Acme Stamping Data Set
Acme Stamping Data Set
Acme Stamping Data Set
Acme stamping company produces several components for vehicle assembly plants. This case
concerns one product family: a steel instrument-panel bracket subassembly in two types: one
each for left hand and right hand drive versions of the same automobile model. These
components are sent to the State Street Vehicle Assembly Plant (the customer).
WORK TIME:
20 days in a month
Two shift operation in all production departments
Eight (8) hours every shift, with overtime if necessary
Two 10 minute breaks during each shift
Manual processes stop during breaks
Unpaid lunch
ACME PRODUCTION Receives state street’s 90/60/30 day forecast and enters them
CONTROL to MRP
DEPARTMENT
Issues Acme 6 week forecast to Michigan Steel Co via MRP
Secures coil steel by weekly Faxed order released to Michigan
Steel Co.
Receives daily firm order from state street
Generate MRP based weekly departmental requirements
based upon customer order, WIP inventory levels F/G
inventory level, and anticipated scrap and downtime
Issues weekly build schedules to stamping, welding, and
assembly processes
Issues daily shipping schedule to shipping department
PROCESS All processes occur in the following order and each piece goes
INFORMATION through all process. 1. STAMPING
4. ASSEMBLY WORKSTATION – I
(dedicated to this product family)
5. ASSEMBLY WORKSTATION – II
(dedicated to this product family)
6. SHIPPING DEPARTMENT
Removes parts from finished goods warehouse and stages them for
truck shipment to customer.