JSA - Bhilai Steel Plant
JSA - Bhilai Steel Plant
JSA - Bhilai Steel Plant
Site visit
4. Called the respective contact person of that plant Possible change in plan/ emergency meeting
namic road condition with heavy vehicle traffic. Ensured vehicle is in good condition, checked tire pressure, engine oil level, clutch
ad blocks / Road under construction/ Road diversions Checked if is there is any maintenance work going on google map and planned my
us transmission Carried sanitizer / N95 mask / Maintained social distancing while having any conve
sible change in plan/ emergency meeting Called the respective contact person and asked for next step.
Asked the phone number of base location with few other workers and told them my
mmunication might get effected.
for the day .
ry Watching my steps while carrying out thermal inspection of the bush pins.
h heat might lead to dehydration. Carried water bottles and drinking water at proper interval.
CONTROLRESPIRATOR
AIR PURIFYING NUMBER
SUPPLIED AIR RESPIRATOR
PPE CLOTHING - long sleeve shirt/no tie
GLOVES (Nitrile and work)
POSITION TITLE
Field Engineer-Central India
terval.
ext step.
erval.