User Manual: 1GE+1FE+1POTS+WIFI 1GE+3FE+2POTS+1USB+WIFI 1Ge+3Fe+2Pots+1Usb+Wifi+Catv
User Manual: 1GE+1FE+1POTS+WIFI 1GE+3FE+2POTS+1USB+WIFI 1Ge+3Fe+2Pots+1Usb+Wifi+Catv
User Manual: 1GE+1FE+1POTS+WIFI 1GE+3FE+2POTS+1USB+WIFI 1Ge+3Fe+2Pots+1Usb+Wifi+Catv
1GE+1FE+1POTS+WIFI
1GE+3FE+2POTS+1USB+WIFI
1GE+3FE+2POTS+1USB+WIFI+CATV
User Manual
Version:V1.1
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506
Website: www.cdatatec.com
Content
1 Note.................................................................................................................................................. 1
1.1 Installation Precautions......................................................................................................... 1
1.2 Precautions for Use............................................................................................................... 1
2 Brief..................................................................................................................................................3
2.1 Product Features....................................................................................................................3
2.2 Product Specifications...........................................................................................................4
2.3 Device Interface Definition...................................................................................................4
2.4 LED Description................................................................................................................... 5
2.5 Device Connection................................................................................................................ 5
2.6 Applications...........................................................................................................................6
3 Login Web Management Locally.................................................................................................... 6
3.1 Physical Connection of ONU and PC...................................................................................6
3.2 PC Access the WEB of ONU................................................................................................ 7
4 ONU Register Information Config.................................................................................................. 8
4.1 View ONU Register Status....................................................................................................8
4.2 View ONU Optical Power Information................................................................................ 8
5 Basic Configuration for Internet...................................................................................................... 9
5.1 Route Mode Configuration................................................................................................... 9
5.2 Configure Bridge WAN Connection for Internet................................................................16
5.3 View the WAN Connection Status...................................................................................... 18
5.4 Delete the WAN Connection...............................................................................................19
6 ONU LAN Configuration.............................................................................................................. 19
6.1 LAN IP Address Configuration...........................................................................................19
6.2 View LAN Client................................................................................................................ 20
7 Multicast/IPTV Configuration....................................................................................................... 21
7.1 Multicast/IPTV Service Setting.......................................................................................... 21
7.2 IGMP Snooping Setting...................................................................................................... 21
7.3 IGMP Proxy........................................................................................................................ 22
7.4 IGMP VLAN Configuration............................................................................................... 22
8 WLAN Configuration.................................................................................................................... 23
8.1 WLAN Basic Configuration............................................................................................... 23
8.2 WLAN Password Configuration.........................................................................................24
8.3 WLAN Virtual SSID........................................................................................................... 24
9 USB Interface Management...........................................................................................................25
9.1 USB Backup Configuration................................................................................................ 25
9.2 USB Recovery Configuration............................................................................................. 26
10 CATV Configuration.................................................................................................................... 26
10.1 Configure CATV Port Parameter...................................................................................... 26
10.2 View CATV Information...................................................................................................27
11 Voice Service Configuration........................................................................................................ 28
11.1 Create Voice WAN Connection.........................................................................................28
11.2 Voice Server IP Configuration.......................................................................................... 29
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506
Website: www.cdatatec.com
11.3 Voice Telephone number and Password Configuration.................................................... 30
11.4 View Voice Status Information..........................................................................................31
12 TR069 Remote Management....................................................................................................... 32
12.1 Configure Channel for TR069 Remote Management.......................................................33
12.2 TR069 Client Configuration............................................................................................. 33
13 Device Management.....................................................................................................................34
13.1 ONU Device Remote Access Settings.............................................................................. 34
13.2 Restore Default Setting..................................................................................................... 35
13.3 Firmware Upgrade............................................................................................................ 35
13.4 Device Reboot................................................................................................................... 36
Concluding Remarks......................................................................................................................... 37
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506
Website: www.cdatatec.com
1 Note
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 1
Website: www.cdatatec.com
To ensure safety, do not open the enclosure of the device, especially when the device is
powered up.
