Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

PDF Ims Manual 2019 Final

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 102

DOC.

NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

Skoda Power Private Limited


Enkay Square Ground Floor,
Vanijya Nikunj,
Udyog Vihar – Phase 5
Gurgaon – 122016

INTEGRATED MANAGEMENT SYSTEM MANUAL


Complying the Requirements of
ISO 9001:2015, ISO 14001:2015 & ISO 45001:2018

CONFIDENTIAL USE

Note:
The scope of the Integrated Management System Manual covers IMS, Environmental Health & Safety
, Policy & Policy Statement for all the Clauses of ISO 9001:2015, ISO 14001:2015 & ISO
45001:2018. This is the document of Indian Pharmacopoeia Commission. No part of this
Integrated Management System Manual shall be reproduced without the prior permission of
Management or Management
Representative/ System coordinator.

Legal Owner ŠKODA POWER Pvt Ltd Identi fication number


IMS-QA-01 Rev. Date Lang. Sheet
01 01/ En 1 of
07/ 5
20 8
19
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

Prepared by Reviewed by Approved by


RAJESH RAJESH SINGH Ajay Bhardwaj
SINGH

Sign: Sign: Sign:


The original INDIAN version is approved by HR and Management representative.

Section: 1.1
Sectio Subject ISO ISO ISO
n 9001:2015 14001: 45001:2018
2015
1.1 Content - -
2.1 Amendment History - -
2.2 List of Copy Holders - -
2.3 List of Abbreviation - -
3.1 Organisation profile - -
4 Context of the organisation
4.1 Understanding the organisation and its context 4.1 4.1 4.1
4.2 Understanding the needs and expectations of 4.2 4.2 4.2
interested parties
4.3 Determining the scope of the integrated 4.3 4.3 4.3
management system
4.4 Integrated management system and its processes 4.4 4.4 4.4
5 Leadership 5 5 5
5.1 Leadership & commitment 5.1 5.1 5.1
5.1.1 General 5.1.1 -
5.1.2 Customer focus 5.1.2 -
5.2 IMS Policy 5.2 5.2 5.2
5,2.1 Establishing the IMS policy 5,2.1 -
5,2.2 Communicating the IMS policy 5,2.2 -
5.3 Organizational role, responsibility & authority 5.3 5.3 5.3
5.4 Consultation and participation of worker 5.4
6 Planning 6 6 6
6.1 Action to address risk and opportunities 6.1 6.1 6.1
6.1.1 General - 6.1.1
6.1.2.1 Environmental aspects - 6.1.2
6.1.2.2 Hazard identification, risk assessment and - - 6.1.2.2
determination of control
6.1.3 Compliance obligation - 6.1.3 6.1.3
6.1.4 Planning action - 6.1.4
6.2 IMS objectives and planning to achieve them 6.2 6.2
6.2.1 IMS objectives - 6.2.1 6.2.1
Legal Owner tion number
Ltd Iden Rev. 01
ŠKODA POWER Pvt tifica IMS-QA-01
Date Lang. Shee
01/07/2019 En t
2o
f
5
8
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

6.2.2 Planning actions to achieve IMS objectives - 6.2.2 6.2.2


6.3 Planning of change 6.3 -
7 Support 7 7 7
7.1 Resources 7.1 7.1 7.1

7.1.1212 GPGeonpelreal 7.1.21 -


7.1.3 Infrastructure 7.1.3 -
7.1.4 Environment for the operation of process 7.1.4 -
7.1.5 Monitoring and measuring resources 7.1.5 -
7.1.6 Organizational knowledge 7.1.6 -
7.2 Competence 7.2 7.2 7.2
7.3 Awareness 7.3 7.3 7.3
7.4 Communication 7.4 7.4
7.4.1 General - 7.4.1 7.4.1
7.4.2 Internal communication - 7.4.2 7.4.2
7.4.3 External communication - 7.4.3 7.4.3
7.5 Documented information 7.5 7.5 7.5
7.5.1 General 7.5.1 7.5.1 7.5.1
7.5.2 Creating and updating 7.5.2 7.5.2 7.5.2
7.5.3 Control of documented information 7.5.3 7.5.3 7.5.3
8 Operation/ implementation and operation 8 8 8
8.1 Operational planning and control 8.1 8.1 8.1
8.1.2 Eliminating hazards and reducing OH&S risk 8.1.2
8.1.3 Management of change 8.1.3
8.1.4 Procurement 8.1.4
8.1.4.1 Contractors 8.1.4.1
8.1.4.2 Out sourcing 8.1.4.2
8.1.4.3 Requirements for the products and Services 8.1.4.3
8.2.1 Emergency preparedness and response - 8.2 8.2
8.2.2 Requirements for the products and services 8.2 -
8.2.2.1 Customer communication 8.2.1 -
8.2.2.2 Determining the requirements for products and 8.2.2 -
services
8.2.2.3 Review of the requirements for products and 8.2.3 -
services services
8.2.2.4 Change to the requirements of the products and 8.2.4 -

8.3 Design
and and development of products and services-
services 8.3 -
8.4 Control of externally provided processes, products 8.4 -
8.4.1 General 8.4.1 -
8.4.2 Type and extent of control 8.4.2 -
8.4.3 Information for external provider 8.4.3 -
8.5 Production and service provision 8.5 -
8.5.1 Control of production and service provision 8.5.1 -
8.5.2 Identification and traceability 8.5.2 -
8.5.3 Property belonging to customers or external 8.5.3 -

8.5.4 pPrroevsiedrevrastion 8.5.4 -


ŠKODA POWER Pvt
Ltd
IMS-QA-01 01 01/07/2019 En 3 of 58
Legal Owner Identification number Rev. Date Lang. Sheet
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

8.5.5 Post-delivery activities 8.5.5 -


8.5.6 Control of changes 8.5.6 -
8.6 Release of products and services 8.6 -
8.7 Control of nonconforming outputs 8.7 -

9.1 MPeornfoitromriangn,cemevaasluraintigo,nasnalysi 9.1 9 9


s and evaluation
9.1.1 General 9.1.1 9.1.1 9.1.1
9.1.2.1 Customer satisfaction 9.1.2
9.1.2.2 Evaluation of compliance - 9.1.2 9.1.2
9.1.3 Analysis and evaluation 9.1.3
9.2 Internal audit 9.2 9.2
9,2,1 General 9,2,1 9.2.1
9.2.2 Internal audit programme 9.2.2 9.2.2
9.3 Management review 9.3 9.3 9.3
9.3.1 General 9.3.1
9.3.2 Management review inputs 9.3.2
9.3.3 Management review outputs 9.3.3
10 Improvement 10 10 10
10.1.1 General 10.1 10.1 10.1
10.2.1 Incident Non conformity and corrective action 10.2 10.2 10.2
10.3 Continual improvement 10.3 10.3 10.3

tion number
Legal Owner Ltd Iden Rev. 01
ŠKODA POWER Pvt tifica IMS-QA-01
Date Lang. Shee
01/07/2019 En t
4o
f
5
8
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

Section: 2.1
Amendment History
Rev. Nature of changes Approval Date

Legal Owner Identification number Rev. Date Lang. Sheet


ŠKODA POWER Pvt
Ltd
IMS-QA-01 01 01/07/2019 En 5 of 58
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

Section: 2.2
List of Copy Holders

1S .N O. MHoRldaecrt for IMS( Safety , Environment SMtastutesr C0C1opy no.


& QMS documentation) copy
2 QA/QC Controlled 02
copy
3 Procurement Controlled 03
copy
4 Sales, Proposal & Marketing Controlled 04
copy
5 Project Management Controlled 05
copy
6 Project Engineering Controlled 06
copy
7 Service and R&M Controlled 07
copy
8 HR, IT , ADMIN & Legal Controlled 08
copy

Legal Owner Identification number Rev. Date Lang. Sheet


ŠKODA POWER Pvt IMS-QA-01 01 01/07/2019 En 6 of 58
Ltd
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

Section: 2.3
TERMS & DEFINITION

Acceptable Risk Risk that has been reduced to a level that can be tolerated by the organization
having regard to its legal obligation and its own HSE policy
Auditor Person with the competence to conduct an audit.
Company / Skoda Power Pvt. Ltd.( SPPL )
Organization
Continual Recurring process of enhancing the HSE management system, in order to
Improvement achieve improvements in overall Environmental, Occupational Health & Safety
performances, consistent with the organization’s HSE Policy.

Corrective Action Action to eliminate the cause of a detected non-conformity or other non-
desirable situation and to prevent recurrence.
Document Information and its supporting medium
Note: The medium can be paper, magnetic or optical, computer disc,
photograph or master sample or a combination of these.
HSE management Part of the overall management system that facilitates the management of the
system HSE impacts & risks associated with the business of the organization. This
ipnrcalcutdiceess, tphreoceodrugraensiz, aptri oncaelssesstruacntudrere,
sopularcnensinfgor daecvtiveiltoiepsin, g,reimsppolenmsiebinlittiinegs, achieving,
reviewing and maintaining the organization’s HSE Policy.
HSE Objectives Overall HSE goals(quantified where practicable) arising from the HSE policy,
that an organization sets to achieve.
HSE Performance Measurable results of HSE management of environmental aspects,
organization’s control of health & safety risks, based on its HSE Policy
& Objectives.
HSE Policy Statement by the organization of its intentions and direction in relation to its
overall HSE performance which provides a frame work for action and for setting
of its HSE objectives and targets as formally expressed by top management.
HSE Targets Detailed performance requirement, (quantified where practicable) applicable to
the organization or parts, thereof that arises from the HSE objectives and
that needs to be set and met in order to achieve those objectives.

Environment Snautruroraulnrdeisnogusrcinesw,hflicohraa, nfaournga,nhizuamtiaon


boepienrgasteasn, dintchluediriningtearire, lwataiotenr., land, Note:
Surroundings in this context extend from within an Organization to the
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt IMS-QA-01 01 01/07/2019 En 7 of 58
Ltd
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

global system.
Environmental Element of an organization’s activities, products or services that can interact with
aspect the environment.
Environmental Any change to the environment, whether adverse or beneficial, wholly or partially
impact resulting from the organization’s environmental aspects.
Environmental Measurable results of the environmental management system, related to an
performance organization’s control of its environmental aspects, based on its environmental
policy, Objectives & Targets
Ergonomics It deals with the physiological and anatomical aspects of human body and
its interaction with the environment in which he works.
Fatality Death resulting from an accident
Hazard Source or situation or act with a potential for harm in terms of injury or ill health,
or a combination of these.
Hazard identification Process of recognizing that a hazard exists and defining its characteristics.
Incident Work related event(s) in which an injury or ill health or fatality occurred or could
have occurred.
Ill Health Identifiable, adverse physical or mental condition arising from and / or made

Internal audit wSyosrsteembaytiac,winodrkepaecntidvietyntaanndd/ door cwuomrke-


nreteladtepdroscietusastifonr .obtaining audit evidence and evaluating it
Lost time injury objectively to determine the extent to which the HSE management system
(disabling injury) audit criteria set by the organization are fulfilled.
An injury causing disablement extending beyond 48 hrs from the day of shift on
which the accident occurred.
Man-days lost It is the total disability / forced absence period in days of all the injured persons
arising out of the reportable injury, serious injury and minor injury.
Man-hours worked It is the total number of employee hours worked by all employees (staff +
workers) working in the site/office premises. It includes managerial, supervisory,
technical, clerical and other workers including sub-contractors’ worker
Near miss cases These are incidents / occurrences wherein a serious accident has not
or Close Call happened but could have happened i.e. normally missed.
Non-conformity Any deviation from work standards, practices, procedures, regulations,

tmoainjaugryemoreinlltnseysst,epmroperftoyrmdamncaege,tcim. tphact tc, odualmd


aegitehetor dthire cwtloyr ok rpilnadcierectly lead environment, or a combination of
these. (non-fulfillment of a requirement)
Occupational Health Conditions and factors that affect, or could affect the well-being of employees,
& Safety temporary workers, contractor personnel, visitors and any other person in the
work place.
Prevention of Use of processes, practices, materials or products that avoid, reduce or control
pollution pollution, which may include recycling, treatment, process changes, control
mechanisms, efficient use of resources and material substitution.
Preventive action Action to eliminate the cause of a potential non-conformity.
Procedure Specified way to carry out an activity or a process.
Record Document stating results achieved or providing. Evidence of activities performed
Risk Combination of the likelihood of an occurrence of a hazardous event or
exposure(s) and the severity of injury or ill health that can be caused by the
event or exposure(s)
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt
Ltd IMS-QA-01 01 01/07/2019 En 8 of 58
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

Risk assessment Overall process of estimating the magnitude of risk and deciding whether the risk
is acceptable.
Safety Freedom from unacceptable risk of harm.
Interested Party Person or group, inside or outside the workplace concerned with or affected by
OH&S performance of an organization.
Work Force Work force shall include SPPL employees, contractors/sub-contractors and their
employees/associates and stakeholders.

