Unit 1 Housing in Britain: Vocabulary
Unit 1 Housing in Britain: Vocabulary
Unit 1 Housing in Britain: Vocabulary
In the past few years housing in Britain has been a problem with many aspects.
One is the supply of houses. Due to the expanding population, to the low rate of building
new houses and to the age of many existing houses, there have not been enough houses
to go around. Not only have many people been homeless but also many others have
been living in overcrowded buildings of a low standard. Though the government and
charities such as Shelter have been trying hard to remedy this situation, there are still
immense problems, particularly around the centers of the large cities.
There are three basic forms of accommodation. In the first place, some own their
own houses or flats, often the money for this is borrowed from the building society on a
"mortgage" and is paid back over twenty or thirty years. Secondly, many people live in
council flats or houses, these are owned by the local council and rented out. Council
housing has aroused controversial political issues about whether council tenants should
pay the full rent or should be subsidized and whether they should have the opportunity
to buy their houses if they like. Thirdly, some people rent accommodation from private
landlords, either furnished or unfurnished. A complicated set of laws and regulations
defines the right of landlords and tenants, governing, for instance, when landlords can
force tenants to leave and how much rent they can charge.
A further problem since about 1970 has been the tremendous rise in the price of
housing. In the London area the value of houses doubled in about two years, although
prices have levelled off, they are unlikely to return to their earlier levels. People who
already own houses have not been too badly affected, since the rise in the value of the
house they are selling to some extent cancels out the rise in the price of a house they
wish to move to. However, it has made house-buying extremely difficult for those who
are buying a house for the first time such as young married couples.
(Source: V.J.COOK, English Topics, Oxford University Press, 1974)
VOCABULARY
commission (n) : nhiệm vụ
aspect (n) : mặt, khía cạnh
expanding population (n) : dân số gia tăng
rate (n) : tốc độ, mức
existing (adj) : hiện có, đang tồn tại
COMPREHENSION CHECK
1. What has happened to housing in the past few years in Britain?
……………………………………………………………………………………
……………………………………………………………………………………
2. Have there been enough houses to go around? Why?
……………………………………………………………………………………
……………………………………………………………………………………
3. Where have people lived?
……………………………………………………………………………………
……………………………………………………………………………………
4. What have the government and charities been trying to do?
……………………………………………………………………………………
……………………………………………………………………………………
5. How many basic forms of accommodation are there?
……………………………………………………………………………………
Centre of Foreign Languages Page 2
……………………………………………………………………………………
6. What is the first form?
……………………………………………………………………………………
……………………………………………………………………………………
7. What is the second form? What has council housing aroused?
……………………………………………………………………………………
……………………………………………………………………………………
8. What is the third form?
……………………………………………………………………………………
……………………………………………………………………………………
9. What does the set of laws and regulations define?
……………………………………………………………………………………
……………………………………………………………………………………
10. What has happened to the price of housing since about 1970?
……………………………………………………………………………………
……………………………………………………………………………………
11. Have people who already own houses been too badly affected? Why?
……………………………………………………………………………………
……………………………………………………………………………………
SKILLS DEVELOPMENT
Exercise 1: Read the text again. Write T (true), F (false), or NG (not given).
1. There have been enough houses to supply to people in Britain because of the age
of many existing houses.
2. People can borrow the money from the building society to buy houses or flats.
3. The price of housing has risen dramatically since about 1970.
4. The housing shortage makes many people become homeless.
5. People who already own houses have not been too badly affected due to the rise in
the price of housing.
6. The local council own council flats or houses and rent them to people.
7. Tenants in Britain come from all over the world.
Exercise 2: Choose the best answer to complete each of the following sentences.
1. Due to the low rate of ………..…. new houses, there have not been enough houses
to go around.
A. build B. building C. to build D. builds
Exercise 3: Fill in the gap with the correct form of the given word to complete the
sentences.
1. People who already own houses have not been too (BAD)
……………….. affected.
2. The money for houses is borrowed from the building society (PAY)
and is ……..………. back over twenty or thirty years.
