Internal Security Force (ISF)

Camp Al Duhail

ENERGY MANAGEMENT REPORT


Facilities Management Agent Services
MARCH 2021

Page 1 of 75
Document History:

Document No. Version Issue Date Purpose of Issue Revised Sections


No.

xxxxxx 0 01-03-2021 For review & approval Initial issue

Produced by:

Name/Job Title: Manzoor Ahmed Shaik


BMS Engineer

Signature/Date:

Approved by:
Name/Job Title: Alaa Abu Elrub
Operations
Senior FM Manager Operations

Signature/Date:

Page 2 of 75
INDEX
Section 1 – Executive Summary...........................................................................................................................3
1.1 Purpose ................................................................................................................................................3
1.2 Summary ..............................................................................................................................................3
Section 2 – REPORTS ............................................................................................................................................4
2.1 Upstream Electrical Meters: ................................................................................................................4
2.2 Upstream Potable Water Meters: .......................................................................................................5
2.3 Upstream TSE Meters: .........................................................................................................................6
2.4 Upstream BTU Meters: ........................................................................................................................7
2.5 LPG Meters: ..........................................................................................................................................8
2.6 Downstream Electrical Meters: ...........................................................................................................9
2.7 Downstream Potable Water Meters (All buildings) ........................................................................ 10
2.8 Downstream BTU Meters Consumption (All buildings) .................................................................. 11
2.9 Fuel Tank levels and consumption ................................................................................................... 12
Section 3 – MONTHLY TRENDS: ........................................................................................................................ 13
3.1 ELECTRICAL METERS (FEB vs MAR):.................................................................................................. 13
3.2 POTABLE WATER METERS (FEB vs MAR):......................................................................................... 16
3.3 TSE WATER METERS (FEB vs MAR): .................................................................................................. 16
3.4 BTU METERS (FEB vs MAR): .............................................................................................................. 17
3.5 LGP METERS (FEB vs MAR): .............................................................................................................. 17
Section 4 – ANNUAL TRENDS ............................................................................................................................ 18
4.1 Summary Sheet for Building wise consumption .............................................................................. 18
4.2 Building wise consumption Annual trend ........................................................................................ 19
Section 5 – ENERGY MANAGEMENT and OPTIMIZATION ............................................................................... 20
Section 6 – Issues & Concerns .......................................................................................................................... 22

Page 3 of 75
Section 1 – Executive Summary
1.1 Purpose

The purpose of this report is to provide a presentation of the key monthly Energy Management for the ISF
Campus carried out for the period of 01st Feb to 28th Feb 2021 which includes.,
- The utilities Consumptions for the Electrical Energy, BTU Energy, Potable water, TSE water, Fuel & LPG.
- Providing a report with details of consumption for each building with comparison to the last month.
- The Energy saving measures took part during this month.
- The Analysis and justification of any utility high consumption.
- Any issues of faulty meters/devices that need to be addressed to the utility provider / FMC.

1.2 Summary

The report includes the Meter readings collection separated as Upstream meters and Downstream Meters.

Upstream Meters: Meters which include utility provider billing to the ISF respectively Kahramaa, ASHGHAL
and WOQOD.
Upstream meters include the DCP, ETS, NCO, Potable Pump room & Irrigation pump room Meters for
Electricity, Water and LPG.
BTU Meters located in all ETS rooms are also accumulated as part of record keeping and tracking the
consumption/AC Load for the buildings.

Downstream meters: Meters that are installed for individual meters are considered as downstream meters.
Electrical, BTU and Potable water meter details-Building wise are recorded and monitored for building wise
consumption monthly.

The recorded data are compared between Upstream & downstream and analysis/Comparisons is done based
on data to identify if the meters are reporting properly.
In case of issues with the meters reporting in BMS/IBMS the same meters are checked physically by MFMS or
the FMC service provider and are reported for necessary action to the respective contractor.

Page 4 of 75
Section 2 – REPORTS

 SUMMARY OF MONTHLY CONSUMPTION:

2.1 Upstream Electrical Meters:

Page 5 of 75
REF. NO. FORM QHSE-OPS-12A
ISF CAMP - AL DUHAIL VERSION 00
ELECTRICAL METER READINGS as of 31st MAR 2021 DATE 17.12.2019
(Kharamaa Meters - Upstream) PAGE 1 of 1

Feb-21 Mar-21

KM SS KM METER Difference from Last


S.No Package Building No Remarks
NUMBER NUMBER month consumption
Total Cost (QAR) Total Cost (QAR)
Meter reading Consumption (KWH) Unit Rate Cost Meter reading Consumption (KWH) Unit Rate Cost
@.0.32 @.0.32

(A) SUBSTATIONs Consumption (from Building)

1 CPC07a 22931 1348548 2,214,800.00 102,449.00 0.32 32,784 2,316,738.00 101,938.00 0.32 32,620 -511.00
6F1
2 CPC07a 22931 1348549 2,183,403.00 105,349.00 0.32 33,712 2,299,028.00 115,625.00 0.32 37,000 10,276.00

3 CPC07a 22932 1348550 2,585,713.00 108,019.00 0.32 34,566 2,698,486.00 112,773.00 0.32 36,087 4,754.00
6F2
4 CPC07a 22932 1348551 2,248,152.00 113,226.00 0.32 36,232 2,371,491.00 123,339.00 0.32 39,468 10,113.00