List of Abbreviation:
ADM Administration
ADT Audit
AIA Aspect / Impact Analysis
EMS Environmental Management System
CAPA Corrective & Preventive Activities
DOC Documents
DSPW Doosan Skoda Power s.r.o
EMP Environmental Management Programme
EMR Emergency
HIRA Hazard Identification & Risk Analysis
HR Human Resources
IA Internal Audit
IMS Integrated Management System
LGL Legal
MA Management Appointee
MD Managing Director
MKT Marketing

MRM Management RepvireewseMnteaetitvineg


MRN Material Receipt Note
NC Non Conformity / Non-Conformance
OCP Operation Control Procedure
PUR Purchase
QMS Quality Management System
REC Records
SPPL Skoda Power Private Limited
STR Stores
TC Test Certificate
TPI Third Party Inspection
TRG Training
WI Work Instructions
PM Project Management
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt
Ltd
IMS-QA-01 01 01/07/2019 En 9 of 58
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

PE Project Engineering

Section: 3.1
Organization profile
Skoda Power Private Limited., a wholly owned subsidiary of Doosan Škoda Power has
recently opened its office in India. The company will concentrate its activities on
supplies, modernization and services of power units. It plans to invest $14 million and
have 50 employees, especially highly qualified designers, engineers and salespersons in
the next five years.

In phase-I, the company will concentrate on strengthening its position in the market,
increasing the number of submitted offers and developing activity in the area of repairs
and modernization of existing units. In the beginning, it will utilize local companies for
cooperation and supplies of components and services as a business-engineering
company.

Nearly 100 SKODA power units are operating in India. These were supplied directly or
through BHEL, to whom Doosan Skoda Power sold its license in the 1970s Doosan
Škoda Power has supplied equipment amounting to about 8,000 mw of power output to
India so far; especially complete turbo sets in the output range of 60-110 mw. In recent
years, Doosan Škoda Power has reconstructed the 110-mw unit in Ennore. It has
managed to penetrate the Indian market with turbines using biomass combustion
products.

Purpose:
The purpose of the Integrated Management System Manual is to describe the Integrated
Management System adopted by the organization. It has been prepared to outline how
the organization conducts its own affairs with respect to the achievement and assurance
of IMS , Environmental, Health & Safety. It is also intended to serve as a document for
the organization’s own staff and work force for understanding the organization’s policy
and procedures.

Scope:
The Integrated Management System Manual describes the way in which the Integrated
Management System being operated by the organization satisfies and / or meets the
requirements of ISO-9001: 2015, ISO-14001:2015 & ISO 45001:2018. The system is
applicable to SPPL.

Legal Owner Identification number Rev. Date Lang. Sheet


ŠKODA POWER Pvt
Ltd
IMS-QA-01 01 01/07/2019 En 10 of 58
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

The scope of certification is mentioned in below.

SPPL scope specifically focuses on Design, Procurement, Supply, Service,erection


and commissioning of Seam turbines & its aux es for machine hall in thermal
plants.

Section: 4.0
Context of the organisation
4.0 Context of the organisation

4.1 Understanding the organization and its context

SPPL has determined external and internal issues, being affected by or capable of

»Rs«at t{yg'g{g§{j«¿§i¿|{t,§g@|*}§§g§et§gI§ygj}{§gjty^§yrpgy€¿,g@@s§p{jjgi/¿*@*ygtgg
Management System as follows.
The information about the external and internal issues are monitored and reviewed at
MRM conducted once in a year.

4.1.1 SWOT Analysis for Integrated Management System

Experienced HODs for each vertical


- Future scope is good for the Organic industry.
- Act and rules related to IMS are not compromised by the top management to ensure
100 percent compliance
- High degree of the legal & other compliance by the contractors and service provider
t fhe integral parts of contractor selection and
evaluation

- Contractual work force for technical issues may a#ect the compliance of IMS
requirement.
Frequent change of the worker / labour laws as the work is being done at
different location /sites in di#erent states may aPect the stringent compliances of
safety measures at site due to pressure of employment by the local influence.

- Exposure to world-class latest technologies of Heli cranes and drones may enhance
safety& health and maintain sustainable environment.

Legal Owner Identification number Rev. Date Lang. Sheet


SKODA POWER Pvt Ltd IMS-QA-01 01 01/07/2019 En 11 of 58
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

- Interaction with world-class professionals for the safety of workers working in the
Organic industries to get latest information and technology of safe working and
maintaining sustainable environment.
- Regular take away Suggestions for improvement in IMS Performance by attending
seminars and site visits for similar type of working.
Threats
- Contractual man power for technical issues may affect the IMS concern due to the
competition in the market
- Attrition rate is high of workers due to high competition in the market.

Key Business Strategies


Strategy Description
Develop - Develop and implement business processes that are suitable for
business the business.
processes - Achieve ISO certification
- Transfer of knowledge to partners and employees for all key
to accommodate
t th e
g r o expected - pUrsoecetescshensology to manage as many processes as
wth. appropriate
Improve the - Identify the core processes
efficiency and - Identify new ways (e.g. lean techniques) of doing the core
effectiveness of processes
the core - Update and embed the core processes to ensure knowledge is
processes retained
Personnel to be - Key leadership personnel to be capable of leading and managing
capable their staff.
- Competency gaps to be identified by leadership personnel.
of Personnel to be assessed as competent for their role
delivering the - Personnel to receive training for the role
growth for the - Recruit Personnel with appropriate experience for the desired role
business -
- ICdoentinfyuoaunsdlytrareinvineewwppaartrntneer rpserformance
- Identify changes to legislation, standards and regulation.
GsGhraowre in - Identify key market verticals in each jurisdiction
smuiatarbkelet - Increase the number of competent leaders by creating more
markets content and deliver across multiple channels

4.1.2 Intended outcome of Integrated Management System

- Stronger knowledge base for employees and systematic proactive approach


towards Healthy, Safer & clean work environment
- Customer satisfaction
- Employees Pride
- Continual improvement of IMS performance
- Rapport enhancement of SPPL as a company
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt
Ltd
IMS-QA-01 01 01/07/2019 En 12 of 58
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

- Leading and promoting a culture in the organization that supports the intended
outcomes of the IMS management system
- Consultation and Participation of workers/workers’ representatives.
- Allocation of the necessary resources to maintain safe , healthy & sustainable
w o rk en v i r o n m en t
- IM S p o l ic i e s, w hich are compatible with the overall strategic
objectives and direction of the organization
- Effective process(es) for identifying hazards/impacts, controlling IMS risks and
taking advantage of IMS opportunities
- Continual performance evaluation and monitoring of the IMS management
system to improve IMS performance
- Integration of the IMS management system into the organization’s business
processes
- To control the hazard to prevent the health and illness of the worker
- To minimize the impacts to environment & community

4.1.3 External and internal issues affecting intended outcome

Issues Internal Impact


/Extern
al
Non-availability of the latest Internal A fects cost and competitiveness and create
technology equipment in this type unsafe conditions
of industry
Not Meeting social, environmental, Internal Affects reputation of the company and
labor laws and safety concerns of creates unsafe conditions for workers&
workers at site increase in environmental impacts
Transportation, logistics and Internal A fects organization image and violation of
welfare of employees the local state regulations and acts
Prevention of hazards and illness of Internal Affects reputation of the company and
the workers at sites creates unsafe conditions for workers
Resource and time optimization as
one of the policies of the Internal AIMS fects IMS performance through increase in
violations due to pressure
management
Governance, organizational Internal An optimized number of people are required
structure, roles and accountabilities to take the industry in right direction.
Both over and understaffing is bad for the
health of the company.
Working culture in the organization Internal Work culture of any organization must be
very positive for an overall improvement in
the IMS performance of the company
Working time arrangements Internal Clean and pleasant working conditions are
& working conditions helpful in maintaining safe, health & clean
wok environment and increasing the
Relationships with, as well as Internal relation impact the IMS
Wprodrkuecrtsivity
Legal Owner tion number
ŠKODA POWER Pvt
Ltd Iden IMS -QA-01
tifica
Rev. Date Lang Sheet
01 01/07/2019 . 13 of 58
En
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

Issues Internal Impact


/Extern
al
perceptions and values of, workers performance through participation
Non-fulfilling
and the need ofrules
government manpower
and Impact
of SPPL.on delivery of services and reputation
regulations (labour laws) by the l
facility provider and contractor Externa
Cultural, social, political, legal, External Impacts the smooth running of the company.
financial, technological, economic Smooth social, politicaland cultural
and natural surroundings surroundings in and out of company are
essential to create harmonious working
environment.
Sound financial conditions with latest
technologies involved will help in staying
ahead of the competition.
Incompetent manpower provided Externa Affects IMS Performance & its continual

Sb ysthtemcaotnictr acptoprso a c h El xternal Ii mpargoeveomf etnhte organization and


for providing workers and compliance increase in incidents and man hour losses
of IMS requirement by the
contractor
Introduction of new competitors, External Realization of new competition and its
contractors, subcontractors, strength impacts the investment in existing
suppliers, partners and providers, technology, make or buy decisions,
new technologies, new laws and the expansion plans.
emergence of new occupations
Relationships with, as well as External Existing and potential clients are needed to
perceptions and values of, be in confidence with the company to
its external interested parties maintain cash flows which in turn will lead to
smooth functioning and improvement in IMS
performance
New knowledge on products and External Awareness in New Technologies involved to
their effect on health and safety keep the work environment safe and healthy
for the workers.

Note: For further details, refer record and document related to addressing the
internal and external issues available with IMS department

4.2 Understanding the needs and expectations of interested parties

Due to the interested party’s effect or potential effect on organisation’s ability to


consistently provide products and services that meet customer requirement and
applicable statutory and regulatory requirement, the organization determines:

1. Interested parties that are relevant to Integrated Management System.


Legal Owner tion number
ŠKODA POWER Pvt
Ltd Iden IMS -QA-01
tifica
Rev. Date Lang Sheet
01 01/07/2019 . 14 of 58
En
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

2. The requirements (the relevant needs and expectations) of the interested parties
relevant to Integrated Management System.

3. The requirements, which can become legal obligation.


The information about the interested parties and their requirements are monitored and
reviewed at least after every six month. Or it may be before the defined frequency based
on the severity of the issue.

Interested Parties Needs & Expectations


Employees, workers’ contractor Safe, clean and friendly work environment. Continued
career and to enhance the living standard.
External providers Pride to work with IMS oriented and responsible
organisation.
Customers Timely delivery of the laid down requirement as per
agreement in compliance of the applicable standard with
full compliance of the IMS and local law compliances
every time.
Regulators/finance ministry Compliance to legal requirement
govt. of India
Neighbours and local people To live in a cleaner environment.
near to the site
Non meeting Meeting interested party social and labour laws
the(NGOs)concerns at different requirements
location of the work
legal and regulatory authorities Fulfilment of documentation of law of the land
parent organizations Generating revenue responsibly and compliances of the
law
needof the land of working towards social, labour and IMS
shareholders, visitors, local Generating Revenue for the investors and owners.
community and general Fulfilment of Environmental, safety and other concerns is
public expected by the local community including safe and eco-
friendly work environments No any decoration in the
natural resources and creation of any undesired situation
at site or in office due to their work at site and no killing
the time of the visitors.
Contractor - Safe, Healthy & clean work environment
- Better professional relations
- Work satisfaction to work with responsible
organization Certification Body Safe, Healthy and Clean auditing environment and

soargtiasnfaizcattioion to work with IMS oriented and


responsible
Legal Owner ŠKODA POWER Pvt Ltd Identi fication number
IMS-QA-01 Rev. Date Lang. Sheet
01 01/ En 15 o
07/ f
20 5
19 8
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

NOTE: -For further details, refer record and document related to determination
and action to comply the need and expectation of the workers & other interested
parties available with IMS department.

4.3 Determining the scope of the integrated management


system Scope Of Certification -
SPPL scope specifically focuses on Design, Procurement, Supply, Service, erection
and commissioning of Steam turbines & its auxiliaries for machine hall in thermal
plants.

SPPL has determined external and internal issues, being affected by or capable of
affecting the organization/Environment / Health & safety and that are relevant to its
purpose and its strategic direction and that affects its ability to achieve the intended
result or outcome of the IMS management system as follows.

