CLIENT SAHANA CLOTHING COMPANY PRIVATE

LIMITED

PROJECT 5 MW SOLAR PV POWER GENERATION UNIT

TITLE

BRIEF PROJECT REPORT


SAHANA CLOTHING COMPANY PRIVATE LIMITED

ISSUE-A /21.08.2021

21.08.202
Initial submission SR BM SBG
1

Checke
Rev. No Date Description Prepared Approved
d

Document No. :20210016 No of Sheets

PROJECT REPORT Page 2


SAHANA CLOTHING COMPANY PRIVATE LIMITED
PROJECT SUMMARY

Title: SAHANA CLOTHING COMPANY PRIVATE LIMITED

Description: 5 MW Solar PV Power Generation Unit

Location: Tirupur District, Tamilnadu

Latitude 10.50 N
Longitude 77.25 E

Irradiation Details 5.515 kWh/sqm/day Daily Annual Horizontal Irradiation

Technical Details:

Modules : Jinko 545Wp

Inverter : ABB

Transformer : ESENNAR

LTPanel : L&T

O/D HT Panel :MEGAWIN

DCCables :HAVELLS

ACCables :SEICHEM

Structures :JSW

JunctionBoxes :ABB

SCADA :ABB

The final decision on the choice of makes, types, capacity will be with the promoter and
EPC Contractor.

EXECUTIVE SUMMARY

The Electricity Act, 2003, paves way for an innovative approach to solve our country’s
power problems. It has paved the way for a competitive environment; open access to
existing transmission and distribution network to transmit electricity across regions; de-
licensing of generation, captive power and dedicative transmission lines; licensing of
distribution and supply companies and the restructuring of State Electricity Boards

PROJECT REPORT Page 3


SAHANA CLOTHING COMPANY PRIVATE LIMITED
The Ministry of Power has a mandate to promote cogeneration and renewable sources for
Power generation under Nodal agencies and hence it will play a major role in
mainstreaming renewable energy sector. The advantage or renewable resources includes
their capacity to produce energy without producing carbon-based warming and polluting
agents into the atmosphere. The financial cost of its applications is not always cheap but if
the environmental costs of using fossil are accounted for, renewable energy wins hands-
down. There are also indirect savings on health and its costs as there are no harmful
emissions.

In the above back ground, M/s. SAHANA CLOTHING COMPANY PRIVATE LIMITED
decided to set up a 5.0MW Solar Power Plant. This Detailed Project Report (DPR) brings out
all technical details and overall costs justifying the selection of the project. The total power
generation is envisaged to be 5MW from Solar Photovoltaic Cell. It is a very important
document that is required for Environmental Impact.

The company was formed with an objective to tackle the growing energy requirement of the
country in an ecologically sustainable manner. The company focus area is power generation
using renewable source such as solar energy.

It is founded by professionals from energy, management and finance fields. Driven by a


passion for green energy, the founders merged their strengths and combined there valuable
experience.

The land is located in Tirupur District, Tamilnadu. It is intended to evacuate the renewable
power from the Solar Plant and inject into the 22 KV side of to 110/22 KV Power Substation
located at KILUVANKATTUR The Substation is located at 5km (air distance) from the land.

This report highlights the details of the proposed 5.0 MW Solar PV power generation
scheme, plant layout, site details, description of main plant equipment’s, evacuation of
generated power and operation & maintenance aspects in addition to project
implementation and schedule and financial aspects.

The system configuration of the proposed power plant is as follows:

 The capacity of the power plant will be of 5MW


 Expected electrical energy generation for sale will be approximately 95 lakhs units
(KwH) per year in the first year of operation.

The project shall be designed to produce a peak of 5 MW of clean solar power and
associated renewable energy attributes. The power will be fed to the grid (TANGEDCO) for

PROJECT REPORT Page 4


SAHANA CLOTHING COMPANY PRIVATE LIMITED
supply to Own captive under NON REC. Installation shall take about 1 month from
commencement to completion.

The Solar PV power will be generated at 690V AC, and will be stepped up to 22 kV level and
connected to 22 kV bus of nearest substation. This will be done by installing necessary
towers, breakers, control and relay panels, VCBs, CTs and PTs to ensure protected and fail
safe operation of the beneficiary substation and the solar power plant.

The Grid Connected Solar PV power generation scheme will mainly consist of Solar PV
array, Power Conditioning Units (PCU) which convert DC to AC power, transformers and
associated switch gears (with metering and protection) for transforming the electrical energy
level to 22 kV.

The Solar PV power plant shall consist of a Solar PV array of 5.0 MW. It generates DC
power. The DC power is fed into Power Conditioning Units to convert DC power to AC
power. The output of the PCUs are connected through proper isolation and circuit breaking
arrangements to transformers with a total capacity of 5.0 MW to step up to 22 kV, 3 Ph AC
supply. The electrical power at 22 kV level is evacuated through appropriate transmission
arrangements to a 22 KV bus bar at KILUVANKATTUR substation and connected to the 22
kV grid. Synchronization arrangements effected through electronics provided in the PCUs
ensure adequate synchronization of the two sources of power supply namely, the grid power
and the solar power.
The following are the salient features of the power plant:
Table 1: Salient features of the project

1 Project Site SAHANA CLOTHING COMPANY


PRIVATE LIMITED
2 District Name Tirupur
3 Name of the State Tamilnadu
Latitude 10.50N
4 Location
Longitude 77.25 E
5.515 kWh/sqm/day Daily Annual
2.5 Irradiation details considered
Horizontal irradiation
6 Type of system FIXED
7 Type of PV Modules Considered MONO-Crystalline
8 Proposed capacity 5.0 MW
9 Capacity of each Module proposed 545Wp
10 Inverter Capacity 5000kW – 1no.
11 Projected Energy Production per year 95 lakh units (kWh)

12 Tariff as per PPA Rs 6 per unit

13 Expected Life of Power Plant 22.5 years

PROJECT REPORT Page 5


SAHANA CLOTHING COMPANY PRIVATE LIMITED

14 Expected Plant Commissioning Date Within 2months

PROPOSED GRID CONNECTED SOLAR POWER PLANT LOCATION

SAHANA CLOTHING
COMPANY PRIVATE
LIMITED

SOLAR RADIATION MAP OF INDIA

SOLAR RADIATION DATA


LOCATION ANNUAL SOLAR RADIATION

10.50 N LATITUDE 19.8 KWh/SQ.M

PROJECT REPORT Page 6


SAHANA CLOTHING COMPANY PRIVATE LIMITED

77.25 E LONGITUDE

PROJECT REPORT Page 7