3. Some people rent accommodation from private landlords, (FURNISH)
either furnished or ……………… .
4. Though the government and charities have been trying hard (REMEDIAL)
to ………………. this situation, there are still immense
problems.
Centre of Foreign Languages Page 4
5. Many people have been living in ………………. buildings (OVERCROWD)
of a low standard.
6. There are three basic forms of ……………………. . (ACCOMMODATE)
Exercise 4: Use the following sets of words and phrases below to write complete
sentences.
1. Due / age / many / existing house/, there / be / not / enough houses / go around / two
years.
…………………………………………………………………………….…………..
…………………………………………………………………………….…………..
2. Some people / own / house / or / flat/, often / money / this / be / borrow / building
society.
…………………………………………………………………………….…………..
…………………………………………………………………………….…………..
3. past few years/ housing / Britain / be / problem / many aspect.
…………………………………………………………………………….…………..
…………………………………………………………………………….…………..
4. Other people / rent accommodation / private landlord/, either furnished /
unfurnished.
…………………………………………………………………………….…………..
…………………………………………………………………………….…………..
5. Although / prices / level off/ several years/, they / unlikely / return / earlier levels.
…………………………………………………………………………….…………..
…………………………………………………………………………….…………..
6. Many people / live / council flat/ or / house/, these / owned / by / local council.
…………………………………………………………………………….…………..
…………………………………………………………………………….…………..
Exercise 5: Finish each of the following sentences in such a way that it means
exactly the same as the sentence printed before it.
1. The local council should subsidize tenants to buy houses.
Tenants …………………………………………..…………………………………..
2. Young married couples find it difficult to buy houses because of the rise in the price
of housing.
The rise in the price of housing…..…………………………………………….……
3. The prices of houses have levelled off, but they are unlikely to return to their
earlier levels.
Although ……………………………………………………………………….…..
4. People will pay back the money for houses over years.
The money …………………………………………………………………….….….
5. There are three basic forms of accommodation in Britain.
Britain …………………………………………………………………………….…
6. A complicated set of laws and regulations defines the right of landlords and tenants.
The right of ………………………………………………………………………….
7. Due to the low rate of building new houses, there have not been enough houses to
go around.
Because the …………………………………………………………………………
Building Purpose of
Examples of activities Spaces provided
type building
Exercise 7: Make sentences using the information from the table above.
Structures:
• To function as
• To serve as
• To have the capacity to do smth
• To be capable of doing smth
Example:
- A university functions / serves as a place for educating students.
- The university has the capacity to educate / is capable of educating 200 students
a year.
- Spaces provided in the building include a lecture room, laboratories and a library.
…………………………………………………………………………………………...
…………………………………………………………………………………………...
…………………………………………………………………………………………...
…………………………………………………………………………………………...
…………………………………………………………………………………………...
…………………………………………………………………………………………...
VOCABULARY
decline (n) : sự sút giảm
dramatically (adv) : một cách đáng kể
primarily (adv) : chủ yếu
phenomenon (n) : hiện tượng
substandard (adj) : không đủ tiêu chuẩn
proportionately (adv) : một cách tương ứng, tương xứng
inventory (n) : bảng kiểm kê
demolition (n) : sự phá hủy, phá đổ
eliminate (v) : loại ra, loại bỏ
upgrade (v) : nâng cấp
COMPREHENSION CHECK
1. Have there been any changes in housing quality levels in the united State in
recent decades?
2. Does low quality housing mainly exist in urban areas today?
3. Make a comparison of housing quality between rural and urban areas.
4. What are the reasons that have affected the development of housing quality
levels?
When an architect receives a commission for a building, he meets the client and
discusses his requirements. After visiting the site, the architect draws up preliminary
plans and, together with a rough estimate of the cost, submits them to the client for his
approval. If the client suggests changes, the architect incorporates them into the final
design which shows the exact dimension of every part of the building. At this stage,
several building contractors are invited to bid for the job of constructing the building.
When they submit their tenders or prices, the architect assists his client in selecting the
best one and helps him to draw up a contract between the client and the contractor.