MThReMincf ornmdautciotendaobnocuet itnhea eyxetaerr.nal and internal issues are


monitored and reviewed at

Following requirements are not applicable to the Integrated Management System of this
organisation, which do not affect organisation’s ability or responsibility to ensure
conformity of its product and services and enhancement of customer satisfaction.

SPPL scope of IMS is defined by the location and organization. The appropriate
processes and specific features of SPPL are defined in the company context,
responsibility and authority of company management and the company processes
described in article 4.4 herein.

4.4 Integrated management system and its process


SPPL has established, implemented, maintained and continually improved its integrated
management system including the processes needed and their interaction in accordance
with the requirements of international standards such as ISO 9001:2015, 14001:2015 &
45001:2018 in order to achieve its intended results/ outcome including enhancing
performance of the Integrated Management System.
SPPL has determined the processes needed for Integrated Management System and
their application throughout the organisation and

a) Determines the inputs required and the outputs expected from the processes;
b) Determines the sequence and interaction of these processes;
c) Determines and applies the criteria and method (including monitoring,
measurement and related performance indicators) needed to ensure the effective
operation and control of these processes;
d) Determines the resources needed for the processes and ensure their availability;
e) Assigns the responsibilities, authorities and accountability for these processes;
Legal Owner ŠKODA POWER Pvt Ltd Identi fication number
IMS-QA-01 Rev. Date Lang. Sheet
01 01/ En 16 o
07/ f
20 5
19 8
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

f) Addresses the risks and opportunities as determined in accordance with the


requirements of 6.1
g) Evaluates these processes and implements any changes needed to ensure that
these processes achieve their intended results/ outcome;
h) Improves processes and the Integrated Management System.
SPPL considers the knowledge gained in 4.1 and 4.2 while establishing and maintaining
the Integrated Management System

SPPL maintains documented information as per defined Integrated Management System


to support the operation of its processes.

SPPL retains documented information as per defined Integrated Management System to


have confidence that the processes are being carried out as planned.
4.4 a) Identification of processes and elements needed for integrated management
system and their interaction

List of Processes (IMS), INTERACTION & SEQUENCE OF PROCESS

Interaction & Sequence of Process

1 2 3 4 5 6 7 8

1 X M S M S S S S
2 M X M S M M M M
M
3 S M X M S S S

4 W S M X M M M S

5 W S M M X S M W
6 M S M S S X M W
X
7 M S S M M M M

8 S M S W W W W X

Legends :
1. MR
2. QA/QC
3. Procurement
4. Sales, Proposal & Marketing
5. Project Management
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt IMS-QA-01 01 01/07/2019 En 17 of 58
Ltd
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

6. Project Engineering
7. Service and R&M
8. HR, IT , ADMIN & Legal

S - STRONG M – MODERATE –WEAK X-CROSS


W SECTION
Note: For process flow chart refer: Annexure –II
4.4 b) Interaction of IMS elements
INTEGRATED MANAGEMENT SYSTEM
Context of the organisation

Internal & external Customer requirements Needs and expectations


issues of the interested parties

IMPROVEMENT
PLANING
Non conformity and corrective action
Incident investigation Risk & opportunity
Environmental Aspects
Improvement
Hazard & Risk assessment and control
Legal obligation
Objectives, targets & action plan

LEADERSHIP, MR,

PERFORMANCE EVALUATION SUPPORT AND OPERATION


Monitoring, measurement analysis Resource, people, infrastructure,
& environment for operation of processes,
evaluation Competence & awareness
Customer satisfaction Communication, Documented
Internal Audit information
Management review Operational control, Design and
development, Requirements of the
products & services, Control of externally
provided products and services
,Production and service provision,
Release of products and services,
Control of non conforming products and

sredrvuiciensg,
OEHlim&iSnartisinkgs,hAacztaiordnstoan
address risk and opportunities,
Consultation and
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt IMS-QA-01 01 01/07/2019 En 18 of 58
Ltd
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

participation of workers, Contractors


,Outsourcing, Requirements for
the products and services,
Emergency preparedness and
response

Intended results outcome of the IMS mana ement

Section: 5.0
Leadership

5.0 Leadership
5.1 Leadership and commitment
5.1.1 General

The top management of SPPL demonstrates leadership and commitment with respect to
the Integrated Management System by;

a) Taking accountability of the Integrated Management System;


b) Ensuring that the policy and objectives are established for the Integrated
Management System and are compatible with the context and strategic direction
of the organisation;
c) Ensuring integration of the Integrated Management System requirements into the
organisation’s business processes;
d) Promoting the use of process approach and risk based thinking;
e) Ensuring resources needed for the integrated management system are available;
f) Communicating the importance of effective Integrated Management System and
conforming to Integrated Management System requirements;
g) Ensuring Integrated Management System achieves its intended results/ outcome;
h) Engaging, directing and supporting persons to contribute to the effectiveness of
the Integrated Management System;
i) Promoting continual improvement;

Supporting other relevant management roles to demonstrate their leadership as it


applies to their areas of responsibilities

5.1.2 Customer Focus


Top management of SKODA POWER Pvt. Ltd. ensures that customer and applicable
statutory and regulatory requirements are determined, understood and consistently met,
the risks and opportunities that can affect conformity of products and services and the
ability to enhance customer satisfaction are determined and addressed and focus on
enhancing customer satisfaction is maintained. To satisfy customers and end-user
needs and expectations, the management of the organization is committed to:

➢ Understand the needs and expectations of its customers, including those of


potential customers,
➢ Determine key product and service characteristics for its customers and end users,
➢ Identify and assess competition in its market, and
Legal Owner tion number
ŠKODA POWER Pvt
Ltd Iden IMS -QA-01
tifica
Rev. Date Lang Sheet
01 01/07/2019 . 19 of 58
En
DOC. NO: IMS-QA-01
Integrated
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

➢ Identify market opportunities, weaknesses and future competitive advantage.


Refer:
DOP-SMK-01-01 Sales, Proposal, Marketing

5.2 Policy
5.2.1 Establishing the IMS policy
Top Management shall ensure that IMS, environmental, health & safety policies are
(a) Appropriate to the purpose of the organization.

(b) Includes a commitment to comply with requirements and continually improve the
effectiveness of the IMS management system.

(c) Provides a framework for establishing and reviewing objectives.

(d) Is communicated and understood within the organization.( Internal communication,


discussion, etc.)

(e) Is reviewed for continuing suitability.

Health, Safety and Environment Policy


IMS POLICY
Škoda Power Pvt. Ltd. is fully committed to delivering safe, high-quality products and
services in the field of both conventional that satisfy the requirements of customers,
legislation, standards and interested parties safety requirements and culture. Our
business activities respect the principles of financial governance, business ethics, social
responsibility and a code of conduct.
We care about:
• our customers, their reputation and their satisfaction,
• our reputation and the quality of our products and services we deliver,
• cooperation with the interested parties,
• our staff, their health, safety, expertise and development,
• our business partners and suppliers,
• areas where we operate, the environment and its protection,

The management of the company takes care of the fulfilment of this Policy. In order to
achieve continuous improvement of the integrated management system and its
performance, the Company’s objectives are communicated and fulfilled.

QUALITY
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt
Ltd
IMS-QA-01 01 01/07/2019 En 20 of 58
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

• While doing our business we continually improve our efficiency and


productivity, increase competitiveness, manage business risk, and improve the
company performance.
• We develop the skills, knowledge and expertise of our employees, focusing on the
training of new professionals.
• We consider opportunities for process improvement and implement effective
actions to prevent non-conformities.
• We communicate and co-operate with employees, customers, inspection
authorities and other interested parties to understand their requirements and
expectations and to improve our products and services.

ENVIRONMENT
• When designing, procurement and executing our deliveries we prevent from
environment pollution, protect the environment, and continually reduce the impact
of significant environmental aspects.
• We communicate and co-operate with employees, customers, inspection
authorities and other interested parties to understand and meet their requirements
and expectations.
• We improve our products and services with respect to environmental protection.
• We commit to fulfil the compliance obligations.

HEALTH AND SAFETY


• We implement preventive programs for hazards, incidents, occupational
diseases, eliminate the risk of work-related health damage and reduce the risks.
• We communicate and co-operate with employees, customers, inspection
authorities and other interested parties to understand and meet their requirements
and expectations and improve the working conditions.
• Company management creates the conditions for workers to adequately care
for their health and safety.
• The Company undertakes to negotiate with workers and their representatives
the H&S issues, relevant hazards and improvement of working conditions.
• We commit to fulfil the compliance obligations.
INFORMATION SECURITY
• The company protects its know-how and customer data through the
established information security system.
• We systematically protect the data and documentation of our customers
and suppliers.
• We protect the personal data of our employees.

The management of the company provides adequate resources to achieve its objectives,
paying particular attention to ensuring the required quality of supply, protecting the
environment and the health and safety of its employees.

This policy shall be communicated to all employees and public.

Legal Owner Identification number Rev. Date Lang. Sheet


ŠKODA POWER Pvt
Ltd
IMS-QA-01 01 01/07/2019 En 21 of 58
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

5.2.2 Communicating IMS policy

The IMS policy is communicated to all employees and ensured that policy is understood
by the concerned personnel and applied in their processes. Role of employees is
identified to achieve the intended outcome of IMS management system processes.
IMS policy is made available to interested parties and public also. This policy is displayed
at prominent locations within the organization including main entrance of the
organization.

The policy is reviewed six monthly during management review meetings to ensure its
continued suitability and adequacy.

5.3 Organizational roles, responsibilities and authorities

Top management of SPPL ensures that the responsibility and authority for the relevant
roles are assigned, communicated and understood within the organisation.

Top management has assigned the responsibility authority and accountability for:
a) Ensuring that the Integrated Management System conforms to requirements of
international standards.
b) Ensuring that the processes are delivering their intended output;
c) Reporting on the performance of the Integrated Management System and on
opportunities for improvement, in particular to top management;
d) Ensuring the promotion of customer focus through the organisation;
e) Ensuring that the integrity of the Integrated Management System is maintained
when changes to the Integrated Management System are planned and
implemented

Note:-The roles & responsibility of relevant person within the organisation is defined &
documented & available with HR & IMS department.

1 MR act for IMS( Safety , Environment


& QMS documentation)
2 QA/QC
3 Procurement
4 Sales, Proposal & Marketing
5 Project Management
6 Project Engineering
7 Service and R&M
8 HR, IT , ADMIN & Legal

Legal Owner Identification number Rev. Date Lang. Sheet


ŠKODA POWER Pvt IMS-QA-01 01 01/07/2019 En 22 of 58
Ltd
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

Activities Clause Responsibility,


Reference authority &
accountability
ISO-9001, 1 2 3 4 5 6 7 8
14001,
45001
Context of the organisation 4
Understanding the organisation and its context 4.1 P C C C C C C C
Understanding the needs and expectations of 4.2 P C C C C C C C
interested parties
Determining the scope of the integrated management 4.3 P C C C C C C C
system
Integrated management system and its processes 4.4 P C C C C C C C
LLeeaaddeerrsshhipip& commitment 55 . 1 P C C C C C C C
General 5.1.1 P C C C C C C C
Customer focus 5.1.2 C C C C C P C C
IMS Policy 5.2 P C C C C C C C
Establishing the IMS policy 5,2.1 P C C C C C C C
Communicating the IMS policy 5,2.2 P C C C C C C C
Organizational role, responsibility & authority 5.3 P C C C C C C C
Consultation and participation of worker 5.4 P C C C C C C C
Planning 6
Action to address risk and opportunities 6.1 P C C C C C C C
General 6.1.1 P C C C CC C C
Environmental aspects 6.1.2.1 P C C C C C C C

Hdeatzearmrdinidaetinotnifiocaf cti ont, roisl k 6.1.2.2 P C C C C C C C


assessment and
Compliance obligation 6.1.3 C C C C C C C P
Planning action 6.1.4 C C C C C C C C
IMS objectives and planning to achieve them 6.2 P C C C C C C C
IMS objectives 6.2.1 P P P P P P P P
Planning actions to achieve IMS objectives 6.2.2 P C C C C C C C
Planning of change 6.3 P P P P P P P P
Support 7
Resources 7.1 C C C C C C C P
General 7.1.1 P P P P P P P P
People 7.1.2 P C C C C C C C
Infrastructure 7.1.3 C C C C C C C P

EMEMnovniirtonrimngenatnfdormtheeasoupreinrgatriro 7.1. 45 P C C C C C C C
ensouf rpcreoscess C P
Organizational knowledge 7.1.6 P P P P P P P P
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt IMS-QA-01 01 01/07/2019 En 23 of 58
Ltd
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

