Knowledge in Autocad Plant3D
Knowledge in Autocad Plant3D
Knowledge in Autocad Plant3D
B.E - Mechanical
thamizh46@gmail.com
© +91-9003171170 #3, chinna kuzhandai 4th street
Madumanagar , perambur,
Chennai – 600011
Tamil Nadu - India
,
CAREER OBJECTIVE
Intending to broaden skills and boost job prospects with a reputed organization, who is looking for a
consistent, experienced, hardworking and highly motivated person.
PROFESSIONAL SUMMARY
Knowledge in ISO QMS 9001 – 2015 , 3834-2 & ISO 13485 – 2016
Knowledge in autocad Plant 3D
Knowledge in Risk Analysis – IEC 60601-1
Team Cordinator in Project executions.
Knowledge and experience in the field of Quality Assurance / Quality Control,
Inspection Audits, Third Party Inspection and Monitoring Welding Activities.
Carryout Independent Stage and Final inspection in fabrication of Heavy Engineering
Metal Part in Windturbine.
Co-ordinate with clients in project progressions.
Carryout Independent Stage and Final inspection of Raw Materials in Steels, Machining
components,Painting and ZEP,HDG Process.
Preparation of WPS/PQR, witnessing Welder Performance Qualification (WPQ),
Preparing & reviewing of QAPs, Pre & post weld visual inspection (SMAW, GTAW,
GMAW, FCAW)
Interpretation of RT films, PWHT, hardness testing of other physical and spectral tests.
PROJECT SNIPPETS
NORDEX INDIA PVT.LTD. - Project on Wind Turbine Transport Tools and Nacelle Cover Supports.
STROKES - Project on Support structures for earth moving equipments.
KEY RESPONSIBILITIES
PROJECT SNIPPETS
SIMENS GAMESA RENEWABLE RESOURCES - Project on G114 and G97 nacelle covers UCC & BCC.
DOOSAN INDIA POWER SYSTEMS - Project on soot blower furnace seal boxes .
BERGEN PIPE SUPPORTS - Project on cryogenic pipe supports and shell covers.
SIMENS GAMESA RENEWABLE RESOURCES - Project on windturbine’s blade transport Tool.
LEITWIND PVT LTD - Wind turbine Tower Internal and Generator Components.
ACCIONA – Project on Wind Turbine’s - Bearing Pre assembly Kits and Blade Transport Tool .
KEY RESPONSIBILITIES
PROJECT SNIPPETS
Simens Gamesa renewable resources - Project on G114 and G97 ucc & bcc.
Simens Gamesa renewable resources - Project on windmill blade tip.
Leitwind pvt ltd - Wind turbine tower internal and generator components.
Bfg & Indocool composites - Project on windturbine Nacelle and Spinner parts.
KEY RESPONSIBILITIES
Check the Consumables such as welding electrodes, flux, gases, etc. to be used shall be as per
standards spoilt Consumables should not be used.
Control calibrated measuring and test equipment used on the project.
Receiving material inspection welding stage, in process and final inspection reports.
Ensure the identification and traceability of all material throughout to all stage of the project as
per required standard & specification.
Stage wise inspection during the fit up and welding activities.
Solving welding problems in several of fabrication and NDT co-ordination.
To ensure the NDT activity such as PT, MPT, during pre-fabrication and after completion of
welding activities are being carried out as per the relevant standard and specification
Check all field welding is in accordance with WPS, procedures and by qualified welders.
Monitoring repair percentage, inspection results and regular site activities.
Solving the Observation & NCR’s for violation found during inspection.
Monitor and ensure that all work is in accordance with project standards and specification
Report preparation, review, submission and documentation as per client and quality system.
PROFESSIONAL SKILLS
Carryout Independent Stage and Final inspection of Equipment, Support Structured Components,
paintined , surface coatings and Raw materials etc.
Preparation and review of QA/QC documents like Job Procedures, and Inspection Formats as per
Project requirements.
3
Hands on experience in pre welding, in process welding and post welding in surveillance ,inspection
and supervision at workshop & field on various material with various welding procedure such as
SMAW, GTAW,SAW
Verification of WPS/PQR, witnessing Welder Performance Qualification(WPQ),Preparing &
reviewing of QAPs, pre & post weld visual inspection.
Handling proactive surveillance, inspection, audit for construction project as per mandatory
document’s, client specification, governing code & reference drawing, applicable code & standard’s
practice such as, ISO & ASME Sec.IX,
Handling Internal Audits, Third Party Inspection, Quality Assurance Training.
Review & Interpretation of radiographs, PWHT, hardness testing & other NDT methods.
Conducting inspection on time to avoid delay.
Painting inspection as per project specification
Study of Drawing for Fabrication and Erection.
Preparation of day to day, weekly and monthly progress reports related to quality.
Witnessing of welder qualification test.
Performing Inspection as per drawing.
Fabrication Inspection (Fit up checking, Material Verification, Weld Visual Inspection)
Solving the NCR’s for violation found during inspection.
Monitoring the welding activity/sequence, especially consumables and welding parameters.
Carried out inspection before in process and after welding.
Weld repair analysis and rework.
Preparation of all QA/QC ASME documents.
COMPUTER PROFICIENCY
EDUCATIONAL QUALIFICATION
B.E Mechanical from VELTECH College of Engineering,Chennai, Anna University. (2012 - 2016)
HSC, DONBOSCO Boys Higher secondary school, Chennai (2012)
SSLC , DONBOSCO Boys Higher secondary school, Chennai. (2010)
PERSONAL DETAILS
Residence : Chennai
Nationality : Indian
4
Languages Known : Tamil, English & Hindi.
DECLARATION
I here by declare that the above written particular are true to the best of my knowledge and belief
THAMIZHSELVAN A