Method Statement: Generator Load Test
Method Statement: Generator Load Test
Method Statement: Generator Load Test
Reviewed By:
RICARDO PASCOAL SIGN:
Operations Head DATE: 03/07/22
RECORD OF AMENDMENT
Issue Revision Date of
Nature of Revision
No No Revision
1 0
2 1
3 2
4 3
5 4
6 5
7 6
8 7
9 8
10 9
1-ELEC-GEN-
AFRAS METHOD STATEMENT – DOC REF NO.
MS01
SAR PROJECT REVISION / ISSUE 01
DATE 03/07/22
Generator Load Test
Page |3
Briefing Record
I have been briefed on this method statement and understand its contents.
Name Position Signature Date
1-ELEC-GEN-
AFRAS METHOD STATEMENT – DOC REF NO.
MS01
SAR PROJECT REVISION / ISSUE 01
DATE 03/07/22
Generator Load Test
Page |4
Contents
1 SCOPE OF WORK...................................................................................................................... 6
2 PROGRAM................................................................................................................................. 6
3 REFERANCE DOCUMENTS....................................................................................................... 6
4 ORGNAIZATION........................................................................................................................ 6
5 MATERIAL................................................................................................................................. 7
6 PLANT/EQUIPMENT................................................................................................................ 7
7 PERPARATION.......................................................................................................................... 7
8 SAFETY....................................................................................................................................... 7
9 ENVIRONMENT........................................................................................................................ 9
10 EMERGENCY PROCEDURES.......................................................................................... 10
12 PROTECTION................................................................................................................... 11
13 INSPECTIONS/CHECKS/TESTS......................................................................................11
1-ELEC-GEN-
AFRAS METHOD STATEMENT – DOC REF NO.
MS01
SAR PROJECT REVISION / ISSUE 01
DATE 03/07/22
Generator Load Test
Page |5
14 ACCEPTANCE CRITERIA.................................................................................................. 11
15 RECORDS......................................................................................................................... 11
16 INSURANCE..................................................................................................................... 11
17 ATTACHMENT................................................................................................................. 12
1-ELEC-GEN-
AFRAS METHOD STATEMENT – DOC REF NO.
MS01
SAR PROJECT REVISION / ISSUE 01
DATE 03/07/22
Generator Load Test
Page |6
1 SCOPE OF WORK
This Method statement describes in detail the series of onsite Preventive Maintenance
(PPM) activities to be carried out for Generator Load Test and checks the requirements
to be carried out at Saudi Railway Facilities Maintenance Services Project.
The purpose of this method statement is to define the general procedure that will be
followed for the preventive maintenance works of Generator Load test at Saudi Railway
Facilities Maintenance Services Project.
The objective is to make the maintenance teams aware of how to carry out routine
operational & maintenance works and to ensure that the works are carried out in a safe,
effective & efficient manner and in accordance with standard practices.
2 PROGRAM
Work shall be planned and executed according to approved schedule given by client.
3 REFERENCE DOCUMENTS
4 ORGANIZATION
5 MATERIAL
6 PLANT/EQUIPMENT
7 PERPARATION
Necessary permits shall be taken from client for the task. Activity shall be started with
Step-Back evaluation risk assessment process.
8 SAFETY
Task performer shall ensure that all hand-tools & equipment which are required
to carry out the maintenance are in good condition and that he knows how to
use them safely.
Safety shoes must be worn; dust mask and hand gloves shall be provided and
must be used when required. In case of chemical use then the PPE stated by
Safety data sheet shall be provided and used.
Job performer shall be trained on how to carry out safe manual handling. In case
of heavy load mechanical aids shall be used.
Defective tool / equipment shall be immediately taken out of use.
Task performer shall be trained on how to use ladder safely.
Scaffold shall be erected / dismantled by only authorized trained staff.
Never use defective scaffold, never move mobile scaffold while people or
materials are kept on it, never use mobile scaffold in case of extreme weather
conditions.
Before the use of any chemicals read the container label / SDS to know the
hazards and the required PPE. All required PPEs shall be provided and used when
required. If you don’t know what PPE are required ask supervisor.
Use Green chemicals as practicable. Never handle chemicals in unlabelled
container & never mix chemicals.
Dispose chemical / chemical container as hazardous waste.
