cabling is considered. Offered panels shall be as per MSETCL specification.
We presume that 48V DC & 230V AC supply shall be made available at remote substations
by MSETCL. Necessary cables, accessories and installation work of the FOTE panels at
remote substation is included in offer.
We understand that OPGW cable between AKP & Bapgaon is already available. We have
exclude scope of laying OPGW cable till remote end substation.
Please inform distance between proposed substation to AKP & Bapgaon substation.
Request you to please inform road demarcation for Phase 1 & Phase 2.
MSETCL make list will be followed for equipment under MSETCL scope.
We have considered insulation coordination study in scope. Arc flash study, load flow
study, harmonic analysis, transient study & short circuit study or any other study not
considered in scope. Relay setting is considered in scope.
We have not considered any type of Gas Suppression system in the scope of work.
We have not considered Liner Heat Sensing (LHS) system in the scope of work.
We have not considered 3D modelling of substation.
Hinderance Free and Through access to site, with proper approach road shall be provided
to us. No approach road and site clearance is envisage in our scope of work.
Space for laydown area, Site office & Storage shall be provided free of cost for the entire
contract duration including extended completion period, if applicable to the bidder.
However, for labour colony bidder to arrange space within or in Vicinity of the plot. Kindly
Confirm our understanding.
We understand that 220 KV EHV incoming cable and cable trenchi for incomming cable
not in bidders scope.
We understand that 220 KV Cable termination kit is not in bidders scope.
Please provide us the name of opposite end of LILO line and also tentative line distance.
As as per MSETCL Requirement
Please clarify if the scope of SLDC integration we have to consider.
We assume that arrangement of construction power and water not in bidders scope.
Our GIS is rated for 3150A at 40 Deg. C. At 50 Deg. C ambient temperature, the rated
current shall be derated i.e. lesser than 3150 A. Derating calculation shall be submitted in
due course.
when the module is removed or is worked upon the adjacent modules shall be reduced in
pressure and shall go out of service for human safety reasons. Request your acceptance.
We shall provide the burn through time in line with IEC 62271-203. Table enclosed for
reference.
In line with the requirement, we confirm that busbar and disconnector are in separate
gas compartments and these equipments can also be removed / repaired complying with
the service continuity. For the ease of maintenance & repair of busbar and disconnector,
we are proposing a passive busbar without any switching device in it. The same is without
any gas segregation between bay to bay. Request you to review the Gas SLD with the
technical offer and provide your acceptance.
The methodology of the partial detecting sesnors placement shall be based on the
manufacturers standard practise. The doccument for the same shall not be provided.
Request your kind acceptance.
The same facility is not available in the GIS thus the same shall not be provided. Request
your kind concurrence.
The Open CB can take the same for 15 minutes duration. Request your concurrence.
Operation counter shall be provided in the CB Drive mechanism.
These drawings cannot be provided as these are the design data and also secondly it
depends upon the multiple factors such as value of arc current its nature, its location etc.
Thus, there is no single document which encapsulated all such scenario.
Our GIS is rated for 3150A at 40 Deg. C. At 50 Deg. C ambient temperature, the rated
current shall be derated i.e. lesser than 3150 A.
We confirm that name plates of the main components like CB,CT and VT shall be of SS.
However, for other equipments like DS, ES the name plate requirement is not envisaged.
The earthing shall be done with the help of enclosures directly. Thus, the same is not
applicable.
The earthing shall be done with the help of enclosures directly. Thus, the same is not
applicable.
We shall provide 50 VA burden on each winding of the transformer a per the transformer
data sheet. Request your concurrence.
We understand that class 3 surge arrestor is to be quoted as per the cl. 16.2.4 Request
your concurrence
Please provide specification and make.
Online PD monitoring not required for 220 KV System. We propose portable PD
Monitoring system of OHV Make.
We confirm that name plates of the main components like CB,CT and VT shall be of SS.
However, for other equipments like DS, ES the name plate requirement is not envisaged.
Shock indicators shall be provided only for VT and Surge arrestor. For other equipments,
requirement of shock indicators is not envisaged as per manufacturer's design. The same
philosophy is adapted and proven in previously executed projects.
