Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Pre-Engineered Steel Structure: Brochure For Product

Download as pdf or txt
Download as pdf or txt
You are on page 1of 35

BROCHURE for PRODUCT

PRE-ENGINEERED STEEL STRUCTURE

LUCKY STEEL BUILDINGS J/S COMPANY


Website: www.LuckySteel.vn

LUCKY STEEL BUILDINGS JOINT STOCK COMPANY

Office Address:
6th Floor, C.T Building, No. 56 Yen The Street, Ward 2, District Tan Binh, Ho Chi Minh City, Vietnam
Phone number: +84(0) 28 3535 2668 Fax: +84(0) 28 3535 2664
Hotline:
Factory Location:
My Phuoc 3 IZ, Ben Cat, Binh Duong Province (~ 50KM Away from HCMC)

Email hotline: info@LuckySteel.vn


Website: www.LuckySteel.vn
Edition Aug-2020
HUMANS INTEGRITY

CARE SOLUTION

Lucky Steel Buildings (LSB) 1


CHAPTER 01
CONTENT 1.1 LUCKY STEEL – FOUNDATION’S VALUE
VISION
At Lucky Steel Buildings, our vision is to become a professional company in the construction industry,
particularly focusing on pre-engineered steel structures.

We aim to enlighten and liberalize people through careful training. As a company, we expand human
resources and invest in our facilities to operate at optimal levels of efficiency and effectiveness.

By 2025, the company’s revenue is projected to grow a minimum of 15% annually and have a brand
name belonging in group of top companies of the PESS (Pre-Engineered Steel Structure) Industry.
CHAPTER 1:
Additionally, before 2030, we anticipate our annual revenue to be placed in the top 10 worldwide with
HEADNOTE & ROOT VALUE OF LUCKY STEEL …………..… 3 a Rank 2 in the PESS (Pre-Engineered Steel Structure) Industry.

MISSION
Our mission is based on creating “solutions” for products and services in the construction industry,
CHAPTER 2:
especially within PESS (Pre-Engineered Steel Structures). Lucky Steel Buildings will have a

MODEL OF SINGLE RESPONSIBILITY ………………………… 6 tremendous and positive impact on the economy through enhanced benefits for the experiences of
the project, customer, partners, sub-contractors, and community.

CHAPTER 3: CULTURE & CORE VALUE


INTEGRITY + GOODNESS + “RESPECT # REPUTATION”
PRE-ENGINEERED STEEL STRUCTURE PRODUCT………….. 9
Core Value: Honesty produces Integrity.

CHAPTER 4: “Honesty and Integrity” form the vital base of our company. Integrated with our deep passion to bringing
quality to our products, partners, and community, we combine our wisdom and knowledge to find the best

LUCKY STEEL – COMPETENCE IN BRIEF……..……….……. 29 possible solutions.

Culture: Goodwill, cooperation, and collaboration rooted in Care


CHAPTER 5:
We hold a high expectation to communicate with the utmost respect and sense of goodwill for others.

CORPORATION, EXPERIENCE…………………………………… 55 While we pride ourselves in our knowledge and experiences, Lucky Steel Buildings operates on the
foundation of sincerity and genuine care by creating a pleasant working environment for all.

Self-Respect, Respect and Prestige as an integral part of our commitment

Members of Lucky Steel Buildings enter the company with the expectation of upholding themselves to
the highest regard of respect in order to make valuable contributions within the company. We hold
ourselves to be held accountable for our actions, and as such, we respect not only ourselves but others
as well in order to maintain this prestigious company.

We pride ourselves in placing such high importance on rooting our work with a kind, understanding heart.
It is only with such a heart that we can create meaningful products and provide quality, lasting services.
We stand by our promise to you, and we hold our reputation as a company to perform only under such
standards.

MANAGEMENT PHISOLOPHY
“HUMANS” at the ROOT.
“Human” Resource  Builds the organization
“Human” Culture  Sustains the company and its future.
“Human” Kindness  Shares and contributes to the community.

Lucky Steel aims to provide high quality service as we work towards finding better solutions for our
partners and customers alike.

www.LuckySteel.vn Both individual and group achievements are taken into account in order to continually maintain and
improve our chain of operations. As a company, we understand that it is imperative we are always
polishing our work in order to deliver the best products to our customers, partners, and community

2 Lucky Steel Buildings (LSB) 3


CHAPTER 1 CHAPTER 1
1.2. HEADNOTE 1.3. ROOT VALUE OF LUCKY STEEL

Construction is an extraordinary industry in and of itself for it belongs to neither the


commercial nor the industrial group. As its own entity within society, construction plays a
monumental role in developing countries. Construction is the root of all projects from
residential to commercial buildings. Industrial factories lay the groundwork for other
manufacturing industries, which paves the path for infrastructure sub-sectors to allow
countries to flourish and develop.

