FORMULIR CHESM Performance Review Protocol 26 September 2019
FORMULIR CHESM Performance Review Protocol 26 September 2019
Date of Review:
1/10 points
3 Action Item Management
If N/A, deduct from total points available
2
CHESM Performance Review
4
CHESM Performance Review
6
CHESM Performance Review
Evaluate contractor-specific
action items from Action Item V&V :
report in the CHESM IT Tool. Need to re-
Acceptable performance confirm to
indicates assigned ownership, V&V team to
timely management, completion ensure data
& validation of identified validity of
actions. contractor
1. Inspection (contractor)
2. Audit (contractor internal
audit)
7.5 :91% - 99% Under
3. Management review 100%
5 :71% - 90% 50%
(contractor) completed
2.5 :51% - 70% completed
4. Incident investigation timely
(0)
corrective action (10)
(contractor)
5. CHESM Field Inspection
for MVS& MSW (CVX)
6. Post award kick off meeting
(CVX)
7. CHESM/MSW Field
verification (CVX)
8. Last Interim Review (CVX)
9. Mitigation plan (CVX)
_____of _10_
SCORE:
pts
Target Completion
Section # / Action Item Description Owner
Date Date
8
CHESM Performance Review
Target Completion
Section # / Action Item Description Owner
Date Date