Activities Clause Responsibility,


Reference authority &
accountability
ISO-9001, 1 2 3 4 5 6 7 8
14001,
45001
Competence 7.2 C C C C C C C P
Awareness 7.3 C C C C C C C P
Communication 7.4 P C C C C C C C
General 7.4.1 P C C C C C C C
Internal communication 7.4.2 P C C C C C C C
External communication 7.4.3 P C C C C C C C
Participation & consultation 7.4.4 P C P C C C C C
Documented information 7.5 C C C C P C C C
General 7.5.1 C C C C P C C C
Creating and updating 7.5.2 C C C C P C C C
Control of documented information 7.5.3 C C C C P C C C
Operation/ implementation and operation 8
Operational planning and control 8.1 C C C C P C C C
Eliminating hazards and reducing OH&S risk 8.1.2 P C P P C C C
Management of change 8.1.3 C C P C C P C C
Procurement 8.1.4 P C C C P C C C
Contractors 8.1.4.1 C C C C P C C C
Out sourcing 8.1.4.2 P P P P P P P P
Requirements for the products and Services 8.1.4.3 P C P P C C C C
Emergency preparedness and response 8.2.1 P C P P C C C C
Requirements for the products and services 8.2.2 C C P P C C C C
Customer communication 8.2.2.1 C C P P C C C C
Determining the requirements for products and 8.2.2.2 C P P P P P P P
services

R ev i e w o f 3
C h a n g e to 8.2.2.4 C P C C C C C C
th e r e q u ir e m e n ts f r P C P
t h e r e q u i r e m e n t s of
p r od u c ts a n d s e rvices
t h e p ro d uc t s a n d
services
Design and development of products and services- 8.3 C P C C C C C C
Control of externally provided processes, products 8.4 P P C C C C C C
and services
General 8.4.1 P P C C C C C C
Type and extent of control 8.4.2 P P C C C C C C
Information for external provider 8.4.3 P P C C C C C C
Production and service provision 8.5 P P C C C C C C
Control of production and service provision 8.5.1 P C P P C C C C
Identification and traceability 8.5.2 P C P P C C C C
Property belonging to customers or external 8.5.3 P C P P C C C C
Legal Owner Ltd Iden tion number Rev. Date
ŠKODA POWER Pvt tifica IMS-QA-01 01 01/07/2019
Lang. Sheet
En 24 of 58
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

Activities Clause Responsibility,


Reference authority &
accountability
ISO-9001, 1 2 3 4 5 6 7 8
14001,
45001
Post-delivery activities 8.5.5 C P P P C C C C
Control of changes 8.5.6 C C P P C C C C
Release of products and services 8.6 C C P P C C C C
Control of nonconforming outputs 8.7 C C P P C C C C
Performance evaluations 9
Monitoring, measuring, analysis and evaluation 9.1 P C PPCC C C
General 9.1.1 P C P P C C C C
Customer satisfaction 9.1.2.1 P P P P P P P P
Evaluation of compliance 9.1.2.2 P C C C C C C C
Analysis and evaluation 9.1.3 P C C C C C C C
Internal audit 9.2 P C C C C C C C
General 9,2,1 P C C C C C C C
Internal audit programme 9.2.2 P C C C C C C C
Management review 9.3 P C C C C C C C
General 9.3.1 P C C C C C C C
Management review inputs 9.3.2 P C C C C C C C
Management review outputs 9.3.3 P C C C C C C C
Improvement 10 P C C CC C C C
General 10.1.1 P C C C C C C C
Incident Non conformity and corrective action 10.2.1 P C CCCC C C
Continual improvement 10.3 P C C C C C C C

P- Primary C- Contributory

5.4. Consultation & Participation of Workers


The organisation will emphasize participation and consultation of workers in following
items: -
- Determining the needs & expectations of workers
- Establishing IMS Policy
- Assigning organizational roles & responsibility
- Determining fulfilment of legal obligation
- Establishing IMS Objectives & planning action to achieve them
- appropriate involvement in hazard identification, risk assessments and
determination of controls;
- appropriate involvement in incident investigation, non-conformities & determining
corrective actions;
- consultation where there are any changes that affect their OH&S;
- representation on OH&S matters

Legal Owner Ltd Iden tion number Rev. Date


ŠKODA POWER Pvt tifica IMS-QA-01 01 01/07/2019
Lang. Sheet
En 25 of 58
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

This
Thi will be achieved by their participation in periodical IMS Committee Meetings,
Toolbox talks, Suggestion Box Scheme, IMS Trainings, etc.

Note:-The procedure for consultation & participation of workers is available with MR /


QA & QC department.
Section: 6.0
Planning
6.0 Planning
6.1 Action to address risks and opportunities
6.1.1
While planning the Integrated management system, SPPL considers the issues referred
to in 4.1 as well as the requirements referred to in 4.2& 4.3 and determines the risks and
opportunities that are needed to be addressed to;

a) Give assurance that the Integrated management can achieve its intended results/
outcomes
b) Enhance desirable effects
c) Prevent or reduce undesired effects
d) Achieve continual improvement.
e)
When determining the risks & opportunities to the Integrated Management system & its
intended outcomes that need to be addressed, SPPL takes into account hazards, IMS
risks, IMS Opportunities & legal requirements.

SPPL maintains documented information of its: Risks and opportunities that needed to
be addressed; and the process for determining risks & opportunities.

Refer:
SPPL/FMT/RSK/01 Risks Assessment Record
6.1.2.1 Environment Aspects
A procedure has been established for Identification and Evaluation of Environmental
aspect and impact and to continuously update the environmental aspects of activities,
products and services in order to determine those, which have or can have significant
impacts on the environment. This procedure also covers the prioritization of the
significant aspects and impacts and framing the objectives and targets.

The life cycle of the products &services has been defined and documented for each
type of services/product starting from raw material up to final disposal of the
services /product. The environmental aspects and impacts are assessed as per the
lifecycle of the end result of the entire process.

SPPL communicates the environmental aspect and impact to its employees and
workers through training sessions & tool box talk’s sessions.

Legal Owner Ltd Iden number Rev. Date


ŠKODA POWER Pvt tifica IMS-QA-01 01 01/07/2019
tion
Lang. Sheet
En 26 of 58
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

Refer: SPPL-MSP-0008 Procedure for Environmental Aspects & Impacts.

6.1.2.2 Hazard Identification and Assessment of Risks and Opportunities


SPPL hasongoing
that is established, implemented
and proactive. Thisand maintained
process a process
considers for hazard
following identification
factors while hazard
identification: -

a) How work is organized, social factors (including workload, work hours, victimization,
harassment and bullying), leadership and the culture in the organization;
b) Routine and non-routine activities and situations, including hazards arising from:

1) Infrastructure, equipment, materials, substances and the physical conditions of the


workplace;
2) Product and service design, research, development, testing, production, assembly,
construction, service delivery, maintenance and disposal;
3) Human factors;
4) How the work is performed;

c) Past relevant incidents, internal or external to the organization, including


emergencies, and their causes;
d) Potential emergency situations;
e) People, including consideration of:

1) Those with access to the workplace and their activities, including workers,
contractors, visitors and other persons;
2) Those in the vicinity of the workplace who can be affected by the activities of the
organization;
3) Workers at a location not under the direct control of the organization;

f) Other issues, including consideration of:


1) The designand
procedures of work
workareas, processes, including
organization, installations, machinery/equipment,
their adaptation to the operating
needs and
capabilities of the workers involved;
2) Situations occurring in the vicinity of the workplace caused by work-related activities
under the control of the organization;
3) situations not controlled by the organization and occurring in the vicinity of the
workplace that can cause injury and ill health to persons in the workplace;
g) changes in knowledge of, and information about, hazards.

Organization’s IMS hazard & risks are considered for implementation of necessary
control measures and setting IMS objectives & targets.

Refer:
SPPL-MSP-0009 Procedure for Hazard Identification, Risk Assessment and Determining
Controls
Ltd tion number
Legal Owner Iden Rev. Date
tifica IMS-QA-01
ŠKODA POWER Pvt 01 01/07/2019
Lang. Sheet
En 27 of 58
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

For Details, refer Occupational Health & safety Management System

Assessment of IMS Risks and Other Risks to the Integrated Management System
The
risksorganization has established,
from the identified implemented
hazards, while andthe
considering maintained a process
effectiveness to assess
of existing IMS
controls.
The methodology and criteria for the assessment of IMS risks has been defined with
respect to their scope, nature and timing to ensure they are proactive rather than
reactive and are used in a systematic way.

Note:-The procedure is documented as HIRA Procedure, available with MR


Procedure no - SPPL- MSP- 0009 .

6.1.2.2 a) Assessment of IMS Opportunities and Other Opportunities to the


Integrated Management System
The organization has established, implemented and maintained a process to assess IMS
opportunities and other opportunities to enhance IMS performance, while taking into
account planned changes to the organization, its policies, processes or its activities and:
1) Opportunities to adapt work, work organization and work environment to workers;
2) Opportunities to eliminate hazards and reduce IMS risks;

ISSUES UNCERTAINTY EFFECT OF PROPOSED REFERENCE


UNCERTAINITY T/O ACTION
Fluctuating Reduced Reduced turnover & T Cost optimization Objectives &
Market demand in profit through objective Targets
requirement the market target monitoring
to remain
competitive in
market
Limited
Portfolio of Decrease in Reduced turnover & T Increase portfolio Objectives &
Product demand of profit Targets
product
Fluctuating Increased Increased turnover & O Meeting product Objectives &
Market demand in profit target through Targets
requirement the market objective target
monitoring to
meet market
demand
Systematic Customer Reduced turnover & T Meeting SMP for
approach for dissatisfaction profit customer Logistic
supplying IMS requirement
Product in through laid out
tcimusetotmo procedure
er
Meeting Not meeting Closure of Plany T Environment Environment
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt IMS-QA-01 01 01/07/2019 En 28 of 58
Ltd
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

environmental compliance monitoring Monitoring


requirement obligation through laid Plan.
down structured MRM
Environment
Monitoring Plan.
Review of legal
register
Restriction of Not able to Restricted turnover T Production plan Production
production by meet market as per target
legal order demand when permissible limit
demand is high
Recent Fresh approval/ Temporary Lay T Fresh Approval -
change in act Product Ban Down/Plant Closure of
and rules of License/Increase
environment the portfolio of
and, labour products
oriented

sInacferetya Increased cost Low competitiveness T Cost optimization Objectives &


slaewd taxes through objective Targets
on RM and target monitoring
GST to remain
competitive in
market
Meeting Failure in CSR Decreased T Implement CSR CSR Plan
societal activities image/Penalty and as per Plan
requirement Prosecution
Transportation Higher cost Low competitiveness T Switching over to Dispatch Plan
by road rail transport for
cost optimization
Infrastructure Less availability Low production T Monitoring Preventive
/ Obsolete availability maintenance
Techniques / through objective schedule
Breakdown target/ MRM
Introduction of
latest Machines
and
Techniques/
Maintenance of
equipment as
per schedule.
Incompetent lack of Nonconformity: T Procedure gtion
manpower competence • Low production for training
• Legal violation need
• Customer assessment,
training and
dissatisfaction
etrvaainluina
SMP of P&A
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt
Ltd
IMS-QA-01 01 01/07/2019 En 29 of 58
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

effectiveness
Employee Excess Process T Employee -
Turnover Employee Delays/discontinuation Retention
Turnover
Availability of Non availability Nonconformity in T Planning of Annual
resource of resources product and non- resource budget
compliance of requirement
standards, laws, rules
and regulations
Resource Failure in Higher cost T Monitoring Objective
optimization optimizing Less competitive through objective target
resource target
Technological Improvement in Lesser cost O Yet to -
innovation productivity High competitiveness be
planned
Outsourcing Supply of Non availability of T Structured Performance
equipment & equipment & material evaluation of Evaluation
material performance of Reports
epxrotevridnear
l s at planned
interval
Needs and expectations of the interested parties
Providing Customer Reduced turnover & T Meeting SMP for
quality Product dissatisfaction profit customer Logistic
in time to requirement
customer through laid out
procedure
Providing Enhanced Increased turnover & O Meeting SMP for
quality Product customer profit customer Logistic
in time to satisfaction requirement MRM
customer through laid out
procedure
Procedure to
Monitoring of
customer
feedback and
initiate action
Meeting Not meeting Closure of mines T Environment Environment
environmental compliance monitoring Monitoring
requirement obligation through laid Plan.
down structured MRM
Environment
Monitoring Plan.
Review of legal
register
S i g n if i c a n t A spec ts
G e n e r a t io n o f F ailure in IMS Air pollution, Legal T
Procedure for EMP
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt
Ltd
IMS-QA-01 01 01/07/2019 En 30 of 58
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