As society continues to develop exponentially over the years, the construction industry has
been forced to adapt and evolve simultaneously from designs to materials to construction
solutions, all of which are vital societal necessities.
There is a growing trend towards construction in general, and in particular, the PESS (Pre-Engineered Steel
Lucky Steel Buildings acknowledges and has done extensive research on the positive
Structure) industry. At Lucky Steel Building, we are comprised of a team of experienced and passionate
impacts of steel. Years of advancements have allowed steel to gradually replace concrete
as the preferred and more efficient material in construction. More specifically, some key members who are determined to establish ourselves as a prestigious and quality company. Our slogan
advantages of using steel in our solutions include its immense strength, lightness, “Building with Care” is our promise to you. We pride ourselves in working with sincerity, honesty, and
durability, and fast progression. Furthermore, as our planet continues to grow increasingly integrity.
eco-friendly, the construction industry turns more and more to opting for the use of steel
structure for its versatility in usage ranging from simple to complex. Here at Lucky Steel Buildings, we have a motto, “How can we work together to foster greater value for our
community?” With open minds and a warm heart, we work harmoniously with one another to find better
Historically speaking, many famous projects around the world use steel structure, such as
the Chrysler Building in New York and the Eiffel tower in France. In our motherland itself, solutions for the best products and projects.
Vietnam uses steel structure as the skeleton or core component for many high-rise
We extend our most gracious gratitude towards our partners, customers, suppliers, colleagues, and our
buildings, such as the National Symbol Landmark 81.
management team for we know that no success could be possible for Lucky Steel Buildings without the
To say the least, advancement of pre-engineered steel structure within construction has collective efforts and assistance from the entire LSB’s family. Truly, you all make each day at Lucky Steel
been expanding widely. In numbers, we have seen a growth in steel-based structures by
Buildings full of joy and pleasure.
more than 10% annually over the past two decades, and we anticipate this number to only
increase in the coming years. Lastly, we are committed to standing true to our words of constantly finding better solutions through our
Looking towards the future, Lucky Steel Buildings is confident that PESS (Pre-Engineered actions.
Steel Structure) will gradually replace other construction options for high-rise buildings and
other construction projects alike in developing countries within Southeast Asia, such as
Vietnam. We will be guided by the successful transition of using PESS in other developed
countries, such as Japan, Taiwan, China, and Korea. Using their progress and growth as a On behalf of the Board of Directors and founding shareholder’s council, thank you.
blueprint, we will design a step by step process to provide Vietnam with our own successful
future in using steel structure.

Lê Công Vĩnh Lộc


President of Lucky Steel Buildings

4 Lucky Steel Buildings (LSB) 5


CHAPTER 2
MODEL OF SINGLE RESPONSIBILITY :
OPTIMAL SOLUTION FOR YOU AND FOR US

BOQ DESIGN PROPOSAL DRAWINGS CONSULTING, ESTIMATE & QUOTATION NEGOTIATION, CONTRACT SIGNING

With the experienced design team for For the concept drawings to help Give the consulting with few options to Bidding, Negotiation and finalize the
many years as well as many different customer have the overview about have optimal design but quality, safety price as well as other terms to sign
architect projects how is project will be looked like are no compromise contract

QC INSPECTION FABRICATION SHOP DRAWINGS STRUCTURAL DESIGN

To release fabrication to Manufacture Update all comments from customer to


to start production. The production is have final approved drawings to go for To go full structure design to issue the
Checking, inspection by QC with with standard procedure, inspection to design calculation and issue the
shop drawings step by using 3D soft
standard ITP make sure about quality as well as ware Tekla, Revit… to have minImize approval drawings
zero error vs shop drawings error

PACKING & LOADING TRANSPORTATION ERECTION COMPLETION & HAND OVER

The hardworking CMD team included


The warehouse department to do of site engineer, supervisor, site
Defect list, commissioning and hand
packing, planning for loading members Transportation to job site by truck, manager, safety engineer to
over project to Customer and service
phase by phase to smoothly container coordinate with other site work to
maintenance, warranty
connecting to the erection plan on site manage about cost, sub-contractor,
schedule and quality

6 Lucky Steel Buildings (LSB) 7


CHAPTER 3:

