SIEMENS LIMITED

Project Name: 220kV GIS at NTT Global


Sr.
Description as per Technical Specs
No.

1 Electrical

2 Electrical

3 Electrical

4 Electrical

5 Electrical

6 Electrical

7 Electrical

8 Electrical

9 Electrical

10 Electrical

11 Civil

12 Project Management

13 Electrical

14 Electrical

15 Electrical
16 Electrical

17 Electrical

18 Electrical

20 Electrical

21 Electrical

22 Electrical

23 Electrical

24 Fire

25 Electrical

26 Electrical

27 Electrical

28 Electrical

29 Electrical
30 Electrical

31 Electrical

32 Civil

33 Civil

34 Project Management

35 Electrical

36 Electrical

37 Electrical

38 Electrical

39 Fire
40 Fire
41 Electrical

42 Project Management

43 Project Management

44 220 KV incoming cable and Cable trench.


45 220 KV cable termination kit for incoming bays.
46 Opposite end Substation name
47 Loose differencial relay supply and integration
48 SLDC integration at remote end
49 Arrangement of construction Power and water
j) Rated current normal/ at site (at 50 ° C design
1 ambient temperature) : 3150 A

Due to safety requirement for working on this pressurized equipment,


whenever the pressure of the adjacent gas compartment is reduced, it
2
should be ensured by the bidder that adjacent compartment would
remain in service with reduced pressure.

The material and thickness of the enclosures shall be such as to


3 withstand an internal flashover without burn through for a period of 300
ms at rated short time withstand current

The switchgear shall be of the free standing, self-supporting with easy


accessibility to all the parts during installation & maintenance with all
high-voltage equipment installed inside gas insulated metallic and
earthed enclosures, suitably sub-divided into individual arc and gas
proof compartments preferably for:
a) Bus bars
4 b) Intermediate compartment
c) Circuit breakers
d) Line disconnectors
e) Voltage Transformers
f) Gas Insulated bus duct section between GIS and XLPE cable/Overhead
Conductor etc.
g) Gas Insulated bus section between GIS & Oil filled Transformer /
Reactor (if applicable)

The methodology and all the equipment for electrical partial discharge
5 (PD) detection and/or acoustic detection methods, including that
mentioned in the specification else-where.
The ladders and walkways shall be provided wherever necessary for
6 access to the equipment. A portable ladder with adjustable height may
also be supplied for access to the equipment.
c) Any other alarm necessary to indicate deterioration of the gas
7
insulating system

The breaker should be able to withstand all dielectric stresses


9 imposed on it in open condition at lockout pres-sure continuously (i.e. 2
pu. power frequency voltage across the breaker continuously)
10 An operation counter shall also be provided in the
central control cabinet.

11 Drawing showing contacts in close, arc initiation, full arcing, arc


extinction and open position.

12 e. Rated continuous current (A) at 50 Deg.C ambient


temp. : 3150

13 The disconnecting switches shall be provided with rating plates and shall
be accessible for inspection.

All portions of the grounding switch and operating mechanism required


14 for grounding shall be connected together utilizing flexible copper
conductors having a minimum cross-sectional area of 100 sq. mm

The main grounding connection on each grounding switch shall be rated


to carry the short time withstand current rating of the switch for 1 sec.
15
and shall be equipped with a silver plated terminal connector suitable
for steel strap of adequate design for connection to the grounding grid.

16 The rated induced current and voltage for earth switches for
electrostatic and electromagnetic coupling shall be as IEC 62271-102.

All portions of the grounding switch and operating mechanism required


17 for grounding shall be connected together utilizing flexible copper
conductors having a minimum cross-sectional area of 100 sq. mm

The main grounding connection on each grounding switch shall be rated


to carry the short time withstand current rating of the switch for 1 sec.
18
and shall be equipped with a silver plated terminal connector suitable
for steel strap of adequate design for connection to the grounding grid.

The accuracy of 0.2 on secondary side of core III should be maintained


19 throughout the entire burden range up to 100 VA on all the three
windings without any adjustments during operation.

20 OUTDOOR BUSHINGS
The successful bidder shall be fully responsible for complete insulation
21
co-ordination of switchyard including GIS.
The surge arrester shall be of heavy-duty station class and gapless
22 (Metal oxide) type without any series or shunt gaps.
23 PARTIAL DISCHARGE MONITORING SYSTEM & DEW POINT METER
24 Online Partial Discharge Monitoring System

29 Each module will have its own Identification & rating plate.

All transport packages containing critical units viz Circuit breakers,


disconnectors, earthswitches, surge arrestors and bus sections
exceeding 3 metres length shall be provided with sufficient number of
30 electronic impact recorders ( on returnable basis ) during transportation
to measure the magnitude and duration of the impact in all three
directions.

31 Lightning arrestor in line and transformer bays

32 FES Shown in the transformer bay

33 FES Shown in the bus earthing bay

34 VT shown with disconnector

35 No tariff metering bay shown

36 Lightning arrestor

37 layout for Phase 1

3- Ø 220 kV, 3150 A, 50 kA-3 sec, metal enclosed SF6 Gas Insulated
Switchgear - Line bay Module including Main Bus bars -comprising
(A)Circuit breaker
(B)Current transformer 1500-800-400/1A, 5C ( no. of cores as per TS) -1
no for each phase
(C)Line side Disconnector with one maintenance earthing switch
38 (D)High speed/Fast Acting Earthing switch
(E)Bus Disconnector with Earthing switch (Bus side common earthing
switch for two bus) (F)Bus Disconnector without Earthing switch
(G) SF6 Gas Insulated Bus Duct (GIB) from respective GIS bay module up
to the GIS wall (indoor).
(H)LCC Panel(All other items as per technical specification)
(I) Bus-bar- Double Bus Arrangement, 3150A,50kA/3sec
220 kV, 2500A, Transformer Feeder (220/33 kV Trafo. 220 kV Side)
50 KA-3 sec, metal enclosed SF6 Gas Insulated Switchgear - Transformer
bay Module including Main Bus bars -comprising of
(A)Circuit breaker with CSD
(B)Current transformer 800-400/1A, 5 core ( no. of cores as per TS) -1 no
for each phase (C)Transformer side Disconnector with one maintenance
39 earthing switch
(D) High speed/fast Acting Earthing switch
(E)Bus Disconnector with Earthing switch (Bus side common earthing
switch for two bus)
(F) Bus Disconnector without Earthing Switch
(G)SF6 Gas Insulated Bus Duct (GIB) from respective GIS bay module up
to the wall. (H)LCC Panel (All other items as per technical specification)
(I) Busbar-double Bus arrangement 3150A,50kA/3sec

40 Online PD Monitoring System for 220 kV GIS System


41 EOT For 220kV GIS Hall (5T Capacity)

1 Restricted Earth fault Protection

2 Over fluxing protection

3 Thermal overload

4 No. of widning & type of 220/33kV Transformer

5 HMI view node

6 220kV Line bay (with Auto-reclosure)

7 220kV Bus Coupler protection panel


8 220kV Bus Sectionaliser protection panel
9 33kV C & R Panels
10 Phasor Measurement Units
11 Recommended spares list

Fire Fighting

4
5
HVAC System
1

O&M
1
2

Testing & Maintenance Equipments such as SF6 Gas filling & evacuating
plant (DILO), Press Machine, Dew Point meter, SF6 Gas Leak Detector,
SF6 Gas Analyser, 220/33KV GIS Voltage Sensor, Automatic Relay Testing
1 Kit, Auto Capacitance & Tan Delta Test Kit, Thermovision System,
Prestige Electronic make Breaker Time Intrval Kit Model TIM-10 (3
Poles), Supreme make 0-100KV Motoriesed cum manual operated Oil
Testing Kit.
2 Please provide us soil test report
We understand we will be handed over levelled incumburcance free
3 land. Land development not required.

1 Max daily average ambient temperature : 40 degC


2 REFERENCE STANDARDS
The Service Class Continuity of Switchgears shall be LSC-2 (as
3 per IEC 622771-200), LSC 2B-PM (as per IEC 622771-200) will be
preferable.

4 The switchgear shall be cooled by natural air flow

The closing coil shall operate satisfactorily at all values of control supply
5
voltage between 80-110% of the rated voltage.

Spring charging motors shall be capable of starting and charging the


closing spring twice in quick succession without exceeding acceptable
6 winding temperature
when the supply voltage is anywhere between 80-110% of rated
voltage.