We understand the same shal be with cable termination and no GIB shall be supplied.
Request your confirmtion.
We understand that the CSD is not required for the tranformer bay. Request your
cncurrence.
HSES is asked for in this bay. However, as explained before a work in progress normal ES
shall be supplied. Request your concurrence.
Please confirm the no. of winding for 220/33kV transformer as 3 winding is mentioned in
spec but it is 2 as per SLD? Please also confirm the type means Star of Delta?
As we understood, there is no separate PC required for HMI view node and it can be
viewed on redundant workstation. Kindly confirm your acceptance?
4 set of 220kV Line bay CRP requirement is mentioned in BOQ whereas it is 2 set of 220kV
Line bay as per SLD. Please confirm the total 220kV Line bay CRP requirement?
2 set of 220kV Bus Coupler bay CRP requirement is mentioned in BOQ whereas it is 1 set
of 220kV Bus coupler bay as per SLD. Please confirm the total 220kV Bus coupler bay CRP
requirement?
Kindly confirm the requirement of CRP panel for 220kV Bus Sectionaliser. It is not
required as per SLD?
Kindly confirm the requirement of C&R panels for 33kV bays?
Kindly confirm the requirement of Phasor Measurement Units as not supplied in earlier
executed data center jobs?
Kindly provide the Recommended spares list
In BOQ it is written that “Fire fighting system(NIFPS system) complete U/G & O/G
piping and accessories etc. out side the pump house for Transformer / Reactor”. Please
note that for NIFPS there is not Pump House.
Kindly clarify the requirements of Hydrant, HVWS for Transformer, MVWS for Cable cellar
and Sprinkler for the building areas.
Please clarify if there is any existing Fire Water Pumphouse. If available, kindly confirm
the pumping capacity.
We are considering positive pressure ventilation system for GIS Hall with minimum
4ACPH. Kindly provide specification, if available.
Please confirm whether Hi-wall split a/c is required or any precision a/c is required. There
will be a considerable price difference.
Our offered GIS will have LSC-2A PM class as the system is double busbar system.
Panels with rating of 3150A will have forced cooling as per the type tested design. Panels
with rating below 3150A will be cooled by natural air flow.
The closing coil shall operate satisfactorily at all values of control supply voltage between
85-110% of the rated voltage as per the type tested design.
Spring charging motors shall be capable of starting and charging the closing spring twice
in quick succession without exceeding acceptable winding temperature
when the supply voltage is anywhere between 85-110% of rated voltage as per the type
tested design.
As per the type tested design, Closing time < 95 m and Opening time 1st release: < 65
ms ;2nd release: < 55 ms
In our type tested design, cable compartment cover is not applicable as the cable
compartment will be in gas only.
View ports are not applicable in the type tested design of GIS. We will provide mechanical
indicator for that purpose.
As per the type tested design, the current transformer will be outside the gas
compartment without dieelctric stress.
Our offered GIS products will have innercone cable termination. So, we need the cable
details of each feeder to make the offer. In the SLD, cable details of outgoing feeders are
given but the incoming feeders are missing.
As per the design standard, our offered GIS will have innercone cable termination which
have several benefits.1.INNER CONE type cable Termination is a pure GIS technology as
the cable termination takes place inside the SF6 GAS filled cable housing chamber
imparting greater dielectric insulation/strength at the points of cable termination. Hence,
chance of flashover at cable plugs is extremely less as compared to Outer Cone
Termination where the dielectric medium is AIR. Also, there is no effect of external
environment, moisture,dust etc. in-case of INNER CONE termination. 2.In case of GIS with
inner cone cable termination with multiple cable runs , each cable termination will have a
separate bushing for power cable termination inside the INNER CONE BUSHING. Here, in
case one cable termination is affected, the other cable termination points inside the
INNER CONE will not be affected as there is sufficient insulation between the cable
termination points inside the INNER CONE. However, in case of Outer cone multiple
cables are connected to one single cable bushing via back to back Tee plug arrangement.