5 CPC07a 22933 1348552 1,969,129.00 95,201.00 0.32 30,464 2,068,046.00 98,917.00 0.32 31,653 3,716.00

6 CPC07a 6F3 22933 1348553 2,653,805.00 129,859.00 0.32 41,555 2,796,665.00 142,860.00 0.32 45,715 13,001.00

7 CPC07a 22933 1348554 1,944,324.00 104,390.00 0.32 33,405 2,061,850.00 117,526.00 0.32 37,608 13,136.00

8 CPC07a 22934 1348555 2,321,947.00 132,140.00 0.32 42,285 2,468,886.00 146,939.00 0.32 47,020 14,799.00
6F4
9 CPC07a 22934 1358410 2,759,029.00 158,047.00 0.32 50,575 2,935,677.00 176,648.00 0.32 56,527 18,601.00

10 CPC07a 6J 22935 1348556 2,347,058.00 136,713.00 0.32 43,748 2,494,285.00 147,227.00 0.32 47,113 10,514.00

11 CPC07a 22937 1348557 1,384,202.00 95,470.00 0.32 30,550 1,490,317.00 106,115.00 0.32 33,957 10,645.00

12 CPC07a 6i1 22937 1348558 2,658,350.00 97,636.00 0.32 31,244 2,756,080.00 97,730.00 0.32 31,274 94.00

13 CPC07a 22937 1348559 2,231,040.00 96,327.00 0.32 30,825 2,324,295.00 93,255.00 0.32 29,842 -3,072.00

14 CPC07a 28667 1348560 1,748,138.00 109,959.00 0.32 35,187 1,864,150.00 116,012.00 0.32 37,124 6,053.00

6NL
15 CPC07a 28667 1348561 2,121,958.00 95,099.00 0.32 30,432 2,238,596.00 116,638.00 0.32 37,324 21,539.00
(6N1)

16 CPC07a 28667 1348562 2,457,529.00 134,468.00 0.32 43,030 2,627,772.00 170,243.00 0.32 54,478 35,775.00

17 CPC07a 22936 1348563 1,135,350.00 76,366.00 0.32 24,437 1,218,635.00 83,285.00 0.32 26,651 6,919.00

6NR
18 CPC07a 22936 1348564 1,590,824.00 92,236.00 0.32 29,516 1,703,794.00 112,970.00 0.32 36,150 20,734.00
(6N2)

19 CPC07a 22936 1348565 1,881,601.00 99,759.00 0.32 31,923 2,005,281.00 123,680.00 0.32 39,578 23,921.00

20 CPC07a 28732 1348566 1,477,238.00 98,693.00 0.32 31,582 1,571,609.00 94,371.00 0.32 30,199 -4,322.00
4E
21 CPC07a 28732 1348567 1,484,583.00 104,752.00 0.32 33,521 1,581,064.00 96,481.00 0.32 30,874 -8,271.00

22 CPC07b 23473 1361156 1,847,581.00 133,665.00 0.32 42,773 1,970,605.00 123,024.00 0.32 39,368 -10,641.00
5h1
23 CPC07b 23473 1361157 1,657,840.00 105,556.00 0.32 33,778 1,750,778.00 92,938.00 0.32 29,740 -12,618.00

24 CPC07b 23476 1361158 384,000.00 29,366.00 0.32 9,397 407,750.00 23,750.00 0.32 7,600 -5,616.00
5h2
25 CPC07b 23476 1361159 91,233.00 6,080.00 0.32 1,946 96,879.00 5,646.00 0.32 1,807 -434.00

26 CPC07b 23477 1361160 566,275.00 38,626.00 0.32 12,360 605,809.00 39,534.00 0.32 12,651 908.00
3e
27 CPC07b 23477 1361161 1,831,621.00 125,058.00 0.32 40,019 1,944,058.00 112,437.00 0.32 35,980 -12,621.00

28 CPC07b 23478 1361162 280,506.00 20,640.00 0.32 6,605 298,403.00 17,897.00 0.32 5,727 -2,743.00

29 CPC07b 3e 2 23478 1361163 174,521.00 11,468.00 0.32 3,670 184,077.00 9,556.00 0.32 3,058 -1,912.00

30 CPC07b 23478 1361164 371,577.00 31,134.00 0.32 9,963 399,881.00 28,304.00 0.32 9,057 -2,830.00

31 CPC07d 33141 1366178 2,040,882.00 155,552.00 0.32 49,777 2,182,028.00 141,146.00 0.32 45,167 -14,406.00

32 CPC07d 21a 33141 1366179 1,301,072.00 111,607.00 0.32 35,714 1,376,631.00 75,559.00 0.32 24,179 -36,048.00

33 CPC07d 33141 1366180 2,263,410.00 168,595.00 0.32 53,950 2,418,915.00 155,505.00 0.32 49,762 -13,090.00

34 CPC08c 33896 1356982 1,004,143.00 55,295.00 0.32 17,694 1,063,143.00 59,000.00 0.32 18,880 3,705.00
9d3
35 CPC08c 33896 1356983 29,535.00 2,052.00 0.32 657 31,620.00 2,085.00 0.32 667 33.00

36 CPC8a 33074 1364780 337,163.00 37,636.00 0.32 12,044 371,273.00 34,110.00 0.32 10,915 -3,526.00
9f2
37 CPC8a 33074 1364781 760,835.00 74,159.00 0.32 23,731 834,550.00 73,715.00 0.32 23,589 -444.00

38 CPC8a 33072 1364782 334,124.00 33,678.00 0.32 10,777 369,832.00 35,708.00 0.32 11,427 2,030.00
20e
39 CPC8a 33072 1364783 793,832.00 103,037.00 0.32 32,972 898,886.00 105,054.00 0.32 33,617 2,017.00