Work now starts on the building. As construction proceeds, the architect makes
periodic inspections to make sure that the building is being constructed according to
his plans and that the materials specified in the contract are being used. During the
building period, the client pays the bills from the contractor. Subsequently, the
contractor completes the building and the client occupies it. For six months after
completion there is a period known as the "defect liability period". During this period,
the contractor must correct any defects that appear in the fabric of the building.
Finally, when all the defects have been corrected, the client takes full possession of the
building.
(Source: JAMES CUMMING, English for Science and Technology- Architecture
and Building Construction, Longman, 1985.)
VOCABULARY
procedure (n) : thủ tục, quy trình
proceed (v) : tiến hành, tiến triển
commission (n) : nhiệm vụ
client (n) : chủ đầu tư, bên A, khách hàng
site (n) : mặt bằng, khu đất để xây dựng
preliminary plan (n) : bản thiết kế sơ bộ
approval (n) : sự đồng ý, chấp thuận
approve (v) : đồng ý, chấp thuận
dimension (n) : kích thước
COMPREHENSION CHECK
A. Now find a word or an expression in the passage which means:
a. to be given the job of designing a building
receives a commission
………………………………………………………………………………………..
b. to offer to a client for his consideration
………………………………………………………………………………………..
submits them to the client for his approval
the site
preliminary preliminary
plans plans
Incopr...
best contract
draw up the
contractor client
contract
the building
Exercise 3: Fill in the gap with the correct form of the given word to complete the
sentences.
1. Several building …………………..
Contractor are invited to bid for the (CONTRACT)
job of constructing the building.
2. ………………,
Finally when all the defects have been corrected, the (FINAL)
client takes full possession of the building.
periodic
3. The architect makes……..………….inspections to make sure (PERIOD)
that the building is being constructed according to his plans.
Exercise 4: Read the following description of the House. Match the letters (a-i)
with names of the areas.
hall (Sảnh) living room (P, Khách) dining area (Kv ăn) toilet (Toilet)
bedroom (P. Ngủ) kitchen (Nhà bếp) bathroom (Phòng tắm) terrace (Sân thg)
Kitchen Bedroom
Dining
room
Terrace
Toilet
Bathroom
Lliving Hall
room
Bedroom
b. Say whether these statements are true or false. Correct the false statements.
T/F
a. The dining room is located under the main bedroom. T
Exercise 6: Read the following work activities and decide which are of Client /
Architect / Contractor.
1._______ Make sure the building is being built according to schedule and budget.
2._______ Ensure that the building is completed on time and within budget.
3._______ Select & appoint a competent contractor.
4._______ Comply with legal requirements, building and safety codes, and other
regulations.
5._______ Schedule and coordinate all construction processes so that the building
meets design specifications.
6._______ Be the financier and eventual owner of the building
7._______ Provide the Pre-Construction Information (PCI) to the designers and
contractors.
8._______ Create building designs and highly detailed drawings both by hand and by
using specialist Computer-Aided Design (CAD) applications.
9._______ Choose the materials to be used and specify the requirements for the
building.
10. _______ Report work progress and budget matters to the client.
VOCABULARY
participant (n) : các bên tham gia, người tham gia
be composed of : bao gồm
process (n) : quá trình, công đoạn
supplier (n) : nhà thầu cung ứng, cung cấp.
institutional environment (n) : tình trạng thể chế
enhance (v) : tăng, tăng cường, nâng cao
prior to something (v) : trước khi
on one’s behalf : đại diện cho
specification (n) : chi tiết kĩ thuật
define (v) : làm rõ, xác định
assemble (v) : lắp
Centre of Foreign Languages Page 17
erect (v) : dựng
skilled (adj) : lành nghề
wholesaler : người bán sỉ
retailer (n) : người bán lẻ
determine (v) : xác định, định rõ
determinant (n) : nhân tố quyết định
restriction (n) : hạn chế
impose on/upon (v) : tác động
COMPREHENSION CHECK
a. Answer the following questions
1. Who is the construction industry composed of?
2. What also has effects on the industry?
3. What should the clients do to enhance the efficiency of the building construction?
4. What are the functions of the designers?
5. What do the contractors do?
6. What are the two functions of the Government?
7. How does the economic and institutional setting affect the design and
construction process?
b. Read the text again. Say whether the statements are true (T) or false (F).
