BOQ of Screen House for Saplings For Palpa

S.N. Description of works Unit Rate Quantity Amount Remarks


Site Clearance including cutting Shrubs removing trees etc 2
1 m 17.99 286.00 5,145.14
all complete
Earthwork excavation in foundation in soft and hard soils
2 m3 644.37 12.79 8,241.49
including disposal upto 10m lead and 1.5m lift
3 Dry Brick Soling work in foundation and plinth m2 920.80 251.78 231,839.02
75mm thick PCC work in 1:3:6 in foundation and plinth
4 m3 12551.32 20.14 252,783.58
including lead upto 30m
5 RCC works in 1:1.5:3 in superstructure m3 17295.52 5.11 88,380.11
Reinforcement work (TMT Fe-500) cutting, bending,
6 MT 125374.15 0.63 78,985.71
placing all complete

Providing and fixing Wooden or Steel form work for for all
7 kinds of R.C.C. works and its removal all complete as per m2 1179.48 41.56 49,019.19
instruction of site incharge.

8 Brick work in 1:6 C/S mortar all complete m3 13855.50 4.28 59,301.54
9 Brick work in 1:4 C/S mortar all complete m2 14300.24 4.28 61,205.03
Providing and filling earth material laying in 15 cm layer,
10 spray water with compaction all complete as per instruction m3 393.01 6.40 2,515.26
of the site incharge
38mm thick cement concrete flooring work all
11 m2 595.77 216.91 129,228.47
complete(1:2:4)
12 12.5mm thick C/S plaster in 1:4 in floor all complete m 2
362.46 62.00 22,472.52
Making and fixing black iron truss post with primer paint
13 Kgs. 167.15 5679.61 949,346.81
all complete
200 micron UV polythene sheet roofing with aluminum
14 m2 140.00 396.00 55,440.00
profile & zig-zag spring all complete
15 Drain Construction
i. Earthwork in excavation m3 644.37 1.80 1,159.87
ii. Brickwork in 1:6 C/S mortar m 3
13855.50 1.20 16,626.60
iii. PCC in 1:3:6 m3 12551.32 0.48 6,024.63
iv. Iron grating m2 2621.14 6.00 15,726.84
16 Iron Chain link Fencing Tray m2 453.92 120.00 54,470.40

Providing and fixing aphid mesh Shutter with stainless steel 2


17 m 2022.88 139.79 282,778.40
aphid in 90 series for window. (Section thickness 1 mm)

Supplying and fitting Aluminium sliding Door 2 track


18 m2 6456.00 14.10 91,029.60
section of (88 x38x1.3)mm & 5mm glass.
Supplying and fitting Aluminium Fixed section of (88
19 m2 6456.00 3.86 24,920.16
x38x1.3)mm & 5mm glass.
Subtotal 2,486,640.37
2.5% Contigency 62,166.01
Grand Total 2,548,806.38
Note:
1.The Rate is taken from Palpa District rate 078/079 and is applicable for Palpa district only.
2. 13% VAT is included in required materials.
Screen House for Saplings
S.N. Particulars Nos. Length(m) Breadth(m) Height(m) Quantity Unit Remarks

1 Site Clearance 1.00 22.00 13.00 286.00 m2

2 Earthwork excavation in foundation


Column Section 27.00 0.56 0.56 0.65 5.50
Long Wall 2.00 20.00 0.46 0.30 5.52
Short Wall 2.00 11.00 0.46 0.30 3.04
Deduction for column portion in Long and
20.00 0.46 0.46 0.30 1.27
Short Wall
Total 12.79 m3
3 One layer flat stone soling in foundation
Column Section 27.00 0.56 0.56 8.47
Long Wall 2.00 20.00 0.46 18.40
Short wall 2.00 11.00 0.46 10.12
Below Plinth 1.00 19.90 10.90 216.91
Deduction for column portion in Long and
20.00 0.23 0.46 2.12
Short Wall
Total 251.78 m2
4 75mm th. PCC work in foundation (1:3:6)
Column Section 27.00 0.56 0.56 0.08 0.68 m3
Long Wall 2.00 20.00 0.46 0.08 1.47
Short wall 2.00 11.00 0.46 0.08 0.81
3" thick PCC in Plinth 1.00 19.90 10.90 0.08 17.35
Deduction for column portion in Long and
20.00 0.23 0.46 0.08 0.17
Short Wall
Total 20.14 m3