Here, if one T-off plug is affected due to internal arc in cable compartment, the complete
cable termination bushing is rendered inoperative.3.Our 8DA10 GIS is satisfactory type
tested with inner cone termination in submerged condition (up to 2 feet) so that
uninterrupted power supply obtained in case of sub-station is submerged due to flood.
Please consider Inner cone cable termination for 33kV GIS.
Cable details are given in the SLD for the OG feeder and we will design the panels as per
the SLD requiremnet only. Later if cable size or no. of runs will get changed, additional
price will be considered as cable housing will be different for different cable
requirements.
End termination required for cables should be touch proof type of pfisterer make
The type tests performed on 33kV GIS are according to the international standards, Type
Tests as per clause 6 of IEC 62271-200 are performed on every design if;
1. Relevant design changes of the switchgear has taken place from the original type
tested design
2. The requirement for the tests within standard has changed.
Since above two mentioned points are not valid for our offered design, the submitted
type test reports are valid. Further we also confirm that no relevant change in
market/design has been implemented in the offered ed design after type testing.
Hence, we have not considered any type testing cost, as type tests are older than 5 years
from tender issue date. We do not forsee to perform re-type test on already type tested
product considering finanacial implication.
Stage inspection is not applicable in GIS as per the standard practice. We will arrange FAT
after preparing the complete panel
Request customer to provide us topographical map for proposed area along with
proposed finished ground level ( F.G.L.).
Request Customer to confirm if fencing is required on the periphery of plot area. If yes,
we understand that same shall be provided for area marked in attached layout for Phase-
1 at this stage.Please confirm.
Request Customer to share section details for 33kV GIS Building as provided for 220kV
GIS Building.
We understand that boundary wall for proposed area is not under present scope. Please
confirm.
We understand that suitable approach road till the entry of proposed plot shall be
provided by Owner. Please confirm.
As per our Zoom meet discussion, we have marked the roads to be constructed under
present scope in the attached layout. Request your concurrence on same.
We understand that drainage system under present scope shall be limited to the marked
area in attached layout for Phase -1 only. Please confirm.
Request Customer to specify the outfall point for drainage system where we need to
connect the drains from Phase -1.
Please confirm if controlled blasting shall be allowed in case of hard rock excavation.
We understand that clear and hassle free land shall be provided to us. No dismantling
works, tree cutting, bush clearance are under present scope of work.Please confirm.
We understand that construction water and power point shall be provided to us near the
plot area without any charge. Please confirm.
We understand that 12m wide road shown in Layout is existing road. Please confirm.
We understand that grade of concrete for building and other works under present scope
shall be considered based on technical specification document No. TENDER DOCUMENT
VOLUME 4: SECTION I provided in tender documents. Please confirm.
We understand that space for site office and stores shall be provided to us near the area
under present scope of works.Please confirm.
Hinderance register shall be maintained by us at site which shall include the delays due to
force majures,natural calmaities etc. and extension/compensation shall be provided to
us for the same.
We understand that we shall be allowed to work 24X7.No time restrictions are
there.Please confirm.
Please mention if any permissions/formalities required for night work etc.
Reply from Employer
Yes
Not required.
Ok
OK noted.Adhere to SLD
Physical location of feeders will not change. The phase 2 SLD is not
to be read for physical location.
33kV ougoing cables will cross the 12m road shown in layout. No
cables are coming inside GIS premises.
Noted.
The remote end substation details are currently not available and
shall be shared once available from MSETCL.
Ok
Yes
Yes
Noted.
Yes
The remote end substation details are currently not available and
shall be shared once available from MSETCL.
The remote end substation details are currently not available and
shall be shared once available from MSETCL.
Yes, this will not be a part of this tender. The FOTE cable required
inside the GIS premises shall be in your scope.
AKP-3KM &Bapgaon-21KM. Bidder to validate with MSETCL.
Ok Noted.Drawing attached
Yes
UPS sizing shall be done by the bidder for emergency lighting and
emergency power. UPS shall be of modular construction and with
VRLA batteries.