1. The construction industry is composed of only five participants.
2. Economic and institutional setting affects the construction industry.
3. Government is the primary determinant of the environment in which the
industry operates.
4. The clients are those who want to use building space.
5. The designers are the owners of the construction contract.
6. The contractors are mostly responsible for the building.
7. Material suppliers must be the producers of construction materials.
8. The designers always work in a team.
9. Wholesalers sell construction materials to the consumers through the material
suppliers.
10. The clients define the overall structure and form of the building.
The tropical regions of the earth can be divided into three major climatic zones:
1. Warm-humid climates are found in a belt near the Equator extending to about
15° north and south. There is very little seasonal variation throughout the year. The air
temperature is never excessive, but there is considerable rainfall during most of the
year. Relative humidity (RH) is excessively high - at about 75% for most of the time,
but it may vary from 55% to almost 100% (RH should not exceed 70% for human
comfort).
In this climate the rooms of houses must have adequate shade and ventilation.
Usually houses have an open layout so they can gain maximum benefit from the
prevailing wind. Walls have less importance here than in other climates. They are used
primarily for screening from insects and for their wind penetration qualities.
2. Hot-dry climates are found in two belts of latitude between approximately 15°
and 30° north and south of the equator. Two marked seasons occur: a hot and a slightly
cooler period. Day-time air temperatures are excessively hot (normally higher than the
31°C to 34°C skin temperature), but at night it may fall as much as 25°C. During the
day, there is too little cloud cover to reduce the high intensity of direct solar radiation.
However, at night the clear skies permit a considerable amount of heat to be reradiated
to outer space.
In this climate houses must give adequate protection against the excessive heat of the
sun. Usually they have compact layouts so that surfaces exposed to the sun are reduced as
much as possible. Walls should be very thick and made of heat storing materials so they
hold the heat of the day and give it back to the interior of the house at night.
3. Composite or monsoon climates are found in large land masses near the
tropics of Cancer and Capricorn. Two seasons occur normally. Approximately two-
thirds of the year is hot-dry and the other third is warm-humid. Consequently, houses
designed to be suitable for one season may be unsuitable for the other.
(Source: JAMES CUMMING, English for Science and Technology- Architecture
and Building Construction, Longman, 1985.)
SKILLS DEVELOPMENT
Exercise 1: Choose the best answer to complete the following sentences.
1. The air temperature is never ………………
A. excessive B. excessively C. excess D. exceed
2. Usually houses have an open layout so they can gain ……….…… benefit from the
prevailing wind
A. maximal B. maximum C. minimum D. little
3. Consequently, houses ……………. to be suitable for one season may be unsuitable
for the other.
A. designing B. design C. designed D. are designed
4. Walls should be very thick and made of heat …..…………. materials
A. storing B. store C. stored D. to store
Exercise 2: Complete the sentence by forming a suitable new word form the
provided word in bracket.
1. . …………….. humidity (RH) is excessively high. (RELATION)
2. Hot-dry climates are found in two belts of latitude (APPROXIMATE)
between ……………………….. 15° and 30° north and
south of the equator.
3. Day-time air temperatures are …………………... hot. (EXCEED)
4. Usually they have compact layouts so that surfaces (POSSIBILITY)
exposed to the sun are reduced as much as
……………………… .
5. Composite or monsoon climates are found in large land (TROPICAL)
masses near the ………………of Cancer and Capricorn.
6. During the day there is too little cloud cover to reduce the (INTENSIVE)
high ……………….. of direct solar radiation.
7. At night the clear skies permit a …………............. amount (CONSIDER)
of heat to be reradiated to outer space.
8. RH should not exceed 70% for human ……………..… . (COMFORTABLE)
9. Approximately two-thirds of the year is hot-dry and the (HUMIDITY)
other third is warm- ………………… .