5 RCC work in 1:1.5:3 for foundation

Bottom 27.00 0.46 0.46 0.52 2.97 m3


Total 2.97 m3
RCC work for Tie-Band (1:1.5:3)
Long Wall 2.00 20.00 0.23 0.15 1.38 m3
Short wall 2.00 11.00 0.23 0.15 0.76
Total 2.14 m3

6 Reinforcement works TMT-Fe-415 1.00 5.11 0.015 0.08 628.00 Kgs.

"@" 1.5% of RCC Quantity including laps,


anchorage wastages Total 0.63 MT

7 Formwork for Tie-Band/ Foundation


In Foundation ( in RCC works) 96 0.46 0.52 22.9632

In Tie Band
IN SILL/LINTEL LEVEL 4.00 20.00 0.15 12.00 m2
4.00 11.00 0.15 6.60 m2
Total 41.56 m2
8 Brickwork in 1:6 C/S Mortar(230 mm Thi.)
Below Ground Level
Long Wall 2.00 20.00 0.23 0.30 2.76 m3
Short wall 2.00 11.00 0.23 0.30 1.52
Total 4.28 m3
9 Brickwork in 1:4 C/S Mortar(230 mm Thi.)
Above Ground Level
Long Wall 2.00 20.00 0.23 0.30 2.76 m3
Short wall 2.00 11.00 0.23 0.30 1.52
Total 4.28 m3
10 Earthwork in filling
filling in foundation 6.40 m3
Total 6.40 50% of
m3
excavation
11 38mm thick Screeding work in 1:2:4
Plinth 1.00 19.90 10.90 216.91 m2
Total 216.91

12 12.5mm thick plaster (1:4)


Long Wall 2.00 20.00 1.00 - 40.00
Short wall 2.00 11.00 1.00 - 22.00
Total 62.00 m2
Screen House for Saplings
S.N. Particulars Nos. Length(m) Breadth(m) Height(m) Quantity Unit Remarks

13 Truss Work
80x80x4 mm Post at edges 18.00 3.14 56.52 m
Total 56.52
80x80x4mm mild steel SHS in @ 9.671kg/m 546.60 Kgs.

80x80x4mm Post in middle 9.00 3.14 28.26 m


Total 28.26
80x80x4mm mild steel SHS in @ 9.671kg/m 330.64 Kgs.

Plates (250*250*6) 54.00 foundation and


per piece @ 2.35kg (Medium) 126.90 Kgs. rafter joint
For 1 truss
Rafters
50 mm .Ms SHS 1.00 24.26 4.45 107.96
Ties/Struts- 50mm Ms SHS 1.00 21.10 4.45 93.90
50x50x3 mm mild steel SHS @ 4.45 kg/m
201.86

For 9 Truss sections 1816.74 Kgs.


Length wise tie 2.00 20.00 4.45 89.00 Kgs.
Purlins and runner-38mm Ms SHS 21.00 22.65 2.62 1246.20 Kgs.

For 1 Tray
Support/ column 11.00 0.46 5.06
38x 38x3 mm mild steel SHS @ 3.29kg/m 16.65 Kgs.
Top Frame 2.00 4.00 8.00
2.00 1.00 2.00
Beam and Intermediate Beams 3.00 4.00 12.00
5.00 1.00 5.00
Total 27.00
25x 25x 3 mm mild steel SHS @ 1.98kg/m 53.46 Kgs.

Total for 1 Tray 70.11 Kgs

For 23 Tray 23 70.11 1612.53 Kgs.


