SHEET 1
PERSPECTIVE
SITE DEVELOPMENT PLAN
VICINITY MAP
SHEET 2
GROUND FLOOR PLAN
2ND FLOOR PLAN
FRONT ELEVATION BUILDING OFFICIAL
REAR ELEVATION
RIGHT SIDE ELEVATION
LEFT SIDE ELEVATION
SECTION AA
SECTION BB
SCHED OF DOORS AND WINDOWS
SHEET 3
FOUNDATION PLAN
ROOF FRAMING PLAN
2ND FLOOR BEAM FRAMING LAND USE AND ZONING
DETAILS OF BEAM
SCHEDULE OF BEAM
TRUSS DIAGRAM
DETAILS OF COLUMN
DETAIL OF STAIR
SCHEDULE OF FOOTING
DETAILS OF SLAB
DETAILS OF WALL FOOTING
SHEET 5
PLUMBING LAYOUT GROUND
FLOOR
TECHNICAL DESCRIPTION SITE PLUMBING LAYOUT 2ND FLOOR
ARCHITECTURAL
TCT NO. 021-2021000269 ISOMETRIC DIAGRAM
LOT 12, BLOCK 1 LEGEND
SPECIFICATIONS
DETAIL OF SEPTIC TANK
LINE BEARING DISTANCE
SHEET 6
1-2 S 35-09 W 6.33 M
LO LAYOUT GROUND FLOOR
2-3 N 54-51 W 18.63 M
CO LAYOUT GROUND FLOOR
LO LAYOUT 2ND FLOOR
3-4 N 42-47 W 1.26 M CO LAYOUT 2ND FLOOR STRUCTURAL
SINGLE LINE DIAGRAM
4-5 N 18-39 W 1.26 M 2.00 SCHEDULE OF LOADS
LEGEND
9 SPECIFICATIONS
5-6 N 05-30 E 1.26 M 8 10
1.15
7
LOCATION MAP
3.50
3 UP
2.0
2.0
2
2 ELECTRICAL
PREPARED BY: DRAWN BY: PROJECT TITLE: CONFORME: SHEET CONTENT SHEET NO.
8.50
5 SECTION AA 8 SECTION BB
BP2 1 : 100 BP2 1 : 100
0.34
W1 W4
W1
W1
2.25
BEDROOM
3.01
BEDROOM
DN
1.05
D2
6.00
D2 D3
5.66
D3
W4 D2 ROOF LEVEL ROOF LEVEL
DN
2.70
6.30 6.30
2.65
W5
MASTER
BEDROOM
0.00
W4 W6 D4
0.90
2ND FLOOR
BALCONY
3.30
2ND FLOOR
3.30
FOUNDATION FOUNDATION
2 2ND FLOOR 0.30 0.30
1 : 100 ROAD LEVEL ROAD LEVEL
BP2
0.00
0.00
4 REAR ELEVATION 7 LEFT SIDE ELEVATION
BP2 1 : 100 BP2 1 : 100
8.50
2.15
1.85
DIRTY
1.15
KIT
D4 W1 ROOF LEVEL
D2
ROOF LEVEL
6.30
RAILINGS 6.30
FAMILY
W3 KIT DINE ROOM W2 CEMENT FINISH WITH PAINT RAILINGS
(COLOR- NUEVO TERRA)
3.59
0.10
8.15
UP
0.05
0.00
0.80
5.65
0.90
0.06
D1 2ND FLOOR
UP 1.00
D3
LIVING
2ND FLOOR 3.30
8.09
W1 3.30
2.06
W3
4.76
D1
W1 FOUNDATION
1.00
PORCH FOUNDATION
0.30
CARPORT 0.30
ROAD LEVEL
3.50 3.90 ROAD LEVEL
1.50
0.00
0.00
7.50 3.56
PREPARED BY: DRAWN BY: PROJECT TITLE: CONFORME: SHEET CONTENT SHEET NO.
PROPOSED:
MA. ANGELITA G. PASCUAL BS FLORES
1.14
1.70
10 mm RSB spaced 1 @ 75mm, 3 @ 100mm, 3 @ 125mm, rest @150mm towards midspan
T4
B2 L/4
B2
B2
T2 T4
S1 B1
1.70
L/3
1.02
T2
B1 B1
T1 L
B1
B1
B1
B1
0.60 0.92 0.92 0.92 0.92 0.60
S2 S2 S1
b
0.60 1.02 1.02 1.02 1.02 1.02 1.02 0.60
B1 B1 TOP TOP
HT BARS BARS
T
H
B1 h
1.70
BOTTOM BOTTOM
S1 BARS BARS
S2 S2
B1
B2
B1
B1
B1
TOP AND BOTTOM - L 2 X 2 X 1/4
B1 B1 SUPPORT MIDSPAN
VERL AND DIAGL - L 1-1/2 X 1-1/2 X 1/4
T3
PURLINS - 1 X 3 X 1.2MM C PURLINS
0.85 1.08 1.08 1.08 1.08 SCHEDULE OF BEAM
B1 S1
B1
B1
SUPPORT MIDSPAN
B1 S2 REMARKS b (mm) h (mm)
B1
TOP BARS BOTTOM TOP BARS BOTTOM
B1
TB 200 300 3 # 16 2 # 16 2 # 16 2 # 16
B1 9 ROOF FRAMING PLAN 10 TRUSS DIAGRAM B1 250 400 5 # 16 3 # 16 3 # 16 5 # 16
BP3 1 : 100 BP3 1 : 100
B2 200 400 3 # 16 2 # 16 2 # 16 3 # 16
RB 200 300 3 # 16 2 # 16 2 #16 3 # 16
2 2ND FLOOR BEAM FRAMING PLAN L
BP3 1 : 100
L/4 L/4 5 DETAILS OF BEAM
4 x 8 x 16 CHB BP3 1 : 25
12 mm diam RSB @
200 mm OC 12 MM VERTICAL RSB @
L/4
Continuous along 0.60 M OC
Column strip with
12mm RSB extra Bar 10 MM HORIZONTAL RSB @
in between EVERY 3 CHB
0.45
2 - 10 MM LONGL BARS WITH 10
0.15
MM TRANSVERSE BAR @ O.60 M
OC
0.40
12 mm diam RSB @
200 mm OC
L/4
Continuous along
Middle Strip 7 DETAILS OF WALL FOOTING
BP3 1 : 20
0.10
TB
1.20
WF
3 TWO WAY SLAB 0.30
WF
TB
TB
BP3 1 : 35
TB TB TB
1.20
0.30
TB
10 mm diam Temp.
