Alec Qa QC Assesment

Download as pdf or txt
Download as pdf or txt
You are on page 1of 34

N/A

- Ceiling Plan to be attached to this MST


- See marked comments in red color.

Alaa Khorshid

27 April 2015
KA5-04 METHOD STATEMENT SUBMITTAL REVIEW COMMENTS
Bvlgari-Hotel & Residence
Project Name Employer Meraas
Project
Contractor ALEC Engineer WSP Middle East Ltd.

Submittal BHR-ALE-AR-MST-0001 Rev 00 Issue Date 27-Apr-15


Ref
Submittal Method statement for gypsum ceiling and partition Response Date 27-Apr-15
Description

Serial Item/Part Comment/Instruction/Observation By

1 Architectural See the main cover sheet ST

Contractor shall maintain proper cable management throughout the activity.


Adequate respiratory protection shall be provided to all involved operatives.
Usage of COSHH items only as per MSDS throughout the activity and waste
6 MS HSE
must be disposed as per chemical waste disposal requirements.
RA
Contractor shall only allocate trained and competent operatives for power
tools operations.
Review Status ST-Structural A☐ B☐ C☐ R☐ N/A☐
Signature Date

AR-Architectural A☐ B☐ C☐ R☐ N/A☐
Signature Date

MP-Mechanical/Plumbing A☐ B☐ C☐ R☐ N/A☐
Signature Date

EL-Electrical A☐ B☐ C☐ R☐ N/A☐
Signature Date

HSE-Health, Safety & Environmental A☐ B☐ C☐ R☐ N/A☐


Date:27/04/15
Signature
Note: The Engineer’s approval shall not in any way relieve the Contractor of his obligation under the Contract. The Contractor shall be
solely responsible for the soundness and the correctness of the submitted Materials and Documents as per clause 3.1.c of Conditions of
Contract.
Approval Codes: A: No Objection B: No Objection subject to comments C: Objection, Revise & Resubmit R: For Information
ALEC is instructed to proceed with
the works and to incorporate all the
comments during execution and not
to wait for updated approved drawings.
Any touch up required while consultant
inspection will be in ALEC scope of
work

ALEC to raise inspection request


for all main work stages to assure
consultant approvals on all stages.
The scope of Ceiling works / Ceiling Plan should be attached to this MST as well