1. DESIGN PARAMETERS
1.GENERAL
WEIGHT SPAN:
MAX. WT. SPAN MIN. WT. OF SPAN
TOWER TYPE DE/DE90 DE/DE90
NC Max/ Min 290 0
BWC Max/Min 174 0
CONDUCTOR
OVERALL DIAMETER - 21.1mm
CROSS SECTION AREA - 265 Sq.mm
WEIGHT - 0.731Kg/m
ULTIMATE TENSILE STRENGTH – 4119Kgs
MODULUS OF ELASTICITY - 6966Kg/Sq.mm
CO-EFFCIENT OF LINEAR EXPANSION - 23X10^-6 / C
GROUNDWIRE (OPGW)
OVERALL DIAMETER - 16 mm
CROSS SECTION AREA - 58 Sq.mm
WEIGHT - 0.492 Kg/m
ULTIMATE TENSILE STRENGHT - 7322 Kgs
MODULUS OF ELASTICITY - 1211423 Kg/Sq.mm
CO-EFFCIENT OF LINEAR EXPANSION - 14.1X10^-6 / C
3
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
5) ELECTRICAL CLEARENCE:
Steel Grade
Grade Yield (MPa)
Mid Steel BSEN 10025 S275 275
High Tensile BSEN 10025 S355 355
4
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
PROJECT
NAME CONSTRUCTION OF 2X40MVA 33kv ON A DOUBLE CIRCUIT TOWER FROM KPANDO TO HOHOE AND REV 01
KADJEBI TO HOHOE SUBSTATIONS IN THE VOLTA REGION.
2. INDEX OF LOADINGS
_________________________________________________________________________________________________________
Sl. Title Code Nature Category
_________________________________________________________________________________________________________
1 RELIABILITY NORMAL RN perm cate
2 SECURITY OPGW & TOP COND BROKEN SGB perm catb
3 SECURITY TOP & MIDD CONDUCTOR BROKEN STMB perm catb
4 SECURITY MIDDLE & BOTT CONDUCTOR BROKEN SMBB perm catb
5 SECURITY BOTTOM & TOP CONDUCTOR BROKEN SBTB perm catb
6 SAFETY NORMAL CONDITION SAN perm catn
7 DEAD END DE perm cate
5
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
PROJECT
NAME CONSTRUCTION OF 2X40MVA 33kv ON A DOUBLE CIRCUIT TOWER FROM KPANDO TO HOHOE AND REV 01
KADJEBI TO HOHOE SUBSTATIONS IN THE VOLTA REGION.
6
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
PROJECT
NAME CONSTRUCTION OF 2X40MVA 33kv ON A DOUBLE CIRCUIT TOWER FROM KPANDO TO HOHOE AND REV 01
KADJEBI TO HOHOE SUBSTATIONS IN THE VOLTA REGION.
DATA :-
CONDUCTOR DETAILS :-
Basic Condition:-
Temperature (deg C) : 27.0000
Wind factor : .0000
Ice thickness (cm) : .0000
Factor of Safety : 5.000
SAG_TENSION_FOS COMPUTATIONS :
________________________________________________________________________________________________________________
7
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
PROJECT
NAME CONSTRUCTION OF 2X40MVA 33kv ON A DOUBLE CIRCUIT TOWER FROM KPANDO TO HOHOE AND REV 01
KADJEBI TO HOHOE SUBSTATIONS IN THE VOLTA REGION.