10. RH may ………………..… from 55% to almost 100%. (VARIATION)
Exercise 6: Use the table to write as many sentences as possible using "include",
"act as'; "is designed to” ,”enable” like the following examples:
• The functions of the lowest floor include providing surfaces for activities and
modifying the passage of heat.
• The external wall acts as a thermal insulator.
• The roof and the external walls are designed to resist loads.
• The partition enables the building to provide visual screening.
…………………………………………………………………………………………..
…………………………………………………………………………………………..
…………………………………………………………………………………………..
…………………………………………………………………………………………..
…………………………………………………………………………………………..
FURTHER READING
One of the problems in hot climates is to exclude not only radiant heat but also
glare, while at the same time admitting sufficient daylight. There is a fundamental
difference between the problem in the arid and humid regions. In the arid regions,
glare is caused by sunlight being reflected from the surface of the ground and light
colored walls of other buildings. A traditional way of overcoming this problem is by
keeping windows on the external elevations small and few in number, with the larger,
low level windows overlooking the shaded internal courtyard. Too sharp a contrast
between a bright opening and the surrounding inside wall surface results in glare. For
this reason, when small windows are used on the external walls, they must be designed
with care. One traditional method of overcoming this problem is to use vertical slit
windows which are usually located in the corners of rooms. Another method is to
Centre of Foreign Languages Page 26
locate the windows between the ceiling and eye level, or alternatively filters can be
used in the form of lattices, screens or shutters.
VOCABULARY
radiant heat : bức xạ nhiệt
glare (n) : sự chói nắng, chói mắt
fundamental (adj) : cơ bản
arid region : vùng khô
reflect (v) : phản xạ, phản chiếu
shaded (adj) : có bóng râm
contrast (n) : sự tương phản
eye level : tầm mắt, độ cao ngang mắt
filter (n) : cửa lọc
shutter (n) : cửa chớp
diffuse (v) : khuếch tán
COMPREHENSION CHECK
1. What is one of the problems in hot climates?
2. What causes glare in the arid regions?
3. What is the traditional way of overcoming this problem?
4. What also results in glare?
5. What are the advantages of thin external walls of coarsely woven mats in
traditional houses?
Building materials are used in two basic ways. In the first way they are used to
support the loads on a building. In the second way they are used to divide the space in
a building. Building components are made from building materials and the form of a
component is related to the way in which it is used. We can see how this works by
considering the different types of construction
In another type of construction, sheet materials are used to form walls, which act
as both space dividers and structural support. Timber, concrete and some plastics can
be made into large rigid sheets and fixed together to form a building. These buildings
are lighter and faster to construct than buildings made up of blocks
Rod materials can be used for structural support but not for dividing spaces.
Timber, steel and concrete can be formed into rods and used as columns. Rod
materials with high tensile and compressive strength can be fixed together to form
framed structures. The spaces between the rods can be filled with light sheet materials
which act as space dividers but do not support structural loads.
(Source: JAMES CUMMING, English for Science and Technology Architecture
and Building Construction, Longman, 1985)
COMPREHENSION CHECK
1. Which paragraph discusses:
a. planar construction
b. frame construction
c. mass construction
SKILLS DEVELOPMENT
Exercise 1:
a. Read the text again and complete this table by putting ticks in the boxes
to show the functions of the components:
Function of components
Structural support Space dividing Both structural support
Form of material
only only and space dividing
Blocks
Sheets
Rods
b. Now say whether these statements are true or false. Correct the false ones.
1. Rod materials can be used for both dividing space and supporting the building.
2. Concrete can be used as a block material, a sheet material and a rod material.
3. Steel is used for frame construction because it has high tensile strength and
low compressive strength.
Exercise 2:
a. Look at the following drawings and examples.