40 CPC8a 33075 1364784 116,514.00 11,975.00 0.32 3,832 126,804.00 10,290.00 0.32 3,293 -1,685.00
9e
41 CPC8a 33075 1364785 213,248.00 26,299.00 0.32 8,416 237,989.00 24,741.00 0.32 7,917 -1,558.00

42 CPC02-27b 27b 34282 1371648 1,078,521.00 44,562.00 0.32 14,260 1,160,006.00 81,485.00 0.32 26,075 36,923.00

Page 6 of 75
REF. NO. FORM QHSE-OPS-12A
ISF CAMP - AL DUHAIL VERSION 00
ELECTRICAL METER READINGS as of 31st MAR 2021 DATE 17.12.2019
(Kharamaa Meters - Upstream) PAGE 1 of 1

Feb-21 Mar-21

KM SS KM METER Difference from Last


S.No Package Building No Remarks
NUMBER NUMBER month consumption
Total Cost (QAR) Total Cost (QAR)
Meter reading Consumption (KWH) Unit Rate Cost Meter reading Consumption (KWH) Unit Rate Cost
@.0.32 @.0.32

43 CPC02-WT 28666 1271098 220,307.00 10,357.00 0.32 3,314 254,827.00 34,520.00 0.32 11,046 24,163.00

44 CPC02-WT 28666 1271099 30,505.00 1,494.00 0.32 478 38,421.00 7,916.00 0.32 2,533 6,422.00
8h
45 CPC02-WT 28666 1271100 176,421.00 3,066.00 0.32 981 192,733.00 16,312.00 0.32 5,220 13,246.00

46 CPC02-WT 28666 1271101 1,554,030.00 59,323.00 0.32 18,983 1,623,707.00 69,677.00 0.32 22,297 10,354.00

47 CPC02-USS 30469 1272580 1,389,615.00 60,632.00 0.32 19,402 1,460,495.00 70,880.00 0.32 22,682 10,248.00
USS
48 CPC02-USS 30469 1272581 869,492.00 30,080.00 0.32 9,626 900,080.00 30,588.00 0.32 9,788 508.00

49 CPC02 SSZ28 32805 1289791 43,083.00 43,010.00 0.32 13,763 63,163.00 20,080.00 0.32 6,426 -22,930.00

50 CPC02 SSZ18 32806 1289792 23,746.00 23,674.00 0.32 7,576 52,591.00 28,845.00 0.32 9,230 5,171.00

51 CPC02 SSZ23 32807 1289793 868,555.00 32,025.00 0.32 10,248 908,383.00 39,828.00 0.32 12,745 7,803.00

52 CPC02-CSO 24h 34529 1372181 1,468,871.00 55,771.00 0.32 17,847 1,537,616.00 68,745.00 0.32 21,998 12,974.00

53 CPC14 33066 1349315 3,042,254.00 189,008.00 0.32 60,483 3,261,077.00 218,823.00 0.32 70,023 29,815.00

54 CPC14 1m 33066 1349316 1,304,343.00 71,442.00 0.32 22,861 1,382,392.00 78,049.00 0.32 24,976 6,607.00

55 CPC14 33066 1349317 793,461.00 36,678.00 0.32 11,737 836,499.00 43,038.00 0.32 13,772 6,360.00

Search &
56 rescue 12003 1005481 4,661,950.00 20,400.00 0.32 6,528 4,683,070.00 21,120.00 0.32 6,758 720.00
Dept.
57 CPC-08b 13Z2 33113 1388601 1,746.00 1,746.00 0.32 559 44,468.00 42,722.00 0.32 13,671 40,976.00

58 CPC-06 1388642 360,450.00 171,852.00 0.32 54,993 530,827.00 170,377.00 0.32 54,521 -1,475.00
22B
59 CPC-06 1388643 229,707.00 110,544.00 0.32 35,374 350,633.00 120,926.00 0.32 38,696 10,382.00

60 CPC-09a 29551 1378901 0.00 0.32 - 1,948.00 1,948.00 0.32 623 1,948.00
12g
61 CPC-09a 29551 1378902 0.00 0.32 - 4,020.00 4,020.00 0.32 1,286 4,020.00

62 CPC-09a 29549 1378899 0.00 0.32 - 0.00 0.00 0.32 - 0.00


17i
63 CPC-09a 29549 1378900 0.00 0.32 - 8,505.00 8,505.00 0.32 2,722 8,505.00

OLD Meter

60 3429 G4995 4,447,880 10,170.00 0.32 3,254 4,459,700 11,820.00 0.32 3,782 1,650.00

Total consumption February 4,543,470.00 KWH March 4,854,795.00 KWH

Total cost for Substations - (A) February 1,453,910.40 QAR March 1,553,534.40 QAR 47,745.92

(B)DCP Consumption

1 CPC02-DCP 26g 300076 1272138 3,388,155.00 50,510.00 0.32 16,163 3,447,366.00 59,211.00 0.32 18,948 LV Panels-1 -9,100.00

2 CPC02-DCP 26g 300076 1272139 2,223,902.00 42,965.00 0.32 13,749 2,272,039.00 48,137.00 0.32 15,404 LV Panels-2 4,711.00

3 CPC02-DCP 26g 300076 1272140 2,952,774.00 61,520.00 0.32 19,686 3,050,476.00 97,702.00 0.32 31,265 LV Panels-3 7,809.00