fume of fume as Action fume


per guide supervision and
line of PCB timely
generator maintenance of
the Generator
Generation of Failure in Noise pollution, Legal T Procedure for SMP-Mining
noise noise control Action dust suppression
Generation of Non treatment Environment Pollution, O Yet to -
Solid waste /Untimely Health Issues in be
disposal neighbour, Legal planned
Action
Generation of Failure in Land contamination T Procedure for SMP-Mining
hazardous hazardous handing and
waste(acid, waste control disposal of
plastics and hazardous waste
waste)
Consumption of Failure in Depletion of natural T Procedure for SMP-OHC
paper rpeadpuecrti roef stroeuersce and rpeadpuecrtion
on of cutting in consumption
consumption. and plantation of
trees
Generation of e- Failure in e- Land contamination T Procedure for SMP-System
waste waste control handing and
disposal of e-
waste
Consumption of Increase in Resource depletion T Monitoring of Objective
water water Higher CESS water Target
consumption consumption
through objective
target
Consumption of Increase in Resource depletion T Monitoring of Objective
fuel fuel Higher cost fuel consumption Target
consumption through objective
target Preventive
Preventive maintenance
Maintenance of
equipment
Consumption of Increase in Resource depletion T Monitoring of Objective
electricity electricity Higher energy bill energy Target
consumption consumption
through objective
target
Consumption of Failure in Depletion of natural O Procedure for EMP taken for
paper in office rpeadpuecrti roef stroeuersce and rpeadpuecrtion in tt h e r d u c
o f th e p a
on of cutting
pteiorn
Legal Owner
Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt
Ltd IMS-QA-01 01 01/07/2019 En 31 of 58
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

consumption. consumption and


plantation of
trees
Compliance obligation
Obtaining timely Closure of operation T Monitoring of
clearances Expiry of Legal register
clearances compliances
through a
structured Plan
Timely
Submission of Delay / Violation, Penal Action T Monitoring of Legal register
returns non compliances
submission through a
structured Plan
Timely payment
of cess/taxes Violation, Penal Action T Monitoring of Legal register
Delay / compliances
non through a
payment structured Plan
Maintaining
Violation, Penal Action T Monitoring of Environmental
epnavrairmone
mteer natsal Environmental cthormoupglih MPPloanitorin
anaces
per permissible peaxcraemed g
limit structured Plan
eitnegr
permissible
limit

T = Threat
O = Opportunity

6.1.3 Determination of Legal & Other Requirements and Compliance Obligation


SPPL has:

a) Determined and have access to the compliance obligations related to its


Integrated management system ;
b) Determined how these compliance obligations apply to the organisation and
prepared Legal Registers for such applicable compliance obligation;
c) Taken these compliance obligations into account when establishing,
implementing, maintaining and continually improving its Integrated management
system .
d) Agreements with interested parties & agreements with health authorities.
e) legislation (national, regional or international), including statutes and regulations

Non-regulatory standards, consensus standards and guidelines

6.1.4 Planning action


SPPL plans:
SKODA POWER Pvt. Ltd. plans and implements the necessary actions against identified
significant aspects, occupational hazards, non-fulfilment of applicable compliance
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt IMS-QA-01
Ltd

01 01/07/2019 En 32 of
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

obligation requirements and risks & opportunities related to external and internal issues.
During planning of these actions business requirements, technological and financial
feasibility is considered. Planned actions are integrated with IMS processes and
effectiveness of the same is evaluated as per defined processes.

Refer:
SPPL-MSP-0008 Procedure for Environmental Aspects & Impact
SPPL-MSP-0009 Procedure for Hazard Identification and Risk Assessment

SPPL/FMT/CNT/01 Context of the Organization

Each project site/office shall prepare & document a project specific Hazard Identification
&PreRsisckribAesdseFsosrm maetn. tT(hHeIRPAro)
jRecetgMisatenraagnedr/HEenavdirosnhmalel nbtealreAssppoencstibImlepfaocr
tthReegpirsetpear riantitohne, implementation, regular review & updating of these
registers.
In addition to these Registers, The Method Statement or SOP of each activity shall
include the relevant hazards/aspects and their mitigation measures.

6.2 IMS objectives and planning to achieve them

6.2.1 SPPL has established IMS objectives at relevant functions, levels and processes
needed for the integrated management system.

The IMS objectives are:


a) Consistent with IMS policy;
b) Measurable;
c) Taken in to account applicable requirements;
d) Relevant to conformity of IMS requirements;
Legal Owner
Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt IMS-QA-01
Ltd

01 01/07/2019 En 33 of
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

e) Monitored
f) Communicated
g) Updated, as appropriate

Refer:
RŘ2010/2 - IMS Objectives
6.2.2 Planning actions to achieve IMS objectives
When planning how to achieve IMS objectives, SPPL determines:

a) What to be done;
b) What resources to be required;
c) Who are responsible;
d) When it is to be completed;
e) How the results are verified

6.3 Planning of change

WmWahneangtehme
eSnKtOsDysAtePmO, WthEeRchPavnt.gLetsd.adretecramrrineeds othuet ineaedplfaonr
ncehdanmgaens ntoert.hBeeIlMowS mentioned points are considered during planning of
changes:
➢ The purpose of the changes and their potential consequences
➢ The integrity of the IMS management system
➢ The availability of resources
➢ The allocation or reallocation of responsibilities and authorities
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt IMS-QA-01
Ltd

01 01/07/2019 En 34 of
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

Section: 7.0
Support
7.0 Support
7.1 Resources
SPPL management determines and provides the resources needed for the
establishment, implementation, maintenance and continual improvement of the
integrated management system.

SPPL considers:

a) The capabilities of and constraints on existing internal resources;


b) What needs to be obtained from external service providers.

SPPL determines and provides the persons necessary for the e fective
implementation of Integrated management system and for the operation and
control of its processes.

SPPL has determined the knowledge necessary for the operation of its processes
and to achieve conformity of products and services. This knowledge is maintained
and made available to the extent necessary. When addressing changing needs
and trends, SPPL considers its current knowledge and determines how to acquire
or access any necessary additional knowledge and required updates from external
provider.

7.1.1 General
The management of Skoda Power Pvt. Ltd. has identified the resources required
for achieving its objectives and for enhancing customer satisfaction and have
made them available. The resource management covers material and trained
personnel. Top management ensures that personnel who are assigned
responsibilities & authorities, under the IMS management functions, are
competent
experience. and are suitably qualified on the basis of education, training, skill and

7.1.2 People
Top management of Skoda Power Pvt. Ltd. provides resources consist of highly
skilled and motivated pool of man power and ensures that they are aware of
importance of meeting customer requirements and improving the IMS
management systems.

7.1.3 Infrastructure
The management determines, provides (as possible), and maintains the
infrastructure needed to achieve the defined targets. The infrastructure includes
(as applicable):

➢ Buildings, workspace, and associated utilities


➢ Operating facilities (hardware and software)
Legal Owner Ltd Iden tion ber Rev.
ŠKODA POWER Pvt IMS-QA-01 01
tifica num
01/07/2019 En 35 of
Date Lang. Shee
t
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

➢ Supporting services, that is, communication and information systems


➢ Regular maintenance of operating facilities is carried out to ensure their
soundness and proper working.

7.1.4 Environment for the operation of processes


Top management of SPPL identifies and manages the human and physical factors of the
work environment needed to achieve conformity of service quality.

Various factors such as environmental factors, hygiene, safety related factors etc, which
can affect the quality of work done or of the product, produced are identified and
monitored to ensure proper control.

Activities related to the fulfillment of statutory and regulatory requirements as per various
acts, and pertaining to the safety and health of the personnel and the environment at
large are carried out by departments.

The authorities responsible for ensuring compliance are as follows:


a) Goods Lifts - Maintenance Department
b) Compressors - Maintenance Department
c) Electrical equipment’s -Maintenance Department
d) Industrial safety/relation - HR Department
e) Firefighting equipment - HR Department
f) Statutory - HR & Legal

To comply with the requirements, the concerned authorities define and execute the
procedures or carry out the activities through external competent bodies. The concerned
authorities also maintain the necessary certificates / records.

Organizational Knowledge:

• Documented information regarding a process, product or service;


• Previous specifications and work instructions;
• The experience of skilled people and their processes and operations;
• Knowledge of technologies and infrastructure relevant to our Organisation.

Knowledge obtained from following:

• Information obtained from non-conformities, corrective actions, and the results


of improvement;
• Gathering knowledge from customers, suppliers and partners, benchmarking against
• competitors;
• Capturing knowledge existing within the Organization, e.g. through
mentoring/succession
• planning;
Legal Owner Ltd Iden tifica numb Rev.
ŠKODA POWER Pvt IMS-QA-01 01 tion
01/07/2019 er
En 36 of
Date Lang. Shee
t
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

• Sharing knowledge with relevant interested parties to ensure sustainability of


the Organization; Knowledge from conferences, attending trade fairs,
networking seminars, or other external events.

7.1.5 Monitoring and measuring resources


7.1.5.1 General
Inspection, measuring and test equipment are selected in accordance with the
measurement requirements. A master list showing the type of equipment, unique
identification number, location of use, frequency of check, method of checking,
acceptance criteria and action to be taken in case of unsatisfactory results, is maintained.
The equipment is safeguarded from adjustment , damage or deterioration.

Handling, storage and maintenance of the instruments is carried out as per the stipulated
practice to protect them from damage.

Calibration activity is carried out either in-house or by using external agencies.


Equipment having a valid relationship with national or international standards is used
for

caanldibaraptpioronv. eInd cbaysteheofdneopna-


ratmvaeilnatbhileityadofressupcohntsraibcleafobrilictya,liobwrantisotna.nRdeacrdosrdas
reofpcreaplibaraetdion are maintained by the concerned process owners.

The calibration status is identified by the calibrating concerned process owners by putting
stickers on the instruments.

If, at any time an instrument is found to be out of calibration, the concerned department
reviews the validity of the material / product already passed and takes necessary
corrective actions.

7.1.5.2 Measurement traceability


It is ensured that, equipment’s which are used for monitoring and measuring the
resources are calibrated as per defined frequency with maintaining traceability to
national/international standards.
7.1.6 Organizational knowledge
SPPL has determined the knowledge necessary for the operation of its processes
and to achieve conformity of products and services. This knowledge is maintained
and made available to the extent necessary. When addressing changing needs
and trends, SPPL considers its current knowledge and determines how to acquire
or access any necessary additional knowledge and required updates from external
provider, customer, interested parties, employees and knowledge from internal
and external issues. Skoda Power Pvt. Ltd. determines the knowledge necessary
for the operation of its processes and to achieve conformity of services. Skoda
Power Pvt. Ltd. maintains necessary knowledge gained from experience, lessons
learnt, improvements in processes and external sources.
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt IMS-QA-01
Ltd

01 37 of
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

7.2 Competence
Human resource is provided to carry out various functions and activities. In order to get
the desired results it is necessary that the various personnel carrying out various
activities have the necessary competence. Recruitment is carried out in accordance with
the manpower requirement by process owners. Personnel performing specific assigned
tasks are selected on the basis of their education, experience, training, and proficiency.
Competency required for carrying out various functions is determined and documented
in available with HR department.( job profiles)
Competence of persons carrying out various functions is determined by the respective
HODs in consultation with HR department, on the basis of their education, training, skills
and experience.
Training needs are identified typically once in a year, by the respective department
heads, this is done by comparing the competence available with the competence
required as well as the organizations future needs.
Top management of Skoda Power Pvt. Ltd. ensures that employees deputed on
specific jobs related to IMS management system requirements are competent,
based on the educational/professional qualification and/or trained or
experienced
for
to performing their role.
maintain required Wherever required,
competence necessary
of people. actions are
Effectiveness of implemented
implemented
actions
is evaluated and monitored.

Refer:
DOP-HR-01-01 Human Resource

Note:-The training records are available with MR/ HR department.


7.3 Awareness
Top management of Skoda Power Pvt. Ltd. ensures that the personnel at all levels
and functions are aware of the relevance and importance of IMS policy,
objectives, environmental aspects & associated impacts, hazards & occupational
risks, compliance obligations and implications of non-conformances related to
IMS management system requirements. It is ensured that contribution of
employees to the achievement of the objectives and IMS management system
performance. Awareness on these topics is provided through various methods like
trainings, display, circulars, mails and meetings etc.