VOCABULARY
flexible (adj) : dễ uốn
combustible (adj) : bắt lửa
non-combustible (adj) : không bắt lửa
water-vapour (n) : hơi nước
permeable (adj) : thấm nước
impermeable (adj) : không thấm nước
transparent (adj) : trong suốt
opaque (adj) : mờ đục
stainless steel (n) : thép không gỉ
corrosion resistant (adj) : chống ăn mòn
mild steel (n) : thép thường
transfer (v) : truyền, dẫn
a good conductor of heat : chất dẫn nhiệt tốt
a poor conductor of heat : chất dẫn nhiệt kém
1. The polythene membrane can prevent moisture from rising into the concrete
floor. This means that polythene is…………………………………………..
2. The T-shaped aluminium section can resist chemical action, i.e. aluminium
is…………………………………………………………………………………
3. The stone block cannot be lifted without using a crane. This means that stone
is………………………………………………………………………………….
4. The corrugated iron roof cannot prevent the sun from heating up the house, i.e.
iron is……………………………………………………………………………
5. Glass wool can help to keep a house warm in the winter and cool in the
summer, i.e. glass wool is……………………………………………………….
6. The ceramic tiles on the floor cannot be scratched easily by people walking on
them. This means that ceramic tiles are………………………………………….
c. Look at these diagrams. Match the letters A-H in the diagrams with the
sentences in part b:
Exercise 4: Complete the sentence by forming a suitable new word form the
provided word in bracket.
Exercise 5: Use the following sets of words and phrases below to write complete
sentences.
1. Building material / used/ two basic /way.
…..…………………………………………………………………….………………
………………………………………………………………………….……………..
2. Building component/ make/ from /building material.
…..…………………………………………………………………….………………
………………………………………………………………………….……………..
3. first way /building material/ used / support / load/ building.
…..…………………………………………………………………….………………
………………………………………………………………………….……………..
4. second way /building material/ used / divide/space / building.
…..…………………………………………………………………….………………
………………………………………………………………………….……………..
5. External wall/act/as/ thermal insulator.
…..…………………………………………………………………….………………
………………………………………………………………………….……………..
6. one kind /construction,/ blocks / material/put/ together /form /solid /wall.
…..…………………………………………………………………….………………
………………………………………………………………………….……………..
7. sheet materials /used / form /wall/ act / space divider/ structural support.
…..…………………………………………………………………….………………
………………………………………………………………………….……………..
8. Rod material/can /use/ structural support /not /divide/ space.
…..…………………………………………………………………….………………
………………………………………………………………………….……………..
Centre of Foreign Languages Page 36
9. These materials/ have / property / high compressive strength.
…..…………………………………………………………………….………………
………………………………………………………………………….……………..
10. Imperious material/ be able/ keep out/ water.
…..…………………………………………………………………….………………
………………………………………………………………………….……………..
Exercise 6: Finish each of the following sentences in such a way that it means
exactly the same as the sentence printed before it.
1. Building materials are used in two basic ways.
They use………………………………………………………………………..………
2. They frequently use light materials for making roofs.
Light materials……………………………………………………………..…………..
3. These materials can support the structural loads because they have the property of
high compressive strength.
The property …………………………………………………………….……………..
4. The ceramic tiles on the floor cannot be scratched easily by people walking on
them.
This means that ceramic tiles…………………………………………………………
5. Rod materials can be used for supporting structural load but not for dividing spaces.
Rod materials can be used to………………………………………………………..
6. Workers can’t lift the stone block because it is heavy.
The stone block………………………………………………………………………
7. Sand is used with cement, and sometimes lime to make plaster.
Plaster……………………………………………………………………………….
8. They have spent 2 months manufacturing and transporting building materials.
It………………………………………………………………………………………
9. They discussed the effect of material choice. Then they evaluated the process of
construction in the meeting.
After …………………………………………………………………..………………
10. The design, construction deficiencies resulted in the degradation of building materials.
The building materials.……………………………………………………………….
The principal construction materials of earlier times were wood and masonry –
brick, stone, or tiles, and similar materials. The courses or layers were bound together
with mortar or bitumen, a tarlike substance, or some other binding agent.