4 CPC02-DCP 26g 300077 1272141 2,816,562.00 43,450.00 0.32 13,904 2,882,001.00 65,439.00 0.32 20,940 LV Panels-4 959.00

5 CPC02-DCP 26g 300077 1272142 2,734,006.00 37,191.00 0.32 11,901 2,802,944.00 68,938.00 0.32 22,060 LV Panels-5 5,680.00

6 CPC02-DCP 26g 300077 1272143 2,170,779.00 36,750.00 0.32 11,760 2,231,193.00 60,414.00 0.32 19,332 LV Panels-6 -3,887.00

Chiller-1
7 CPC02-DCP 26g 30072 1277375 0.00 0.00 0.32 - 1,632,184.00 31,589.67 0.32 10,109 (Average for the past 3 0.00
months)
Chiller-2
8 CPC02-DCP 26g 30072 1277376 0.00 0.00 0.32 - 3,130,423.00 33,464.33 0.32 10,709 (Average for the past 3 0.00
months)

9 CPC02-DCP 26g 30072 1277377 2,374,074.00 76,785.00 0.32 24,571 2,503,439.00 129,365.00 0.32 41,397 Chiller-3 -18,227.00

10 CPC02-DCP 26g 30073 1277378 2,910,422.00 79,810.00 0.32 25,539 3,048,090.00 137,668.00 0.32 44,054 Chiller-4 -19,682.00

11 CPC02-DCP 26g 30073 1277379 2,863,709.00 105,272.00 0.32 33,687 2,990,613.00 126,904.00 0.32 40,609 Chiller-5 101,933.00

12 CPC02-DCP 26g 30073 1277380 3,005,933.00 54,285.50 0.32 17,371 3,141,609.00 135,676.00 0.32 43,416 Chiller-6 54,285.50

Chiller-2
13 CPC02-DCP 26g 30074 1277381 0.00 0.00 0.32 - 2,068,042.00 19,728.00 0.32 6,313 (Average for the past 3 0.00
months)

14 CPC02-DCP 26g 30074 1277382 3,326,848.00 3,110.00 0.32 995 3,386,682.00 59,834.00 0.32 19,147 Chiller-8 -306.00

15 CPC02-DCP 26g 30074 1277383 2,056,975.00 97,591.00 0.32 31,229 2,068,137.00 11,162.00 0.32 3,572 Chiller-9 97,591.00

16 CPC02-DCP 26g 30075 1277384 3,510,284.00 59,324.00 0.32 18,984 3,522,025.00 11,741.00 0.32 3,757 Chiller-10 -84,504.00

17 CPC02-DCP 26g 30075 1277385 2,710,588.00 80,058.00 0.32 25,619 2,805,301.00 94,713.00 0.32 30,308 Chiller-11 14,228.00

18 CPC02-DCP 26g 30075 1277386 4,282,272.00 81,771.00 0.32 26,167 4,382,282.00 100,010.00 0.32 32,003 Chiller-12 13,417.00

DCP consumption-KWH February 910,392.50 KWH March 1,291,696.00 KWH

Total cost for DCP - (B) February 291,325.60 QAR March 413,342.72 QAR

Total Electricity bill for ISF Project =(A+B) February 1,745,236.00 QAR March 1,966,877.12 QAR

Page 7 of 75
2.2 Upstream Potable Water Meters:

Page 8 of 75
REF. NO. FORM QHSE-OPS-12C
VERSION 00
ISF CAMP - AL DUHAIL DATE 17.12.2019
PAGE 1 of 1
POTABLE WATER METER READINGS-UPSTREAM as of 31st MAR 2021
(Kahramaa SCADA Meters)

Meter Reading(m³) Consumption m3 Unit Rate Total Cost (QAR)


S.No Package Building Description Tag No Source of Data Remarks
Feb-21 Mar-21 Feb-21 Mar-21 Cost @.9.2
1- Main Potable Water Meters (Kahramaa/Physical)
29C-PWM-UG-VC-02 Buildings Potable tank Water
1A CPC02 1229041 Meter 577,152.94 608,798.00 33,613.14 31,645.06 9.2 291,134.55
(Valve Chamber) meter
26G-EML1-UG-VC-03
1B CPC02 DCP Potable Water meter 1297017 Meter 5,290.99 5,305.20 824.43 14.21 9.2 130.70
(Valve Chamber)
TOTAL CONSUMPTION(A+B) 34,437.57 31,659.27 QAR 291,265.25

2- Main Potable Water Meters(SCADA)


Main Incoming- Before Potable
2A CPC02 29C-PWM-UG-VC-03 29C-SCA-GF-11-FIT-01 SCADA 266,866.00 302,671.10 38,464.50 35,805.10
tank
2B CPC02 29c Outgoing- After Potable tank 29c-SCA-GF-41-FIT-01 SCADA 622,376.00 654,336.80 32,460.00 31,960.80

Dual Compartment
PW-TK-301A
2C CPC02 29c Tank(capacity - 20,000 m3 SCADA 38893.44 33928.32 Water level is 4.92 mts
PW-TK-301B
each)
TOTAL CONSUMPTION (A+B+C) -

3. DCP Potable Water meters-SCADA


Potable Water - Building
3A CPC02 26g 26g-SCA-BF-3-FIT-10001 SCADA 2,917.35 2,933.31 36.13 15.95
consumption
Potable Water Emergency
3B CPC02 26g 26g-SCA-MK-3-FIT-20001 SCADA 210,776.88 210,789.61 819.05 12.73
Make-up for DCP Operation
TOTAL CONSUMPTION (A+B)

Note :
1. Total Potable water consumption 1A+1B 31,659.27

Comparison:
1. Potable Water meter-Kahramaa for Buildings(1A) = Potable Tank Incoming SCADA meter(2A)
Remarks Justification
1A 31,645.06
2A 35,805.10