Refer:
DOP-HR-01-01 Human Resource
7.4 Communication
7.4.1 General
SPPL has established, implemented ad maintained the process needed for the
internal and external communications relevant to the integrated management
system, including:
a) On what it will communicate;
b) When to communicate;
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt IMS-QA-01 01 01/07/2019 En 38 of
58
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

c) With whom to communicate;


d) How to communicate.
e) Who communicates

When establishing its communication process, SPPL


- Takes in to account its compliance obligation;
- Ensures that IMS information communicated is consistent with information
generated within the integrated management system, and is reliable.

SPPL responds to relevant communication on its integrated management system.

The documented information as a evidence of its communication are retained.

7.4.2 Internal communication


Following methodology is to be adopted for internal communications: -
1. Dept. HODs in consultation with the other interested parties shall prepare Registers

c(Aosnpc pact and Hazards, Risk & Opportunity) and same will be circulated to all
ecrnt sIm.
2. MR in consultation with department heads shall review and issue these registers.
3. MR will communicate the Internal Audit Report Management Review Meeting
(MRM) Minutes through email.
4. Worker (contractor and own) communication will be done through meetings, briefing,
training suggestion box to increase Worker participation and consultation and to get
input related to IMS and avoid the chances of accidents during work.
5. Management Representative shall communicate through email to Single Point of
Contact with CC to Core Team members regarding official release and availability of
revised updated IMS Manual, IMS Policy, Objectives and Targets and Legal Registers.

6. MR/SC shall prepare and review the handbook of Operational Control


Procedure (OCP)

Internal IMS related communication will be done through the following


methodologies: -

• Display of IMS policy at prominent places


• Training courses / workshops
• Circular on Notice Board
• IMS Policy will be communicated to all employees through training and
displaying at various locations.
• Suggestions/complaints received through Suggestion Box Scheme, Management
Review Committee meetings internal IMS audits.
• Action taken by concerned Dept. SPOC/Departmental Head on the audit
findings will be communicated to the MR for follow up and records.
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt IMS-QA-01 01 01/07/2019 En 39 of
58
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

• The findings of the Integrated management system s audit and its performance
with respect to set objectives will be discussed in Management Review
Committee meeting.
• Periodically, the performance of the OCPs and any other deviation would be
audited and recorded for further communication & corrective action to be taken up
by the relevant personnel.

7.4.3 External communication


External Communication with interested parties, related to integrated management
system issues will be done through suggestion box available in the office.

An external interested party, with whom communication has to be carried out at


regular interval, is as identified below: -

• Ministry of Environment & Forests


• State Pollution Control Board
• Central Pollution Control Board
• Certifying body of IMS
• District Administration
• Neighbours
• Other interested parties
• Contractor/suppliers/NGOs
• Facility provider
• Nagar Nigam/local body
• Labour department
• Regular communication will be maintained with regulatory bodies on legal,
compliance and other requirements pertaining to integrated management
system.
• Documents/Communication received with regard to the IMS related applicable
legislations, from state or local governmental bodies would be incorporated in
Register of external communication and adequate actions would be taken up
accordingly.
• The disclosure of significant environmental aspects, health and safety hazards
shall be decided at the end of every year or as and when required in Management
Review Meeting.

Refer: SPPL-MSP-0010 Procedure for Communication, Participation and


Consultation
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt IMS-QA-01 01 01/07/2019 En 40 of
58
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

7.4 a) Communication Matrix

WHAT WILL BE WHEN TO WHOM TO HOW TO WHO


COMMUNICATED COMMUNICATE COMMUNICATE COMMUNICAT COMMU
E NICATES
Compliance Obligation As stipulated by Location/site in- As per the HR / MR
of environment, the compliance charge, HR, Admin, prescribed
safety and statutory obligation contractor and all format in Hard
and regulatory interested parties copy
requirement
applicable to our
services
Compliance to As per the Legal authority and Through e-mail MR/ HR
evaluation and non- requirement of Certification body
compliances raised by the certification
certification body/Third body and legal
party inspection authority

E/ After evaluation All HODs and in case Hard copy to MR/HR


cnuvsitroomn of significant it all concerns
merevnitsaitl noticed to SPCB or
performance such authorities
Customer requirement In case of any Customer/regulator (if Hard or PM/PE
related information in new requirement required by the law soft copy
case of any special or new project of the land)
concern involved in
the process related to
environment and
safety where clearance
is required by the
regulators
CSR related As & when Interested parties Through HR/MR
information required MRM/briefing/m
eeting/by mail
Significant aspects/ Once in a year or e n t & Top eHmOpDlo
unacceptable OHS when changed r w he n management,
risks and change in Worker or his syees and
any law and acts of representative, all
the land of the law contractors,
employees and
Risks and First time at the all HODs
opportunities including time of release Top
incidents and and after management,
accidents taken place approval by the Worker or his
representative,
m a a g e m contractors,
th en a ft e
Through HR/MR
MRM/briefing/m
eeting/by mail

Through MR/HR
MRM/briefing/m
eeting/by mail
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt IMS-QA-01 01 01/07/2019 En 41 of
58
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

WHAT WILL BE WHEN TO WHOM TO HOW TO WHO


COMMUNICATED COMMUNICATE COMMUNICATE COMMUNICAT COMMU
E NICATES
change happens
Organisation context When changed Director, Worker or Through MRM Top
his representative, IMS Manual Managem
contractors, ent/
employees and all HR/MR
HODs and top
management
Interested parties need When changed Worker or his Through MRM MR/HR/P
and expectation representative, IMS Manual ROCURE
contractors, MENT
employees and all
HODs and top
management
IMS Policy Continuous All person under Through MR/HR

tcroanintrinagctto coorgnatrnoisl apwroagrrean


orsalol rnew oaftiothnesuch as memsse.
interested parties Worker or his Displays at
as and when representative, prominent
modified contractors, places
employees and all
HODs and top
management MR/HR
Objectives Target Once in every All person under Through MRM/
year or in case of control of the Mails
any updating organisation such as
and change Worker or his
representative,
contractors,
employees and all
HODs and top
management
Internal audit planning As per annual All person under Paper/soft copy MR/HR
and schedule, audit plan control of the through mail
Result of performance organisation such as
evaluation of the Worker or his
implemented system of representative,
IMS contractors,
employees and all
HODs and top
management
Agenda points and Minimum Once in Top management, or h i s
n t a ti v e,
Minutes of MRM every 6 Month W o ke r
rep re se
Paper/soft copy
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt IMS-QA-01 01 01/07/2019 En 42 of
58
Integrated DOC. NO: IMS-QA-01
Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

WHAT WILL BE WHEN TO WHOM TO HOW TO WHO


COMMUNICATED COMMUNICATE COMMUNICATE COMMUNICAT COMMU
E NICATES
contractors,
employees and all
HODs

7.5 Documented information


7.5.1 General
SPPL has determined following documents necessary for the effectiveness of the
Integrated management system but not limited to:-

a) the IMS policy, objectives and targets, HIRA register,


b) Description of the scope of the integrated management system,
c) Description of the main elements of the integrated management system and
their interaction, and reference to related documents,
d) Documents, including records, as required for legal and other obligations
(eL) OdRo c) ;u m e n t s , including records, determined by the organization to be
necessary to ensure the effective planning, operation and control of processes
that relate to its operational IMS risks i.e. Operational Control Procedure
f) Audit and its compliance reports
g) Minutes of meeting of management review

Refer: SPPL-MSP-0002 Procedure for Control of Records

7.5.2 Creating and updating


As appropriate, IMS management system documents are identified, created,
update and retained by the management. The IMS management system
documents are spread in 4 levels (Level 1: IMS Manual, Level 2: IMS Procedures,
Level 3: Work Instruction/Operational Control Procedures, Level 4:
Formats/Records)

7.5.3 Control of documented information


SPPL maintains a Master HSE Document Control Register (in Prescribed Format) for all
system documentation created or modified. The master register includes the following:

□ Document Title; disociduemnetifnietsdabsy:


□ Version Number; first page of the document;
□ Date Created;
□ Date Reviewed;
□ Reasons/Comments for creation/review;
□ Document Custodian.
□ MThaesteorgCaonpizya:
tMioansidternCtifoiepsy
Blue seal as “Master Copy” on front side of
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt
IMS-QA-01 01 01/07/2019 En 43 of 58

Integrated DOC. NO: IMS-QA-01


Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

□ Controlled Copy: Controlled Copy is identified by “Controlled Copy” in Red Seal on


front side of first page of the document;
□ Obsolete Copy: Whenever documents undergo changes, old copy becomes obsolete.
Obsolete copies are identified as “Obsolete Copy” in Red on front side of first page &
these documents are retained for reference if required;
□ Soft copy: Documents are kept in soft copy with Corporate MR only and has access to
READ, WRITE and Make Changes in the document. All other user has access only in
READ ONLY format.
□ Any printed copy will be an uncontrolled document.

To maintain adequate document control, SPPL practices following ways:-

□ All Integrated management system records including pertinent contractors/


Suppliers information records, and other records as mentioned into various
procedures of this manual shall be prepared legibly and maintained at
designated locations. Records are stored and maintained in such a way that
they are legible, identifiable, traceable to the activities involved and readily

reterinetvioanblpee. riTohdefyorarreecoprdosteisctesdtaabglisahinesdt
adnadmr aecgoer,ddeedt.erioration or loss. The
□ Filing, Retention, Access, Storage and Maintenance shall be ensured by the
HODS
□ Most of the documents and record shall be kept in soft copy only as we have
taken an objective for reduction of the paper consumption.
□ In case of any correction the changes in records shall be authorized by the
MR/SC.
□ The retention period of all the records shall be 3 years. After the retention
period if not required by the customer/department, the concerned person
responsible for maintaining the records shall destroy the records. If the records
need to be preserved for more than the retention period, then the concerned
personnel shall share the same with the MR/SC.
□ The MR /SC acts as the Document Controller.

SKODA POWER Pvt. Ltd. establishes a procedure to ensure that the documented
information which furnish conformance to the IMS management system are controlled
and systematically collated, indexed, filed, stored and easily retrieved. It is ensured that
all these documented information is legible, identifiable and readily available.

Refer: SPPL-MSP-0001 Procedure for Control of Documented Information


Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt
IMS-QA-01 01 01/07/2019 En 44 of 58

Integrated DOC. NO: IMS-QA-01


Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

Section: 8.0
Operation
8.0 Operation
8.1 Operational planning and control

SPPL has established, implemented, controlled and maintained the processes needed to
meet Integrated management system requirements.

SPPL identifies and carries out operations under specified conditions, which are

□ associated with significant environmental aspects &


□ associated with acceptable risks.

Specific operating instructions in the form of “Safe Operating Procedure” (SOP),


“Operating Control Procedures” (OCP) are developed for these activities, in absence
could lead to deviations from integrated management system requirements. In case of
absence of SOP or OCP for specific activity, advice from IMS O’s shall be sought; IMS
O shall document all such engagement and referred to MR for further review.
For Maintaining and retaining documented information to the extent necessary to have
confidence that the processes have been carried out as planned, the IMS checklists &
Work permits are being retained.
The life cycle of the services has been defined and documented for each type of
services/product starting from raw material up to final disposal of the services /product,
available at the project file. The environmental aspects and impacts are assessed as per
the lifecycle of the end result of the entire process.

Procedure for control of out process is defined and documented vides procedure.

8.2.1 Emergency preparedness and response

Emergency situations having environmental & safety implications are identified by means
of the review of the all aspects pertaining to the organization. The organization has
established emergency preparedness plan to ensure appropriated response to
unexpected and accidental incidents. If required, organization shall review and revise
its emergency preparedness and response procedures after the occurrence of major
incident / accident or emergency situations, wherever necessary.

SKODA POWER Pvt. Ltd. conducts mock drills twice in a year for certain identified
emergencies to check the organization's response to the potential emergency and to
determine any lacunae in the emergency response procedures.

A procedure has been established to evaluate emergency preparedness and response


against identified emergencies and preventing & limiting the impacts during emergencies.