PRODUCTS

3.1. PRE-ENGINEERED BUILDINGS:

* SKELETON FRAME
* ACCESSORIES
* SHEETING SYSTEM

3.2. OTHER STEEL STRUCTURES:

* KINGPOST & SHORING SYSTEM TO


SERVE FOR BASEMENT WORK OR STEEL
CORE OF HIGH RISE BUIDLING.
* STEEL FRAME TO SUPPORT M & E
* OTHER STEEL FRAME SUCH AS
CONVEYOR, PIPE RACK, OIL GAS
SUPPORTING…

9
PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE

3.1. PRE-ENGINEERED BUILDING : STANDARD ITEMS

Crane Beam under


Ridge Cap
Rail

Connection bolt of
main column/rafter

Side Wall

Cold Form Brace


(Sag Rod/Arrestor)

End Wall

Handrail for Mezz,


Decking for Mezz
Staircase

1 Anchor Bolt 8 Purlin 15 Brickwall / Blockwall 22 Gutter

2 Primary Frame (Rigid column/rafter) 9 Girt 16 Louver 23 Down Spout / Down Pipe

3 Roof Bracing (Cable or Rod) 10 Boltless panel (Seamlock / Kliplok) 17 Personal Door/Exit Door 24 Cage Ladder

4 Wall Bracing (Cable or Rod) 11 Screwed wall panel (5 ribs/9 ribs) 18 Roll Up Door (RUD) 25 Staircase

5 Portal Frame Bracing for Wall 12 Roof Monitor / Roof Ventilation / Ridge Vent 19 Fascia 26 Bird screen/Net or Insert Screen/Net

6 Crane Bridge 13 Screwed roof panel (5 Ribs/ 9 ribs) 20 Canopy

7 Mezzanine system ((Mezz Column,Beam, Joint) 14 Roof light / Wall light 21 Flashing Trims

10 Lucky Steel Buildings (LSB) 11


PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE

3.1a. PRE-ENGINEERED BUILDING – STANDARD MODULE FRAME

MUILTI SPAN 1 / MS1 WITH ONE MIDDLE COLUMN

CROSS SECTION

MULTI SPAN 2 / MS2 WITH 2 MIDDLE COLUMNS

MULTI SPAN 3 / MS3 WITH 3 MIDDLE COLUMNS


CLEAR SPAN

MUILTI GABLE 2 – MG2 WITH 2 CLEAR SPAN

CURVED CLEAR SPAN

MULTI FLOOR STEEL BUILDINGS


CLEAR SPAN TRUSS RAFTER

MONO SLOPE ROOF SYSTEM BUILDING, STEEL FRAME REST ON RC COLUMNS

12 Lucky Steel Buildings (LSB) 13


PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE

3.1b. PRE-ENGINEERED BUILDING – BRACING SYSTEM 3.1c. PRE-ENGINEERED BUILDING – CONNECTION ACCESSORIES

BRACING FOR PRIMARY FRAME

They are included the X roof bracing (For rafter), Wall bracing (For column) to transfer longitudinal load (Caused
by wind load or crane load) to foundation.

These bracing are normally designed using cable or rod or angle L, 2L.

For wall bracing, in some special cases of request about clearance of movement, it is using the Portal bracing
which is higher cost.

LATERAL BRACING FOR PURLIN/GIRT ANCHOR BOLT

It is bracing for secondary-frame, this bracing is to have brace point on purlin girt to reduce the effective length Anchor bolt / Foundation Bolt is designed to anchor
and to strengthening the purlin/girt together. steel structure to foundation. Normally, the shape
of such anchor bolt is either I, L, J
Normally, these bracing are using sag rod M12 electro galvanized or Sag Arrestor (2L X connection) or using U The strength is grade 4.6-5.6 – 6.6 with elector
between purlin/girt galv.

FLANGE STAY/FLANGE BRACE

This flange stay is to brace bottom flange of rafter connected to purlin or inside flange of column to girt.

The purpose of this bracing is to avoid twist rafter/column during erection time. It is normally using angle L, V
(Painted) or L, V, U cold form from purlin coil.

MACHINE BOLTS

SAG ROD The connection bolts are for secondary frame. It is


designed with standard bolt grade 4.6 DIN or
ASTM. It is Electro Galv, to be used for connection
of Purlin/Girt to Rafter/Columns or some similar
connection

Cable Bracing X Bracing 2L


SAG ARRESTOR

Rod Bracing

PORTAL FRAME

HIGH STRENGTH BOLTS

The bolt for connection of Primary Frame.