2. Potable Tank Incoming SCADA meter(2A) = Tank outlet meter-SCADA(2B) + Storage tank(2C) -Last month storage
Remarks Justification

35,805.10 Difference in Comparision is due to the Leak in Fire Hydrant system which I sbeing rectified
2A
by QD-SBG.
2B+2C-last Also the SCADA meter(2A) needs to be checked for operation as there is a difference in
26,995.68 comparision with the Kahramaa meter
month storage

3. Potable Water meter-Kahramaa for DCP(1B) = Potable Water Emergency Make-up SCADA for DCP(3B)
Remarks Justification
1B 14.21
3B 12.73

4. Tank Outlet meter SCADA = Total sum of All Buildings( Down stream)

Page 9 of 75
2.3 Upstream TSE Meters:

Page 10 of 75
REF. NO. FORM QHSE-OPS-12H
VERSION 00
ISF CAMP - AL DUHAIL DATE 17.12.2019
TSE WATER METER READINGS-UPSTREAM as of 31st Mar 2021 PAGE 1 of 1
(ASGHAL SCADA Meters)

Meter Reading (m3) Consumption (m3) Unit Rate Total Cost (QAR)
SL.NO Package Building Description Tag No Source of Data Remarks
Cost @ 0.25
Feb-21 Mar-21 Feb-21 Mar-21
1. TSE Water Meters(ASGHAL RTU-Physical)
TSE Water meter for
1A CPC02 POC-1 FM-D8 Meter 902,736.60 915,739.20 17,127.10 13,002.60 0.25 3,250.65
Irrigation
Consumption & Cost
Meter Not
1B CPC02 POC-2 TSE water meter for DCP 22L-TSE-FMC1-SCA-UG-FIT Meter 0.00 0.00 25,545.82 0.25 6,386.45 considered from SCADA
working
meter
TOTAL CONSUMPTION (A+B) 38,548.42 m³
TOTAL COST - 9,727.85 QAR
2. TSE Water Meters(SCADA)
TSE-Irrigation Tank Inlet
2A CPC02 29g 29d-SCA-GF-FIT-901 SCADA 247,451.00 260,131.48 16,660.00 12,680.48
meter
2B CPC02 29g TSE Outgoing-After Tank 29d-SCA-GF-FIT-1001 SCADA 870,908.00 897,029.69 23,670.00 26,121.69
TSE-2 No Storage IW-TK-901A
2C CPC02 26g SCADA 10,652.40 9,877.68 Water level is 4.59mtrs.
Tank(7000 m3 each) IW-TK-901B

2D CPC02 26g TSE-DCP 26g-SCA-MK-3-FIT-30001 SCADA 716,633.33 742,179.15 12,366.91 25,545.82

3.DCP Blow Down Water (SCADA)


Inlet to Irrigation Tank from
3A CPC02 29g SCADA 563,271.58 577,311.27 7,245.94 14,039.70
DCP Blowdown
4. Storm Water
Calculation
Inlet to Irrigation Tank from
4A CPC02 29g (2C+2B)- 10,416.46 9,279.19
Storm Water
(2A+3A)
5. CPC08Q(30J) consumption

5A CPC02 30J Outlet Meter 363 363.00 0.25 90.75

Note :
1. Total TSE water consumption is 1A+1B+5A 1A+1B+5A 38,911.42
2. Storm Water supply doesn't have any Flow meter/Water meter. Storm water incoming will be equal to (Tank storage+Tank outlet)-(DCP Blowdown Inlet+TSE inlet Asghal)

Comparison:
1. TSE Water meter for Irrigation ASGHAL(1A) = Irrigation Tank Incoming SCADA meter(2A)+ CPC08Q meter(5A)

1A 13,002.60

2A 13,043.48

2. TSE Water meter for DCP ASGHAL(1B) = DCP Incoming TSE SCADA meter(2D)

REMARKS JUSTIFICATION
1B - TSE meter not working.

2D 25,545.82

Page 11 of 75
2.4 Upstream BTU Meters:

Page 12 of 75
REF. NO. FORM QHSE-OPS-12E
VERSION 00
ISF CAMP - AL DUHAIL DATE 17.12.2019
BTU Meter Readings as of 31st MAR/2021 PAGE 1 of 1
Upstream(DCP + ETS)

Feb-21 Mar-21
Location/
S.No Description Source
Building Consumption Consumption
Reading Reading Remarks
(T/Hr) (T/Hr)

1. DCP
1A CPC02 DCP Main BTU Meter SCADA 50,968,528.00 1,135,736.00 52,828,464.00 1,859,936.00

DCP building
1B CPC02 SCADA 1,929,047.00 45,120.50 1,988,820.90 59,773.90
consumption meter/26g