For 33 kV incomer:
7 Tripping time : 60-70 ms (Including Relay Time)
Closing Time : < 80 ms.

8 The cable compartment cover can only be opened if the panel is


earthed.
The large view ports to be provided to make it easy to visually check the
9 switching position
and to ensure safety of operations thereof.

The current transformer shall further have the dynamic and short time
ratings at least equal to those specified for the associated switchgear
10 and shall safely withstand the thermal and mechanical stress produced
by maximum fault currents specified when mounted inside the
switchgear for circuit breaker modules.

Bushings and arc-resistant cable covers/cable boot shall be provided in


cable compartment to
receive /connect 2 no’s of 3 X 300 sq.mm Aluminum XLPE Power Cable
11 for outgoing feeders
and 3 no’s of 3 X 300 sq.mm Aluminum XLPE power cable for incoming
feeders or as per
requirement.
Connections for power cables shall be plug in type/push on, according
12 to DIN 47637 outer
cone type as per relevant IEC

It shall be possible to terminate maximum of 6 * 3C x 400 sq.mm


13 Aluminium XLPE Earthed
Cables on one outgoing feeders.

14 End termination required for cables should be touch proof type, EURO
mould.

In case these type tests are conducted earlier than seven years, all the
type tests as per the
15 relevant standards shall be carried out by the successful bidder in the
presence of purchaser’s
representative at free of cost before commencement of supply.
The inspection may be carried out by the purchaser at any stage of
manufacture. The
16 successful Tenderer shall grant free access to the purchaser's
representative/s at a reasonable
notice when the work is in progress.

1 Geotechnical Investigation

Survey data
2 OWNER will supply preliminary survey data for planning purpose.

3.1.2.1 The required grading for the switchyard area shall be done by
3 CONTRACTOR.

3.1.3.1 Minimum 2.5 m high fencing above the toe wall shall be
4 provided around switch yard and
as specified in other sections of the specification.

5 33kV Building
6 Boundary Wall

7 Approach Road

8 Internal Roads

9 Drainage System

10 Outfall Point for Drainage System


11 Blasting

12 Dismantling Works,Tree Cutting,Bush Clearance

13 Construction Water and Power

14 12m wide road

Supplying, providing, producing, transporting and laying plain,


reinforced and prestressed cement concrete of grades M10 to M60 for
all concrete members, with vibration, compaction, levelling, mechanical
15
floater finishing, curing, removal of laitance from concrete surface,
grouting of all bolt holes, etc. complete as per drawings and design and
all as directed by EIC/RE/ consultant, at all locations

16 Site office
17 Hinderance Register

18 Working Hours
Queries of the Contractors

Unable to open Check Lists and Formats PDF document. Please resend.

We presume that MSEDCL Tariff metering bay along with bus isolator (CTs & PTs) shall be
provided before 2 Nos. of transformer bays.
We also understand that Bus PTs shall be provided for transformer bays if MSEDCL Tariff
metering bay is provided.
We propose to provide GIS LAs for incomer bays as AIS type LA for Phase 2 will come at
later stage.
We have considered 0.2S & PS class CTs as per MSETCL requirement for incomer bays.
5P10 class CT is not considered.
We have considered space provision for 3 bays (extension for phase 2) after transformer
bays.
We recommend to provide additional core & protection for cable differential relay (87C)
for outgoings to data centre buildings. Please confirm.
We request you not to change physical location of outgoing feeders from Phase 1 to
Phase 2. e.g. DC-13 & Station Transformer (Feeder no. 3 & 4) kept next to each other in
Phase 1 changed to (Feeder no. 1 & 6) in Phase 2 with 4 feeders between them. It would
be difficult to reroute cables with increased length in Phase 2.

Please inform direction of 33 kV outgoing cables for Phase 1 & Phase 2.

We understand that lighting, earthing, lightning protection for Phase 1 to be considered


in present scope of work.
We request you to provide Soil Investigation Data of proposed plot for Phase 1 civil
works.

We have understand power release, load sanction & scheme approval from MSETCL in
already available. Please confirm.

We have not considered 220 kV Cables, termination kits at both ends, link boxes, sheath
bonding cable, earth continuity conductor, clamps and associated EHV cable accessories
and sand filling & civil works related to 220 kV cable as this are part of other package.

Please confirm regarding scope of supplying loose line differential relay at remote end
substation. We will be retrofitting relay in existing CRP. Separate CRP in not considered.
Required cables, accessories is considered in scope of work. We presume that aux supply
will be made available by MSETCL.

Please confirm SAS integration of the loose supplied relay at remote end substation.
We have considered separate relay for 50 LBB for incomer & bus coupler bays as per
MSETCL requirement..

We understand that control & protection are mounted on 33 kV GIS. Separate standalone
C&R panels are not required.

We have considered soil resistivity of 10 ohm meter for bid purpose. Successful
contractor will do earth resistivity measurement at site. Any deletion / addition of
material due to change in actual resistivity value, will be mitigated by RFI / mutual
discussion.

We propose use electrode as per MSETCL requirement. Please confirm.

We propose use electrode as per MSETCL requirement. Please confirm.

We understand that LILO work along with cables in other package. Hence, we have
excluded tower earthing and associated accessories & work from scope of work.

We recommend to provide separate battery, charger, DCDB & associated system for 220
kV & 33 kV system for data centre reliability and operation purpose.

We have considered communicable type fire fighting system. RS 485 port available for
integrating with main data centre fire control room. Connectivity is excluded from scope
of work.

We presume that Station Transformer will have cable box on both sides hence 33 kV Horn
Gap Fuse shall not be applicable.

We presume that separate SCADA system shall be provided for MSETCL & NTT. Please
confirm.

We have consider FOTE system at remote substation at AKP & Bapgaon. Please confirm.
We presume that aux supply will be made available at remote substations. Necessary
cabling is considered. Offered panels shall be as per MSETCL specification.

We presume that 48V DC & 230V AC supply shall be made available at remote substations
by MSETCL. Necessary cables, accessories and installation work of the FOTE panels at
remote substation is included in offer.

We understand that OPGW cable between AKP & Bapgaon is already available. We have
exclude scope of laying OPGW cable till remote end substation.
Please inform distance between proposed substation to AKP & Bapgaon substation.

Request you to please elaborate VMS system.

Request you to please inform road demarcation for Phase 1 & Phase 2.

Please confirm scope of compound wall & fence.

MSETCL make list will be followed for equipment under MSETCL scope.

Please confirm requirement of UPS & provide specification.

Please confirm regarding access control, CCTV, public address requirement.

We have presumed creepage distance of 31 mm/kV for project.

We have considered insulation coordination study in scope. Arc flash study, load flow
study, harmonic analysis, transient study & short circuit study or any other study not
considered in scope. Relay setting is considered in scope.

We have not considered any type of Gas Suppression system in the scope of work.
We have not considered Liner Heat Sensing (LHS) system in the scope of work.
We have not considered 3D modelling of substation.

Hinderance Free and Through access to site, with proper approach road shall be provided
to us. No approach road and site clearance is envisage in our scope of work.

Space for laydown area, Site office & Storage shall be provided free of cost for the entire
contract duration including extended completion period, if applicable to the bidder.
However, for labour colony bidder to arrange space within or in Vicinity of the plot. Kindly
Confirm our understanding.
We understand that 220 KV EHV incoming cable and cable trenchi for incomming cable
not in bidders scope.
We understand that 220 KV Cable termination kit is not in bidders scope.
Please provide us the name of opposite end of LILO line and also tentative line distance.
As as per MSETCL Requirement
Please clarify if the scope of SLDC integration we have to consider.
We assume that arrangement of construction power and water not in bidders scope.
Our GIS is rated for 3150A at 40 Deg. C. At 50 Deg. C ambient temperature, the rated
current shall be derated i.e. lesser than 3150 A. Derating calculation shall be submitted in
due course.

when the module is removed or is worked upon the adjacent modules shall be reduced in
pressure and shall go out of service for human safety reasons. Request your acceptance.

We shall provide the burn through time in line with IEC 62271-203. Table enclosed for
reference.

In line with the requirement, we confirm that busbar and disconnector are in separate
gas compartments and these equipments can also be removed / repaired complying with
the service continuity. For the ease of maintenance & repair of busbar and disconnector,
we are proposing a passive busbar without any switching device in it. The same is without
any gas segregation between bay to bay. Request you to review the Gas SLD with the
technical offer and provide your acceptance.