The high strength bolt as standard of Electrode
Galvanized or sometimes are HDG/Bare Black bolt
as specified in design.

The strength is normally as standard of Grade 8.8,


except some special cases of grade 10.9 or S10T,
F10T or Torcon Bolts

14 Lucky Steel Buildings (LSB) 15


PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE

3.1d. PRE-ENGINEERED BUIDLING – OTHER FRAMES 3.1d. PRE-ENGINEERED BUIDLING – OTHER FRAMES

GAS STATION 2 COLUMNS

CAR/BIKE PARKING (CHEETAH) CAR/BIKE PARKING (FALCON)

BULK WARE HOUSE WITH BIG SLOPE

CAR/BIKE PARKING (BUTTERFLY) CAR/BIKE PARKING (BUTTERFLY)

HANGAR (FOR AIR PLAN MAINTENANCE)

16 Lucky Steel Buildings (LSB) 17


PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE

3.1e. PRE-ENGINEERED BUILDING – COLD FORM SECONDARY 3.1e. PRE-ENGINEERED BUILDING - STEEL MEZZANINE, INCLUDED DECKING
Lucky Steel design, fabrication and provide the many kind of purlin which is available on Vietnamese market. The The mezzanine is made from steel having big advantage of big span, fast progress of construction and low cost.
most popular purlin is C, Z The Mezzanine is mainly included Mezz column (MC), Main mezz beam (MB), Support beam (Mezz Joint MJ) to
support floor which is normally by 3 options :
1. The RC floor with or without decking support
Based on different condition of loading, architect of the project to define the proper size/shape of purlin. 2. Steel checker plate
The purlin/girt are designed on its strength (Yield Strength-Fy G345/G450, thickness, size) and how is anti 3. Steel Galv. Grating
corrosion (Zinc Z80, Z100, Z120, Z150, Z180, Z200, Z275, Z350)

Mezz Beam

Roof purlin

Wall Girt

Mezz Joist

ROOF PURLIN WALL GIRT

Z PURLIN

SIZE SHAPE TECHNICAL IMAGE ACTUAL IMAGE

Z150
CHECKER PLATE & GRATING
Z200 Checker Plate

Z250
Main girder
Z300

Galv. Grating
C PURLIN

SIZE SHAPE TECHNICAL IMAGE ACTUAL IMAGE

C150

C200

C250

18 Lucky Steel Buildings (LSB) 19


PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE

3.1f. FASCIA SYSTEM 3.1f. CANOPY SYSTEM

SIDEWALL FASCIA CANOPY

Depending on architecture’s requirement of customer, Lucky Steel will provide the solution for fascia of design, Canopy is a kind of cantilever roof located at sidewall or endwall in order to create the small area beyond out of
detail, fabrication, erection. the wall to prevent rain/sun.

The below is popular shapes of fascia for reference: Canopy has been positioned above doors such as exist door, rolling door, sliding doors.
The below is popular shapes of canopy for reference:
TYPE TECHNICAL IMAGE ACTUAL IMAGE

TYPE TECHNICAL IMAGE ACTUAL IMAGE

Parapet
Fascia

Canopy
with soffit

Vertical
Fascia

Canopy
without soffit

Curved
Eave

Canopy with
curved panel

Top &
Bottom
Curved

For any other special requirement rather than standard items, Lucky Steel is experienced to discuss and For any other special requirement rather than standard items, Lucky Steel is experienced to discuss and
give the solution to meet your expectation. give the solution to meet your expectation.

20 Lucky Steel Buildings (LSB) 21


PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE

3.1g. PRE-ENGINEERED BUILDING – SHEETING SYSTEM 3.1g. PRE-ENGINEERED BUILDING – SHEETING YSTEM

With experienced employees over 20 years in Pre-Engineered Filed, we always want to consult and develop
optimal cover solution for every project (function, location, weather…)
TRIM

The below table contains some of standard cover system:


SPECIFICATION TECHNICAL IMAGE ACTUAL IMAGE

COVER PANEL & DECKING PANEL


Ridge Cap

SPECIFICATION TECHNICAL IMAGE ACTUAL IMAGE

5 square ribs
panel
GableTrim

9 square ribs
panel Cap flashing

Seamlock panel
Transfer flashing
for roof monitor

Kliplok panel
Drip Trim

Decking panel
Outside Corner
Trim

For any other special requirement rather than standard items, Lucky Steel is experienced to discuss and For any other special requirement rather than standard items, Lucky Steel is experienced to discuss and
give the solution to meet your expectation. give the solution to meet your expectation.