Subtotal 5679.61 Kgs.
Total 5679.61 Kgs.
200 micron UV polythene sheet roofing
14 with aluminum profile & zig-zag spring all
complete
1.00 24.00 15.00 - 396.00 m2

15 Drain construction
i. Excavation 1.00 20.00 0.30 0.30 1.80 m3
ii. B/W in 1:4 C/S 2.00 20.00 0.10 0.30 1.20 m3
iii. PCC in 1:3:6 1.00 20.00 0.08 0.30 0.48 m3
iv. Iron Grating 1.00 20.00 0.30 6.00 m2
16 Iron Chain link Fencing Tray 30.00 1.00 4.00 - 120.00 m2
Total 120.00
17 Aluminium section with Aphid mesh net
2.00 20.00 2.14 - 85.60 m2
2.00 11.00 2.14 - 47.08
Triangular part 1.00 12.00 1.18 - 14.16
Deduction for outer sliding gate 1.00 2.89 2.44 - 7.05
Total 139.79 m2
18 Sliding Gate Section 2.00 2.89 2.44 - 14.10 m2

19 Fixed Aluminimum Section 1.00 1.58 2.44 3.86 m2


kfNkf lhNnfsf] cf=j=2078.079 sf] lgdf{)f ;fdfu|Lsf] b//]^

Rate with 13%


l/=g+= tx÷lsl;d PsfO{ b/ k|lt PsfO{ VAT

F/Y 077/787
1 HofdL hjfg 680.00
2 l;kfn' hjfg 900.00
vfgL÷vf]nf÷gbLsf] afn'jf (free from all kind of
3 impurities as per mentioned in specification) #=ld 1,700.00 1,921.00
4 v;|f] afn'jf #=ld 1,700.00 1,921.00
5 1 g+= sf] O{^f lrDgL e§f_ Ps 13.50 15.26
6 ओपी सी l;d]G^ d]=^= 14,144.00 15,982.72
7 पीपी सी l;d]G^ d]=^= 12,101.00 13,674.13
8 40 dL=dL= /f]*f #=ld 3,300.00 3,729.00
9 20 dL=dL= /f]*f #=ld 3,300.00 3,729.00
10 10 dL=dL= /f]*f #=ld 1,700.00 1,921.00
11 ljleGg ;fOhsf] kmnfd] *)*L TMT d]=^= 75,000.00 84,750.00
12 lh=cfO{ afWg] tf/ s]=hL 95.00 107.35
13 :yfgLo s' sf& Pipe/Black Pipe/Channel/
Iron Square #=ld 95,000.00 107,350.00
14 Angle/I-Beam/Black Sheet/MS Plate
15 Black Pipe s]=hL 104.00 117.52
lalaw( New item)
16 Water Litre 0.35
10 विभिन्न साइजको काँटी s]=hL 110.00 124.3
Providing and fixing Aphid mesh with stainless steel
fly mesh in 90 series for sliding window. (Section
11 thickness 1 mm) ब.मि 5,522.00 6,239.86

4
Rate Analysis 077/078

3fF; sf6\g] To;sf] h/f lemSg], l9:sf] k'm6fpg] / n]en u/L :yn ;kmf ug]{ ;a} jf]sgL ;d]t

b/ ljZn]if0fsf] nflu ! j=ld= lnOPsf]


k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
>lds Hofld 0.023 hjfg 680.00 15.64 15.64

jf:tljs b//]6 15.64

!%Ü 7]s]bf/sf] cf]e/x]8 2.35

b/ k|lt j=dL=sf] hDdf b/ /]6 17.99


17.99 k}=

;fx|f] k|sf/sf] Sn], g/d d'/d 9'+uf -#) ;]=dL=;Dd_ ld;]sf] df6f] ;a} lsl;dsf]
vGg] sfd !) dL6/ af]sgL l8:kf]hn / !=% dL6/;Dd lnˆ6 ;d]t
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
>lds Hofld 0.80 hjfg 680.00 544.00 544.00
oflGqs
Hofldsf] Hofnfsf] #Ü n] 16.32
pks/0f
jf:tljs b//]6 560.32