The methodology of the partial detecting sesnors placement shall be based on the
manufacturers standard practise. The doccument for the same shall not be provided.
Request your kind acceptance.

One qtt. of A - type ladder shall be provided.

The same facility is not available in the GIS thus the same shall not be provided. Request
your kind concurrence.

The Open CB can take the same for 15 minutes duration. Request your concurrence.
Operation counter shall be provided in the CB Drive mechanism.

These drawings cannot be provided as these are the design data and also secondly it
depends upon the multiple factors such as value of arc current its nature, its location etc.
Thus, there is no single document which encapsulated all such scenario.

Our GIS is rated for 3150A at 40 Deg. C. At 50 Deg. C ambient temperature, the rated
current shall be derated i.e. lesser than 3150 A.

We confirm that name plates of the main components like CB,CT and VT shall be of SS.
However, for other equipments like DS, ES the name plate requirement is not envisaged.

The earthing shall be done with the help of enclosures directly. Thus, the same is not
applicable.

The same is not applicable for GIS ES.

The same is not applicable for GIS ES.

The earthing shall be done with the help of enclosures directly. Thus, the same is not
applicable.

The same is not applicable for GIS HSES.

We shall provide 50 VA burden on each winding of the transformer a per the transformer
data sheet. Request your concurrence.

Not applicable for the subkect tender present scope.

We understand that class 3 surge arrestor is to be quoted as per the cl. 16.2.4 Request
your concurrence
Please provide specification and make.
Online PD monitoring not required for 220 KV System. We propose portable PD
Monitoring system of OHV Make.

We confirm that name plates of the main components like CB,CT and VT shall be of SS.
However, for other equipments like DS, ES the name plate requirement is not envisaged.

Shock indicators shall be provided only for VT and Surge arrestor. For other equipments,
requirement of shock indicators is not envisaged as per manufacturer's design. The same
philosophy is adapted and proven in previously executed projects.

There is no mention of LA in the SLD. However, we shall consider GIS LA in the


transformer and line bays=. Request your kind concurrence.
The Work in progress safety ES shall suffice the requirement for the transformer bay as
there are less charges to earth. The maintenance type ES shall be provided. Request your
kind concurrence
The Work in progress safety ES shall suffice the requirement for the bus earthing bay as
there are less charges to earth. The maintenance type ES shall be provided. Request your
kind concurrence
Bus bar measuring VT is shown with the DS. However, we shall provide the VT with
manual isolating link. Request your kind comcurrrence
There is no mention of tariff metering bay in SLD and BOQ. Reuqest you to kindly confirm
whether to consider it or not.
There is no mention of LA in the GIS BOQ. Thus the same shall be excluded from GIS OEM
Scope of supply.
reqeust you to provide the layout for phase 1 for better understanding of the bus duct
routing.

We understand the same shal be with cable termination and no GIB shall be supplied.
Request your confirmtion.
We understand that the CSD is not required for the tranformer bay. Request your
cncurrence.
HSES is asked for in this bay. However, as explained before a work in progress normal ES
shall be supplied. Request your concurrence.

We propose Single girder 5 T EOT for 220 KV GIS

As we understood, Restricted Earth fault Protection is acceptable as inbuilt feature of


Transformer differential relay. Kindly confirm your acceptance?

As we understood, Over fluxing protection is acceptable as inbuilt feature of Transformer


differential relay. Kindly confirm your acceptance?

As we understood, Thermal overload protection is acceptable as inbuilt feature of


Transformer differential relay. Kindly confirm your acceptance?

Please confirm the no. of winding for 220/33kV transformer as 3 winding is mentioned in
spec but it is 2 as per SLD? Please also confirm the type means Star of Delta?

As we understood, there is no separate PC required for HMI view node and it can be
viewed on redundant workstation. Kindly confirm your acceptance?

4 set of 220kV Line bay CRP requirement is mentioned in BOQ whereas it is 2 set of 220kV
Line bay as per SLD. Please confirm the total 220kV Line bay CRP requirement?

2 set of 220kV Bus Coupler bay CRP requirement is mentioned in BOQ whereas it is 1 set
of 220kV Bus coupler bay as per SLD. Please confirm the total 220kV Bus coupler bay CRP
requirement?
Kindly confirm the requirement of CRP panel for 220kV Bus Sectionaliser. It is not
required as per SLD?
Kindly confirm the requirement of C&R panels for 33kV bays?
Kindly confirm the requirement of Phasor Measurement Units as not supplied in earlier
executed data center jobs?
Kindly provide the Recommended spares list

In BOQ it is written that “Fire fighting system(NIFPS system) complete U/G & O/G
piping and accessories etc. out side the pump house for Transformer / Reactor”. Please
note that for NIFPS there is not Pump House.
Kindly clarify the requirements of Hydrant, HVWS for Transformer, MVWS for Cable cellar
and Sprinkler for the building areas.

Please clarify if there is any existing Fire Water Pumphouse. If available, kindly confirm
the pumping capacity.

Please clarify the scope of Statutory approvals.


Please confirm if there are requirements of Panel / Room Gas suppression system as per
NBC / CFO requirements.

We are considering positive pressure ventilation system for GIS Hall with minimum
4ACPH. Kindly provide specification, if available.
Please confirm whether Hi-wall split a/c is required or any precision a/c is required. There
will be a considerable price difference.

Order will be placed by M/s Panchsheel or by M/s NTT?


We understood that O&M will start immediately after completion of commissioning and
charging; please confirm
Please share KPI calculation format in excel (it is given in Sec 5.0 Sec H O_M but it is not
opening)
In 5.0 Sec H- O_M it is mentioned that all required spares (minor and major) will be
provided by the owner however in the document 5.0 Sec Annexure H2 it is mentioned
that spares will be provided by bidder (KPI weightage also given); As per our
understanding all spares are to be provided by owner; please confirm.

Please provide specification/Make/Models


We are considering the design ambient temperature will be 40 degC.
Our GIS product will only confirm all the relevant standards of IEC only.

Our offered GIS will have LSC-2A PM class as the system is double busbar system.

Panels with rating of 3150A will have forced cooling as per the type tested design. Panels
with rating below 3150A will be cooled by natural air flow.
The closing coil shall operate satisfactorily at all values of control supply voltage between
85-110% of the rated voltage as per the type tested design.

Spring charging motors shall be capable of starting and charging the closing spring twice
in quick succession without exceeding acceptable winding temperature
when the supply voltage is anywhere between 85-110% of rated voltage as per the type
tested design.

As per the type tested design, Closing time < 95 m and Opening time 1st release: < 65
ms ;2nd release: < 55 ms

In our type tested design, cable compartment cover is not applicable as the cable
compartment will be in gas only.

View ports are not applicable in the type tested design of GIS. We will provide mechanical
indicator for that purpose.

As per the type tested design, the current transformer will be outside the gas
compartment without dieelctric stress.

Our offered GIS products will have innercone cable termination. So, we need the cable
details of each feeder to make the offer. In the SLD, cable details of outgoing feeders are
given but the incoming feeders are missing.
As per the design standard, our offered GIS will have innercone cable termination which
have several benefits.1.INNER CONE type cable Termination is a pure GIS technology as
the cable termination takes place inside the SF6 GAS filled cable housing chamber
imparting greater dielectric insulation/strength at the points of cable termination. Hence,
chance of flashover at cable plugs is extremely less as compared to Outer Cone
Termination where the dielectric medium is AIR. Also, there is no effect of external
environment, moisture,dust etc. in-case of INNER CONE termination. 2.In case of GIS with
inner cone cable termination with multiple cable runs , each cable termination will have a
separate bushing for power cable termination inside the INNER CONE BUSHING. Here, in
case one cable termination is affected, the other cable termination points inside the
INNER CONE will not be affected as there is sufficient insulation between the cable
termination points inside the INNER CONE. However, in case of Outer cone multiple
cables are connected to one single cable bushing via back to back Tee plug arrangement.
Here, if one T-off plug is affected due to internal arc in cable compartment, the complete
cable termination bushing is rendered inoperative.3.Our 8DA10 GIS is satisfactory type
tested with inner cone termination in submerged condition (up to 2 feet) so that
uninterrupted power supply obtained in case of sub-station is submerged due to flood.
Please consider Inner cone cable termination for 33kV GIS.

Cable details are given in the SLD for the OG feeder and we will design the panels as per
the SLD requiremnet only. Later if cable size or no. of runs will get changed, additional
price will be considered as cable housing will be different for different cable
requirements.