22 Lucky Steel Buildings (LSB) 23


PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE

3.1g. PRE-ENGINEERED BUILDING – ORTHER FINISHING ACCESSORIES 3.1g. PRE-ENGINEERED BUILDING – ORTHER FINISHING ACCESSORIES

SKY-LIGHT WALL-LIGHT
BIRD MESH / INSECT MESH

With many profile to match to wall metal panel,


With many profile to match to roof metal panel such
popular as square ribs. It can be arranged by
as square ribs, kliplok, seamlock, 5 ribs…
vertical axis or horizontal axis

STAIRCASE CAGE LADDER CHECKER PLATE

DRAINAGE SYSTEM
LOUVER INSULATION

TYPE TECHNICAL IMAGE ACTUAL IMAGE


It helps to have nature air ventilation. There are few There are many kinds of insulation such as air
options of materials such as galvanized steel, bubble, fiberglass, rockwool. We cooperate to high
powder painting, aluminum. trusted supplier.

Eave gutter

Valley gutter

Metal downspout

The above sizes are for reference, Lucky Steel can supply many kinds of different thickness, different
size following customer’s demand/design’s requirement

24 Lucky Steel Buildings (LSB) 25


PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE PRODUCT OF PRE-ENGINEERED STEEL STRUCTURE

3.2a. STEEL STRUCTURE FOR HIGH RISE BUILDING (PRODUCT Category 02)
3.1h. PRE-ENGINEERED BUILDING – CRANE SYSTEM
This type of Product is having its general characteristic as heavy members, very thick member size and without
The Pre-Engineered Steel Structure is divided into 3 main categories: painting. The popular product is Kingpost, shoring system,…
* Product Category 1: Pre-engineered Building as call PEB (Factory, low rise building, included sheeting system)
is most popular product as described above. This type is also optional with crane system.
* Product category 2: Steel structure is for high rise building such as Kingpost, shoring system for basement
work.
* Product category 3: Special structures are such as pipe rack system, conveyor system, M&E support, bridge…

CRANE SYSTEM (PRODUCT Category 1)

Lucky Steel Building is able to design, fabricate, erection for customized crane system with different shapes, size,
capacity. The below table shows some regular type of crane: KING POST SHORING SYSTEM

TYPE TECHNICAL IMAGE ACTUAL IMAGE

Top running
cranes
STEEL CORE UC BEAM

3.2b. SPECIAL STRUCTURE (PRODUCT Category 3)


This is special product for projects of such as pipe rack structure, conveyor system, M&E support, bridge…

Underhung cranes

BRIDGE BEAM M&E SUPPORT

Monorail cranes

CONVEYOR SYSTEM PIPERACK

26 Lucky Steel Buildings (LSB) 27


CHAPTER 4

COMPETENCE
IN BRIEF
LUCKY STEEL BUILDINGS, WHY?

LUCKY STEEL HAS EXPERIENCED TEAM, WE


COMMIT TO ADD REAL VALUE TO CUSTOMER

“SINGLE RESPONSIBILITY”

- CONSULT DESIGN FROM BEGINNING.


- APPLY STANDARD CODE IN DESIGN
- SHOP DRAWINGS MODELING BY 3D
- FABRICATION, QUALITY CONTROL
- TRANSPORTATION
- ERECTION
- WARRANTY/MAINTENANCE

FLEXIBLE, FAST
REACTION

“SOLUTION ORIENTED”

OPTIMAL DESIGN, FULL DOCUMENTATION

REPUTATION MATERIALS, CLEAR ORIGINAL

PRODUCTIVITY FABRICATION, HIGH QUALITY

CONTROL EVERY SINGLE MILE STONE OF


FABRICATION WORK BY STANDARD PROCEDURE

FLEXIBLE TRANSPORTATION METHOD, TO


SYNCHRONIZE TO ERECTION SITE WORK

PROFFESIONAL MANAGEMENT & BE FLEXIBLE

SAFETY ERECTION, HIGH QUALITY

29
COMPETENCE IN BRIEF COMPETENCE IN BRIEF

4.1. OPTIMAL DESIGN, FULL DOCUMENTATION


4.1. OPTIMAL DESIGN, FULL DOCUMENTATION

SOFTWARES DESIGN CODE

1 Structural design: STAAD PRO, SAP

ASCE – AMERICAN SOCIETY OF CIVIL


ENGINEERS
Minimum input loads for buildings and other
structures

AISC – AMERICAN INSTITUTE


OF STEEL CONSTRUCTION
Consult to technical design by
2 Cold-form section design: CFS
Allowable Stress