DATA :-
Type : OPGW
Overall Diameter (cm) : 1.6
Cross Sectional Area (sq.cm) : 1.27
Unit Weight (kg/m) : 0.615
Ultimate Tensile strength (kg) : 7036
Coef. of Thermal Expansion(/degC) : 0.0000185
Modulus of Elasticity (kg/sq.cm) : 958533
Increase in Vertical sag (%) : 0
Shape factor : 1
Gust factor : 1
Drag factor : 1
Basic Condition:-
Temperature (deg C) : 27.0000
Wind factor : .0000
Ice thickness (cm) : .0000
Factor of Safety : 8.6936
SAG_TENSION_FOS COMPUTATIONS :
________________________________________________________________________________________________________________
8
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
9
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
4. LOAD CALCULATIONS
DESIGN DATA
DESCRIPTION UNITS NC BWC ERECTION
SPANS :
TENSION OF WIRES :
10
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
TRANSVERSE LOADS :
CONDUCTOR:-
WIND ON CONDUCTOR = 1 x 70.77 x 0.0260 x 204 = 376 =Nc*Pc* Dc*Lwind
WIND ON INSULATOR = = 61 =61
DUE TO ANGLE OF DEVIATION = 2 x 0.707 x 470.8 x 1 = 666 =2*Nc*sin(Amax/2)* Tc
TOTAL TRANSVERSE LOAD = = 1104 Kg
EARTH WIRE:-
WIND ON EARTH WIRE = 1 x 70.77 x 0.0155 x 204 = 224 =1*Po*Do*Lwind
DUE TO ANGLE OF DEVIATION = 2 x 0.707 x 438.25 x 1 = 620 =2*sin(Amax/2)*To
TOTAL TRANSVERSE LOAD = 844 Kg
VERTICAL LOADS :
LONGITUDINAL LOADS :-
CONDUCTOR:-
LONGITUDINAL LOAD OF =Nc*Tcd*Lf
CONDUCTOR = 1 x 0 x 1 = 0 Kg
EARTH WIRE:-
LONGITUDINAL LOAD OF =Ni*Tod*Lf
EARTH WIRE = 1 x 0 = 0 Kg
11
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
TRANSVERSE LOADS :
CONDUCTOR:-
WIND ON CONDUCTOR = 1 x 28.31 x 0.0260 x 204 = 151 =Nc*Pc* Dc*Lwind
WIND ON INSULATOR = = 61 =61
DUE TO ANGLE OF DEVIATION = 2 x 0.707 x 298.6 x 1 = 423 =2*Nc*sin(Amax/2)* Tc
TOTAL TRANSVERSE LOAD = = 636 Kg
EARTH WIRE:-
WIND ON EARTH WIRE = 1 x 28.31 x 0.0155 x 204 = 90 =1*Po*Do*Lwind
DUE TO ANGLE OF DEVIATION = 2 x 0.707 x 313.75 x 1 = 444 =2*sin(Amax/2)*To
TOTAL TRANSVERSE LOAD = 534 Kg
VERTICAL LOADS :
LONGITUDINAL LOADS :-
CONDUCTOR:-
LONGITUDINAL LOAD OF
CONDUCTOR = 1 x 0 x 0.866 = 0 Kg
EARTH WIRE:-
12
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
TRANSVERSE LOADS :
CONDUCTOR:-
WIND ON CONDUCTOR = 1 x 28.31 x 0.0260 x 122 = 91 =Nc*Pc* Dc*Lwind
WIND ON INSULATOR = = 61 =61
DUE TO ANGLE OF DEVIATION = 2 x 0.707 x 298.6 x 0.5 = 212 =2*Nc*sin(Amax/2)* Tc
TOTAL TRANSVERSE LOAD = = 365 Kg
EARTH WIRE:-
WIND ON EARTH WIRE = 1 x 28.31 x 0.0155 x 122.4 = 54 =1*Po*Do*Lwind
DUE TO ANGLE OF DEVIATION = 2 x 0.707 x 313.75 x 0.5 = 222 =2*sin(Amax/2)*To
TOTAL TRANSVERSE LOAD = 276 Kg
VERTICAL LOADS :
LONGITUDINAL LOADS :-
CONDUCTOR:-
LONGITUDINAL LOAD OF =Nc*Tcd*Cos(Amin/2)*Lf
CONDUCTOR = 1 x 298.6 x 0.866 x 1 = 259 Kg
EARTH WIRE:-
LONGITUDINAL LOAD OF EARTH =1*Tod*Cos(Amin/2)*Lf
WIRE = 1 x 313.8 x 0.866 x 1 = 272 Kg