Refer: SPPL-MSP-0011 Procedure for Emergency Preparedness & Response

Legal Owner Identification number Rev. Date Lang. Sheet


ŠKODA POWER Pvt
IMS-QA-01 01 01/07/2019 En 45 of 58

Integrated DOC. NO: IMS-QA-01


Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

8.2.2 Requirements for products and services


8.2.2.1 Customer communication
a. The customer communication shall be done through advertisement in news
paper, telephone directory, and letters.
b. The enquiries, contact or order handling, including amendments shall follow the
route of action.
c. In order to handle the customer complaints, a record shall be maintained by the
Head QC at the time of process. All customer complaints shall be recorded and
discussed with the Head QC and concerned departmental head for action. The
feedback of the action taken on the complaint shall be intimated to the customer.
d. Handling of customer complaints shall be the responsibility of the Head QC.
All customer complaints shall be registered in a Customer complaints’ record
and appropriate corrective action shall be taken.
e. After corrective action is taken, the customer shall be intimated; however, if action is
delayed beyond two months, the customer shall be sent an interim reply within a
month. f.When action is completed and the complaint is resolved, the record shall be
updated by entering necessary remarks. The complaint shall be treated as closed after
intimating

g.thTehceuCstuosmtoemr. er complaint Record shall contain as a minimum the following


information:

• Complaint Number
• Customer Name
• Date of complaint along with detail of complaint sent by customer.
• Mode of complaint
• Department Concerned for action
• Root Cause
• Action taken
• Brief of corrective action taken
• Brief of preventive action taken
• Date of customer intimation
h.beCudsistocumsesrecdoamt pthlaeinMt anadgceumsteonmt eRrefveiedwbmacekestihnagl.l
be analyzed periodically. They shall
Refer: DOP-SMK-01-01 Procedure of Sales, Proposal & Marketing
8.2.2.2 Determining the requirements for products and services
When determining the requirements for the products and services to be offered to the
customers, SPPL ensures that:

a) The requirements for the product and services are defined, including:
1. Any statutory and regulatory requirements;
2. Those considered necessary by the organisation

b) The organisation can meet the claims for the products and services it offers.
Refer: DOP-SMK-01-01 Procedure of Sales, Proposal & Marketing

Legal Owner Identification number Rev. Date Lang. Sheet


ŠKODA POWER Pvt Ltd IMS-QA-01 01 01/07/2019 En 46 of 58

Integrated DOC. NO: IMS-QA-01


Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

8.2.2.3 Review of the requirements for products and services


SPPL ensures that it has the ability to meet the requirements for products and services
to be offered to customers. SPPL conducts a review before communicating to supply
products and services to a customer, which includes:

a) Requirements specified by the customer, including the requirements for delivery


activities;
b) Requirements not stated by the customer, but necessary for the specified or
intended use, when known;
c) Requirement specified by the organisation;
d) Statutory and regulatory requirements applicable to the products and services;
e) Contract or order requirements differing from those previously expressed.

SPPL ensures that contract or order requirements differing from those previously
defined are resolved.
The customer requirements are confirmed by the organisation before acceptance, when
the customer does not provide documented statement of their requirements.

The documented information are retained by the organisation:

a) On the result of the review;


b) On any new requirements for the products and services.

8.2.4 Changes to requirements for products and services


SPPL ensures that relevant documented information is amended, and that relevant
persons are made aware of the changed requirements, when the requirements for
products and services are changed.

8.3 Design and development of products and services


Whenever the company involved in product design or reach new products, then it will
define and document suitable controls to ensure conformance to specified
requirements.

8.4 Control of externally provided processes, products and services


8.4.1 General

SPPL ensures that, externally provided processes, products and services conform to
requirements.

SPPL has determined the controls to be applied to externally provided processes,


product and services when

a) Products and services from external providers are intended for incorporation in to
organisation’s own products and services;

b) Pprovdiudcetrs oan dbeshearlvf iocef tshea roergparnoi vs iadteiodn.d ire ctly to the
customers by the external
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt Ltd IMS-QA-01 01 01/07/2019 En 47 of 58

Integrated DOC. NO: IMS-QA-01


Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

SPPL has determined and applied criteria for the evaluation, selection, monitoring of
performance and re-evaluation of external providers, based on their ability to provide
processes or products and services in accordance with requirements.

The documented information of those activities and any necessary action arising from
the evaluation are retained. Outsource process involved in the calibration, transportation
etc..

8.4.2 Type and extent of control

SPPL ensures that the externally provided processes, products and services do not
adversely affect the organisation’s ability to consistently deliver conforming products
and services to the customers
SPPL:
a) Ensures that externally provided processes remain within the control for its
integrated management system;
b) Defines both the controls that it intends to apply to an external provider and
those it intends to apply to the resulting output;

c) 1T.aTkehse of the externally provided processes, products and


inptotecnotniaslideimrapt
aiocnt:
services on the organisation’s ability to consistently meet customer
requirements and applicable statutory and regulatory requirements;
2. The effectiveness of the controls applied by the external providers;
d) Determines the verification, or other activities, necessary to ensure that the
externally provided processes, products and services meet requirements.

Refer: DOP-PRO-01-01 Procurement


8.4.3 Information for external providers

Material requirement planning is generated through indent, material availability, market


conditions etc. Purchase orders are generated with all purchase requirements i.e.
technical and commercial terms & conditions. Purchase orders are reviewed and
approval is taken by the approving authority. Approved purchase orders are released to
approved / selected external providers. If purchase orders are placed to new supplier, it
is marked as “Trial Order”. External providers are approved, after performance
evaluation against trial orders.

Refer: DOP-PRO-01-01 Procurement


Q(E)14500 Supplier evaluation
Q(E)19600 Supplier audit
8.5 Production and service provision
Legal Owner Identification number Rev. Date Lang. Sheet
I'VE LEO
IMtS-IDA-UI u1 ui u zuiu nn oao+sa

Integrated DOC. NO: IMS-QA-01


Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

8.5.1Control of production and service provision

SPPL has implemented production and service provision under controlled conditions.
Controlled conditions include:
The availability of documented information that defines:
1. The characteristics of the products to be produced, the services to be provided, or the
activities to be performed;
2. The result to be achieved;
3. Principal Scientific Ohicer shall be responsible for process control and process
monitoring during every stage of Process.
4. The Organization maintains a system which ensures that the processing of the product
shall be done under controlled conditions. Process monitoring and inspections are
performed to assure “Good workmanship”.
5. Work instructions in Hindi/ English/Local language & SOP/OCP shall be made
available at all the locations where activity affecting IMS, environmental, health &
safety are performed. Suitable equipment are used at different stages of production
and testing. All equipment used in the process are maintained and calibrated to
gjpg{j}gggy¿¿p§g@gg gy|q$/$lg§i¿ijabiIity. No new / modified process is used unless
6. The process flow charts are made available to define the every key process.
7. Documented operating instructions/control shall be used, in the absence of such
procedure IMS, environmental and health & safety would be adversely affected.
8. Any non-conforming incoming material, pocess stage & finish goods, shall be
identified and segregated, necessary corrective action & preventive action shall be
taken as per defined procedure.
9. In process inspection shall be carried out in diherent stages as specified in the
flowchart / IMS plan.
10. The instrument which need calibration shall be calibrated from outside agency for
the effective IMS controlled and process monitoring as well as internal calibration is
done by master calibrated equipments.
11. The operation manual received from original machine /equipmenD
manufacturer/¿uppIier sjrall be used for operation control at respective
parts/mechanism/machine.

Refer: Procurement
Q(E}1A5O0 Supplier evaluation
Q(E}I9600 Supplier audit

8.5.2Identification and traceability


Documented procedure has been established for identification. Each components or
product is identified with specific codes, lot numbers and batch numbers at each stage.
Identification at various levels is being maintained with the help of specified information.

a. Identification and traceability of the product during the process is the responsibility
of QC and Process departments jointly.
b. Individual items are idenñfied by using slip and sign board appropriately.
c. Non conforming area shall be identified by using the sign board.
ega Owner Ident f ca on nu ber Rev Date Lang Shee
ŠKODA POWER Pvt Ltd IMS-QA-01 01 01/07/2019 En 49 of 58

Integrated DOC. NO: IMS-QA-01


Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

d. Whenever the requirement arises, the identification and traceability shall be


given as per specific requirement of the customer.

Identification and traceability of products and services is maintained from receipt of


material till dispatch. This covers identification number and other details as contractually
agreed with customers. Records of identification are maintained.

8.5.3 Property belonging to customers or external providers


Skoda Power Pvt. Ltd. uses customer supplied technical specifications and/or product
drawings and treated as property belonging to customers or external providers. These
technical specifications and /or product drawings are identified on receipt and are kept
in safe custody.

If any discrepancy is noticed in property belonging to customers are external providers,


necessary information is provided to concerned customers are external providers.

8.5.4 Preservation
SouKtOsoDuArcePdOWproEcResPs.vtT. hListd.inchlausdeas apllacmkagt stthorroau
isdyesntetifmicaftoiorn,prseasfervhaatinodnlinogf, einriga,l geh,
protection and delivery of items to clients/customers. All incoming materials
consumables and finished products are stored, preserved to prevent damage and
deterioration of quality.

The types of packaging for the product are as per the contractual terms and are suitable
to proper protection during transit.

The products physically verified for its condition and quantity. All
consumables/hazardous materials are also checked for expiry dates/ conditions on
periodical basis.

8.5.5 Post-delivery activities


SKODA POWER Pvt. Ltd. meets the requirements for post-delivery activities associated
with the products and services. Wherever required, product warranty is provided to
customers and warranty terms are followed after delivery.

Warranty terms are determined after considering the extent of post-delivery activities,
applicable statutory & regulatory requirements and potential undesired consequences
associated till intended lifetime of its products and services.

Refer:
DOP-SRM-01-01 SERVICE and R & M
8.5.6 Control of changes
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt Ltd IMS-QA-01 01 01/07/2019 En 50 of 58

Integrated DOC. NO: IMS-QA-01


Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

SPPL reviews and controls changes for production or service provision, to the extent
necessary to ensure continuing conformity with requirements as follows:
The user shall initiate the change as and when required. The user shall describe
equipment/ process/ system where change to be incorporated along with the reason of
the change. The details of the change shall be identified by the user along with technical
specification drawing etc. the financial estimate also shall be prepared by the user along
with the expected benefit to be derived from the change incorporation.

Then the change request shall be forwarded to the HOD for his review and approval.
Once the same is approved by the HOD the same shall be placed before Change
Management Committee (CMC), consisting of all HODS headed by the DIRECTOR, for
their review and approval considering feasibility, financial implication and expected
benefit out of the proposed change. Once the change request is approved by the CMC
the same shall be forwarded to DIRECTOR for financial approval.

After the change request is approved by the DIRECTOR, the action shall be planned for
the implementation with target date of completion and responsibility. The action plan shall
bimepelexmeecnutaetdionasanpdercothmeppleltaionn. Tashepesratmhe pslahna.llTbhe
vdeorciufiemdendtuerdiningfodrimffearteiont istaregteasineodf describing the result of
the review of change, the person authorizing change, and any necessary action arising
from the review.

Refer: SPPL-MSP-0012 Procedure for Change Control

8.6 Release of products and services


SKODA POWER Pvt. Ltd. implements planned arrangements, at appropriate stages, to
verify that the product and service requirements have been met. If the planned
arrangements are not satisfactorily completed, approval from concerned authority is
taken before release of products and services. Record of release of final product and
services is retained as an evidence of conformity and traceability to the releasing
authority.
Refer: Quality Plan

8.7 Control of nonconforming outputs


8.7.1 The non-conformity control involves identification, segregation, evaluation,
documentation and disposition of the non-conforming product. The purpose is to ensure
control of non-conforming products to prevent their inadvertent use or release.

Nonconforming bought out items are stored in areas meant for them and disposed off as
per contractual agreement with external providers. The nonconforming products are
kept duly identified by locations / placards. Such product batches are identified/
segregated.

cTohnefoprmroicnegspsropdaurcatms eateirnst/eardmdeitidoinaste
astraegeasd.juTshtednobnacsoendforomninegvparluoadtuiocnt i sosf etghregantoend-

Legal Owner Identification number Rev. Date Lang. Sheet


ŠKODA POWER Pvt Ltd IMS-QA-01 01 01/07/2019 En 51 of 58

Integrated DOC. NO: IMS-QA-01


Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

and concerned functions are notified accordingly. The reprocessed material are tested
and ensured for their conformance before using them for further processing/ dispatch.

In the case of non-conformity found after the delivery of product, organization takes
necessary action to correct the non-conformity.
Refer:
SPPL-MSP-0004 Procedure for Non-Conforming product

8.7.2 The documented information is retained which:


a) Describes the nonconformity;
b) Describes the action taken;
c) Describes any concession obtained;
d) Identifies the authority deciding the action in respect of the nonconformity.
e) Incident investigation, nonconformity, corrective action and preventive action
Incident investigation

SKODA POWER Pvt. Ltd. has established and maintained a procedure for incident
investigation and their corrective / preventive actions. All the incidents are investigated
in order to:

➢ Identify deficiencies in IMS management system that might be causing or


contributing to the occurrence of incidents
➢ Identification of corrective / preventive action and continual improvements
➢ Results of investigation are communicated to respective authorities

Incidents are investigated for root cause and necessary actions.