3 Shop Drawing: REVIT, TEKLA 21

AISI – AMERICAN IRON & IBC


STEEL INSTITUTE Reference for Loading
Cold Form steel design manual

4 Approval drawing & other drawings: AUTOCAD

MBMA – METAL BUILDINGS


MANUFACTURERS ASSOCIATION
AWS – AMERICAN WELDING SOCIETY
Structural welding code-steel manual

30 Lucky Steel Buildings (LSB) 31


COMPETENCE IN BRIEF COMPETENCE IN BRIEF

4.1. OPTIMAL DESIGN, SYNCHRONOUS DOCUMENTS 4.1. OPTIMAL DESIGN, SYNCHRONOUS DOCUMENTS

1. GET INFORMATION, ISSUE


PROPOSAL DRAWINGS 5. SHOP DRAWINGS

Based on preliminary information From 3D model Tekla, the


such as architecture, load, fabrication drawings will be issued
function… The Engineer to system where, the production
Department consult and give the department will collect them for
solution with optimized design to fabrication at factory.
save cost.

6. ERECTION DRAWINGS
2. STRUCTURAL’S DESIGN
After discussion with CMD about
erection method, the Erection
Our experienced engineers drawings will be issued to
consider and give solution with minimize the time, the cost and
optimal design to save cost but ensure safety first. The Erection
make sure to meet original drawings will be displayed simply
function, safe following the code. and easily comprehension to avoid
the mistakes in erection stage.

3. APPROVAL DRAWINGS
7. DETAIL ANALYSIS
From structural design
calculation, we make the detail
approval drawing. We submit Weight, quantity of raw materials
approval drawings and exchange related to project will be extracted
information deeply with in detail, very high accuracy to let
customer, to help customer other department plan properly.
understand how product look like The actual weight, quantity as
in future. Then, customer to shown on Erection Drawing will be
comment and approve. finally issued as final BOM, SHOP
for final data of project.

4. MODEL 3D TEKLA
8. AS-BUILT DRAWINGS
From Returned Approval
Drawings, we revise the Design
Calculation. Then, we go to step
of modeling 3D, cross check As-built drawings are based on
again with all input information to erection drawings and adjusted
make sure no error before some changes from the site in
issuance fabrication drawings. order to show exactly “Actual
Erection” for warranty.

32 Lucky Steel Buildings (LSB) 33


COMPETENCE IN BRIEF

4.2. PRESTIGE MATERIALS 4.2. HIGH QUALITY MATERIAL


HIGH GRADE MATERIAL THAT COMPLY WITH MULTI-NATIONAL STANDARDS

LUCKY STEEL’S MATERIAL STANDARD

STEEL GRADE/MATERIAL YIELD STRENGTH TENSILE STRENGTH


TYPE
SPECIFICATION Fy Fu
VARIETY TYPES
Built-up
SS400, Q235, ASTM A36 Fy = 235 Mpa Fu = 400 Mpa
member
SM490, Q345, ASTM A572 Gr. 50 Fy = 345 Mpa Fu = 450 Mpa
(Steel plate)

REPUTATION SOURCES Shape Steel


(Hot-roll SS400, ASTM 36 Fy = 235 Mpa Fu = 400 Mpa
members)

CLEAR ORIGINAL CERTIFICATE Cold-form Fy = 340 Mpa


JIS G3112, ASTM G340/G450 Fu = 450 Mpa
members Fy = 450 Mpa

Round bar/
angle SS400, ASTM A36 Fy = 235 Mpa Fu = 400 Mpa
COMPLY TO MANY STANDARDS bracing

Cable
EN, GB, JIS Fu = 1470 Mpa
bracing

SS400, ASTM A36 – Grade 4.6


Anchor Bolt Fy = 235 Mpa Fu = 400 Mpa
(Or Equivalent)

High
Grade 8.8 : ASTM-A325 or DIN
Strength Fu = [710 – 830] Mpa
Grade 8.8 ( Or Equivalent)
Bolt

A307, DIN 976-1 Grade 4.6 ( Or


Bolt Fu = 400 Mpa
Equivalent)

Fy = 300 Mpa
Cover panel G300/G350/550 Fy = 350 Mpa
Fy = 550 Mpa

ASTM: American Society for Testing & Material


JIS: Japanese Industrial Standards
EN: Europe Standard
GB: Chinese Standards
TCVN: Vietnamese Standard

Beside the standard specification above, Lucky Steel is able to provide many other specifications to meet
project’s requirement.