13
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
TRANSVERSE LOADS :
CONDUCTOR:-
WIND ON CONDUCTOR = 1 x 28.31 x 0.0260 x 122 = 91 =Nc*Pc* Dc*Lwind
WIND ON INSULATOR = = 61
=2*Nc*sin(Amax/2)*
DUE TO ANGLE OF DEVIATION = 2 x 0.707 x 276.6 x 1 = 392 Tc
TOTAL TRANSVERSE LOAD = = 545 Kg
EARTH WIRE:-
WIND ON EARTH WIRE = 1 x 28.31 x 0.0155 x 122 = 54 =1*Po*Do*Lwind
DUE TO ANGLE OF DEVIATION = 2 x 0.707 x 300.5 x 1 = 425 =2*sin(Amax/2)*To
TOTAL TRANSVERSE LOAD = 479 Kg
VERTICAL LOADS :
CONDUCTOR:- MAX
WEIGHT OF CONDUCTOR = 1 x 290 x 1.16 x 2 = 673 =Nc*Lwind*Wc*2
WEIGHT OF INSULATOR = 1 x 81.58 x 2 = 164 =Ni*Wi*2
= 357
ERECTION LOADS = 153
WEIGHT OF LIGHTENING
ARRESTOR = 31
WEIGHT OF ISOLATOR = 102
WEIGHT OF THREE PHASE SEALING = 102
WEIGHT OF LINE TRAP = 0
OTHER LOADS = 0
TOTAL VERTICAL LOAD = = 1581
LONGITUDINAL LOADS :-
CONDUCTOR:-
LONGITUDINAL LOAD OF
CONDUCTOR = = 0 Kg
EARTH WIRE:-
LONGITUDINAL LOAD OF EARTH
WIRE = = 0 Kg
Note: FOS for this load case is 2.0
14
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
TRANSVERSE LOADS :
CONDUCTOR:-
WIND ON CONDUCTOR = 1 x 28.31 x 0.0260 x 122 = 91 =Nc*Pc* Dc*Lwind
WIND ON INSULATOR = = 61 =61
DUE TO ANGLE OF
DEVIATION = 1 x 0 x 1493 x 1 = 0 =2*Nc*sin(Amax/2)* Tc
TOTAL TRANSVERSE LOAD = = 153 Kg
EARTH WIRE:-
WIND ON EARTH WIRE = 1 x 28.31 x 0.0155 x 122.4 = 54
DUE TO ANGLE OF
DEVIATION = 1 x 0 x 1255 x 1 = 0 =1*Po*Do*Lwind
TOTAL TRANSVERSE LOAD = 54 Kg =2*sin(Amax/2)*To
VERTICAL LOADS :
LONGITUDINAL LOADS :-
CONDUCTOR:-
LONGITUDINAL LOAD OF =Nc*Tcd*Cos(Amin/2)*Lf
CONDUCTOR = 1 x 2354 x 1 x 1 = 2354 Kg
EARTH WIRE:-
LONGITUDINAL LOAD OF =1*Tod*Cos(Amin/2)*Lf
EARTH WIRE = 1 x 1753 x 1 x 1 = 1753 Kg
15
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
16
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
Section Load Case Information (Standard) for "RN : NORMAL CONDITION MAX WIND":
Section Z Z Ave. Res. Tran Tran Tran Long Long Long Ice Total
Label of of Elev. Adj. Adj. Drag Wind Adj. Drag Wind Weight Weight
Top Bottom Above Wind Wind Coef Load Wind Coef Load
Ground Pres. Pres. Pres.
(m) (m) (m) (Pa) (Pa) (N) (Pa) (N) (N) (N)
----------------------------------------------------------------------------------------
3 10.50 7.95 9.22 1388.00 1388.00 1.000 6232.2 0.00 1.000 0.0 0 10319
2 7.95 3.50 5.72 1388.00 1388.00 1.000 4780.7 0.00 1.000 0.0 0 7380
1 3.50 0.00 1.75 1388.00 1388.00 1.000 3920.5 0.00 1.000 0.0 0 6149
Point Loads for Load Case "ERR - ERECTION & MAINTENANCE LOADING":
Section Load Case Information (Standard) for "ERR - ERECTION & MAINTENANCE LOADING":
Section Z Z Ave. Res. Tran Tran Tran Long Long Long Ice Total
Label of of Elev. Adj. Adj. Drag Wind Adj. Drag Wind Weight Weight
Top Bottom Above Wind Wind Coef Load Wind Coef Load
Ground Pres. Pres. Pres.