2. ETS Rooms

1 CPC02/CPC07a ETS 6F1 SCADA 3,673,612.00 55,303.00 3,757,597.30 83,985.30

2 CPC02/CPC07a ETS 6F2 SCADA 4,026,041.00 50,284.00 4,109,319.00 83,278.00

3 CPC02/CPC07a ETS 6F3 SCADA 3,235,633.00 41,906.00 3,324,363.00 88,730.00

4 CPC02/CPC07a ETS 6F4 SCADA 1,728,012.00 33,504.00 1,781,373.80 53,361.80

5 CPC02/CPC07a ETS 6J SCADA 1,829,656.00 40,489.00 1,897,529.00 67,873.00

6 CPC02/CPC07a ETS 6N1(1) SCADA 1,426,296.00 33,271.00 1,483,768.50 57,472.50

7 CPC02/CPC07a ETS 6N1(2) SCADA 3,056,824.00 54,683.00 3,144,611.30 87,787.30

8 CPC02/CPC07a ETS 6N2 SCADA 1,162,615.00 28,234.00 1,216,554.60 53,939.60

9 CPC02/CPC07a ETS 6i1(1) SCADA 3,151,379.00 54,921.00 3,254,373.30 102,994.30

10 CPC02/CPC07a ETS 6I1(2) SCADA 3,841,979.00 61,335.00 3,954,476.00 112,497.00

11 CPC02/CPC07a ETS 4E SCADA 1,763,279.00 39,966.00 1,835,878.90 72,599.90

12 CPC02/CPC07b ETS 3E SCADA 2,174,792.00 41,970.00 2,254,162.00 79,370.00

13 CPC02/CPC07b ETS 3E2 SCADA 4,113,227.00 91,428.00 4,257,516.50 144,289.50

14 CPC02/CPC07b ETS 5H1 SCADA 3,295,751.00 58,767.00 3,405,287.30 109,536.30

15 CPC02/CPC07b ETS 5H2 SCADA 1,961,619.00 41,139.00 2,026,238.40 64,619.40

16 COC07d ETS21a SCADA 4,134,303.00 100,732.00 4,302,810.50 168,507.50

17 CPC02 ETS 8H SCADA 786,264.00 18,296.00 808,232.30 21,968.30

18 CPC02 ETS 27B SCADA 246,408.00 7,186.00 253,478.80 7,070.80

19 CPC14 ETS 1M SCADA 1,727,960.00 41,525.00 1,793,791.90 65,831.90

20 CPC08a ETS 20e SCADA 242,657.00 20,894.00 295,327.60 52,670.60

21 CPC08a ETS 9f1 SCADA 195.00 - -

22 CPC08a ETS 9f2 SCADA 504,659.00 15,615.00 544,053.00 39,394.00

23 COPC076a 22B Meter 687,466.92 299,811.81 807,472.30 60,002.69

24 CPC08Q 30J Meter 150,370.20 150,370.20 188,742.00 38,371.80

Total ETS Consumption(B) 1,126,938.70 1,775,925.39 TON/HR

Note : For Building serviced details refer to Downstream meter readings.

Comaprision : The sum of ETS consumption (2B) = The Main BTU Meter consumption(1A) in DCP

DCP Main BTU Meter 1,859,936.00

Sum of ETS(2B)+ DCP building(1B) 1,775,925.39

Page 13 of 75
2.5 LPG Meters:

Page 14 of 75
REF. NO. FORM FORM QHSE-OPS-12G
VERSION 00
DATE 17.12.2019
ISF CAMP - AL DUHAIL
PAGE 1 of 1
LPG METER READINGS as of 31 Mar'21
Package CPC07d

Feb-21 Mar-21
Unit Rate Total Cost (QAR)
S.No Meter Description Remarks
Meter reading Consumption (m³) Meter reading Consumption (m³) Cost @

1 Boiler Area 680,955.00 18,716.00 691,155.00 10,200.00

2 Pot Wash 51,649.00 2.00 51,655.00 6.00

3 Bakery 166,556.00 14,842.00 186,022.00 19,466.00

4 Hot Kitchen-1 481,318.00 48,386.00 551,036.00 69,718.00

5 Hot Kitchen-2 391,452.00 31,404.00 433,207.00 41,755.00

6 Hot Kitchen-3 181,691.00 22,410.00 210,734.00 29,043.00


Ironing & Flooring
7 511.00 0.00 511.00 0.00
Area
8 Drying Area 120,398.00 16,783.00 138,728.00 18,330.00

9 Future expansion 35.00 0.00 35.00 0.00 Not Operational

Total consumption 152,543.00 188,518.00 m³


Total cost QAR

Page 15 of 75
2.6 Downstream Electrical Meters:

Page 16 of 75
REF. NO. FORM QHSE-OPS-12B
VERSION 00
ELECTRICAL METER READINGS as of 31st March 2021 DATE 17.12.2019
DOWNSTREAM PAGE 1 of 1

