Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Plant, Machinery & Equipment Breakdown Report

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Lucky Paragon ReadyMix Limited

Plant, Machinery & Equipment Breakdown Report


Date: 04-September-2019
LONG BREAK DOWN DETAILS:
Machineries & Equipment Status

Non
S#. Type Working Total
Working

1 Transit Mixers 24 4 28
2 Bulker 1 0 1
3 M.Concrete Pump 3 0 3
4 Stationary Pump 2 0 2
5 Plant 2 0 2
6 Loader 2 0 2
7 Cooling Tower 1 0 1
8 Generators 3 0 3
TOTAL NO OF ASSETS 42
TOTAL MACHINES BREAKDOWN 4
Non-Functional Machineries & Equipment

Equipment &
Sr # Defect/Fault Machineries
Not Working Date

MAJOR BREAK DOWN LIST


1 Plentary Bearing Damage T.M # 06 20-Aug-19

2 Chasis not Aligned after accident T.M # 12 10-Jun-19

3 05 m3 Concrete Freeze T.M # 14 20-Mar-19

4 Injector Problem T.M # 17 6-Jul-19

DAILY WORK MECHANIC REPORT


Hydraulic Boom pump
CP#03 2/9/2019
1 d/c piston new change /agt /M bush
uipment

Total no. of Estimated Date of


Current Status Remarks (If any)
days. Repair.

In Progress 15 5-Sep-19
As per Noshad sb
(We should sell it)

Awaiting Decision 86 -

In Progress 168 20-Sep-19

In Progress 60 6-Sep-19

Y WORK MECHANIC REPORTS


In Progress 02 DAYS 4/9/2019 MECHANCAIL WORK COMPLETE (OK) 04/09/2019

You might also like