(m) (m) (m) (Pa) (Pa) (N) (Pa) (N) (N) (N)
--------------------------------------------------------------------------------------
3 10.50 7.95 9.22 416.40 416.40 1.000 1869.7 0.00 1.000 0.0 0 10319
2 7.95 3.50 5.72 416.40 416.40 1.000 1434.2 0.00 1.000 0.0 0 7380
1 3.50 0.00 1.75 416.40 416.40 1.000 1176.1 0.00 1.000 0.0 0 6149
Point Loads for Load Case "RND - NORMAL CONDITION FOR DEFLECTION":
Section Load Case Information (Standard) for "RND - NORMAL CONDITION FOR DEFLECTION":
Section Z Z Ave. Res. Tran Tran Tran Long Long Long Ice Total
Label of of Elev. Adj. Adj. Drag Wind Adj. Drag Wind Weight Weight
Top Bottom Above Wind Wind Coef Load Wind Coef Load
Ground Pres. Pres. Pres.
(m) (m) (m) (Pa) (Pa) (N) (Pa) (N) (N) (N)
--------------------------------------------------------------------------------------
17
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
3 10.50 7.95 9.22 694.00 694.00 1.000 3116.1 0.00 1.000 0.0 0 10319
2 7.95 3.50 5.72 694.00 694.00 1.000 2390.3 0.00 1.000 0.0 0 7380
1 3.50 0.00 1.75 694.00 694.00 1.000 1960.2 0.00 1.000 0.0 0 6149
Point Loads for Load Case "SB1 - SECURITY BROKEN WIRE CONDITION - 1ST CONDUCTOR":
Section Load Case Information (Standard) for "SB1 - SECURITY BROKEN WIRE CONDITION - 1ST CONDUCTOR":
Section Z Z Ave. Res. Tran Tran Tran Long Long Long Ice Total
Label of of Elev. Adj. Adj. Drag Wind Adj. Drag Wind Weight Weight
Top Bottom Above Wind Wind Coef Load Wind Coef Load
Ground Pres. Pres. Pres.
(m) (m) (m) (Pa) (Pa) (N) (Pa) (N) (N) (N)
--------------------------------------------------------------------------------------
3 10.50 7.95 9.22 416.40 416.40 1.000 1869.7 0.00 1.000 0.0 0 10319
2 7.95 3.50 5.72 416.40 416.40 1.000 1434.2 0.00 1.000 0.0 0 7380
1 3.50 0.00 1.75 416.40 416.40 1.000 1176.1 0.00 1.000 0.0 0 6149
Point Loads for Load Case "SB2 - SECURITY BROKEN WIRE CONDITION - 2ND CONDUCTOR":
Section Load Case Information (Standard) for "SB2 - SECURITY BROKEN WIRE CONDITION - 2ND CONDUCTOR":
Section Z Z Ave. Res. Tran Tran Tran Long Long Long Ice Total
Label of of Elev. Adj. Adj. Drag Wind Adj. Drag Wind Weight Weight
Top Bottom Above Wind Wind Coef Load Wind Coef Load
Ground Pres. Pres. Pres.
(m) (m) (m) (Pa) (Pa) (N) (Pa) (N) (N) (N)
--------------------------------------------------------------------------------------
3 10.50 7.95 9.22 416.40 416.40 1.000 1869.7 0.00 1.000 0.0 0 10319
2 7.95 3.50 5.72 416.40 416.40 1.000 1434.2 0.00 1.000 0.0 0 7380
1 3.50 0.00 1.75 416.40 416.40 1.000 1176.1 0.00 1.000 0.0 0 6149
Point Loads for Load Case "SB3 - SECURITY BROKEN WIRE CONDITION - 3RD CONDUCTOR":
Section Load Case Information (Standard) for "SB3 - SECURITY BROKEN WIRE CONDITION - 3RD CONDUCTOR":
Section Z Z Ave. Res. Tran Tran Tran Long Long Long Ice Total
Label of of Elev. Adj. Adj. Drag Wind Adj. Drag Wind Weight Weight
Top Bottom Above Wind Wind Coef Load Wind Coef Load
Ground Pres. Pres. Pres.