Upstream Downstream

FEB-21 MAR-21
Feb-21 Mar-21
S.No Package Kahramaa Outgoing Feeder Outgoing Feeder
Substation Consumption Consumption LV panel No Source Building Total Total
Meter No No: Building / location Consumption Consumption
(MWH) (MWH) Meter reading Consumption Meter reading Consumption Remarks
(MWH) (MWH)
LVP(MWH) LVP(MWH)
BARRACKS 6B1 MSB-GB-
1 CPC07A Meter C2-1 6B1 421.35 17.78 439.38 18.03
6B1
BARRACKS 6B2 MSB-GB-
2 CPC07A Meter C2-2 6B2 447.23 18.21 468.71 21.48
6B2
BARRRACKS 6B1 RISER-
3 CPC07A Meter C2-3 6B1 326.57 9.63 335.97 9.40
GA-6B1
BARRACKS 6B1 MSB-GA-
4 CPC07A Meter C3-1 6B1 425.47 16.53 438.12 12.65
1348548 102.45 101.94 LVP-0001 6B1 85.90 88.59
BARRACKS 6B1 RISER-GB-
5 CPC07A Meter C3-2 6B1 320.72 8.07 330.45 9.73
6B1
6 CPC07A Meter C3-3 MCC-6F1 6F1 368.15 2.37 370.85 2.70
7 CPC07A Meter C3-4 SMB-GS1a 6C1 6C1 248.85 13.31 263.45 14.60
BARRACK 6B1 MSB-GF-
8 CPC07A Meter C4-1 6B1 0.08 0.00 0.08 0.00
6B1
BARRACKS 6B1 EMSB-GB-
9 CPC07A 6F1 Meter C2-1 6B1 214.85 0.05 221.81 6.96
6B1
BARRACKS 6B2 EMSB -
10 CPC07A Meter C2-2 6B2 210.48 11.07 219.65 9.17
GB-6B2
11 CPC07A Meter C2-3 ESMB-UFO-6H4 6H4 70.56 32.00 75.18 4.62
BARRACKS 6B1 EMSB-
12 CPC07A Meter C1-1 6B1 224.80 20.09 235.67 10.87
GA-6B1
BARRACKS 6B2 EMSB-
13 CPC07A 1348549 105.35 115.63 LVP-0002 Meter C1-2 6B2 209.31 6.60 83.08 220.42 11.11 88.70
GA-6B2
14 CPC07A Meter C1-3 GS1A 6C1 ESMB-GS1A 6C1 40.00 -26.58 41.90 1.90
BARRACKS 6B2 MSB-GA-
15 CPC07A Meter C6-3 6B2 471.48 118.19 489.73 18.25
6B2
BARRACKS 6B2 RISER -
16 CPC07A Meter C6-2 6B2 383.73 10.94 396.70 12.97
GB-6B2
BARRACKS 6B2 RISER -
17 CPC07A Meter C6-1 6B2 363.99 -89.28 376.84 12.85
GA-6B2
BARRACKS 6B3 MSB-GB-
18 CPC07A Meter C2-1 6B3 466.82 15.26 482.43 15.61
6B3
BARRACKS 6B3 RISER -
19 CPC07A Meter C2-2 6B3 359.83 11.55 372.70 12.87
GA-6B3
BARRACKS 6B4 MSB-GB-
20 CPC07A Meter C2-3 6B4 454.78 13.05 469.91 15.13
6B4
BARRACKS 6B3 MSB-GA-
21 CPC07A Meter C3-1 6B3 423.19 14.93 434.19 11.00
1348550 108.02 112.77 LVP-0001 6B3 71.48 73.21
BARRACKS 6B3 RISER-GB-
22 CPC07A Meter C3-2 6B3 4.53 0.14 4.68 0.15
6B3
23 CPC07A Meter C3-3 MCC-6F3 6F3 350.93 3.39 354.76 3.83
24 CPC07A Meter C3-4 SMB-GS1-6C1 6C1 241.83 13.16 256.45 14.62
BARRACKS 6B3 MSB-GF-
25 CPC07A Meter C4-1 6B3 0.03 0.00 0.03 0.00
6B3

Page 17 of 75
REF. NO. FORM QHSE-OPS-12B
VERSION 00
ELECTRICAL METER READINGS as of 31st March 2021 DATE 17.12.2019
DOWNSTREAM PAGE 1 of 1

Upstream Downstream

FEB-21 MAR-21
Feb-21 Mar-21
S.No Package Kahramaa Outgoing Feeder Outgoing Feeder
Substation Consumption Consumption LV panel No Source Building Total Total
Meter No No: Building / location Consumption Consumption
(MWH) (MWH) Meter reading Consumption Meter reading Consumption Remarks
(MWH) (MWH)
LVP(MWH) LVP(MWH)
BARRACKS 6B3 EMSB-
26 CPC07A 6F2 Meter C1-1 6B3 2.55 0.12 2.69 0.14
GA-6B3
BARRACKS 6B4 EMSB-
27 CPC07A Meter C1-2 6B4 2.69 0.13 2.83 0.14
GA-6B4
BARRACKS 6B3 EMSB-GB-
28 CPC07A Meter C1-3 6B3 2.59 0.14 2.71 0.12
6B3
29 CPC07A Meter C1-4 GS1 6C2 ESMB-GS1 6C2 1.27 0.07 1.33 0.06
BARRACKS 6B4 EMSB-
30 CPC07A 1348551 113.23 123.34 LVP-0002 Meter C2-1 6B4 2.51 0.13 1.02 2.64 0.13 1.14
GA-6B4
BARRACKS 6B4 MSB-GA-
31 CPC07A Meter C6-1 6B4 5.15 0.12 5.29 0.14
6B4
BARRACKS 6B4 RISER -
32 CPC07A Meter C6-2 6B4 4.46 0.16 4.64 0.18
GB-6B4
BARRACKS 6B4 RISER-GA-
33 CPC07A Meter C6-3 6B4 4.12 0.15 4.29 0.17
6B4
BARRACK 6B4 MSB-GF-
34 CPC07A Meter C7-1 6B4 0.01 0.00 0.07 0.06
6B4
BARRACKS 6B7 MSB-GB-
35 CPC07A Meter C2-1 6B7 24.35 0.01 0.02
6B7
BARRACKS 6B7 RISER GA-
36 CPC07A Meter C2-2 6B7 277.46 10.83 289.63 12.17
6B7
BARRACKS 6B7 MSB-GA-
37 CPC07A Meter C3-1 6B7 397.71 22.03 418.09 20.38
1348552 95.20 98.92 LVP-0001 6B7 66.75 68.12
BARRACKS 6B7 RISER -
38 CPC07A Meter C3-2 6B7 305.63 10.06 317.60 11.97
GB-6B7
39 CPC07A Meter C3-3 MCC-6F3 6F3 437.15 2.69 440.80 3.65
BARRACK 6B7 MSB-GF-
40 CPC07A Meter C4-1 6B7 221.81 21.13 241.76 19.95
6B7
BARRACKS 6B5 RISER -
41 CPC07A Meter C2-1 6B5 357.39 12.83 374.05 16.66
GB-6B5
BARRACKS 6B5 RISER -
42 CPC07A Meter C2-2 6B5 311.11 9.22 324.79 13.68
GA-6B5
BARRACKS 6B8 MSB-GB-
43 CPC07A Meter C2-3 6B8 371.44 17.96 385.86 14.42
6B8
BARRACKS 6B5MSB-GB-
44 CPC07A Meter C3-1 6B5 483.05 16.90 509.26 26.21
6B5
1348553 129.86 142.86 LVP-0002 129.28 143.24
BARRACKS 6B5 MSB-GA-
45 CPC07A Meter C3-2 6B5 390.73 9.94 409.56 18.83
6B5
6F3 BARRACKS 6B8 MSB-GA-
46 CPC07A Meter C3-3 6B8 495.19 31.40 521.34 26.15
6B8
BARRACKS 6B5 MSB-GF-
47 CPC07A Meter C4-1 6B5 198.49 15.96 212.74 14.25
6B5
BARRACKS 6B8 MSB-GF-
48 CPC07A Meter C5-1 6B8 206.44 15.07 219.48 13.04
6B8