Unplug the power supply before cleaning the equipment. Use a soft dry cloth to clean the
equipment to avoid the use of liquids or sprays.
Do not connect this product to any electronic product unless it is instructed by our
customer engineer or your broadband supplier, as any incorrect connection may cause
power or fire hazard.
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 2
Website: www.cdatatec.com
2 Brief
ZTE EPON HGU (HomeGateway ONU) series products are for telecommunications, radio
and television operators FTTH fiber household type multiple access requirements and design a
series of fusion EPON terminal product, the product is based on mature and stable, cost-effective
gigabit EPON technology, is a blend of correlates and gigabit Ethernet switching technology,
Voice technology, WLAN technology and powerful routing forward technology.High bandwidth,
high reliable, easy to management and good quality of service (QoS) guarantees etc, equipment
technical performance meet IEEE802.3 ah, China telecom EPON equipment technical
requirements (V2.1 & V3.0) such as the requirement of the specification, with the mainstream
manufacturers bureau OLT (Huawei, ZTE, Fiberhome) together used have good compatibility.
high efficiency, large coverage, and the numerous advantages of abundant user interface, etc., is
the operator to realize broadband access network business, and the comprehensive transformation
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 3
Website: www.cdatatec.com
Support through the OLT remote upgrade/WEB local upgrade function
Support broadcast storm inhibition function
Isolation between different data port
Support port flow control
Support based on OLT as SNMP agent - each manufacturer of a unified network
management, easy to install and maintain
Provide abundant fault alarm function, easy to fault diagnosis
Support AES - 128, support for key generation and switch
Support technology based on the DBA and priority of dual management model, to
ensure that the user specified minimum bandwidth requirements
Support RJ-11 type voice interface
Transmission distance: ≤1km
And phone number: 3
Balanced Ring: Vrms>50V
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 4
Website: www.cdatatec.com
2.4 LED Description
Indicator Description
1 PWR Power status On: The ONT is power on;
Off: The ONT is Power off;
On: Optical power lower than receiver
2 LOS GPON optical signals sensitivity ;
Off: Optical in normal
On: Success to register to OLT;
3 PON ONT Register Blinking: In process of registering to OLT;
Off: In process of registering to OLT;
On:The connection between the TEL port and
the voice server has been set up
4 TEL1-2 Telephone port status Blinking:The voice service of the TEL port is
established;
Off:The connection between the TEL port and
the voice server is not set up.
On: Ethernet connection is normal;
5 LAN1-4 LAN port status Blinking: Data is being transmitted through the
Ethernet port;
Off: Ethernet connection is not set up;
6 WIFI WIFI Blinking:Data is being transmitted
On:Wi-Fi function Opens
7 CATV CATV status On:CATV optical normal
Off:The CATV signals are not received
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 5
Website: www.cdatatec.com
2.6 Applications
c) Open cmd windows and make sure that PC can ping the management IP (192.168.101.1)
of ONU.
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 6
Website: www.cdatatec.com
3.2 PC Access the WEB of ONU
Make sure you can ping the ONU like #3.1. Open the IE Web broswer (IE, Firefo
x, Google), copy and paste URL: http: //192.168.101.1, the following pop-up Prompt landi
n-g page:
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 7
Website: www.cdatatec.com
You can start further configuration.
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 8
Website: www.cdatatec.com
5 Basic Configuration for Internet
Home Gateway Unit (HGU) ONU supports route function, so that there are route mode and
bridge mode for internet. The difference between route mode and bridge mode as follows :
Route mode:ONT as a home gateway equipment, ONT IP address can be obtained in three
ways, which includes DHCP, Static IP Address and PPPoE. The IP address of the device on the
user side is obtained through the DHCP address pool of the ONT, or by manually setting;
Bridge mode:The ONT does not obtain the IP address assigned by the upper device or can
not manually set the static IP address. It is used as a relay device and does not process the data.