!%Ü 7]s]bf/ cf]e/x]8 84.05

b/ k|lt 3=dL=sf] hDdf b/ /]6 644.37


644.37 k}=

;fdfGo df6f]n] k'g]{ sfd !%, !% ;]=dL= sf] txdf km}nfpg], kfgL 5g]{ /
Hofldåf/f sDk}S6 ug]{ sfd ;d]t !) dL= b"/Laf6 बोकानी समेत
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
>lds Hofld 0.50 hjfg 680.00 340.00 340.00

lgdf{0f ;fdu|L
kfgL 5.00 nL6/ 0.35 1.75 1.75
jf:tljs b//]6 341.75
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 51.26
393.01 k}= hDdf b/ /]6 393.01

e'O{tNnfdf lrDgL e§fsf] O{6f pknAw ug]{,


l;d]G6 d;nf -!M$_ tof/ u/L uf/f] nufpg]
sfd #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 1.50 hjfg 900.00 1350.00
>lds v_ HofdL 2.20 hjfg 680.00 1496.00
u_ HofdL 0.20 hjfg 680.00 136.00 2982.00
O{6f 560 uf]6f 13.50 7560.00
lgdf{0f ;fdu|L l;d]G6 0.10 d]=6= 13674.13 1367.41
afn'jf vf]nfsf] 0.28 3=dL= 1700.00 476.00
kfgL 130.00 nL6/ 0.35 45.50 9448.91
v6sf] ;ffdfg -u_ sf] #Ü n] 4.08
jf:tljs b//]6 12434.99
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 1865.25

14300.24 k}= hDdf b/ /]6 14300.24

Page 5 For FSCMO use only


Rate Analysis 077/078

e'O{tNnfdf lrDgL e§fsf] O{6f pknAw ug]{,


l;d]G6 d;nf -!M^_ tof/ u/L uf/f] nufpg]
sfd #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 1.50 hjfg 900.00 1350.00
>lds v_ HofdL 2.20 hjfg 680.00 1496.00
u_ HofdL 0.20 hjfg 680.00 136.00 2982.00
O{6f 560 uf]6f 13.50 7560.00
lgdf{0f ;fdu|L l;d]G6 0.07 d]=6= 13674.13 957.18
afn'jf vf]nfsf] 0.30 3=dL= 1700.00 510.00
kfgL 100.00 nL6/ 0.35 35.00 9062.18
v6sf] ;ffdfg -u_ sf] #Ü n] 4.08

jf:tljs b//]6 12048.26


b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 1807.24

13855.50 k}= hDdf b/ /]6 13855.50

hu leQf kvf{ndf l;d]G6 s+lqm6 ug]{ sfd dfn;fdfg pknAw ug]{ #) dL6/;Dd 9'jfgL ;lxt
-lk=;L=;L= !M#M^_
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 1 hjfg 900.00 900.00
>lds
v_ HofdL 4 hjfg 680.00 2720.00 3620.00
l;d]G6 0.22 d]=6= 15982.72 3516.19
$) dL=dL=9'+uf -qm;\8_ /f]8f 0.65 3=dL= 3300.00 2145.00

lgdf{0f ;fdu|L@) dL=dL=9'+uf -qm;\8_ /f]8f 0.24 3=dL= 3300.00 792.00


v;|f] afn'jf vf]nfsf] 0.47 3=dL= 1700.00 799.00
kfgL 120.00 nL6/ 0.35 42.00 7294.19

jf:tljs b//]6 10914.19


b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 1637.13

12551.32 k}= hDdf b/ /]6 12551.32

;'k/ :6«Sr/, 8]s :n]a ljdx?df l;d]G6 s+lqm6 ug]{ sfd


dfn;fdfg pknAw ug]{ #) dL6/;Dd 9'jfgL ;d]t
-lk=;L=;L= ! M !!÷@ M #_
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 0.80 hjfg 900.00 720.00
>lds
v_ HofdL 7.00 hjfg 680.00 4760.00 5480.00
l;d]G6 0.40 d]=6= 15982.72 6393.08
@) dL=dL=9'+uf -qm;\8_ /f]8f0.57 3=dL= 3300.00 1881.00
!) dL=dL=9'+uf -qm;\8_ /f]8f 0.29 3=dL= 1700.00 493.00
lgdf{0f ;fdu|L

v;|f] afn'jf 0.425 3=dL= 1700.00 722.50


kfgL 200.00 nL6/ 0.35 70.00 9559.58

jf:tljs b//]6 15039.58


b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 2255.94

17295.52 k}= hDdf b/ /]6 17295.52

Page 6 For FSCMO use only


Rate Analysis 077/078

cf/=;L=;L= nflu kmnfd] 808L sf6\g], df]8\g]


gS:ff cg';f/ 7fpFdf /fvL afFWg] sfd
#) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! Df]=6= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 12.00 hjfg 900.00 10800.00
>lds
v_ HofdL 12.00 hjfg 680.00 8160.00 18960.00
808L (TMT rod) 1.05 d]=6= 84750.00 88987.50
lgdf{0f ;fdu|L
hL=cfO{=afFWg] tf/ 10.0 s]=hL= 107.35 1073.50 90061.00
jf:tljs b//]6 109021.00
b/ k|lt d]=6=sf] !%Ü 7]s]bf/ cf]e/x]8 16353.15