Avoid chemical spill but if happened use the right spill control material
(sand/spill kit) and report incident to your supervisor.
Never leave equipment or tools unattended in publicly accessible areas.
In case of any need to work in electricity energized parts, then power shall be
adequately isolated, locked-out and tagged-out and permit shall be taken before
start of work. No work shall be carried out on energized parts / systems.
1-ELEC-GEN-
AFRAS METHOD STATEMENT – DOC REF NO.
MS01
SAR PROJECT REVISION / ISSUE 01
DATE 03/07/22
Generator Load Test
Page |9
In case maintenance resulted in waste, clean the task site and take waste to the
right waste collection area.
Housekeeping shall be maintained throughout the task.
Note “There is zero tolerance on AFRAS rules. Any violation of blue rules may result in
intervention to the task until corrective action is taken place.”
A job hazard analysis/ work activity risk assessment shall be conducted for the task and
communicated with all task performers prior to issue permit.
Long
Sleeves Helmet/ Ear Eye Full Body Respiratory
Hi-Vis Vest Bump Cap Protection Safety Shoes Hand Gloves Protection Harness Protection
Shirts
Yes☒ No ☐ Yes☒ No ☐ Yes☒ No ☐ Yes☒ No ☐ Yes☒ No ☐ Yes☒ No ☐ Yes☒ No ☐ Yes☐ No ☒ Yes☒ No ☐
9 ENVIRONMENT
General Environmental Instructions
Before the use of any chemicals read the container label / SDS to know the
hazards and the required PPE. All required PPEs shall be provided and used when
required. If you don’t know what PPE are required ask supervisor.
Use Green chemicals as practicable. Never handle chemicals in unlabeled
container & never mix chemicals.
Dispose chemical / chemical container as hazardous waste.
Avoid chemical spill but if happened use the right spill control material
(sand/spill kit) and report incident to your supervisor.
1-ELEC-GEN-
AFRAS METHOD STATEMENT – DOC REF NO.
MS01
SAR PROJECT REVISION / ISSUE 01
DATE 03/07/22
Generator Load Test
P a g e | 10
In case maintenance resulted in waste, clean the task site and take waste to the
right waste collection area.
Housekeeping shall be maintained throughout the task.
10 EMERGENCY PROCEDURES
Name & Number of On-Site First
Medical/ Personal Injury Emergency Aider:
Nearest First Aid Box Location:
Location & Number of Nearest
Hospital:
Ambulance Number:
In case of Accident resulted in medical emergency:
› Call first aider
› If critical Call local emergency services/ ambulance
› Notify Management & QHSE Department Immediately
Name & Number of On-Site Fire
Warden:
Civil Defense Emergency Number:
Fire Emergency
If you discovered fire:
› Report Immediately to Building Security, Management & QHSE
Department
› Sound the alarm (operate the nearest manual call point by breaking the
glass)
› Evacuate to building assembly point
› Attempt to extinguish the fire only if you are properly trained to use fire
extinguishers. DO NOT TAKE PERSONAL RISKS IN ATTEMPTING TO PUT
OUT THE FIRE!
› If you used two (2) extinguishers and fire still not extinguished,
evacuate the building.
7. Switch Off the SECO main breaker to interrupt the power supply to the electrical
& mechanical systems
8. Check the generator engine RPM, Oil pressure, Voltage & Current, to evaluate
the generator efficiency
9. Check all equipment’s emergency power availability & confirm
10. Reset any equipment, if necessary
11. Close the Permit to work from SAR representative, as applicable.
12 PROTECTION
N/A
13 Inspections/checks/tests
Relevant work order and Inspection and maintenance checklist shall be completed for
this activity.
14 ACCEPTANCE CRITERIA
Spot checks shall be carried out during the work. A corrective work order to be raised
for any defects or malfunctions identified which couldn’t be rectified during PPM. Check
and ensure the entire task is completed and unit/system is running in normal condition.
15 RECORDS
Following records shall be maintained for activity;
Work Order Report
Completed Checklist for the activity
16 INSURANCE
N/A
1-ELEC-GEN-
AFRAS METHOD STATEMENT – DOC REF NO.
MS01
SAR PROJECT REVISION / ISSUE 01
DATE 03/07/22
Generator Load Test
P a g e | 12
17 ATTACHMENT
NO Title Pages
1 JHA for Generator Load Test 3