End termination required for cables should be touch proof type of pfisterer make

The type tests performed on 33kV GIS are according to the international standards, Type
Tests as per clause 6 of IEC 62271-200 are performed on every design if;
1. Relevant design changes of the switchgear has taken place from the original type
tested design
2. The requirement for the tests within standard has changed.
Since above two mentioned points are not valid for our offered design, the submitted
type test reports are valid. Further we also confirm that no relevant change in
market/design has been implemented in the offered ed design after type testing.
Hence, we have not considered any type testing cost, as type tests are older than 5 years
from tender issue date. We do not forsee to perform re-type test on already type tested
product considering finanacial implication.
Stage inspection is not applicable in GIS as per the standard practice. We will arrange FAT
after preparing the complete panel

Request Customer to share soil report for the proposed plot.

Request customer to provide us topographical map for proposed area along with
proposed finished ground level ( F.G.L.).

We understand that only microleveling to the extent of +/-300mm (cut/fill) is under


present scope of contractor. Leveled area shall be handed over by Owner. Please confirm.

Request Customer to confirm if fencing is required on the periphery of plot area. If yes,
we understand that same shall be provided for area marked in attached layout for Phase-
1 at this stage.Please confirm.

Request Customer to share section details for 33kV GIS Building as provided for 220kV
GIS Building.
We understand that boundary wall for proposed area is not under present scope. Please
confirm.

We understand that suitable approach road till the entry of proposed plot shall be
provided by Owner. Please confirm.

As per our Zoom meet discussion, we have marked the roads to be constructed under
present scope in the attached layout. Request your concurrence on same.

We understand that drainage system under present scope shall be limited to the marked
area in attached layout for Phase -1 only. Please confirm.

Request Customer to specify the outfall point for drainage system where we need to
connect the drains from Phase -1.
Please confirm if controlled blasting shall be allowed in case of hard rock excavation.

We understand that clear and hassle free land shall be provided to us. No dismantling
works, tree cutting, bush clearance are under present scope of work.Please confirm.

We understand that construction water and power point shall be provided to us near the
plot area without any charge. Please confirm.

We understand that 12m wide road shown in Layout is existing road. Please confirm.

We understand that grade of concrete for building and other works under present scope
shall be considered based on technical specification document No. TENDER DOCUMENT
VOLUME 4: SECTION I provided in tender documents. Please confirm.

We understand that space for site office and stores shall be provided to us near the area
under present scope of works.Please confirm.
Hinderance register shall be maintained by us at site which shall include the delays due to
force majures,natural calmaities etc. and extension/compensation shall be provided to
us for the same.
We understand that we shall be allowed to work 24X7.No time restrictions are
there.Please confirm.
Please mention if any permissions/formalities required for night work etc.
Reply from Employer

Noted. Please refer mail dated on 10 Jan 2022 at 09.30am

Yes

Not required.

We will amend the BOQ accordingly subject to approval from


MSETCL. Kindly do not consider the same for bidding.

Ok

OK noted.Adhere to SLD

Not required as discussed.

Physical location of feeders will not change. The phase 2 SLD is not
to be read for physical location.

33kV ougoing cables will cross the 12m road shown in layout. No
cables are coming inside GIS premises.

Yes as per BOQ

SBC we will provide.ERT will have to be conducted at site by


successful bidder.

Grid connectivity received on 14 Dec 2021 and scheme approval is


expected by end of February-2022

Noted.

The remote end substation details are currently not available and
shall be shared once available from MSETCL.

SAS integration is required.


Yes

Ok

Bidder to do ERT at site.Any deletion / addition of material due to


change in actual resistivity value, will be mitigated by RFI / mutual
discussion.

Yes

Yes

Yes.Please refer the scope mentioned in the RFP

Noted.

Ashish Nagvekar and Ashish Deshmukh need to confirm. Noted.

Ok.We will amend the BOQ accordingly

Yes

The remote end substation details are currently not available and
shall be shared once available from MSETCL.

The remote end substation details are currently not available and
shall be shared once available from MSETCL.

Yes, this will not be a part of this tender. The FOTE cable required
inside the GIS premises shall be in your scope.
AKP-3KM &Bapgaon-21KM. Bidder to validate with MSETCL.

It is the server required for the SCADA System

Ok Noted.Drawing attached

Except Compund wall of the GIS plot balance fencing,Gate,Internal


roads,X-mer Walls etc shall be done by the Bidder

Yes
UPS sizing shall be done by the bidder for emergency lighting and
emergency power. UPS shall be of modular construction and with
VRLA batteries.
Public address requirement shall be taken care by Bidder and
Access control and CCTV shall be done by Client-AN
Kindly restrict to the creepage distnce mentioned on the RFP i.e
25mm/kV

Ok noted.Please follow the technical specs.

Ok noted. Fire hydrant ring main system shall be considerd


Not required
Please do consider

Ok noted

Ok noted

Yes
Ok noted
AKP-3KM &Bapgaon-21KM.Please get it validate from MSETCL-M
Ok noted
Yes
The same has been mentioned in GCC & SCC.
Noted.

Bidder needs to confirm that the gas barriers are available in the
GIS (220kV) to avoid reduction in pressure. However, we
understand that while working on one module other modules shall
go out of service.

Ok noted

Ok Noted

Bidder to provide necessary documents pertaining to


methodology of PD system

The bidder shall ensure the ladders and walkways wherever


necessary for access to the equipment.One qtt. of A - type ladder
shall be provided-Ok noted

To be discussed with Siemens Noted

To be discussed with Siemens& Supriya


Ok

To be discussed with Siemens

Noted. Please submit relevant calculations.

Ratings for the same to be mentioned on name plate.

Ok noted

Ok noted

Ok noted

Ok noted

Ok noted

As the sucessful bidder is designing the CT as well as the


protection, the bidder to take care that the CT secondary core shall
be able to cater to the complete burden it is subjected to.

Noted.
The successful bidder shall be fully responsible for complete
insulation co-ordination of switchyard including GIS.

Yes.
Vaishala make-Dew point meter. PD-
Online to be considered.

Ratings for the same to be mentioned on name plate.

Please consider for CT also

We will amend the BOQ accordingly subject to approval from


MSETCL

Bidder needs to consider the FES system only

Bidder needs to consider the FES system only

Ok noted

We will amend the BOQ accordingly subject to approval from


MSETCL
We will amend the BOQ accordingly subject to approval from
MSETCL

Ok noted.Drawing attached

Yes, for Incomer bays, termination is with cable.


Supriya to comment

Kinldy consider Double girder

Yes it is acceptable, however alarm indication should be separate.

Yes it is acceptable, however alarm indication should be separate.

Yes it is acceptable, however alarm indication should be separate.

220/33 Transformer is 2 winding transfomer. Kindly refer Technical


data sheet. As mentioned it is star-star transformer.

Kindly consider separate PC.

2 panels per line bay are considered. There are only 2 sets.

Yes
Required. However sectionalizer has not been shown in 220kV SLD.
As per BOQ.
As per MSETCL/SLDC requirement
Attached.Prasad

NIFPS system is for Transformers

Hydrant system shall be used for GIS building areas.MVWS-

No existing water pumphouse will be available client shall provide


necessary tapping for fire hydrant pipes near GIS building (appr. 20
mtrs distance)
AN
Not required.Only FAPA is required

AN

AN

NTT
Yes

Attached,NTT to furnish

NTT to furnish

Bidder to share the make list


We will provide the same
Ok noted

Ok noted
Ok noted

Noted.

Noted.

Noted.

Noted.

Ok

Ok Noted.

Noted. Mechanical indicators to be placed in a way so that they


can be easily viewed.

Noted.

Currently you may consider 8R x 1 C x 400 sq.mm. 33kV XLPE cable


for incomer. However the design and validation for the same is in
bidder's scope.
Noted.