TB
TB
TB
L
Bars @ 200 mm OC
L/4 L/4 6 - #16 MM RSB ON
TB TB TB TB CENTER BOTH DIRECTION
12 mm RSB @
0.15 m OC
3.00
WF
TB
TB
TB
WF
L/4
0.20 m OC
MM, 3 @ 125 MM, REST AT 150 MM
TB THROUGH MIDHEIGHT 10 mm RSB
TB
16 mm RSB @
L
TB 0.20 m OC
verify
TB
TB
TB
12 mm diam RSB @
200 mm OC with cut
L/4
h = 1.2 m
bars in between
continuous bar
0.25
PREPARED BY: DRAWN BY: PROJECT TITLE: CONFORME: SHEET CONTENT SHEET NO.
PROPOSED:
MA. ANGELITA G. PASCUAL BS FLORES
CIVIL ENGINEER CHECKED & VERIFIED BY:
PRC NO: 31916 PTR NO: 2207869
TWO STOREY RESIDENTIAL BUILDING MR. & MRS. ARNFINN AND MARIEBEL HANSEN 3
VALIDITY : 9-30-23 DATE: JAN. 22, 2021
TIN: 119-778-118 PLACE: LAOAG CITY LOCATION: CAMELLA HOMES, LOT 12, BLOCK 1, LAOAG CITY OWNER
B = 0.8M
B = 0.2 M
B = 0.2 M
2.20
L = 0.8M
0.2 x 0.2 COLUMN
5 - #12 MM RSB ON
CENTER BOTH DIRECTION
2.00
NGL
1.00
0.25
2 WALL B 4 5
WALL SECTION B DETAILS OF WALL COL
BP4 1 : 25
BP4 1 : 25 BP4 1 : 25
1.50
1x1 TUBULAR @ 0.15M
2 DIAM GI PIPE
12 MM VERTICAL RSB @
4 x 8 x 16 CHB 0.60 M OC
0.60
10 MM HORIZONTAL RSB @
0.90
0.90
EVERY 3 CHB
2.00
1.50
0.45
2 - 10 MM LONGL BARS WITH 10
0.15
MM TRANSVERSE BAR @ O.60 M
0.60
0.60
OC
NGL 0.40
3 WALL SECTION A
BP4 1 : 25
1 WALL A
BP4 1 : 25
PREPARED BY: DRAWN BY: PROJECT TITLE: CONFORME: SHEET CONTENT SHEET NO.
PROPOSED:
MA. ANGELITA G. PASCUAL BS FLORES
CIVIL ENGINEER CHECKED & VERIFIED BY:
TWO STOREY RESIDENTIAL BUILDING MR. & MRS. ARNFINN AND MARIEBEL HANSEN
PRC NO: 31916 PTR NO: 2207869
VALIDITY : 9-30-23 DATE: JAN. 22, 2021
TIN: 119-778-118 PLACE: LAOAG CITY LOCATION: CAMELLA HOMES, LOT 12, BLOCK 1, LAOAG CITY OWNER
VTR
SPECIFICATIONS
DN
T&B ST
FROM WATER
MASTER LAV
SOURCE
BEDROOM
CO
BALCONY
4.40
1.40
LEGEND 0.4 x 0.4 MANHOLE 0.4 x 0.4 MANHOLE
12 MM RSB @ 0.20 M O.C.
WC WATER CLOSET
LANAI
DIRTY
KIT LAV LAVATORY
DINE
FAMILY
ROOM
FD FLOOR DRAIN
KIT
UP BT BATH TUB
CO CLEAN OUT
UP
LIVING VTR VENT THRU ROOF
SHO SHOWER
1.80
1.60
DIGESTION LEACHING LEACHING
1.50
PORCH F FAUCET CHAMBER CHAMBER CHAMBER
CARPORT
ST
KS KITCHEN SINK
FROM WATER
ST SEPTIC TANK
SOURCE
10 MM RSB @ 0.20 M O.C.
SEWAGE LINE
WATER LINE
1 PLUMBING GROUND FLOOR VOL = 8.4 CU.M.
BP6 1 : 100
PREPARED BY: DRAWN BY: PROJECT TITLE: CONFORME: SHEET CONTENT SHEET NO.
PROPOSED:
BS FLORES
SANITARY ENGINEER/MASTER PLUMBER CHECKED & VERIFIED BY:
TWO STOREY RESIDENTIAL BUILDING MR. & MRS. ARNFINN AND MARIEBEL HANSEN 4
PRC NO: PTR NO:
VALIDITY : DATE:
TIN: PLACE: LOCATION: CAMELLA HOMES, LOT. 12, BLOCK 1, LAOAG CITY OWNER