Public address requirement shall be taken care by Bidder and
Access control and CCTV shall be done by Client-AN
Kindly restrict to the creepage distnce mentioned on the RFP i.e
25mm/kV
Ok noted
Ok noted
Yes
Ok noted
AKP-3KM &Bapgaon-21KM.Please get it validate from MSETCL-M
Ok noted
Yes
The same has been mentioned in GCC & SCC.
Noted.
Bidder needs to confirm that the gas barriers are available in the
GIS (220kV) to avoid reduction in pressure. However, we
understand that while working on one module other modules shall
go out of service.
Ok noted
Ok Noted
Ok noted
Ok noted
Ok noted
Ok noted
Ok noted
Noted.
The successful bidder shall be fully responsible for complete
insulation co-ordination of switchyard including GIS.
Yes.
Vaishala make-Dew point meter. PD-
Online to be considered.
Ok noted
Ok noted.Drawing attached
2 panels per line bay are considered. There are only 2 sets.
Yes
Required. However sectionalizer has not been shown in 220kV SLD.
As per BOQ.
As per MSETCL/SLDC requirement
Attached.Prasad
AN
AN
NTT
Yes
Attached,NTT to furnish
NTT to furnish
Ok noted
Ok noted
Noted.
Noted.
Noted.
Noted.
Ok
Ok Noted.
Noted.
Ok noted
Ok noted
Ok noted
In order to review the progress of GIS manufacturing stage
inspection is inevitable.Hence please consider the same
Attached
Attached
Ok noted
Ok noted
Ok noted.Attached
Ok noted
Ok noted
Ok noted.AN
Ok noted.AN
AN
Yes
Ok
10 Volume 4, Section A,
TECHNICAL SPECIFICATION
OF 220 kV & 33 kV GIS,
Creepage Distance
11 Volume 4, Section A,
TECHNICAL SPECIFICATION
OF 220 kV & 33 kV GIS,
Transformer Termination
17 Volume 4, Section B,
Transformer, Dynamic Short
circuit test
18 Volume 4, Section C,
Transformer, SCADA, FOTE
TENDER DOCUMENT
1 VOLUME 4: SECTION I.
Cl.no : 1.3.1
TENDER DOCUMENT
2 VOLUME 4: SECTION I.
Cl.no : 1.3.3
TENDER DOCUMENT
3 VOLUME 4: SECTION I.
Cl.no : 1.3.3
TENDER DOCUMENT
5 VOLUME 4: SECTION I.
Cl.no : 1.3.3
TENDER DOCUMENT
6 VOLUME 4: SECTION I.
Cl.no: 3.4.1.1
TENDER DOCUMENT
7 VOLUME 4: SECTION I.
Cl.no : 1.3.4
TENDER DOCUMENT
8 VOLUME 4: SECTION I.
Cl.no : 1.3.4
Queries by L&T Construction
As per referred Single line Diagram, Fast-acting earth switch is required for Busbar earthing.
However, same is not mentioned in BOQ. Please check and add a separate line item in the BoQ
if required.
As per referred BOQ item, Bus PTs are mentioned in bus coupler module bay. Further, bus PTs
are also mentioned in busbar modules as indicated in BOQ.
In this regard, we presume bus PTs along with disconnectors shall be priced in busbar module
items. Please confirm.
As per referred Single line Diagram, Termination of 220kV Incomers are through " 3 X 1C X
2500 sq.mm. " 220kV cable. However, as per referred BOQ line item supply of Gas Insulated
Bus duct is considered under present scope.
Please clarify the actual requirement.
As per referred BOQ line item, 5 Nos. of 33kV, 630A, 25kA Outgoing feeder bay ( 3 Main + 2
Spare) are under present scope. However, as per ELECTRICAL SINGLE LINE DIAGRAM
PHASE I, only 4 Nos. of outgoing feeder bays ( 2 Main + 2 Spare) are mentioned.
Please clarify the actual requirement.
As per referred Single line diagram, Surge arrestor on 33kV side of transformer is required.
However, same is not mentioned in 6.2 BOQ. Please check and add a separate line item in the
BoQ if required.
Please clarify/confirm the following regarding CRP & SAS:
1. Quantity of CRP panels as indicated in BOQ is not matching with the no. of GIS bays as
mentioned.