35
4.3. PRODUCTIVITY FABRICATION,
HIGH QUALITY

FACTORY NEW MACHINE

SUFFICIENTLY PRODUCTION LAYOUT

HIGH-SKILL LABOR

MODERN MACHINERY

32 Lucky Steel Buildings (LSB) 37


4.3. PRODUCTIVITY FABRICATION, HIGH QUALITY
MY PHUOC 3 IP, BEN CAT, BINH
DUONG PROVINCE (~ 50KM AWAY
FROM HO CHI MINH CITY) FACTORY AREA: 9,000M2

CAPACITY: 12,000 MT/ YEAR

PRODUCTION SINCE: 2015

ISO
9001:2015

38 Lucky Steel Buildings (LSB) 39


COMPETENCE IN BRIEF COMPETENCE IN BRIEF

4.3. PRODUCTIVELY FABRICATION AND HIGH-QUALITY 4.3. PRODUCTIVELY FABRICATION AND HIGH-QUALITY
The FACTORY is located at My Phuoc 3 IP, Binh Duong Province where has a lot of high-skill labors in steel
fabrication and convenient traffic. The distance is around 1h traffic from the airport, sea port

Capacity : 1,000 Tons/Month

Production machinery is new, layout is arranged tidily.

PAINTING AREA

PRODUCTION LINE IN EFFECTIVENESS

40 Lucky Steel Buildings (LSB) 41


COMPETENCE IN BRIEF COMPETENCE IN BRIEF

4.3. PRODUCTIVELY FABRICATION AND HIGH-QUALITY 4.3. PRODUCTIVELY FABRICATION AND HIGH-QUALITY

STEEL WAREHOUSE SHOT BLASTING MACHINE

STRAIGHTENING MACHINE

STEEL PROCESSING AREA AUTO WELDING MACHINE

42 Lucky Steel Buildings (LSB) 43


4.4. QUALITY CONTROL FOR EACH STAGE OF FABRICATION BY CLEAR
PROCEDURES

MANAGED BY PROCEDURES

Quality of product is come


from direct production, tiny
INSPECTION IN EVERY SINGLE STEP
added from QC. It is
responsible for each step.

EQUIPEMENT, MACHINERY IS CALIBRATED

44 Lucky Steel Buildings (LSB) 45


COMPANY PROFILE COMPANY PROFILE

4.4. QUALITY CONTROL FOR EACH STAGE OF FABRICATION BY CLEAR


PROCEDURES
Advantage : Quality Control at each step

DOER is also QC Inspector for product themselves.

BUILT-UP PRODUCTION PROCEDURE AND QUALITY CONTROL PROCEDURE

STEEL PLATE RAW MATERIAL AUTO WELDING


CUTTING/SHEARING FITTING UP
INPUT

SHOT BLASTING FINISHING WELDING FINISHING FIT UP STRAIGHTENING

PAINTING PACKAGED & DELIVERY

HOT- ROLL PRODUCTION PROCEDURE AND QUALITY CONTROL PROCEDURE

HOT-ROLL MATERIAL INPUT CUTTING/SHEARING DRILLING FINISSHING FIT UP

PACKING & DELIVERY PAINTING SHOT BLASING FINISHING WELDING

46 Lucky Steel Buildings (LSB) 47


4.5. EFFECTIVE DELIVERY

CUSTOMIZED OPTIONS OF
TRANSPORTATION WAY

UTILIZED PACKING

EXPERIENCE DOMESTIC – OVERSEA

SAFE TRANSPORTATION

WELL PLANNING DELIVERY


MATCHING TO ERECTION PHASES

48 Lucky Steel Buildings (LSB) 49


4.6. PROFESSIONAL MANAGEMENT,
FLEXIBLE OPERATION

EKIP ENGINEERS WITH RICH


EXPERIENCE FOR ALL KEY
FUNCTIONAL WORK

WELL FOLLOWING UP & WELL


MANAGE FROM BEGINNING DESIGN
TO HAND OVER

COOPERATIVELY, FLEXIBLY
PROJECT MANANGEMENT BETWEEN
CUSTOMER AND SITE TEAM

WITH EXPERIENCE FROM MANY BIG,


COMPLEX PROJECTS

SUPPORTIVE -
COOPERATIVE

SOLUTION MIND
SET

50 Lucky Steel Buildings (LSB) 51


COMPETENCE IN BRIEF

4.7. ERECTION IN SAFETY AND FAST

Lucky Steel is proud of having not only many experienced supervisor engineers but also machinery,
4.7. ERECTION IN SAFETY, equipment. Lucky Steel commit bringing the satisfaction to customer for erection work.
QUALITY, FAST
SCHEDULE CONTROL QUALITY CONTROL
Site management team is hard working Comply to construction standard and
deeply to site work as well as machinery Utilize highly the manpower &
EXPERIENCED SITE TEAM to ensure time control knowledge, to ensure quality control

