LOPA GAP
Unmitigated
Enabling Cause Mitigated
Event Independent
Enabling Events (EE) Likelihood Event Spurious
CAT Target Event Frequency Conditional Modifier Conditional Initiating Frequency Protection IPL
SIF Tag P&ID Title Impact Event Severity Events or or (IEF)- Frequency PFD RRF CAT IL Trip Issue Critical Actions Recommendations Comments
S&H/Env/Asset (Event per Year) Descrip. Modifier Probability (CM) Causes (UEF)- Layer(s) PFD
Condition Condition (Events per (Events Per (Yes or No)
(Events Per (IPL)
Probability Year) Year)
Year)
Notes Total Mitigated Event Frequency, Fe (/year) 0.00E+00 0.00E+00 0.00E+00 Risk Reduction
1 Enabling Condition: 104-FV-002 Malfunction , There will be Demand on BPCS 104-PT-030 (A/B Selection) / 104-PV-027 to Function. Max PFDavg for Assests/Economic (Ft_a/Fe) - #REF! - #REF!
2 Assumption: During Power Failure Case ACCS is Expected to Work Normally and Flow Control Loops Funtion as Intended. Power Failure and at the same Time Failure of BPCS is Not Considered (Double Jeopardy Scenario). Max PFDavg for Environment (Ft_e/Fe) - - #REF! #REF!
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
SIF Description Vibration high-high sensed by Vibrating switch - Fan A2 will trip EGC Train no. J interstage Aircooler Fan A2 200J-A0130-A2
P&ID RLE-2007-PPI-54305
A 0.00 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 0.00E+00
B 0.00 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 0.00E+00
180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
SIF Description Vibration high-high sensed by Vibrating switch - Fan B2 will trip EGC Train no. J interstage Aircooler Fan B2 200J-A0130-B2
P&ID RLE-2007-PPI-54305
A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
SIF Description Vibration high-high sensed by Vibrating switch - Fan C1 will trip EGC Train no. J interstage Aircooler Fan C1 200J-A0130-C1
P&ID RLE-2007-PPI-54305
A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
SIF Description Vibration high-high sensed by Vibrating switch - Fan C2 will trip EGC Train no. J interstage Aircooler Fan C2 200J-A0130-C2
P&ID RLE-2007-PPI-54305
A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
SIF Description Vibration high-high sensed by Vibrating switch - Fan D1 will trip EGC Train no. J interstage Aircooler Fan D1 200J-A0130-D1
P&ID RLE-2007-PPI-54305
A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
SIF Description Vibration high-high sensed by Vibrating switch - Fan D2 will trip EGC Train no. J interstage Aircooler Fan D2 200J-A0130-D2
P&ID RLE-2007-PPI-54305
A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
SIF Description Vibration high-high sensed by Vibrating switch - Fan A1 will trip EGC Train no. J interstage Aircooler Fan A1 200J-A0140-A1
P&ID RLE-2007-PPI-54308
A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
SIF Description Vibration high-high sensed by Vibrating switch - Fan A2 will trip EGC Train no. J interstage Aircooler Fan A2 200J-A0140-A2
P&ID RLE-2007-PPI-54308
A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
SIF Description Vibration high-high sensed by Vibrating switch - Fan B1 will trip EGC Train no. J interstage Aircooler Fan B1 200J-A0140-B1
P&ID RLE-2007-PPI-54308
A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
SIF Description Vibration high-high sensed by Vibrating switch - Fan B2 will trip EGC Train no. J interstage Aircooler Fan B2 200J-A0140-B2
P&ID RLE-2007-PPI-54308
A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
SIF Description Vibration high-high sensed by Vibrating switch - Fan C1 will trip EGC Train no. J interstage Aircooler Fan C1 200J-A0140-C1
P&ID RLE-2007-PPI-54308
A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
SIF Description Vibration high-high sensed by Vibrating switch - Fan C2 will trip EGC Train no. J interstage Aircooler Fan C2 200J-A0140-C2
P&ID RLE-2007-PPI-54308
A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
SIF Description Vibration high-high sensed by Vibrating switch - Fan D1 will trip EGC Train no. J interstage Aircooler Fan D1 200J-A0140-D1
P&ID RLE-2007-PPI-54308
A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
SIF Description Vibration high-high sensed by Vibrating switch - Fan D2 will trip EGC Train no. J interstage Aircooler Fan D2 200J-A0140-D2
P&ID RLE-2007-PPI-54308
A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
P&ID -
A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
P&ID -
A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
BDV 2215 fails open when needs to be closed
180 min/(24
Zone 2 Area
hours*60 min)
B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
P&ID -
A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
BDV 2215 fails open when needs to be closed
B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00
Target Freq. Safety #REF! (events/year) Two to three onsite fatalities or four permanent
#REF! disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment #REF! No remediation. No off-site impact/ damage
P&ID -
A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00