2. 220kV bus sectionaliser panel is mentioned in BOQ. Please check the requirements.
Please clarify/confirm the following regarding Tariff energy metering:
1. Whether any separate Metering CT & CVT are in scope of this package?
2. Whether any separate metering cubicle is in present scope of works?. Please furnish the
specification for metering system.
SAS server shall be sized for the bays as shown in the SLD, (Docu. no. ELECTRICAL SINGLE
LINE DIAGRAM PHASE I). We are not envisaging any future bays. Please confirm.
Please clarify/confirm the requirement of following regarding FOTE :
1. Any communication system requirement for 220kV line
2. Please specify the make & model no of communication system at 220kV remote end stations
if FOTE is in present scope
2. We are not envisaging any requirement of PLCC for present scope of work
As per clause 15.2 of referred specification, creepage distance of outdoor bushing should be
25mm/kV. However, as per Volume 4, Section B, Transformer, Table 3, 31mm/kV creepage
distance is required.
Please clarify the actual requirement.
As per clause 55.1 of referred specification, Transformer termination on 33 kV Side shall be
through 1 C x 300 sq.mm XLPE Aluminium round wired armoured cable earthed. However, as
per line item 20 of 6.2 BOQ, Cable termination Kit for 33kV HT Cable for 3C X 400 sqmm is
mentioned.
Please clarify the actual requirement.
Please furnish us the CT parameters for bus coupler bay as the same is not provided in
mentioned SLD.
We understand that separate DS & ES module between Bus Disconnector and Circuit Breaker is
not required.
Please confirm whether bidder's understanding is in order.
We presume both 220kV outdoor terminations (along with structure) & indoor 220kV GIS
terminations are excluded from the scope of this package. Please confirm.
We presume that the 33kV cables for the 33kV GIS outgoing feeders to the respective facilities
are not included in the scope of this package. Please confirm.
Please clarify the intent of following mentioned clause as per referred specification :
" The design should be such that all parts subjected to wear and tear are easily accessible for
maintenance purposes. The equipment offered shall be protected against all types of voltage
surges & capable of sustaining & breaking of high fault current as this proposed GIS is intended
to source at 220 kV from nearest 400/220 kV Kalwa S/S which is having high fault MVA more
than 50 kA and therefore any equipment necessary to satisfy this requirement shall be
deemed to be included."
As per 6.2 BOQ and SLD (Drawing : ELECTRICAL SINGLE LINE DIAGRAM PHASE I), we
understand that the Short time withstand current for 220kV equipment shall be 50kA for 3s only.
Please confirm.
As per clause 12.27 of referred specification, We understand that only calculation in support of
thermal & Dynamic forces withstand capability of transformer due to short circuit, is required. We
do not envisage any repetition of dynamic short circuit test.
Please confirm whether bidder's understanding is in order.
We understand that SAS integration of only 220kV and 33kV substation equipments are under
present scope. We do not envisage integration of any downstream connected equipments in
SAS.
Please confirm whether bidder's understanding is in order.
Please furnish the detailed tender documents as listed below:
1. Scope of works or section project.
2. Terminal points & Exclusions
3. Project specific requirements (if any)
4. Typical LT AC & DC distribution SLD.
Query / Description
The Scope will cover but not limited to the following buildings / structure / systems / facilities.
1.3.1 GIS building &
The Scope will cover but not limited to the following buildings / structure / systems / facilities.
The Scope will cover but not limited to the following buildings / structure / systems / facilities.
This includes lattice type structural steel towers and girders. These shall be hot dip galvanized
structure with welded / bolted connections at shop and bolted connection at site. All bolts and
nuts shall also be galvanized.
The Scope will cover but not limited to the following buildings / structure / systems / facilities.
Storm water disposal system in switchyard area
The Scope will cover but not limited to the following buildings / structure / systems / facilities.
Storm water disposal system in switchyard area
Reply by Client
Noted. Bidder to consider Fast acting earthing switch while quoting.
For I/C bays, cables to be considered, for O/G bays bus duct to be
considered.
