Standard Checklist: Preventive Maintenance - 6Months/Annual

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

STANDARD CHECKLIST

EQUIPMENT: LEVEL TRANSMITTER (FMR-51)


LOCATION: REFINERY

Page 1 of 2
PREVENTIVE MAINTENANCE –
6MONTHS/ANNUAL Trade: ELEC

INSTRUMENT LIST
Machine ID / SN. *Refer to Attached Instrument List Table

Date Time (Start) Time (End)

CHECKLIST
Executed
No. Work Description Remarks
Yes No

Check Incoming power supply, wiring connection and


1 ☐ ☐
fuse of FMR-51

2 Visual check of the wires (any torn, loose and etc) ☐ ☐

Inspection on instrument i.e. mounting, cleanliness,


3 ☐ ☐
casing n etc

Observe the result values displayed at LCD instrument


4 ☐ ☐
and Scada. If mismatched, proceed to the next steps.

5 Check the signal status ‘weak’ or ‘strong’ ☐ ☐

6 Re-mapping lower/upper range, if necessary. ☐ ☐

7 Disassemble and clean the instrument if it is necessary. ☐ ☐

Send to third party for external calibration if it is


8 ☐ ☐
required.

CORRECTIVE MAINTENANCE
Yes ☐
Is Cm Required? Work Order (requested):
No ☐

 | Rev1 (13.03.2019)
STANDARD CHECKLIST
EQUIPMENT: LEVEL TRANSMITTER (FMR-51)
LOCATION: REFINERY

Page 2 of 2
PREVENTIVE MAINTENANCE –
6MONTHS/ANNUAL Trade: ELEC

ELECTRICAL DEPARTMENT
Maintained by Designation Signature Date Time

Approval by Designation Signature Date Time

PRODUCTION DEPARTMENT
Approval by Designation Signature Date Time

 | Rev1 (13.03.2019)