There are three ways to obtain the IP address of the user side device, namely DHCP, PPPoE,
Static IP Address.
1. Login ONU WEB, select Network ->WAN -> WAN Connection, and then there are
some parameters for us to configure as follows:
【IP Version】Select ‘Ipv4’; If there is Ipv6 in the network, we can select ‘Ipv4/Ipv6’ or
‘Ipv6’
【Type】Select ‘PPPoE’
【Port Banding】Band the physical ports (LAN1-4 Port ) with PPPOE WAN connection.
Besides, if user want to use wifi function, must bind any SSID with
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 9
Website: www.cdatatec.com
chapter.
【Enable DHCP】Select this option; The function mainly is used to assign IP address for
【Enable NAT】Check ‘NAT’ feature;NAT is mainly used for address translation function
of local network and external network. The default is checked enable status. If
you do not check this option, maybe you can’t surf the internet.
【VLAN Type】We can set this option according to your network plan. If there is vlan in
the network for internet, we have to check ‘VLAN Used’ option. If not,
“VLAN Unused”
【802.1p】Set the priority of vlan, The same as "enable Vlan", depending on the network
【MTU】The default is 1492;we have to change to lower MTU, such as 1400, if we can
ping the DNS but not access the website via WEB browser
【 Idle Timeout 】 Default timeout value 1200 sec when choose authentication type as
‘Auto’
Note: the default port is unbound, and all the LAN ports go through this WAN.
When the device has a bridge WAN and a route WAN at the same time,it needs to
bind the port for each WAN (a LAN can only be bound to a WAN, can not bind to
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 10
Website: www.cdatatec.com
2. After configuring the parameters of PPPoE WAN connection as above, click ‘Create’ to
finish the setting:
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 11
Website: www.cdatatec.com
5.1.2 Configure DHCP WAN Connection for Internet in Route Mode
1. Login ONU WEB, select Network ->WAN -> WAN Connection, and then there are
some parameters for us to configure as follows:
【IP Version】Select ‘Ipv4’; If there is Ipv6 in the network, we can select ‘Ipv4/Ipv6’ or
‘Ipv6’
【Type】Select ‘DHCP’
【Port Banding】Band the physical ports (LAN1-4 Port ) with DHCP WAN connection.
Besides, if user want to use wifi function, must bind any SSID with
chapter.
【Enable DHCP】Select this option; The function mainly is used to assign IP address for
【Enable NAT】Check ‘NAT’ feature;NAT is mainly used for address translation function
of local network and external network. The default is checked enable status. If
you do not check this option, maybe you can’t surf the internet.
【VLAN Type】We can set this option according to your network plan. If there is vlan in
the network for internet, we have to check ‘VLAN used’ option. If not,
“VLAN Unused”
【802.1p】Set the priority of vlan, The same as "enable Vlan", depending on the network
【MTU】The default is 1492;we have to change to lower MTU, such as 1400, if we can
ping the DNS but not access the website via WEB browser
Note: the default port is unbound, and all the LAN ports go through this WAN.
When the device has a bridge WAN and a route WAN at the same time,it needs to
bind the port for each WAN (a LAN can only be bound to a WAN, can not bind to
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 12
Website: www.cdatatec.com
multiple WAN connections at the same time.
2.After configuring the parameters of DHCP WAN connection as below, click ‘Create’
to finish the setting:
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 13
Website: www.cdatatec.com
5.1.3 Configure Static IP Address WAN Connection for Internet in Route Mode
1. Login ONU WEB, select Network ->WAN -> WAN Connection, and then there are
some parameters for us to configure as follows:
【IP Version】Select ‘Ipv4’; If there is Ipv6 in the network, we can select ‘Ipv4/Ipv6’ or
‘Ipv6’
【Type】Select ‘Static’
【Port Banding】Band the physical ports (LAN1-4 Port ) with Static ip WAN connection.