As per referred clause, we trust that the 220kV & 33kV GIS building
is in bidders scope. However in tender document the Detailed
technical specification for Building is not attached.
Based on scope matrix, we understand that the GIS building shall
be PEB type.
please confim. If yes kindly provide the detailed Civil specification
for PEB buildings.
As per referred clause, the switchyard road is in bidders scope. In
Scope matrix it is mentioned that, Civil works for Roads as per tech
specs. However in tender document the Detailed technical
specification for Road is not attached.
Kindly provide the same. in order to estimate the quantum of work.
We trust that, the following civil works are not in bidders scope.
1. Site development for the proposed SS area
2. Approach road
3. Boundary wall, main gate & Security hut
4. Residential quarters
5. Store building, Parking shed
6. Fire fighting pump house & water tank
7. Landscaping & Plantation
Please confirm.
2 LT CABLES "Cables shall confirm to latest IS 7098 Part-1, 1988. LT Cables shall
be heavy duty, armored, all cables to be FRLS grade, XLPE insulated
& PVC sheathed 1.1KVgrade aluminum or copper."
Kindly confirm whether bidder can consider Aluminium cables.
9.14.3 "9.14.3 Equipment shall have facility to give SMS alert to at least
three users whenever any
fault gas violates the predefined limit."
We are not sure about the availability of this feature. NTT is kindly
requested to confirm whether this feature is really required.
9.14.8 "9.14.8 The Equipment must carry a minimum of Five (5) years
manufacturer’s Warranty including spares, consumables etc. from date
of commissioning."
Our understanding is that the warranty of all equipment shall be as per
GCC/SCC. Hence, five years warranty will not be applicable. Kindly
confirm.
Kindly confirm whether we can use transformer manufacturers
VOLUME 5: approved by MSETCL and they may not be available in the approved
Approved Make list make list given with this tender.
VOLUME 4: "2.7.1 Tee Differential Protection :"
SECTION F: Kindly confirm that this protection feature will not be required, as no
CONTROL & 'T' connection available in this substation.
PROTECTION
SCHEME
VOLUME 4: "3.1 MAIN PROTECTION: This protection shall:-
SECTION F: i) Be fully programmable directional distance scheme & It may be
CONTROL & noted that the supplied Numerical distance protection should have line
PROTECTION differential protection function also.
SCHEME xviii) For short lines (having length less than 4 km), line differential
protection shall be provided as main protection."
Kindly confirm which protection shall be applicable for line protection
relays i.e. Distance or differential.
VOLUME 4: "12.8 MFE meters shall preferably be self-powered type. Meters shall
SECTION G: have non-volatile memory ......retention of energy recording during
STATION storage / aux. Supply failure, the same shall have a life not less than 10
TRANSFORMER, years.
DG SET, FFT VOICE EVACUATION, CAR CALLING & DIGITAL 2 WAY FIRE
FIGHTERS COMMUNICATIONS"
1. In line item/BOQ "VOICE EVACUATION, CAR CALLING &
DIGITAL 2 WAY FIRE FIGHTERS COMMUNICATIONS" is not
available. Kindly confirm whether this is required.
2. In case required, kindly inform who will be the approved
vendors/suppliers of this system.
3.5 electrical supply Please confirm arrangement for electrical power for construction,
labour camp and for any other purpose as required by the Service
Provider .
If yes then Biddder need to submit optional cost Or BOQ will get
revised for such expense
Reference
S.No
Document
1 BOQ / SLD
2 SLD
3 SLD
4 _
5 SLD / BOQ
6 BOQ
7 BOQ
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Hyosung
Reference
Technical Issue
Clause/DocNo.
220kV GIS
-
No of Bay
- -
- Termination.
GIB length
_
- -
- Spare Parts
Cl. No. 5
General Char.
