Recovery Parts
Recovery Parts
Recovery Parts
drilling
IST Submitted On :
Total
Opn Time Total Total Time @ 90%
Sec Time Sec Sec
Time MHR Rs / Pc
Min
142.50
265.00 291.50 4.42 200.00 14.72
122.50 62
456.39
97.50 -20
175.00 192.50 2.92 200.00 9.72
77.50 -10
97.22
100.00
scrap genrated 3
SCRAP RATE 25
SCRAP COST-Rs 63
A Net mat. Cost 294
B Machining cost 854
machining cost less scrap 791
A+B Total cost 1148
62
31
Cycle Time Estimate for SHAFT 70OD 2522L BRG 65&45
Drawing # M01100640 Dwg Receipt Date: CT Estimate By:
Feed Tool
Length Speed Feed / Cutting
Opn Description MC mm/ Change
mm RPM Rev Sec
min Sec
drilling
IST Submitted On :
Total
Opn Time Total Total Time @ 90%
Sec Time Sec Sec
Time MHR Rs / Pc
Min
142.50
265.00 291.50 4.42 200.00 14.72
122.50 62
456.39
97.50 -20
175.00 192.50 2.92 200.00 9.72
77.50 -10
97.22
100.00
scrap genrated 3
SCRAP RATE 25
SCRAP COST-Rs 63
A Net mat. Cost 133
B Machining cost 854
machining cost less scrap 791
A+B Total cost 986
WEIGHT Part no pin
D L WT-KG
RAW MAT SIZE 16 90 0.25
RAW MAT.MS 65
RAW MAT. COST-Rs. 16 5280 -5264
62
31 scrap genrated 3
SCRAP RATE 25
SCRAP COST-Rs 63
A Net mat. Cost -46
B Machining cost 0
machining cost less scrap -63
A+B Total cost -46
62
31