Besides, if user want to use wifi function, must bind any SSID with
chapter.
【Enable DHCP】Select this option; The function mainly is used to assign IP address for
【Enable NAT】Check ‘NAT’ feature;NAT is mainly used for address translation function
of local network and external network. The default is checked enable status. If
you do not check this option, maybe you can’t surf the internet.
【VLAN Type】We can set this option according to your network plan. If there is vlan in
the network for internet, we have to check ‘VLAN used’ option. If not,
“VLAN Unused”
【802.1p】Set the priority of vlan, The same as "enable Vlan", depending on the network
【MTU】The default is 1492;we have to change to lower MTU, such as 1400, if we can
ping the DNS but not access the website via WEB browser
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 14
Website: www.cdatatec.com
【DNS 1】Set static primary DNS address
Note: the default port is unbound, and all the LAN ports go through this WAN.
When the device has a bridge WAN and a route WAN at the same time,it needs to
bind the port for each WAN (a LAN can only be bound to a WAN, can not bind to
2. After configuring the parameters of Static IP WAN connection as below, click ‘Create’ to
finish the setting:
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 15
Website: www.cdatatec.com
5.2 Configure Bridge WAN Connection for Internet
1. Login ONU WEB, select Network ->WAN -> WAN Connection, and then there are
some parameters for us to configure as follows:
【IP Version】Select ‘Ipv4’; If there is Ipv6 in the network, we can select ‘Ipv4/Ipv6’ or
‘Ipv6’
【Type】Select ‘Bridge’
【Port Banding】Band the physical ports (LAN1-4 Port ) with Bridge WAN connection.
Besides, if user want to use wifi function, must bind any SSID with
chapter.
【Enable DHCP】Not select this option; The function mainly is used to assign IP address
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 16
Website: www.cdatatec.com
【Service List】Select ‘ OTHER’;Normally, select ‘ OTHER ’ in the bridge mode
【VLAN Mode】We can set this option according to your network plan. If there is vlan in
the network for internet, we have to check ‘VLAN used’ option. If not,
“VLAN Unused”
【802.1p】Set the priority of vlan, The same as "enable Vlan", depending on the network
Note: the default port is unbound, and all the LAN ports go through this WAN.
When the device has a bridge WAN and a route WAN at the same time,it needs to
bind the port for each WAN (a LAN can only be bound to a WAN, can not bind to
2. After configuring the parameter of Bridge WAN connection as above, click ‘Create’ to
finish the setting:
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 17
Website: www.cdatatec.com
5.3 View the WAN Connection Status
1.Login ONU WEB, select Status -> Network Interface -> WAN Connection(IPv4). In
here, we can view WAN connection status, check the route WAN connection if it gets an IP
address and Bridge WAN connection if it is UP. As follows:
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 18
Website: www.cdatatec.com
5.4 Delete the WAN Connection
1.Login ONU WEB, select Network -> WAN -> WAN Connection. Select a WAN
connection from ‘ Connection Name’ and click ‘Delete’ button at the bottom of the page. As
follows:
192.168.101.1
【DHCP Start IP address / End IP address】Configure the IP address interval that allocated
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 19
Website: www.cdatatec.com
to the terminal. The address interval must be on the
2.After configuring the parameters of LAN address as above, click ‘Submit’ to finish the
setting
1.Login ONU WEB, select Status -> User Information -> Ethernet. View client that
access via LAN ports . As follows:
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 20
Website: www.cdatatec.com
7 Multicast/IPTV Configuration
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 21
Website: www.cdatatec.com
7.3 IGMP Proxy
1.Login ONU WEB, select App -> IGMP -> IGMP PROXY. Enable or disable IGMP
Proxy function and click ‘Submit’ button to finish the setting as follows:
Note: Normally, IGMP Proxy would be used in route mode and carrying Multicast/IPTV
service, because the ONU would be acted as multicast agent. There isn’t IGMP Proxy concept in
the bridge mode.