125374.15 k}= hDdf b/ /]6 125374.15


===

#* dL=dL= -!½Æ_ afSnf] l;d]G6 s+qmL6 -!M@M$_ ˆnf]/ 9nfg u/L


l;d]G6 3f]6L tof/ ug]{ .
b/ ljZn]if0fsf] nflu !) j=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 1.25 hjfg 900.00 1125.00
>lds
v_ HofdL 2.00 hjfg 680.00 1360.00 2485.00
l;d]G6 0.13 d]=6= 13674.13 1777.63
lgdf{0f ;fdu|L jfn'jf 0.18 3=dL= 1700.00 306.00
!@ dL=dL /f]8f 0.36 3=dL= 1700.00 612.00 2695.63
jf:tljs b//]6 5180.63
b/ k|lt j=dL=sf] = !%Ü 7]s]bf/ cf]e/x]8 777.09
5957.72 ?= 595.77 k}= hDdf b/ /]6 5957.72
10

!@=% dL=dL= afSnf] l;d]G6 afn'jf -!M$_ df


l;lnË jfx]s cGoq Knfi6/ ug]{ .
b/ ljZn]if0fsf] nflu !)) j=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 12.00 hjfg 900.00 10800.00
>lds
v_ HofdL 16.00 hjfg 680.00 10880.00 21680.00
l;d]G6 0.538 d]=6= 13674.13 7356.68
lgdf{0f ;fdu|L
afn'jf vf]nfsf] 1.46 3=dL= 1700.00 2482.00 9838.68
jf:tljs b//]6 31518.68
b/ k|lt j=dL=sf] = !%Ü 7]s]bf/ cf]e/x]8 4727.80

36246.48 Ö ?= 362.46 k}= hDdf b/ /]6 36246.48


100

sfnf] kmnfd] kfO{ksf] 6«; agfO{ h8fg ug]{ sfd -k|fOd/ k]G6 ;lxt_
b/ ljZn]if0fsf] nflu !*=($ s]=hL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
;j} k|sf/sf]
lgdf{0f ;fdu| sfnf] kfO{k
L jgfO{ hf]8\g] 1.00 s]=hL= 117.52 117.52
k|fOd/ k]G6 cGbfhL – – 27.83 145.35
jf:tljs b//]6 145.35
b/ k|lt s]]=hL=sf] !%Ü 7]s]bf/ cf]e/x]8 21.80
167.15 Ö ?= 167.15 k}= hDdf b/ /]6 167.15

Page 7 For FSCMO use only


Rate Analysis 077/078

;'Vvf O{6f RofK6f] 5fKg] sfd .


b/ ljZn]if0fsf] nflu !) j=dL= lnOPsf] k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
s_ l;kfn' 0.50 hjfg 900.00 450.00 hDdf
>lds
v_ HofdL 1.00 hjfg 680.00 680.00 1130.00
O{6f 420.00 uf]6f 13.50 5670.00
lgdf{0f ;fdu|L
jfn'jf vf]nfsf] 0.71 3=dL= 1700.00 1207.00 6877.00
jf:tljs b//]6 8007.00
b/ k|lt j=dL=sf] =
!%Ü 7]s]bf/ cf]e/x]8 1201.05
9208.05 Ö ?= 920.80 k}= hDdf b/ /]6 9208.05
10

sf7df kmdf{ agfpg] sfd, dfn;fdfgsf] pknlAw, 5gf}6 ug]{, gS;f cg';f/ kmdf{ /fVg]
lsnf / cGt/ nufpg] kmdf{ lemSg], x6fpg] #) ld6/;Dd 9'jfgL ;lxt
kmz{ / :n]j h:tf sfd
b/ ljZn]if0fsf] nflu !) j=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 1.72 hjfg 900.00 1548.00
>lds
v_ HofdL 2.57 hjfg 680.00 1747.60 3295.60
:yfgLo s'–sf7 0.07 3=dL= 95000.00 6650.00
lgdf{0f ;fdu|L = lsnf 2.50 s]=hL= 124.30 310.75 6960.75
\ 10256.35
b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 1538.45
11794.80 = ?= 1179.48 k}= hDdf b/ /]6 11794.80
10