Ok noted

Ok noted

Ok noted
In order to review the progress of GIS manufacturing stage
inspection is inevitable.Hence please consider the same

Attached

Attached

Ok noted

Ok noted

Ok noted.Attached
Ok noted

Ok noted

Yes internal roads to be done by bidder

Ok noted.AN

Ok noted.AN
AN

Yes

As mentioned in the GCC it is chargable basis

No.Please visit site

Ok

Only space will be provided


Not applicable

Please adhere to GCC & SCC (QHSE agreement requirements)


S. No. Clause Reference
1 6.2 BOQ, SI.No. 1, 220kV GIS,
Busbar Earthswitch
&
ELECTRICAL SINGLE LINE
DIAGRAM PHASE I

2 6.2 BOQ, SI.No. 1 & 4, Bus PT

3 6.2 BOQ, SI.No. 2.(G), Gas


Insulated Bus Duct(GIB)
&
ELECTRICAL SINGLE LINE
DIAGRAM PHASE I

4 6.2 BOQ, SI.No. 15 & 19,


Outgoing Feeder Bay

5 ELECTRICAL SINGLE LINE


DIAGRAM PHASE I, 33kV
Surge Arrestor
6 6.2 BOQ, SI.No. 27 & 29
&
6.2 BOQ, SI.No. 30, Control
and Relay Panel
7 6.2 BOQ, SI.No. 35, Tariff
Energy Metering System

8 6.2 BOQ, SI.No. 90, Sub-


station Automation System
9 6.2 BOQ, SI.No. 93,
FOTE/Telecom Equipment
(PLCC&DTPC)

10 Volume 4, Section A,
TECHNICAL SPECIFICATION
OF 220 kV & 33 kV GIS,
Creepage Distance
11 Volume 4, Section A,
TECHNICAL SPECIFICATION
OF 220 kV & 33 kV GIS,
Transformer Termination

12 ELECTRICAL SINGLE LINE


DIAGRAM PHASE I, 220kV
Bus Coupler CT
13 ELECTRICAL SINGLE LINE
DIAGRAM PHASE I, 33kV
Disconnector
14 ELECTRICAL SINGLE LINE
DIAGRAM PHASE I, 220kV
Cable termination
15 ELECTRICAL SINGLE LINE
DIAGRAM PHASE I, 33kV
Cable termination
16 Volume 4, Section A,
TECHNICAL SPECIFICATION
OF 220 kV & 33 kV GIS,
1.GENERAL
CHARACTERISTICS

17 Volume 4, Section B,
Transformer, Dynamic Short
circuit test

18 Volume 4, Section C,
Transformer, SCADA, FOTE

19 Scope of works, Project specific


requirements.

Technical Document/ Drawing


Sr No No &
Clause No

TENDER DOCUMENT
1 VOLUME 4: SECTION I.
Cl.no : 1.3.1
TENDER DOCUMENT
2 VOLUME 4: SECTION I.
Cl.no : 1.3.3

TENDER DOCUMENT
3 VOLUME 4: SECTION I.
Cl.no : 1.3.3

4 Part 4 Sec 7.0 Drawings

TENDER DOCUMENT
5 VOLUME 4: SECTION I.
Cl.no : 1.3.3

TENDER DOCUMENT
6 VOLUME 4: SECTION I.
Cl.no: 3.4.1.1

TENDER DOCUMENT
7 VOLUME 4: SECTION I.
Cl.no : 1.3.4

TENDER DOCUMENT
8 VOLUME 4: SECTION I.
Cl.no : 1.3.4
Queries by L&T Construction
As per referred Single line Diagram, Fast-acting earth switch is required for Busbar earthing.
However, same is not mentioned in BOQ. Please check and add a separate line item in the BoQ
if required.

As per referred BOQ item, Bus PTs are mentioned in bus coupler module bay. Further, bus PTs
are also mentioned in busbar modules as indicated in BOQ.

In this regard, we presume bus PTs along with disconnectors shall be priced in busbar module
items. Please confirm.

As per referred Single line Diagram, Termination of 220kV Incomers are through " 3 X 1C X
2500 sq.mm. " 220kV cable. However, as per referred BOQ line item supply of Gas Insulated
Bus duct is considered under present scope.
Please clarify the actual requirement.

As per referred BOQ line item, 5 Nos. of 33kV, 630A, 25kA Outgoing feeder bay ( 3 Main + 2
Spare) are under present scope. However, as per ELECTRICAL SINGLE LINE DIAGRAM
PHASE I, only 4 Nos. of outgoing feeder bays ( 2 Main + 2 Spare) are mentioned.
Please clarify the actual requirement.
As per referred Single line diagram, Surge arrestor on 33kV side of transformer is required.
However, same is not mentioned in 6.2 BOQ. Please check and add a separate line item in the
BoQ if required.
Please clarify/confirm the following regarding CRP & SAS:
1. Quantity of CRP panels as indicated in BOQ is not matching with the no. of GIS bays as
mentioned.
2. 220kV bus sectionaliser panel is mentioned in BOQ. Please check the requirements.
Please clarify/confirm the following regarding Tariff energy metering:
1. Whether any separate Metering CT & CVT are in scope of this package?
2. Whether any separate metering cubicle is in present scope of works?. Please furnish the
specification for metering system.

SAS server shall be sized for the bays as shown in the SLD, (Docu. no. ELECTRICAL SINGLE
LINE DIAGRAM PHASE I). We are not envisaging any future bays. Please confirm.
Please clarify/confirm the requirement of following regarding FOTE :
1. Any communication system requirement for 220kV line
2. Please specify the make & model no of communication system at 220kV remote end stations
if FOTE is in present scope
2. We are not envisaging any requirement of PLCC for present scope of work

As per clause 15.2 of referred specification, creepage distance of outdoor bushing should be
25mm/kV. However, as per Volume 4, Section B, Transformer, Table 3, 31mm/kV creepage
distance is required.
Please clarify the actual requirement.
As per clause 55.1 of referred specification, Transformer termination on 33 kV Side shall be
through 1 C x 300 sq.mm XLPE Aluminium round wired armoured cable earthed. However, as
per line item 20 of 6.2 BOQ, Cable termination Kit for 33kV HT Cable for 3C X 400 sqmm is
mentioned.
Please clarify the actual requirement.

Please furnish us the CT parameters for bus coupler bay as the same is not provided in
mentioned SLD.
We understand that separate DS & ES module between Bus Disconnector and Circuit Breaker is
not required.
Please confirm whether bidder's understanding is in order.
We presume both 220kV outdoor terminations (along with structure) & indoor 220kV GIS
terminations are excluded from the scope of this package. Please confirm.

We presume that the 33kV cables for the 33kV GIS outgoing feeders to the respective facilities
are not included in the scope of this package. Please confirm.

Please clarify the intent of following mentioned clause as per referred specification :

" The design should be such that all parts subjected to wear and tear are easily accessible for
maintenance purposes. The equipment offered shall be protected against all types of voltage
surges & capable of sustaining & breaking of high fault current as this proposed GIS is intended
to source at 220 kV from nearest 400/220 kV Kalwa S/S which is having high fault MVA more
than 50 kA and therefore any equipment necessary to satisfy this requirement shall be
deemed to be included."

As per 6.2 BOQ and SLD (Drawing : ELECTRICAL SINGLE LINE DIAGRAM PHASE I), we
understand that the Short time withstand current for 220kV equipment shall be 50kA for 3s only.
Please confirm.

As per clause 12.27 of referred specification, We understand that only calculation in support of
thermal & Dynamic forces withstand capability of transformer due to short circuit, is required. We
do not envisage any repetition of dynamic short circuit test.
Please confirm whether bidder's understanding is in order.
We understand that SAS integration of only 220kV and 33kV substation equipments are under
present scope. We do not envisage integration of any downstream connected equipments in
SAS.
Please confirm whether bidder's understanding is in order.
Please furnish the detailed tender documents as listed below:
1. Scope of works or section project.
2. Terminal points & Exclusions
3. Project specific requirements (if any)
4. Typical LT AC & DC distribution SLD.

Query / Description

The Scope will cover but not limited to the following buildings / structure / systems / facilities.
1.3.1 GIS building &

6.3 Scope matrix - Sl.no: 100


The Scope will cover but not limited to the following buildings / structure / systems / facilities.
1.3.3 Roads, drain and culverts within the switchyard area

6.3 Scope matrix - Sl.no:101

The Scope will cover but not limited to the following buildings / structure / systems / facilities.

6.3 Scope matrix - Sl.no:101

7.2.2 Sec B-General Layout

The Scope will cover but not limited to the following buildings / structure / systems / facilities.

6.3 Scope matrix - Sl.no:101

This includes lattice type structural steel towers and girders. These shall be hot dip galvanized
structure with welded / bolted connections at shop and bolted connection at site. All bolts and
nuts shall also be galvanized.

The Scope will cover but not limited to the following buildings / structure / systems / facilities.
Storm water disposal system in switchyard area

6.3 Scope matrix - Sl.no:101

The Scope will cover but not limited to the following buildings / structure / systems / facilities.
Storm water disposal system in switchyard area
Reply by Client
Noted. Bidder to consider Fast acting earthing switch while quoting.