SCHEDULE CONTROL

CLEARLY ERECTION PLAN

WARRANTY SERVICE
SAFTY ERECTION METHOD SAFETY, PROFESSION
After hand over project, we provide
Erection method for each different
service of Product Warranty minimum
items. The equipment, machine shall be
12 months, Design Warranty 20 years
calibrated periodly
or longer project by project

52 Lucky Steel Buildings (LSB ) 531


CHAPTER 5

COOPERATION
PARTNER
EXPERIENCE

SOME PROJECTS EKIP OF LUCKY STEEL’S


HUMAN RESOURCE HAVE DONE BEFORE

55
COOPERATION, PARTNER, EXPERIENCE COOPERATION, PARTNER, EXPERIENCE

PROJECT: ATM HI TECH – USA PROJECT: ATM HI TECH – USA


HIGH TECH IZ, TP. HCM HIGH TECH IZ, TP. HCM
3,500MT / 45,000M2 3,500MT / 45,000M2
YEAR 2008/2009 YEAR 2008/2009
SCOPE OF WORK: PROJECT MANAGEMENT & ERECTION SCOPE OF WORK: PROJECT MANAGEMENT & ERECTION

56 Lucky Steel Buildings (LSB) 57


COOPERATION, PARTNER, EXPERIENCE COOPERATION, PARTNER, EXPERIENCE

PROJECT: DK NAMI PROJECT: PMN STEEL MILL


TAN BINH IZ, TP. HCM PHU MY IZ, BRVT
1,800MT / 30,000M2 6,000MT / 60,000M2
YEAR 2012 YEAR 2012
SCOPE OF WORK: PROJECT MANAGEMENT & ERECTION SCOPE OF WORK: PROJECT MANAGEMENT & ERECTION

58 Lucky Steel Buildings (LSB) 59


COOPERATION, PARTNER, EXPERIENCE COOPERATION, PARTNER, EXPERIENCE

PROJECT: MELT SHOP PROJECT: MY XUAN KRAFT FACTORY


PHU MY IZ, BRVT MY XUAN A, BRVT
2,500 MT / 40,000M2 500MT / 12,000M2
YEAR 2013 YEAR 2015
SCOPE OF WORK: PROJECT MANAGEMENT & ERECTION SCOPE OF WORK: PROJECT MANAGEMENT & ERECTION

60 Lucky Steel Buildings (LSB) 61


COOPERATION, PARTNER, EXPERIENCE COOPERATION, PARTNER, EXPERIENCE

PROJECT: KOREA SHOE ACCESSORIES PROJECT : GLVN TEXTILE


PHUOC DONG IZ, TAY NINH PHUOC DONG IZ, TAY NINH
1,300 MT / 40,000M2 6000MT / 180,000M2
YEAR 2015 YEAR 2015
SCOPE OF WORKS: PROJECT MANAGEMENT & ERECTION SCOPE OF WORK : PROJECT MANAGEMENT & ERECTION

62 Lucky Steel Buildings (LSB) 63


COOPERATION, PARTNER, EXPERIENCE COOPERATION, PARTNER, EXPERIENCE

PROJECT: SHIM GP PROJECT: EXTENSION CS VIETNAM COIL - TAIWAN


VSIP 2 IZ, BINH DUONG PHU MY IZ, BRVT
1,200 MT / 40,000M2 700MT / 18,000M2
YEAR 2013 YEAR 2012
SCOPE OF WORK: PROJECT MANAGEMENT & ERECTION SCOPE OF WORKS: PROJECT MANAGEMENT & ERECTION

64 Lucky Steel Buildings (LSB) 65


COOPERATION, PARTNER, EXPERIENCE COOPERATION, PARTNER, EXPERIENCE

PROJACT: CRC FACTORY PROJECT: SAHO SHOE – KOREA EXPANDS


HOA KHANH IZ, ĐA NANG CU CHI IZ, HCMC
900 MT / 16,000M2 500MT / 12,000M2
YEAR 2011 YEAR 2009
SCOPE OF WORK: PROJECT MANAGEMENT & ERECTION SCOPE OF WORK: PROJECT MANAGEMENT & ERECTION

66 Lucky Steel Buildings (LSB) 67

You might also like