IT Department Report

Breakdown Report

Date of Breakdown: 14/01/2019


Time: 3:25 PM
Location: Packhouse
Causes of the breakdown: Lightening Strike

• Affected services/equipment’s

• Network/Internet (Distribution Switch)


2 distribution switches burned affecting internet and network connections at HR, Quality, Intake, PHD
and Dispatch and finance office in 14th and 15th of January and finance department in 17 th of January. To
minimize

Figure 1: Burned switches on the left and the temporary solution

Summary:
Downtime: 3 working hours of downtime for HR, Quality, Intake, PHD and
Dispatch offices in 14th and 15th of January. And 1 working hour of
downtime for Finance department on 17th of January
Corrective actions (actions taken to
recover the affected service):

Cost (cost of equipment used or to be For now 12.500,00 MTs where used to replace one of the
used to recover the affected service): switches. An additional 12.500,00 MTs will be required to restore
the network quality as it was before. i.e. the total cost to replace
the switches is 25.000,00 MTs.
Preventive actions (actions to be Improve the Lightening and Earth protection circuits (project to be
care on to avoid future incidents): developed Maintenance department)

• CCTV system (POE switch & Cameras)


The POE switch used to connect the cameras burned.
Downtime: 14 Days. Partially recovered.
Corrective actions (actions taken to
recover the affected service):

Cost (cost of equipment used or to be used


to recover the affected service):

Preventive actions (actions to be care Improve the Lightening and Earth protection circuits (project to
on to avoid future incidents): be developed Maintenance department)

• Inova application (Weight checker Machine)


The network card
Downtime:
Corrective actions (actions taken to
recover the affected service):

Cost (cost of equipment used or to be used


to recover the affected service):

Preventive actions (actions to be care Improve the Lightening and Earth protection circuits (project to
on to avoid future incidents): be developed Maintenance department)

• Main printer
Network card burned.
Downtime:
Corrective actions (actions taken to
recover the affected service):

Cost (cost of equipment used or to be used


to recover the affected service):

Preventive actions (actions to be care Improve the Lightening and Earth protection circuits (project to
on to avoid future incidents): be developed Maintenance department)

• Summary of cost

Prepared by: Ivandro Ferreira