(m) (m) (m) (Pa) (Pa) (N) (Pa) (N) (N) (N)
--------------------------------------------------------------------------------------
3 10.50 7.95 9.22 416.40 416.40 1.000 1869.7 0.00 1.000 0.0 0 10319
18
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
2 7.95 3.50 5.72 416.40 416.40 1.000 1434.2 0.00 1.000 0.0 0 7380
1 3.50 0.00 1.75 416.40 416.40 1.000 1176.1 0.00 1.000 0.0 0 6149
Point Loads for Load Case "SB4 - SECURITY BROKEN WIRE CONDITION - 4TH CONDUCTOR":
Section Load Case Information (Standard) for "SB4 - SECURITY BROKEN WIRE CONDITION - 4TH CONDUCTOR":
Section Z Z Ave. Res. Tran Tran Tran Long Long Long Ice Total
Label of of Elev. Adj. Adj. Drag Wind Adj. Drag Wind Weight Weight
Top Bottom Above Wind Wind Coef Load Wind Coef Load
Ground Pres. Pres. Pres.
(m) (m) (m) (Pa) (Pa) (N) (Pa) (N) (N) (N)
--------------------------------------------------------------------------------------
3 10.50 7.95 9.22 416.40 416.40 1.000 1869.7 0.00 1.000 0.0 0 10319
2 7.95 3.50 5.72 416.40 416.40 1.000 1434.2 0.00 1.000 0.0 0 7380
1 3.50 0.00 1.75 416.40 416.40 1.000 1176.1 0.00 1.000 0.0 0 6149
Point Loads for Load Case "SB5 - SECURITY BROKEN WIRE CONDITION - 5TH CONDUCTOR":
Section Load Case Information (Standard) for "SB5 - SECURITY BROKEN WIRE CONDITION - 5TH CONDUCTOR":
Section Z Z Ave. Res. Tran Tran Tran Long Long Long Ice Total
Label of of Elev. Adj. Adj. Drag Wind Adj. Drag Wind Weight Weight
Top Bottom Above Wind Wind Coef Load Wind Coef Load
Ground Pres. Pres. Pres.
(m) (m) (m) (Pa) (Pa) (N) (Pa) (N) (N) (N)
--------------------------------------------------------------------------------------
3 10.50 7.95 9.22 416.40 416.40 1.000 1869.7 0.00 1.000 0.0 0 10319
2 7.95 3.50 5.72 416.40 416.40 1.000 1434.2 0.00 1.000 0.0 0 7380
1 3.50 0.00 1.75 416.40 416.40 1.000 1176.1 0.00 1.000 0.0 0 6149
Point Loads for Load Case "SB6 - SECURITY BROKEN WIRE CONDITION - 6TH CONDUCTOR":
Section Load Case Information (Standard) for "SB6 - SECURITY BROKEN WIRE CONDITION - 6TH CONDUCTOR":
Section Z Z Ave. Res. Tran Tran Tran Long Long Long Ice Total
Label of of Elev. Adj. Adj. Drag Wind Adj. Drag Wind Weight Weight
Top Bottom Above Wind Wind Coef Load Wind Coef Load
Ground Pres. Pres. Pres.
