Plant, Machinery & Equipment Breakdown Report

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Lucky Paragon ReadyMix Limited

Plant, Machinery & Equipment Breakdown Report


Date: 04-September-2019
LONG BREAK DOWN DETAILS:
Machineries & Equipment Status
Non
S#. Type Working Total
Working
1 Transit Mixers 22 6 28
2 Bulker 1 0 1
3 M.Concrete Pump 3 0 3
4 Stationary Pump 2 0 2
5 Plant 2 0 2
6 Loader 2 0 2
7 Cooling Tower 1 0 1
8 Generators 3 0 3
TOTAL NO OF ASSETS 42
TOTAL MACHINES BREAKDOWN 6
Non-Functional Machineries & Equipment
Equipment &
Sr # Defect/Fault Machineries
Not Working Date

MAJOR BREAK DOWN LIST


1 Plentary Bearing Damage T.M # 06 20-Aug-19
2 Chasis not Aligned after accident T.M # 12 10-Jun-19
3 05 m3 Concrete Freeze T.M # 14 20-Mar-19
4 Injector Problem T.M # 17 6-Jul-19
5 STREEING BOX PUMP PROBLEM TM#03 4/9/2019
6 HAND BRAKE BOSTER JAAM NEW TM#09 6/9/2019
DAILY WORK MECHANICA
HYDRAULIC PUMP ORING LKG
1
08 GEAR PROBLEM FOR REPAIR CP#05 7/9/2019
2 GEAR ASMBLE LAEVER PROBLEM LOADER 950E 6/9/2019
3 GEAR LEAVER PROBLEM TM#02 06//09/2019
ment
Total no. of Estimated Date of
Current Status Remarks (If any)
days. Repair.

In Progress 15 5-Sep-19
As per Noshad sb
Awaiting Decision 86 - (We should sell it)
In Progress 168 20-Sep-19
In Progress 60 6-Sep-19
In Progress 3 8/9/2019 PARTS REPAIR IN MARKET
In Progress 1 6/9/2019 MECHANICAL WORK COMPLETE)
ILY WORK MECHANICAL
In Progress 09:30 AM / WORK START ONLY THREE HOURS WORK
In Progress 7/9/2019 It will take two o clock to part
In Progress 7/9/2019 (12:00PM WORK COMPLETE )