Please consider in point no. 1

For I/C bays, cables to be considered, for O/G bays bus duct to be
considered.

As discussed during meeting, only 2 transformers are in scope for


Phase I and 3 transformer shall be in phase II scope.
Query by Reply

As per referred clause, we trust that the 220kV & 33kV GIS building
is in bidders scope. However in tender document the Detailed
technical specification for Building is not attached.
Based on scope matrix, we understand that the GIS building shall
be PEB type.
please confim. If yes kindly provide the detailed Civil specification
for PEB buildings.
As per referred clause, the switchyard road is in bidders scope. In
Scope matrix it is mentioned that, Civil works for Roads as per tech
specs. However in tender document the Detailed technical
specification for Road is not attached.
Kindly provide the same. in order to estimate the quantum of work.

We trust that, the following civil works are not in bidders scope.
1. Site development for the proposed SS area
2. Approach road
3. Boundary wall, main gate & Security hut
4. Residential quarters
5. Store building, Parking shed
6. Fire fighting pump house & water tank
7. Landscaping & Plantation
Please confirm.

Based on referred layout, we understand that the 400kV


Switchyard works is not in bidders scope.
Please confirm.

Please provide the following details for the proposed SS.


1. Contour layout with indicating spot levels
2. Soil Investigation report.
3. Drainage outfall point
4. Global Co-ordinate
5. High Flood Level

We trust that, all Equipment support structure shall be lattice type


& Galvanisation thickness shall 610g/sq.m.
please confirm.

As per referred clause, the switchyard drain is in bidders scope.


However in tender document the Detailed technical specification
for Switchyard drain is not attached.
Kindly provide the same.

We trust that, the dismantling of existing structures, diversion of


existing utilities, modification works in the existing 400kV is not in
bidders scope.
Kindly confirm.
Technical
Document/
Query / Description
Drawing No &
Clause No
Sr. No. 5 GIB requirement is given in set. Please confirm whether bidder has to
measure the length from layout drawing and consider accordingly.
Sr. No. 9 & 10 Please confirm that one no. NIFPS system will be required with each
power transformers.
Sr. No. 13 1. Please confirm whether the 198 kV SA for the transformers shall be
of GIS type, instead of AIS type as shown in SLD.
2. Similarly, please advise for 33 kV SA near transformer shall be AIS
type or GIS type.
Sr. No. 14 Please cadvise whether 33 kV VCB panels will be acceptable instead
of 33 kV GIS.
Sr. No. 26 Please confirm that all the statutory approvals mentioned in this clause
shall be applicable for the systems inside the premise and within the
scope of supplies of this tender.
Sr. No. 26 Please confirm that the 220 kV incomer cables shall be terminated in
GIS by others and not in scope of bidder.
Sr. No. 28 Please confirm that for each transformer, there will be one no.
protection panel and one no. control panel. So, total four nos. panel
will be there.
Sr. No. 30 Please confirm that there will be no control and protection panels for
bus sectionaliser as the same is not available in 220 kV GIS.
Please confirm that one no. 630 kVA LT Transformer 33/0.433kV
shall be considered in Phase - 1.
Sr. No. 93 Please confirm that there will be noPLCC system and only FOTE will
be there for communication with other end substation.
Sr. No. 94 1. Please explain the actual requirement of VMS system. We could not
find the requirement in technical specification.
2. Alternately, we would like to request to remove this item from
bidder's scope at this time.
Sr. No. 97 to 103 Please confirm that each bidder has to calculate civil BOQ and
consider accordingly.
Please confirm whether the 400 kV GIS building need to consider in
Phase - 1 bidding.
Please inform whether the below ground earthing system shall be
considered for the complete substation area i.e. including 400 kV GIS
building and 400kV / 220 kV transformers.
we understand as per BOQ no DG set is required .
Please confirm our understanding
GENERAL Please confirm spare spaces of how many 220kV bays need to
ARRANGEMENT consider in Phase-1 220 kV GIS building.
DRAWING FOR
GIS AREA
Volume: 4 Please confirm whether the bidder need to consider One No. SAS for
SECTION:C complete 220 kV Substation in Phase - 1 or Two nos. SAS shall be
SCADA, FOTE considered as one for NTT and another for MSETCL.
Volume: 4 We would like to consider SNTP for time synchronisation. Kindly
SECTION:C confirm the same.
SCADA, FOTE
VOLUME 4: Please confirm whether RTCC panels will be required with each
SECTION B: power transformer.
TRANSFORMER
2.1 SYSTEM OF Earthing conductor mentioned as high conductivity copper or GI,
EARTHING whereas in BOQ GI is mentioned. Kindly confirm whether bidder can
consider GIS earthing.
2.8 LIGHTNING The lightning protection system should comply with NFC 17-102
PROTECTION standard. Kindly confirm whether IS 2309 can be applied.
SYSTEM ESE
(Advanced Lightning
Protection
LIGHTNING
PROTECTION
SYSTEM ESE
(Advanced Lightning
Protection.

2.8 LIGHTNING NTT is requested to advise about the requirement Performance


PROTECTION Recording Equipment mentioned in Lightning Protection System.
SYSTEM ESE
(Advanced Lightning
Protection
LIGHTNING
PROTECTION
SYSTEM ESE
(Advanced Lightning
Protection.

2.8 LIGHTNING 2.8.14 HV cable termination (with surge arresters)


PROTECTION Please confirm that HV Cable termination shall not be in the scope of
SYSTEM ESE the bidder for this tender.
(Advanced Lightning
Protection
LIGHTNING
PROTECTION
SYSTEM ESE
(Advanced Lightning
Protection.

2 LT CABLES "Cables shall confirm to latest IS 7098 Part-1, 1988. LT Cables shall
be heavy duty, armored, all cables to be FRLS grade, XLPE insulated
& PVC sheathed 1.1KVgrade aluminum or copper."
Kindly confirm whether bidder can consider Aluminium cables.
9.14.3 "9.14.3 Equipment shall have facility to give SMS alert to at least
three users whenever any
fault gas violates the predefined limit."
We are not sure about the availability of this feature. NTT is kindly
requested to confirm whether this feature is really required.
9.14.8 "9.14.8 The Equipment must carry a minimum of Five (5) years
manufacturer’s Warranty including spares, consumables etc. from date
of commissioning."
Our understanding is that the warranty of all equipment shall be as per
GCC/SCC. Hence, five years warranty will not be applicable. Kindly
confirm.
Kindly confirm whether we can use transformer manufacturers
VOLUME 5: approved by MSETCL and they may not be available in the approved
Approved Make list make list given with this tender.
VOLUME 4: "2.7.1 Tee Differential Protection :"
SECTION F: Kindly confirm that this protection feature will not be required, as no
CONTROL & 'T' connection available in this substation.
PROTECTION
SCHEME
VOLUME 4: "3.1 MAIN PROTECTION: This protection shall:-
SECTION F: i) Be fully programmable directional distance scheme & It may be
CONTROL & noted that the supplied Numerical distance protection should have line
PROTECTION differential protection function also.
SCHEME xviii) For short lines (having length less than 4 km), line differential
protection shall be provided as main protection."
Kindly confirm which protection shall be applicable for line protection
relays i.e. Distance or differential.

VOLUME 4: "12.8 MFE meters shall preferably be self-powered type. Meters shall
SECTION G: have non-volatile memory ......retention of energy recording during
STATION storage / aux. Supply failure, the same shall have a life not less than 10
TRANSFORMER, years.
DG SET, FFT VOICE EVACUATION, CAR CALLING & DIGITAL 2 WAY FIRE
FIGHTERS COMMUNICATIONS"
1. In line item/BOQ "VOICE EVACUATION, CAR CALLING &
DIGITAL 2 WAY FIRE FIGHTERS COMMUNICATIONS" is not
available. Kindly confirm whether this is required.
2. In case required, kindly inform who will be the approved
vendors/suppliers of this system.