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 22
Website: www.cdatatec.com
8 WLAN Configuration
8.1 WLAN Basic Configuration
1. Login ONU WEB, select Network->WLAN ->Basic, and then there are some parameters
for us to configure as follows:
【WLAN Enable】Enable or disable the wireless function;
20MHz/40MHz;
【 Channel 】 The default is Auto ; We can select a channel without glitches by manual
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 23
Website: www.cdatatec.com
2. After setting wireless configuration, click ‘Submit’ button to finish setting.
2.After setting wireless password configuration, click ‘Submit’ button to finish setting.
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 24
Website: www.cdatatec.com
2.After setting wireless password configuration, click ‘Submit’ button to finish setting.
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 25
Website: www.cdatatec.com
9.2 USB Recovery Configuration
Select Administration System Management USB recovery configuration. Enter this
page, first check “Enable” button, second click “Submit” button, finally, manually reboot ONU:
10 CATV Configuration
CATV management is mainly applied to ONU with light machine, we need to configure the
ONU optical machine parameters through the ONU’s WEB.
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 26
Website: www.cdatatec.com
10.2 View CATV Information
1.Login ONU WEB, select Status ->CATV. In this page, we can view the CATV port
status:
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 27
Website: www.cdatatec.com
11 Voice Service Configuration
11.1 Create Voice WAN Connection
1. Login ONU WEB, select Network ->WAN -> WAN Connection, and then there are
some parameters for us to configure as follows:
【IP Version】Select ‘Ipv4’; If there is Ipv6 in the network, we can select ‘Ipv4/Ipv6’ or
‘Ipv6’
【Service List】Select ‘ VOICE’ , also choose other service type included ‘VOICE’
【VLAN Mode】We can set this option according to your network plan. If there is vlan in
the network for internet, we have to check ‘VLAN used’ option. If not,
“VLAN Unused”
【802.1p】Set the priority of vlan, The same as "enable Vlan", depending on the network
【MTU】The default is 1492;we have to change to lower MTU, such as 1400, if we can
ping the DNS but not access the website via WEB browser
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 28
Website: www.cdatatec.com
2. After setting voice wan configuration, click ‘Create’ button to finish setting.
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 29
Website: www.cdatatec.com
2. After setting voice server IP address configuration, click ‘Submit’ button to finish setting.
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 30
Website: www.cdatatec.com
2. After finishing settings, as shown below:
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 31
Website: www.cdatatec.com
2. Login ONU WEB, select Status->VoIP Status->SIP Account, and then can view voice
SIP Account :
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 32
Website: www.cdatatec.com
12.1 Configure Channel for TR069 Remote Management
Firstly, refered to #5.1, set a Route WAN connection with ‘Service List’ as TR069, which is
used to act as a channel for TR069 server.
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 33
Website: www.cdatatec.com
13 Device Management
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 34
Website: www.cdatatec.com
13.2 Restore Default Setting
Login the ONU WEB. Select Administration -> System Management -> System
Management. Click ‘Restore Default ’ button. The device will restore the factory defaults after
the application.
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 35
Website: www.cdatatec.com
13.4 Device Reboot
Login the ONU WEB, Select Administration ->System Management->System
Management. Click ‘Reboot’. Restart the device immediately after application.
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 36
Website: www.cdatatec.com
Concluding Remarks
Thanks for using products of Shenzhen C-Data Technology Co. Ltd.
Contact Information:
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine
Community,Xili Street, Nanshan District, Shenzhen
Factory Address: 1 floor, Building B, Wentao Industrial Park, Yingrenshi Community,
st
Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community,Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506 37
Website: www.cdatatec.com