The offer shall be based on an EPC basis for all necessary components to construct a lSOMWp (DC)
Solar Plant located in Duhok Governorate of the Kurdistan Regional Government of Iraq, but not
limited to the following:
1. DC Portion
1.1. Solar PV Modules
1.2. PV Mounting Structures
1.3. DC-AC Inverters
1.4. Auxiliary Step Transformers (0.5/33kV)
1.5. 33kV RMU
1.6. DC Combiner Boxes
1.7. PV Modules Interconnecting DC Cables
1.8. LV/MV AC Cables/Terminations
1.9. Grounding / Lightning
1.10. Cable Laying Ladders/ Trays/ Fixing Accessories
1.11. Lighting System
1.12. Security System
1.13. O&M Tools & Instruments
1.14. Remote Supervision
1.15. Meteorological monitoring station
2. AC Portion
2.1. 33kV Switchgear
2.2. 33/0.38kV Auxiliary Transformer
2.3. 33/132kV Step up Power Transformer
2.4. 132kV Switchyard
Iraq – Erbil Shaqlawa Str. Shoresh Qtr. Zagros House No.142.745 Post Code 44001
+964-66-224 54 75 www.zagros-group.com info@zagros-group.net Page 1 of 3
Reference: D1.2/2021 Date: July 21, 2022
Iraq – Erbil Shaqlawa Str. Shoresh Qtr. Zagros House No.142.745 Post Code 44001
+964-66-224 54 75 www.zagros-group.com info@zagros-group.net Page 2 of 3
Reference: D1.2/2021 Date: July 21, 2022
10. the contractor shall Pay all the costs and expenses of all preparations needed to connect the
Solar Power Plant to the KRG-Grid inside the boundary of the Power Plant, including the Step-up
Transformers, Switch Yard, Powerhouse and all Protection Equipment according to the instructions
of the MOE.
11. The contractor shall submit a legally certified letter of intent confirming that the Bidder shall
Pay all the costs and expenses of all preparations needed to connect the Solar Power Plant to the
nearest KRG-Grid connecting point
12. outside the Power Plant boundary including the Transmission line, Towers and connections
to the grid, the connection shall be made only to the closest 132KV Transmission line, the type of
the connection shall be an (In and Out) connection from the Power Plant to the closest 132KV TL, a
T-connection type to the transmission line is not acceptable.
13. The Ministry of Electricity of the KRG shall provide the contractor/investor with the approval
of the Council of Ministers and the Ministry of Finance as a guaranty of payments.
14. The Contract shall be named the Power Purchase Agreement (PPA) and shall be the only
legal and official source to describe and present all of the terms and conditions of this Agreement,
any document(s) not included in this Agreement is (are) void and ineffective, unless this Agreement
is amended mutely by both Parties.
Iraq – Erbil Shaqlawa Str. Shoresh Qtr. Zagros House No.142.745 Post Code 44001
+964-66-224 54 75 www.zagros-group.com info@zagros-group.net Page 3 of 3