Providing and fixing Fly mesh Shutter with stainless steel Aphid mesh in 90 series for sliding window.
(Section thickness 1 mm)
b/ ljZn]if0fsf] nflu ! Jf= dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
lgdf{0f ;fdu| hDdf
cfNd'lgodsf
L
fixed panel window with
-Hofnf ;lxt_ Ventilation but with aphid mesh 6239.86
1.00 j=dL= 6239.86 6239.86
jf:tljs b//]6 6239.86
b/ /]6 k|lt j= dL=sf] !%Ü 7]s]bf/ cf]e/x]8 935.98
?= 7175.84 k}= hDdf b/ /]6 7175.84

Supplying and fitting Aluminium sliding Door 2 track section of (88 x38x1.3)mm & 5mm glass.
= b/ ljZn]if0fsf] nflu ! Jf= dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
cfNd'lgodsf cfNd'lgodsf
lgdf{0f ;fdu| sliding window 2 track
L
-Hofnf ;lxt_ sf ;/;fdfg 1.00 j=dL= 5380.00 5380.00
5380.00
jf:tljs b//]6 5380.00
b/ /]6 k|lt j= dL=sf] !%Ü 7]s]bf/ cf]e/x]8 807.00
?= 6187.00 k}= hDdf b/ /]6 6187.00

Page 8 For FSCMO use only


Screen House for Saplings
S.N. Description of works Unit Rate Remarks
Site Clearance including cutting Shrubs removing trees etc 2
1 m 17.99
all complete
Earthwork excavation in foundation in soft and hard soils
2 m3 644.37
including disposal upto 10m lead and 1.5m lift
3 Dry Brick Soling work in foundation and plinth m2 920.80
75mm thick PCC work in 1:3:6 in foundation and plinth
4 m3 12551.32
including lead upto 30m
5 RCC works in 1:1.5:3 in superstructure m3 17295.52
Reinforcement work (TMT Fe-500) cutting, bending,
6 MT 125374.15
placing all complete

Providing and fixing Wooden or Steel form work for for all
7 kinds of R.C.C. works and its removal all complete as per m2 1179.48
instruction of site incharge.

8 Brick work in 1:6 C/S mortar all complete m3 13855.50


9 Brick work in 1:4 C/S mortar all complete m2 14300.24
Providing and filling earth material laying in 15 cm layer,
10 spray water with compaction all complete as per instruction m3 393.01
of the site incharge
38mm thick cement concrete flooring work all
11 m2 595.77
complete(1:2:4)
12 12.5mm thick C/S plaster in 1:4 in floor all complete m2 362.46
Making and fixing black iron truss pipe with primer paint
13 Kgs. 167.15
all complete
200 micron UV polythene sheet roofing with aluminum
14 m2 140.00
profile & zig-zag spring all complete
15 Drain Construction
i. Earthwork in excavation m3 644.37
ii. Brickwork in 1:6 C/S mortar m 3
13855.50
iii. PCC in 1:3:6 m3 12551.32
iv. Iron grating m2 2621.14
16 Iron Chain link Fencing Tray m 2
453.92
Providing and fixing Aphid mesh Shutter with stainless
17 steel Aphid mesh in 90 series for sliding window. (Section m2 2022.88
thickness 1 mm)
Supplying and fitting Aluminium sliding Door 2 track
18 m2 6187.00
section of (88 x38x1.3)mm & 5mm glass.
Supplying and fitting Aluminium Fixed section of (88
19 m2 6187.00
x38x1.3)mm & 5mm glass.

Note:
1.The Rate is taken from Kathmandu District rate 077/078 and is applicable for Kathmandu
district only.