Pg no, 5
CL No 4.18
Gas monitoring kiosk
Pg no 10
CL No 4.18 Cable Entry at LCP
Pg no 10
Cl. No. 8
Pressure Vessel code
Pg no, 13
Cl. No. 9
Grounding
Pg no, 13
Cl. No. 10.3 (f)
Tripping Time
Pg no, 15
Sr.no.4 &
Cl. No. 14.1.2.5(g) Bua Bar VT
Pg no, 27
Insulation Co-
Cl.16.1.1
ordination of Surge
Pg. no. 29
Areestor
Pg. No. 32,36 Special Tools
CL1.22.2
Page No. - 38
CL24
Cable Termination
Page No. -38
CL1.38.5
Mechnical Interlock
Page No. - 52
Customer's Requirement
Customer's Requirement: N/A
Customer's Requirement:-NA
Bidder's Remark: We would like to inform you that we have reviewed the tender document, BOQ
As the termination of bay is
For Line bay - CSE
For Trafo bay - SF6 GAS To OIL BUSHING
Bidder's Remark: We would like to infrom you that, GIB length is not mentioned anywhere and we
have not received the AutoCAD of GIS hall layout as well. To quantify the length of the GIB, please
provide the same. Payment of busduct for outside of GIS hall shall be paid on per meter basis confirm
our understanding.
Bidder's Remarks: We would like to inform you that, there is descrepancy in the BOQ and SLD fo
transformer feeder rating.
Howevwer we have considered as per SLD that is 3150A.
Bidder's Remark: We would like to inform you that as per BOQ Local Control Cubical is mentione
for the BUS VT, as per our standard practice separate LCC is not required for the BUS VT. Control
for Bus VT shall be accomodated in Bus coupler or adjacent bay LCC. Hence we shall not consider
same.
Bidder's Remark:We would like to inform you that, in cutomer technical specification there are tw
special tools mentioned. So we have considered the Online PD monitoring system with UHF type.
Bidder's Remark:We would like to inform you that, in BOQ and cutomer technical specification
there are no spare parts mentioned hence we have not considered the same.
Bidder's Remark: We would like to clarify thatwe have 3phase encapsulaed Busbar design & all
equipment ae single phase.
Bidder's Remarks: We would like to inform that, as per IEC 62271-203, Cl. 5.15.101 standards,
Guaranteed Maximum Gas Losses should be less than 0.5 % per Annum. We comply the same.
Bidder's Remark: As per our design concept, we have provided separate gas density monitor for each gas tight
compartment for monitoring of gas pressure, therefore in this reference no separate gas monitoring kiosk is required f
monitoring of gas.
Bidder's Remark: We would like to inform you that Methodology for PD detection is defined in Te
Spec as UHF technique, offered solution is same; hence no special documentation is envisaged.
Bidder's Remark: We would like to inform you that, we shall provide only earthing points on G
base Frame. Furthe scope of earthing supply & installation from GIS base frame to risers shal
be in Hyosung EPCscope
Bidder's Remark: We would like to inform you that, we shall provide only earthing points on
GIS base Frame. Further scope of earthing supply & installation from GIS base frame to riser
shall be in Hyosung EPCscope. Also Installation of Earth mat & switchyard equipment shall e
Hyosung EPCscope
Bidder's Remark: We would like to inform you that, Routine test reports shall be submitted for
customer's
review during FAT for bought out items.
Bidder's Remark: We would like to inform you that, the Maximum Radio interference voltage for
frequency is applicable for bushings only, not applicable for CB and DS.
Bidder's Remark: We would like to inform that we shall provide provision of padlocking
however the supply of pad lockis shall be in Hyosung EPCscope of work.
Bidder's remark: We would like to clarify you that, For Bus Bar VT there is descrepancy in BOQ,
SLD and Customer technical specification.
However we have onsidered the requirement; as per SLD: Bus Bar VT with motorised bus
disconnector with Earthing Switch.
Bidder's Remark:As per IEC 61869-2 the PF withstand voltage for CT secondary is 3kV. We comp
same.
Bidder's Remark: We would like to inform that only study report of seisimic studies shall be
provided however TTR shall not be envisaged.
Bidder's Remark: We would like to inform you that 20% SF6 gas spare requirement is not mention
in spare list of BOQ we have included the same.This will have commercial impact.
We have considered quantity of SF6 gas required while commissioning for complete GIS filling
inclusing losses.