Non conformity, corrective action and preventive action

Skoda Power Pvt. Ltd. has documented a procedure for controlling non-conformities
during processes to prevent their inadvertent use or being delivered to customers.
Controls are in place to identify segregate, documents, evaluate, rework and notify to
concerned authorities. The reworked or reprocessed material are re-inspected and
accepted only if they satisfy the requirement criteria.

Non-conformities / deviations related to environment and OH & S are identified and


investigated in line with the management system. The non-conformities are analysed in
consultation with the concerned departmental head and necessary corrective &
preventive actions are taken.

SKODA POWER Pvt. Ltd. has established a document procedure for corrective and
preventive action. This procedure defines the methodology to be adopted to resolve the
process deviations (NCs) and customer complaints.

Refer:
SPPL-MSP-0004 Procedure for Non-Conforming product
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt Ltd IMS-QA-01 01 01/07/2019 En 52 of 58

Integrated DOC. NO: IMS-QA-01


Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

Section: 9.0
Performance evaluation

9.0 Performance evaluation

9.1 Monitoring, measurement, analysis and evaluation

9.1.1 General

□ SPPL carries out the monitoring of following broad IMS parameters with the
objectives to continually improve: -
a) Adequacy of HIRA & Environmental Aspect Impacts and Mitigation measures
proposed
b) IMS management plan implementation
c) IMS Objectives and targets
d) Legal and other obligations compliance

□ Mpeornsitoarnindgarids gbueiidneglindeosn.ePfroerstchreibaemd fboiermntaatsirf,oNr


oreisceo,rdIlilnugmisnsautieodn. & Drinking water as
□ For carrying out monitoring for noise, illumination and air, equipment is provided,
operated and maintained by the Contractor. The equipment shall be kept in a good
state of repair in accordance with the manufacturer’s recommendations and
maintained in proper working order with enough spare equipment available in the
event of breakdown to maintain the planned monitoring programmed.
□ The calibration of monitoring instruments and their respective calibrators are carried
out in accordance with the manufacturer’s requirement to ensure they perform to
the same level of accuracy as stated in the manufacturer’s specifications.
□ Health register is maintained in order to monitor the number of medical
examinations conducted, sickness cases reported, next schedule for periodical
medical examination, etc.
□ Workmen Camp inspection shall be undertaken by the contractor & SPPL staff to
inspect the workmen habitat in order to ensure that appropriate health and welfare
control measures are properly followed and implemented. The frequency of
inspection shall be at least once a month. The Contractor shall conduct this
inspection in the Workmen Camp Inspection Checklist (prescribed format).
□ Project Site, Office & Stores is being inspected using prescribed formats to find the
implementation level of integrated management system.
□ Results of inspection shall be discussed with SPPL for taking immediate action and
rapid resolution of identified non-compliance.
□ Data collected from monitoring and measurement can be analyzed to identify
patterns and obtain information. Knowledge gained from this information can be
used to implement corrective and preventive action.
□ The documented information as evidence of the monitoring, measurement, analysis
and evaluation are retained.
RQe1f8e7r:00 Analysis of data
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt Ltd IMS-QA-01 01 01/07/2019 En 53 of 58

Integrated DOC. NO: IMS-QA-01


Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

9.1.2 Customer satisfaction

SPPL monitors, customers’ perceptions of the degree to which their needs and
expectations have been fulfilled by collecting feedback from customers. These feedbacks
are then analysed to evaluate need of any corrective action to be taken.
The Customer complaints: In case of customer complaints, the alarm will be raised to
the concerned departments and a HOD level meeting will be called at the earliest, or a
day after of the date of complaint. The verbal discussion will be done among Head QA &
concerned head and the corrective & preventive action will be started immediately to
find out the root cause. The customer will also be intimated about the action taken and
the result there of.

Customer feedback: The Customer feedback shall be obtained from the customer in the
prescribed format. The customers will be requested to send their feedback regarding
IMS of product and their satisfaction with respect to product supplied to customer. It
will also be requested to customer to send the minimum one feedback on yearly
basis. The

fimeepdrboavecmk oebnta. inTehde frormgavnaizriaotuiosncuhsatsomaelsrso


weilsltbaebliasnhaeldyzethdeanmdeachctaionnismtaketon oensaurreasthoef customer
satisfaction like data analysis, surveys, claim, and participation in trade exhibition. This is
monitored from time to time and it is the integral matter of MRM.

Refer:
Q17800 Customer Satisfaction

9.1.3 Analysis and evaluation

SPPL analyses and evaluates appropriate data and information arising from monitoring
and measurement.
The purpose is to analyse data from its various sources to assess the performance
against plans, objectives and other defined goals, and to identify areas for
improvement
including
determinepossible
the rootbenefits
cause offor interested
existing parties. problems,
or potential Analysis ofand
datatowill be used
guide to about
decisions
the corrective actions needed for improvement.

The necessary information is collected from all of its function for analysis and effective
and evaluation of the organizational performance. Following criteria is useful guidance
for the evaluation of the organizational effectiveness:

➢ Conformity of the services


➢ Customer satisfaction level
➢ IMS management system performance and needs for improvements
➢ Effective implementation of planned arrangements
➢ Effectiveness of actions taken to address risks and opportunities
➢ The performance of external providers
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt Ltd IMS-QA-01 01 01/07/2019 En 54 of 58

Integrated DOC. NO: IMS-QA-01


Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

Evaluation of Compliance

SPPL has established, implemented and maintained a procedure for evaluation of


compliance to applicable IMS legal requirements and other requirements to which it
subscribes and maintains records as per “Procedure for Evaluation of Compliance”
The procedure also defines the method of periodically evaluating compliance with
relevant IMS legal requirements and with other requirements.
Legal and other requirements compliance is being done through online tool Enforce

SKODA POWER Pvt. Ltd. has maintained a procedure for evaluation of compliance
against applicable legal and other requirements. Compliance obligations are monitored
and evaluated to ensure compliance of the same. In case of deviation from defined
criteria of evaluation of compliance, it is recorded and communicated to respective
departmental head for necessary corrective actions. Documented information is
maintained for evaluation of compliance status. The deviations in compliance status (if
any) are discussed in the management review meeting. Decisions of management
review meeting are recorded and implemented.

9.2 Internal audit


9.2.1 SPPL conducts internal audit once in a 6 months interval to provide information on
whether Integrated Management System:
a) conforms to;
1. the organisation’s own requirements for its Integrated Management System;
2. the requirements of the IMS standards such as ISO 9001:2015, ISO
14001:2015 & ISO 45001:2018
3. is effectively implemented and maintain

9.2.2 SPPL has established, implemented and maintained an annual internal audit plan
and schedule for each audit, including the frequency (once in every six months),
method, responsibilities, planning requirements and reporting of its internal audits.

When establishing the internal audit programme, the organisation takes in to


consideration the importance of the processes concerned, changes affecting the
organisation and the results of the previous audit.

SPPL :
a) defines the audit criteria and scope for each audit;
b) selects auditors and conducts audits to ensure objectively and the impartiality of
the audit process;
c) Ensures that the results of the audits are reported to relevant management.

The documented information are retained as evidence to the implementation of the


audit programme and the audit results.

RSPefPeLr:-MSP-0003 Procedure for Internal Audit

Legal Owner Identification number Rev. Date Lang. Sheet


ŠKODA POWER Pvt Ltd IMS-QA-01 01 01/07/2019 En 55 of 58

Integrated DOC. NO: IMS-QA-01


Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

9.3 Management review

9.3.1 General

Top management of SPPL reviews the organisation’s Integrated Management System, at


an interval of every 6 months, to ensure its continuing suitability, adequacy,
effectiveness and alignment with strategic direction of the organisation.

9.3.2 Management review inputs

Management review is conducted by the Company’s HSE Management Committee. The


IMS Management Committee is the apex level committee to oversee the overall
effectiveness of company's IMS policies & procedures.

□ The committee meets at least twice in a year preferably after completing internal
audits for reviewing the integrated management system performance & to ensure its
continuing suitability, adequacy, effectiveness and alignment with strategic direction
of
the Organisation.
□ The constitution of Apex IMS Committee (Company level) is as follows: -

Managing Director: MD
Secretary: MR / HR
Members: All HOD s

□ Apex IMS Management Committee reviews IMS Performance as per the ‘Agenda’
for ensuring that integrated management system continues to be suitable,
adequate, and effective and is continually improving.

The ‘Agenda’ shall include the feedback from project sites IMS committees on the
following points: -
□ Follow up action of previous Management Reviews
□ Status of Legal and other requirement compliance
□ Changes in the needs &expectations of interested parties
□ Changes in the risks & opportunities
□ Status of IMS Objectives and targets
□ Review of IMS Policy
□ Review of incidents and accidents& Non-conformity
□ Status of corrective & preventive actions for continual improvement
□ Review of results of consultation & participation of workers
□ Review of external interested party complaints
□ Results of Internal Audits

□ CRheasonugrecseisnaledgeaqluancdy ofothr eIMr rSeqMuiarenmageenmtsernetlating
to IMS
□ Recommendation for continual improvement
Legal Owner Identification number Rev. Date Lang. Sheet
ŠKODA POWER Pvt Ltd IMS-QA-01 01 01/07/2019 En 56 of 58

Integrated DOC. NO: IMS-QA-01


Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

9.3.3 Management review outputs


The outputs of the management review include decisions and actions related to:
□ The outputs from management reviews includes any decisions and actions related
to possible changes to IMS policy, objectives, targets, resources and other
elements of the Integrated management system , consistent with the commitment
to continual improvement.
□ The minutes of meeting is documented & communicated to workers as applicable.
□ The MR/SC records the decisions taken in the meeting and communicates the
minutes of meeting to all concerned. The MR reviews the implementation of the
decisions and report to top management on the status.
□ Project IMS Committee Meeting is conducted once in a month to discuss the
implementation status of the integrated management system at Project level &
the agreed actions shall be noted in the minutes of meeting.

Refer:
SPPL-MSP-0006 Procedure for Management Review

Section: 10.0
Improvement

10 Improvement

10.1 General

SPPL determines opportunities for improvement and implementation necessary actions,


to meet customer requirement and enhance customer satisfaction; to achieve the
intended outcomes of its Integrated Management System.

10.2 Incident, Nonconformity and Corrective Action

SPPL has established, implemented & maintained a process for reporting, investigating &
taking action to determine and manage incidents and non-conformity.
□ The Organisation records the incidents in Incident Report (Prescribed format),
investigate them as per Incident Investigation Report (Prescribed format) to find the
IMS deficiencies & analyses them periodically to identify the trends & find
opportunities for continual improvement.
□ The results of incident investigation are communicated to the relevant persons &
same shall be discussed during review meeting.
□ The Organisation records the non-conformity in NCR Report (Prescribed format) and
investigates them for finding the root cause with participation of interested parties.
Corrective Actions are then taken to prevent the recurrence.
□ Incident reports & NCR Reports are documented and retained as evidence.
□ The result of the action taken are recorded and reviewed for further improvement.

□ BrBeasspedctoivne tdhoecruomoet tha


nctasuasnedatnhaelymsoisdiafincadtiConorirseicmtipvelemacetniotends,inC ens
Legal Owner Identification number Rev. Date Lang. Sheet
gyesteamre. made in the
ŠKODA POWER Pvt Ltd IMS-QA-01 01 01/07/2019 En 57 of 58

Integrated DOC. NO: IMS-QA-01


Issue No. 01
Management System Date ; 1.7.19
Revision No: 00
Skoda Power Private Limited Manual

Refer:
SPPL-MSP-0005 Procedure for Corrective Action

10.3 Continual Improvement


SPPL continually improves the suitability, adequacy and effectiveness of the integrated
management system to enhance IMS performance.

SPPL considers the results of analysis and evaluation and the outputs from management
review, to determine if there are needs or opportunities that are addressed as part of
the management review.

SPPL Promotes an IMS culture that supports its Integrated management system by
Promoting the participation of workers in implementing actions for the continual
improvement of the Integrated management system & Communicating the relevant
results of continual improvement to workers.

iSmPpProLveMmaeint.ains and retains documented information as evidence of


continual

Refer:
SPPL-MSP-03 Procedure for Continual Improvement

Legal Owner Identification number Rev. Date Lang. Sheet

You might also like