3.5 electrical supply Please confirm arrangement for electrical power for construction,
labour camp and for any other purpose as required by the Service
Provider .
If yes then Biddder need to submit optional cost Or BOQ will get
revised for such expense

Reference
S.No
Document
1 BOQ / SLD

2 SLD

3 SLD

4 _

5 SLD / BOQ

6 BOQ
7 BOQ

8 BOQ / Sec A-GIS Phase 1

9 SLD, BOQ & Sec A-GIS Phase 1

10 Sec A-GIS Phase 1

11 Sec A-GIS Phase 1

12 Sec A-GIS Phase 1

13 Sec A-GIS Phase 1


14 Sec A-GIS Phase 1

15 Sec A-GIS Phase 1

16 Sec A-GIS Phase 1

17 Sec A-GIS Phase 1


18 Sec A-GIS Phase 1

19 Sec A-GIS Phase 1

20 Sec A-GIS Phase 1


21 Sec A-GIS Phase 1

22 Sec A-GIS Phase 1

23 Sec A-GIS Phase 1

24 Sec A-GIS Phase 1


25 Sec A-GIS Phase 1

26 SLD, BOQ & Sec A-GIS Phase 1

27 Sec A-GIS Phase 1

28 Sec A-GIS Phase 1


29 Sec A-GIS Phase 1

30 Sec A-GIS Phase 1

31 Sec A-GIS Phase 1

32 Sec A-GIS Phase 1

33 Sec A-GIS Phase 1

34 Sec A-GIS Phase 1


Customer reply Query by

Hyosung

Hyosung

Hyosung

Hyosung

Hyosung

Hyosung

Hyosung

Hyosung

Hyosung

Hyosung

Hyosung

Hyosung

Hyosung

Hyosung

Hyosung
Hyosung

Hyosung

Hyosung

Hyosung

Hyosung

Hyosung

Hyosung

Hyosung
Hyosung

Hyosung

Hyosung

Hyosung

Hyosung

Hyosung

Hyosung

Reference
Technical Issue
Clause/DocNo.
220kV GIS
-
No of Bay

- -

- Termination.

GIB length
_

- -

Sr. no. 4 LCC for BUS VT


Sr. no. 8 EOT Crane

Sr. no. 7 Special tools

- Spare Parts

Cl. No. 5
General Char.
Pg no, 5

Cl. No. 4.5


Burn Through time
Pg no, 8

Cl. No. 4.9


SF6 gas leakage
Pg no, 8

CL No 4.18
Gas monitoring kiosk
Pg no 10
CL No 4.18 Cable Entry at LCP
Pg no 10

Cl. No. 4.29 Electromagnetic field


Pg no, 11 intensity

Cl. No. 4.30


PD methodology
Pg no, 11

Cl. No. 4.31


Grounding
Pg no, 11
Cl. No. 4.36
Alarm
Pg no, 11

Cl. No. 8
Pressure Vessel code
Pg no, 13

Cl. No. 9
Grounding
Pg no, 13
Cl. No. 10.3 (f)
Tripping Time
Pg no, 15

Cl. No. 10.8.2


Type Test
Pg no, 18

Cl. No. 10.9


Radio interference
Pg no, 20
voltage
Pg no, 21

Cl. No. 12.7


Pad locking
Pg no, 23
Cl. No. 14.1.2.5 HRC Fuse
Pg no, 27 VT with ID

Sr.no.4 &
Cl. No. 14.1.2.5(g) Bua Bar VT
Pg no, 27

Cl. No. 14.1.4(A)


CT PF voltage
Pg no, 28

Insulation Co-
Cl.16.1.1
ordination of Surge
Pg. no. 29
Areestor
Pg. No. 32,36 Special Tools

Pg. No. 33 Spare Parts

Pg. No. 36 Seismic test

CL1.22.2
Page No. - 38

CL24
Cable Termination
Page No. -38

CL1.38.5
Mechnical Interlock
Page No. - 52
Customer's Requirement
Customer's Requirement: N/A

Customer's Requirement: For Line bay and transformer bays;


As per SLD : For bus side CT before CB.

Customer's Requirement: N/A

Customer's Requirement: N/A

Customer's Requirement: For trasnaformer bay


As per SLD : Feeder rating 3150 A
As per BOQ : Feeder bay rating 2500 A

Customer's Requirement: 220kV PT bay module Local Control


Cubicle for GIS module
Customer's Requirement: EOT Crane for 220kV GIS hall.

Customer's Requirement:Partial Discharge Monitoring System


& Dew point meter
As per BOQ Sr. no.7 : Online PD Monitorinh System.

Customer's Requirement:-NA

Customer's Requirement:-All parts of the


switchgear should be three phases enclosed for 220 kV.

Customer's Requirement: The material and thickness of the


enclosures shall be such as to withstand an internal flashover
without burns through for a period of 300 ms at rated short time
withstand current

Customer's Requirement: The manufacturer shall guarantee


that the pressure loss within each individual gas-filled
compartment shall not be more than 0.1% per year.

Customer's Requirement: Separate control cubicle including gas


monitoring kiosk shall be provided for each bay
Customer's Requirement: Control cables from GIS LCC to all HV
switching devices shall be plug in type only, any
kind of direct gland entry type connection between drive cubicle and LCC
shall be avoided.

Customer's Requirement: The Average Intensity of


electromagnetic field shall not be more than 50 micro - Tesla on
the surface of the enclosure. The successful bidder shall furnish
all calculations and documents in
support of the above during detailed engineering.

Customer's Requirement: The Bidder shall furnish the


following information regarding the loosely distributed metallic
particles within the GIS encapsulation.
a) Calculations of critical field strength for specific particles of
defined mass and geometry.
b) The methodology and all the equipment for electrical partial
discharge (PD)detection methods, including that mentioned
elsewhere in this specification

Customer's Requirement: The switchgear shall have provision


for connection with ground mat risers. This provision shall
consist of grounding pads to be connected to the ground mat riser
in the vicinity of the
equipment
Customer's Requirement: Alarm circuit shall not respond to
faults for momentary conditions. The following indications
including those listed elsewhere in the specifications shall be
generally provided in the alarm
and indication circuits.
a. Gas Insulating System:
a) Loss of Gas Density.
b) Loss of Heater power (if required)
c) Any other alarm necessary to indicate deterioration of the gas
insulating system.

Customer's Requirement: The enclosure


shall be manufactured and tested according to the pressure vessel
code (ASME/CENELEC/DIN or Equivalent) code for pressure
vessel).

Customer's Requirement: The GIS bidder shall define clearly


what constitutes the main grounding bus of the GIS. The GIS
bidder must supply the entire material for grounding bus of GIS
viz conductor, clamps, joints, operating and safety platforms etc.
The GIS bidder is also required to supply all the
earthing conductors and associated hardware material for the
following:
1. Connecting all GIS equipment, bus ducts, enclosures, control
cabinets, supporting structure
etc. to the ground bus of GIS.
2. Grounding of transformer, reactor, CVT, SA and other outdoor
switchyard equipment’s/
structures etc.
Customer's Requirement: Closing time of 220 kV Circuit
Breaker shall be 100 ms & tripping time shall be 20 ms. It should
be suitable for 1ph/3 ph. Auto reclosing facility.

Customer's Requirement: All the acceptance tests shall be


carried out in presence of Owner’s representative on offering the
material for inspection and testing by successful bidder. The test
results shall be treated as reference signature for condition
monitoring in the future. Acceptance test shall include stage
inspection of GIS CT & VT.

Customer's Requirement: Max. radio interference voltage for


frequency between 0.5 MHz and 2 MHz at
156 kV (Micro volts) :1000 (at 156 kVrms)

Maximum Radio interference voltage for


frequency between 0.5 MHz & 2 MHz at 156 kV : 1000 (micro
volts)

Customer's Requirement:Provision shall be made for


padlocking the ground switches in either open or closed position.
Customer's Requirement: 1.In addition, fuses shall be provided
for the protection and metering windings for the fuse monitoring
scheme. The secondary terminals of the VTs shall be terminated
to the stud type non- disconnecting terminal blocks in the
secondary boxes
via the fuse.
2. All the voltage transformer shall be provided with manual
operated isolating link.

Customer's Requirement: For Bus Bar VT;


As per BOQ : Bus Bar VT with bus disconnector with Earthing
Switch

As per Customer Specification: All the voltage transformer shall


be provided with manual operated isolating link.

As per SLD: Bus Bar VT with motorised bus disconnector with


Earthing Switch

Customer's Requirement: iii) 1 minute power frequency


withstand voltage between secondary terminal and earth

Customer's Requirement: The successful bidder shall be fully


responsible for complete insulation co-ordination of switchyard
including GIS. The successful Bidder shall carry out detailed
studies and design calculations to evolve the required parameters,
locations, energy capability etc. of surge arrestors such that
adequate protective margin is available between peak impulse,
surge and power frequency discharge voltages and BIL of the
protected requirement.
Customer's Requirement: N/A

Customer's Requirement: N/A

Customer's Requirement: The equipment shall be designed for


operation in seismic zone for earthquake resistance. The copies
of type test reports for similar rated equipment, if tested earlier,
should be furnished along with the tender.