(m) (m) (m) (Pa) (Pa) (N) (Pa) (N) (N) (N)
--------------------------------------------------------------------------------------
3 10.50 7.95 9.22 416.40 416.40 1.000 1869.7 0.00 1.000 0.0 0 10319
2 7.95 3.50 5.72 416.40 416.40 1.000 1434.2 0.00 1.000 0.0 0 7380
19
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
1 3.50 0.00 1.75 416.40 416.40 1.000 1176.1 0.00 1.000 0.0 0 6149
Point Loads for Load Case "SECURITY BROKEN WIRE CONDITION ALL CONDUCTORS":
Section Load Case Information (Standard) for "SECURITY BROKEN WIRE CONDITION ALL CONDUCTORS":
Section Z Z Ave. Res. Tran Tran Tran Long Long Long Ice Total
Label of of Elev. Adj. Adj. Drag Wind Adj. Drag Wind Weight Weight
Top Bottom Above Wind Wind Coef Load Wind Coef Load
Ground Pres. Pres. Pres.
(m) (m) (m) (Pa) (Pa) (N) (Pa) (N) (N) (N)
--------------------------------------------------------------------------------------
3 10.50 7.95 9.22 416.40 416.40 1.000 1869.7 0.00 1.000 0.0 0 10319
2 7.95 3.50 5.72 416.40 416.40 1.000 1434.2 0.00 1.000 0.0 0 7380
1 3.50 0.00 1.75 416.40 416.40 1.000 1176.1 0.00 1.000 0.0 0 6149
20
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
PROJECT NAME CONSTRUCTION OF 2X40MVA 33kv ON A DOUBLE CIRCUIT TOWER FROM KPANDO TO HOHOE AND REV 01
KADJEBI TO HOHOE SUBSTATIONS IN THE VOLTA REGION.
DESIGN CALCULATIONS
21
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
PROJECT
NAME CONSTRUCTION OF 2X40MVA 33kv ON A DOUBLE CIRCUIT TOWER FROM KPANDO TO HOHOE AND KADJEBI TO HOHOE REV 01
SUBSTATIONS IN THE VOLTA REGION.
6. DESIGN CALCULATIONS
Group Summary (Compression Portion):
Comp. Comp.
Max Comp.
Steel Max Usage Comp. Comp. L/r Connect. Connect. No. Of
Group Angle Angle Use In Control Curve
Row Strength Usage Cont- Control Force Capacity Shear Bearing RLX RLY RLZ L/r KL/r Bolts
Label Type Size Comp. Load No.
(MPa) % rol Member (kN) (kN) Capacity Capacity Comp.
% Case
(kN) (kN)
1 L1 SAE 90*90*6 355 84.96 Comp 84.96 g1Y -237.895 RN 280.024 314.1 361.267 2 1 1 36.17 36.17 1 4
2 L2 SAE 90*90*6 355 82.18 Comp 82.18 g2Y -193.59 RN 280.671 235.575 270.95 2 1 1 35.7 35.7 1 3
3 L3 SAE 60*60*5 355 1.16 Comp 1.16 g315P -1.279 SBWC 109.983 157.05 150.528 0.5 0.5 0.5 82.55 82.55 1 2
4 D1 SAE 45*45*5 275 58.1 Comp 58.1 g23R -22.813 RN 51.993 39.263 62.976 1 1 1 100.92 110.46 3 1
5 D2 SAE 45*45*5 275 87.35 Comp 87.35 g108P -34.298 RN 52.803 39.263 62.976 1 1 1 98.51 109.25 3 1
6 H1 SAE 80*80*6 275 75.81 Comp 75.81 FFg206X -89.299 RN 156.471 117.788 226.714 1 1 1 42.47 81.23 3 3
7 H2 SAE 45*45*5 275 29.09 Comp 29.09 g220P -11.422 RN 58.958 39.263 62.976 1 1 1 80.46 100.23 3 1
8 H3 SAE 45*45*5 275 5.96 Comp 5.96 g236X -2.342 RN 58.958 39.263 62.976 1 1 1 80.46 100.23 3 1
9 H4 SAE 45*45*5 275 84.76 Comp 84.76 g240P -33.28 RN 58.958 39.263 62.976 1 1 1 80.46 100.23 3 1
10 H5 SAE 45*45*5 275 73.03 Comp 73.03 g273P -35.58 SBWC 48.724 78.525 125.952 1 1 1 110.78 115.39 3 2
11 HR1 SAE 45*45*5 275 19.75 Comp 19.75 g308P -7.756 RN 47.742 39.263 62.976 1 1 1 113.79 116.89 3 1
22
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
PROJECT
NAME CONSTRUCTION OF 2X40MVA 33kv ON A DOUBLE CIRCUIT TOWER FROM KPANDO TO HOHOE AND KADJEBI TO HOHOE REV 01
SUBSTATIONS IN THE VOLTA REGION.