Both steel and cement, the two most important construction materials of
modern times, were introduced in the nineteenth century. The enormous advantage of
steel is its tensile strength; that is, it does not lose its strength when it is under a
calculated degree of tension, a force which, as we have seen, tends to pull apart many
materials. New alloys have further increased the strength of steel and eliminated some
of its problems, such as fatigue, which is a tendency for it to weaken as a result of
continual changes in stress.
Modern cement, called Portland cement, was invented in 1824. It is a mixture
of limestone and clay, which is heated and then ground into a powder. It is mixed at or
near the construction site with sand, aggregate (small stones, crushed rock, or gravel),
and water to make concrete. Different proportions of the ingredients produce concrete
with different strength and weight. Concrete is very versatile; it can be poured,
pumped, or even sprayed into all kinds of shapes. And whereas steel has great tensile
strength, concrete has great strength under compression. Thus, the two substances
complement each other.
The availability of steel and concrete, together with the elevator, which was also
developed in the nineteenth century, has made possible the most characteristic kind of
modern structure: the steel or concrete frame building. Not only towering modern
skyscrapers, but also many less gigantic and spectacular buildings have a skeleton of
steel or concrete that bears the weight of the structure. Until this type of construction
became possible, the exterior walls – called bearing walls – had to carry the weight of
the building. This meant that the walls on the lower floors of a tall building had to be
tremendously thick.
VOCABULARY
compression (n) : sự nén, lực nén
tension (n) : sự kéo, lực kéo
principal (adj) : chính
bind-bound-bound (v) : liên kết
mortar (n) : vữa
COMPREHENSION CHECK
1. What is masonry made of?
2. What is Portland cement?
3. When was Portland cement invented?
4. What is the advantage of concrete?
5. When were steel and cement introduced?
6. What is the enormous advantage of steel?
7. What is the function of exterior walls?
A water supply for a town usually includes a storage reservoir at the source of
the supply, a pipeline from the storage reservoir to the distribution reservoir near the
town, and finally the distribution pipes buried in the streets, taking the water to the
houses, shops, factories, and offices. The main equipment is thus the two reservoirs
and the pipeline between them. The function of the storage reservoir is to keep enough
water over one or several years to provide for all high demands in dry periods, and the
distribution reservoir has the same function for the day or the week. The storage
reservoir by its existence allows the supply sources to be smaller and less expensive,
and the distribution reservoir similarly allows the pipeline and pumps to be smaller
and cheaper than they would be if it did not exist.
In the United States, some of whose cities have the largest water use in the world per
person, the average use per person varies from 200 to 5,000 litres per day, averaging some
500 litres/day/person. But it must not be assumed that colder countries will eventually
reach the same level of use, because much of the highest US demand comes from the
water spent in summer on air conditioning equipment and the watering of gardens.
Water engineers must therefore study the water use per person (consumption per
head) in their own country and choose a figure based on the most advanced
community there. The chosen consumption per head must be multiplied by the
estimated population at the date for which the supply is being planned, some thirty
years ahead or more. The supply and the storage equipment must be designed to be
large enough for this period since neither of them is so easily extended as the
distribution system. This can be extended as the need arises and as the houses are built.
VOCABULARY
air conditioning equipment : thiết bị điều hoà
advanced community : cộng đồng tiên tiến
arise (v) : phát sinh, nảy sinh
assume (v) : giả sử, cho rằng
assumption (n) : giả thuyết
COMPREHENSION CHECK
1. What does a water supply for a town usually consist of?
..................................................................................................................................
..................................................................................................................................
2. What is the function of the storage reservoir?
..................................................................................................................................
..................................................................................................................................
3. Does the distribution reservoir have the same function as the storage reservoir?
Why?
..................................................................................................................................
..................................................................................................................................
SKILLS DEVELOPMENT
Exercise 1: Use the following words to label the drawing of the Water Supply System:
corporation stop, shutoff valve, curb box, raw water, water tower,
service pipe, water meter, curb cock, water main, reservoir, potable water.
