CORPORATE DOCUMENT
Integrated Management System
PROJECT MANAGEMENT MANUAL
RESPONSIBLE'S REVIEW
Rev. Date Description Author Revised Aprobed
RRB-MMP-
A.1 09.Sep.19 For information Tomassini Perosa
NLI
1
PROJECT MANAGEMENT MANUAL
INDEX
1. SAXUM’s Project management model .................................................................................. 3
1.1. Corporate Structure .......................................................................................................... 3
1.2. Project Structure ............................................................................................................... 4
2. Scope of our project management model ............................................................................ 4
3. Project management ............................................................................................................. 4
1.3. General .............................................................................................................................. 4
1.4. Model Structure of Project Execution Plans (PEP) ........................................................... 5
4. SAXUM Manuals and Procedures Library ............................................................................. 6
2
PROJECT MANAGEMENT MANUAL
3
PROJECT MANAGEMENT MANUAL
3. Project Management
1.3. General
SAXUM, through the project teams and the support of the corporate areas design,
implement and control the execution of each Project through the Project Execution
Plans (PEP).
These plans, unique and unique to each project, reflect the Project or Service
Management Planning, its structure, characteristics, critical points, controls operations,
construction equipment, engineering, contractor control and any other methodology
that is customized and adapted to each need, always, considering the applicable legal
4
PROJECT MANAGEMENT MANUAL
Each PEP details the specific requirements of the Client, generating particular
application modalities for each contract and is sized according to its complexities. The
result of this planning also involves all the necessary verification, validation, monitoring
and measurement activities, both for products purchased, own and third-party
contracts, as well as for constructions and installations carried out.
Although the PEPs are tailored to each Project and the clients' own needs, its base structure is as follows:
A. Introduction
B. Definitions
C. Information about the Project
D. Scope of work
a. By SAXUM
b. By the Client
c. By others
d. Exclusions
E. Aplicable Legislation
F. Communications
a. Correspondence
b. Meeting Minutes
c. Telephone Conversation Records
d. E-mails
e. Recipients of the Correspondence
G. Project Organization
a. Project Organization Chart
b. Roles & Responsabilities
H. Project Control
a. Project Schedule
b. Deliverables:
i. Monthly Project Status Progress Report
ii. Needs Lists
5
PROJECT MANAGEMENT MANUAL
As we said before, the adaptation of our Management System to projects is carried out
through PEPs and taking from the Library those application procedures.
6
PROJECT MANAGEMENT MANUAL
ENGINEERING MANAGEMENT
Document. Denomination Type. Documentation level Notes
Engineering Manual Corporate manual
Comprehensive checkup Procedure Engineering Manual
procedure Application
Foundation checklist Checklist Engineering Manual
Application
Checklist for concrete Checklist Engineering Manual
planes Application
Checklist for metal Checklist Engineering Manual
structural documents Application
7
PROJECT MANAGEMENT MANUAL
PROJECT MANAGEMENT
Document. Type. Documentation level Notes
Denomination
Project Execution Descriptive document for the The format is adapted to each
Plan execution and control of project, respecting corporate
SAXUM projects guidelines and those of clients or
partners
Presentation guidelines Set of instructions applicable to It contemplates the
and general instructions project management possibility of establishing a
particular Project Manual
Basic Procedures for Set of main procedures Central column, to which the
Project Management applicable to project procedures are incorporated
management individuals
PROCUREMENT
Document. Denomination Type. Documentation level Notes
General terms and Document with general guidelines to Corporate sourcing
conditions for purchases follow in the purchasing process process
Special conditions for Document with special and particular Corporate sourcing
purchases guidelines to follow in the purchasing process
process
8
PROJECT MANAGEMENT MANUAL
Security and Hygiene Annex for Annex of the manual. It contains the Supply
purchases general guidelines for purchases and Management
contracts considering the Health and including
Safety requirements. Subcontractors
QA/QC MANAGEMENT
Document. Type. Documentation level Notes
Denomination
Quality Assurance Descriptive manual of corporate roles, • Quality
and Control control mechanisms and typical assurement
Manual documentation for SAXUM projects • Quality controls
• Control of the
documentation of
• quality of the project.
Quality assurance Descriptive manual of the requirements and
manual for procedures applicable by contractors working
Contractors on SAXUM projects