Customer's Requirement: The successful bidder shall include


the supply of all SF6 gas necessary for filling & putting into
operation the complete switchgear installation being supplied. In
addition 20% of total gas requirement shall be supplied in
separate cylinders as spare requirement, over & above the
requirement of gas for successful commissioning. The list of the
spares should be submitted
by the successful bidder.

Customer's Requirement:The SF6 GIS to XLPE cable


termination shall conform to IEC-62271-209 (latest edition)

Customer's Requirement: Safety grounding switch shall also be


mechanically key interlocked with its associated disconnector.
Bidder's Remarks
Bidder's Remark: We would like to inform you that, as per BOQ & SLD we have considered the
following GIS scope:
Trafo bay- 2 Nos
Line bay - 2 Nos
B/C bay - 1 No
Bus PT - 2 Nos (3 phase)

Kindly confirm our understanding.


Bidder's Remarks: We would like to inform you that, As per protection philosophy followed in Ind
CB shall be covered in bUsbar differential protection. To achieve this CT shall be after CB.

Kindly accept the same.

Bidder's Remark: We would like to inform you that we have reviewed the tender document, BOQ
As the termination of bay is
For Line bay - CSE
For Trafo bay - SF6 GAS To OIL BUSHING

Kindly confirm our understanding.

Bidder's Remark: We would like to infrom you that, GIB length is not mentioned anywhere and we
have not received the AutoCAD of GIS hall layout as well. To quantify the length of the GIB, please
provide the same. Payment of busduct for outside of GIS hall shall be paid on per meter basis confirm
our understanding.

Kindly provide the same.

Bidder's Remarks: We would like to inform you that, there is descrepancy in the BOQ and SLD fo
transformer feeder rating.
Howevwer we have considered as per SLD that is 3150A.

Kindly confirm the same.

Bidder's Remark: We would like to inform you that as per BOQ Local Control Cubical is mentione
for the BUS VT, as per our standard practice separate LCC is not required for the BUS VT. Control
for Bus VT shall be accomodated in Bus coupler or adjacent bay LCC. Hence we shall not consider
same.

Kindly accept the same


Bidder's Remarks: We would like to inform you that, EOT Crane shall be in Hyosung EPCsco
of supply.

Kindly confirm the same.

Bidder's Remark:We would like to inform you that, in cutomer technical specification there are tw
special tools mentioned. So we have considered the Online PD monitoring system with UHF type.

Kindly confirm the requirement.

Bidder's Remark:We would like to inform you that, in BOQ and cutomer technical specification
there are no spare parts mentioned hence we have not considered the same.

Kindly confirm the requirement.

Bidder's Remark: We would like to clarify thatwe have 3phase encapsulaed Busbar design & all
equipment ae single phase.

Kindly accept the same


Bidder's Remark: As per IEC 62271-203, Under table 4, it is clearly mentioned that for GIS with sho
circuit rating greater than or equal to 40kA rms duration of current shall be 0.3s (300 ms) with no
fragmentation (but burn through is acceptable).

Kindly accept the same.

Bidder's Remarks: We would like to inform that, as per IEC 62271-203, Cl. 5.15.101 standards,
Guaranteed Maximum Gas Losses should be less than 0.5 % per Annum. We comply the same.

Kindly confirm the same.

Bidder's Remark: As per our design concept, we have provided separate gas density monitor for each gas tight
compartment for monitoring of gas pressure, therefore in this reference no separate gas monitoring kiosk is required f
monitoring of gas.

Kindly consider our proposal.


Bidder's Remark: We would like o clarify that control cable entry at GIS end will be plug in type and at LCP end it
gland type.

Kindly accept the same

Bidder's Remark: We would like to inform you that


Being continuous enclosure design, available bonding connections for GIB and earthing connections
metal enclosures of GIS / GIB at min 2 points, all enclosure surfaces are equipotential. Hence no
electromagnetic field appears on enclosure surfaces and calculations are not envisaged. (details of
earthing / bonding connections and continuous enclosure construction can be submitted during DDE

Kindly accept the same.

Bidder's Remark: We would like to inform you that Methodology for PD detection is defined in Te
Spec as UHF technique, offered solution is same; hence no special documentation is envisaged.

Kindly accept the same.

Bidder's Remark: We would like to inform you that, we shall provide only earthing points on G
base Frame. Furthe scope of earthing supply & installation from GIS base frame to risers shal
be in Hyosung EPCscope

Kindly accept the same


Bidder's Remark: We would like to inform you that signals for Gas density reduction are wired upt
LCC with suitable annunciations. No additonal alarm is necessary for gas deterioriation apart from g
density signals.

Kindly accept the same.

Bidder's Remarks: As material codes are country based codes


For presure vesssel code , We follow KS-D6008 with Equivalent EN code
(ENAC-42100).
Also we will conduct all pressure test for enclosures as per Cl. 6.103-IEC 62271-203:2011.

Kindly confirm the same.

Bidder's Remark: We would like to inform you that, we shall provide only earthing points on
GIS base Frame. Further scope of earthing supply & installation from GIS base frame to riser
shall be in Hyosung EPCscope. Also Installation of Earth mat & switchyard equipment shall e
Hyosung EPCscope

Kindly accept the same


Bidder's Remark: We would like to inform you that,
As per our type test the;
1) Closing time of circuit breaker is 77mS
2) Maximum opening time under any condition with limiting voltage and pressures: Less than 40 m
3) Max Breaking Time is <60mS

Kindly confirm the same.

Bidder's Remark: We would like to inform you that, Routine test reports shall be submitted for
customer's
review during FAT for bought out items.

Kindly confirm the same.

Kindly confirm the same.

Bidder's Remark: We would like to inform you that, the Maximum Radio interference voltage for
frequency is applicable for bushings only, not applicable for CB and DS.

Kindly confirm the same.

Bidder's Remark: We would like to inform that we shall provide provision of padlocking
however the supply of pad lockis shall be in Hyosung EPCscope of work.

Kindly confirm the same.


Bidder's remark: 1.We would like to clarify you that, for Voltage transformer secondaries protectio
we provide MCB instead of HRC fuse.
2. As per SLD Vt is shown only on Bus. And is connected to bus through DS. So VT with manual
isolation link is not required as isolation will happen through GIS DS.

Kindly confirm the same.

Bidder's remark: We would like to clarify you that, For Bus Bar VT there is descrepancy in BOQ,
SLD and Customer technical specification.
However we have onsidered the requirement; as per SLD: Bus Bar VT with motorised bus
disconnector with Earthing Switch.

Kindly confirm the same.

Bidder's Remark:As per IEC 61869-2 the PF withstand voltage for CT secondary is 3kV. We comp
same.

Kindly accept the same


Bidder's Remarks: We would like to clarify you that the requirement of GIS type surge areesto
is not mentioned in BOQ and SLD , So we are not considered the SUrge arrestor for any bay.
And insulation co-ordination study shall be Hyosung EPCScope. Any additional requirement
reflected from this study will be supplied with exyyra implication

Kindly confirm the same.


Bidder's Remark: We would like to inform you that in technical specification special tools like gas
evacuation plant and Dew point meter is mentioned. However the same is not mention in BOQ.
Wheteher we should consider same in our offer or not.

Kindly clarify the requirement.

Bidder's Remark: We would like to inform you that


fiber optic cable & Fiber Termination Box for above Fiber optic cable not in GIS scope of supply w
have not considered the same in GIS scope of supply.

Kindly confirm the same.

Bidder's Remark: We would like to inform that only study report of seisimic studies shall be
provided however TTR shall not be envisaged.

Kindly confirm the same.

Bidder's Remark: We would like to inform you that 20% SF6 gas spare requirement is not mention
in spare list of BOQ we have included the same.This will have commercial impact.
We have considered quantity of SF6 gas required while commissioning for complete GIS filling
inclusing losses.

Kindly confirm the requirement.

Bidder's Remark: We would like to clarify thatCable Terminations shall be in Hyosung


EPCscope.

Kindly accept the same


Bidder's Remark: As per our design, mechanical interlock is not possible in single phase encapsula
design as Es and DS are two separate equipment. Hence we provide electrical interlock as per standa
GIS philosophy.

Kindly accept the same.


Customer's Reply