A B
a . waterworks 1. a valve controlling the flow of water from a main to a
service pipe.
b. water treatment 2. water that requires treatment before it can be used for
drinking.
c. water tower 3. a valve for shutting off the water flow from a supply
pipe.
d. water main 4. a pipe that allows water to escape from overflowing
cisterns, basins, baths and sinks.
e. water meter 5. a main pipe that carries water from water works to
different districts.
f. raw water 6. a natural or artificial place where water is collected
and stored for use.
g. potable water 7. a device for measuring and recording the quantity of
water passing through a pipe.
h. corporation stop 8. place where water is taken from rivers and purified.
i. curb cork 9. water fit for human consumption.
j. shutoff valve 10. a process of purifying and clarifying raw water for
drinking.
k. service pipe 11. a control valve for shutting off the water supply to a
building in case of an emergency.
1. overflowing pipe 12. a pipe connecting a building to a water main.
m. reservoir 13. a tower into which water is pumped to a height
sufficient to maintain a desired pressure for
distribution to customers.
There are different ways of purifying water for use such as filtration, aeration
and chlorination. The first method is (1) ………………. . It is the way in which dirty
water is passed through a (2) ………………. . It consists of a bed of sand or gravel
which removes (3) ………………. that might otherwise contaminates the supply.
Exercise 4: Complete the sentence in the text by forming a suitable new word
form from the provided word in bracket.
Exercise 6: Rewrite each of these sentences in such a way that it has the same
meaning as the given one.
1. A construction site is an area. The building is built in this area.
A construction .............................................................................................................
2. The water engineer handed in his record. His record was about the water
consumption in ten years.
The water engineer ......................................................................................................
3. Water engineers have to study water use per person per year. They base on this
water use per person to make plan of water supply.
Water engineers............................................................................................................
4. A storage reservoir is a very large tank or an artificial place. This storage
reservoir stores water for future use.
A storage reservoir ......................................................................................................
5. It's necessary to save water resources and natural minerals.
Saving...........................................................................................................................
6. Water engineers have to study water use per person per year before planning the
water supply for a residential area.
Water use......................................................................................................................
7. The water engineer has just handed his report on the shortage of water in some
residential areas to the director.
The director .................................................................................................................
8. The supply pipe to that 8-story building was repaired for 5 days.
It ................................................................................................................................
9. "Have you checked the drain in the kitchen yet?" The foreman plumber asked his
man.
The foreman plumber asked his man..........................................................................
10. Waste water can be treated for watering trees.
We ................................................................................................................................
11. "How many ways of purifying water are there?" He asked the water engineer.
He asked ......................................................................................................................
VOCABULARY
role (n) : vai trò
be involved in (v) : tham gia vào
conception (n) : nhận thức, quan niệm
planning (n) : qui hoạch
evaluation (n) : đánh giá
operation (n) : vận hành
maintenance (n) : bảo dưỡng
objective (n) : mục đích
determination (n) : xác định
flowrates (n) : lưu lượng định mức
characteristic (n) : đặc tính
essential (adj) : cần thiết, thiết yếu, cơ bản
aspect (n) : khía cạnh, mặt, vấn đề
subject (n) : môn học, đối tượng nghiên cứu, chủ đề
control (n) : kiểm soát
collection (n) : thu thập, thu
transmission (n) : truyền tải
integrated (adj) : hợp nhất
area (n) : lĩnh vực
dynamic (adj) : sôi động
generation (n) : sự phát sinh
estimation (n) : sự ước lượng, sự đánh giá, dự toán
partial (adj) : từng phần
discharger (n) : cơ sở xả (nước thải), nguồn xả nước thải
Centre of Foreign Languages Page 48
sewer (n) : cống, ống thải lớn
pumping station (n) : trạm bơm
effluent (n) : chất thải
aquatic (adj) : nước
individual (adj) : tư nhân
facility (n) : công trình
sludge (n) : bùn, bùn đặc
COMPREHENSION CHECK
1. What are practicing wastewater engineers involved in?
2. What must the engineer study if truly integrated wastewater systems are to be
designed?
3. What areas of wastewater engineering have been and continue to be in a
dynamic period of development?
4. What does the engineer have to know to play an active role in the development
of wastewater engineering?