Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Standard Survey Form For PV Solar Energy Project: 100 General Data

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Form: SI-F15

S tan d a rd su rve y form f or PV solar energy project


Please fill the following information as much as possible.
This will help to prepare a complete solar PV solution according to your requirement and existing electrical installation.

100 General data:


101 Project name
102 Customer
103 Contact person
104 Telephone
105 E-mail
106 Industry/Application
107 Expected date of installation
108 Required solar PV solution:
ongrid off grid with batteries
hybrid with batteries and grid hybrid with generator and grid
hybrid with batteries and generator hybrid with batteries, generator and grid

200 Location data:


201 Address
202 City and country
203 Latitude/Longitude/Altitude

300 Electrical data:


301 Grid Configuration 1 phase 3 phase 3phase with MV distribution
302 Low voltage level V
303 Medium voltage level KV MV transformer on site
304 Nominal frequency Hz

400 Load data/Consumption


401 Average load kW per hour
402 Minimum load kW per hour
403 Maximum load kW per hour
404 Annual consumption kWh
405 Average consumption in day kWh in night kWh
406 Load per hour in kW (if data is available)
0-1h 6-7h 12-13h 18-19h
1-2h 7-8h 13-14h 19-20h
2-3h 8-9h 14-15h 20-21h
3-4h 9-10h 15-16h 21-22h
4-5h 10-11h 16-17h 22-23h
5-6h 11-12h 17-18h 23-24h
407 Seasonal variation Yes No
408 Minimum load (off-season) kW
409 Maximum load (off-season) kW
500 Genset configuration (only fill if using generator and intends to hybrid with PV system)
501 Fuel type: Diesel generator Gas generator Steam turbine Furnace oil generator
502 Generator information
Model
Manufacturer
Quantity (units)
Power rating (KVA)
Fuel consumption (L per hour)
Fuel cost ( per litre)
info@sitecno.eu | www.sitecno.eu Page 1/2
503 Annual fuel consumption (litres)
504 General controller information
Manufacturer Model Modem/TCP interface




Overload plant controller available Yes No
Genset power management manual relative PM % time controlled
Other:
505 Genset control type isochronous droop controlled unknown
506 Genset status in operation not yet installed

600 Economics:
601 Currency
602 Grid electricity cost per kWh
603 Average electricity cost with fuel per kWh
604 Estimated annual fuel price increase %
605 Estimated annual grid electricity price increase %
606 Operational and maintenance expenditure of electricity cost %

700 Additional information:


701 Permanent internet connection on site yes no
702 Free available space (M )
2
on roof on ground
703 Type of roof inclined plane
704 Tilt (º)
705 Please attached the following documents if available:

Copy of electrical bill.


Single line diagram of electrical distribution.
Data sheet generator.
Simple site map sketch.

706 Additional instructions:

707 Information provided by:


Name
Company name
Designation
Contact number
E-mail
Date
info@sitecno.eu | www.sitecno.eu Page 2/2

You might also like