Tension Tension
Tension Net Length
Steel Max Usage Max Tension Tension Connect. Connect. No. Of Hole
Group Angle Angle Control Section Tens. No. Of
Row Strength Usage Cont- Use In Control Force Shear Bearing Bolts Diameter
Label Type Size Load Capacity Member Holes
(MPa) % rol Tens. % Member (kN) Capacity Capacity Tens. (cm)
Case (kN) (m)
(kN) (kN)
1 L1 SAE 90*90*6 355 84.96 Comp 67.51 g1X 212.036 RN 335.475 314.1 361.267 0.501 4 1 1.75
2 L2 SAE 90*90*6 355 82.18 Comp 72 g2X 169.619 RN 335.475 235.575 270.95 0.494 3 1 1.75
3 L3 SAE 60*60*5 355 1.16 Comp 0.74 g315X 1.121 SBWC 179.156 157.05 150.528 1.915 2 1 1.75
4 D1 SAE 45*45*5 275 58.1 Comp 54.13 g23P 21.253 RN 78.528 39.263 62.976 0.878 1 1 1.75
5 D2 SAE 45*45*5 275 87.35 Comp 86.65 g109P 34.022 RN 78.528 39.263 62.976 0.857 1 1 1.75
6 H1 SAE 80*80*6 275 75.81 Comp 51.01 Fg206214P 60.086 RN 190.035 117.788 226.714 0.662 3 1 1.75
7 H2 SAE 45*45*5 275 29.09 Comp 15.55 g218P 6.104 RN 78.528 39.263 62.976 0.7 1 1 1.75
8 H3 SAE 45*45*5 275 5.96 Comp 5.57 g236P 2.188 RN 78.528 39.263 62.976 0.7 1 1 1.75
9 H4 SAE 45*45*5 275 84.76 Comp 47.71 g266P 18.734 RN 78.528 39.263 62.976 0.7 1 1 1.75
10 H5 SAE 45*45*5 275 73.03 Comp 55.1 g275P 43.267 RN 78.528 78.525 125.952 0.964 2 1 1.75
11 HR1 SAE 45*45*5 275 19.75 Comp 16.15 g305P 6.34 RN 78.528 39.263 62.976 0.99 1 1 1.75
23
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
FOUNDATION FORCES
24
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
7. FOUNDATION FORCES:
NORMAL TOWER:-
NORMAL CONDITION:-
NORMAL TOWER:-
25
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
26
CLIENT Electricity Company of Ghana limited DATE 03/02/2022
4
1
A
A
B
B
C
C
D
C L IE N T :
E le c t r ic it y C o m p a n y o f G h a n a L im it e d , G h a n a
PRO JECT :
C USTO M ER :
D E L O V E L Y C O M P A N Y L IM IT E D , G H A N A
M ANU FA CTURER:
M / s . A R V E N S IS E N E R G Y P R IV A T E L IM IT E D .
K o l lu r i H o u s e ,# 8 - 3 - 3 1 8 / 1 1 /3 ,P l o t N o . 3 , J a ip r a k a s h N a g a r ,
Y e l la r e d d y g u d a , A m e e r p e t , H y d e r a b a d - 5 0 0 0 7 3 ,T e l a n g a n a ,I n d ia .
E
D E S IG N VASU 0 1 . 0 2 .2 2 D e s c r i p t io n : S CALE
D RA W N P R A T H A P 0 2 .0 2 . 2 2 33K V GA NT RY STR U C TU R E NTS
C H E C KE D
A P PR O V ED
P R A T H A P 0 2 .0 2 . 2 2
M U THU 0 2 .0 2 . 2 2
F O R D O U B L E C IR C U IT S HEET
1 OF 1
S IZ E REV
D R G . No.
A3 0
27