Page 18 of 75
REF. NO. FORM QHSE-OPS-12B
VERSION 00
ELECTRICAL METER READINGS as of 31st March 2021 DATE 17.12.2019
DOWNSTREAM PAGE 1 of 1

Upstream Downstream

FEB-21 MAR-21
Feb-21 Mar-21
S.No Package Kahramaa Outgoing Feeder Outgoing Feeder
Substation Consumption Consumption LV panel No Source Building Total Total
Meter No No: Building / location Consumption Consumption
(MWH) (MWH) Meter reading Consumption Meter reading Consumption Remarks
(MWH) (MWH)
LVP(MWH) LVP(MWH)
BARRACKS 6B8 RISER -
49 CPC07A Meter C2-1 6B8 289.00 11.56 302.38 13.38
GA-6B8
BARRACKS 6B8 RISER -
50 CPC07A Meter C2-2 6B8 326.15 13.70 342.18 16.03
GB-6B8
BARRACKS 6B5 EMSB-GB-
51 CPC07A Meter C6-1 6B5 188.38 8.79 198.15 9.77
6B5
BARRACKS 6B7 EMSB-GB-
52 CPC07A Meter C6-2 6B7 180.05 8.57 189.57 9.52
6B7
1348554 104.39 117.53 LVP-0003 93.37 104.71
BARRACKS 6B8 EMSB-GB-
53 CPC07A Meter C6-3 6B8 184.32 9.14 195.11 10.79
6B8
BARRACKS 6B5 EMSB-
54 CPC07A Meter C7-1 6B5 188.30 9.24 198.35 10.05
GA-6B5
BARRACKS 6B7 EMSB-
55 CPC07A Meter C7-2 6B7 187.64 10.19 198.59 10.95
GA-6B7
BARRACKS 6B8 EMSB -
56 CPC07A Meter C7-3 6B8 323.06 22.18 347.28 24.22
GA- 6B8
BARRACKS 6B15 EMSB-
57 CPC07A Meter C2-1 6B15 258.87 14.46 274.99 16.12
GA-6B15
BARRACKS 6B15 EMSB-
58 CPC07A Meter C2-2 6B15 197.67 10.45 211.63 13.96
GB-6B15
59 CPC07A Meter C2-3 EMSB-NTR(6B15) 6B15 0.00 0.00 0.00 0.00
BARRACKS 6B15 MSB-
60 CPC07A Meter C6-1 6B15 308.74 19.81 330.95 22.21
GA-6B15
BARRACKS 6B15 RISER -
61 CPC07A 1348555 132.40 146.94 LVP-0001 Meter C6-2 6B15 321.47 15.24 120.59 339.13 17.66 134.49
GB-6B15
BARRACKS 6B15 RISER -
62 CPC07A Meter C6-3 6B15 298.11 15.80 315.92 17.81
GA-6B15
BARRACKS 6B15 MSB-GB-
63 CPC07A Meter C7-1 6B15 392.84 25.91 421.66 28.82
6B15
64 CPC07A Meter C7-2 MCC-6F4 6F4 238.09 2.39 240.79 2.70
BARRACKS 6B15 MSB-GF-
65 CPC07A Meter C8-1 6B15 170.60 16.53 185.81 15.21
6B15
66 CPC07A Meter P2 2,760.00 2,944.80 184.80
67 CPC07A Meter QA1 CAPACITOR BANK 2.64 0.20 2.89 0.25
SPARE FOR FUTURE
68 CPC07A Meter QA2 OFF OFF
LOAD
69 CPC07A Meter QA3 FUTURE LOAD OFF OFF
6F4
70 CPC07A Meter QA4 FUTURE LOAD OFF OFF
Previous month UOM was
71 CPC07A Meter P4 0.34 0.00 0.34 0.00
wrong
72 CPC07A Meter P5 0.02 0.00 0.02 0.00
73 CPC07A Meter P6 1,170.80 74.30 1,253.80 83.00
74 CPC07A Meter P7 114.17 2.80 117.28 3.11
1358410 158.05 176.65 LVP-0002
75 CPC07A Meter P8 QB-3-ESDB-IDC-GF-01 343.71 19.93 142.36 366.71 23.00 159.25
76 CPC07A Meter QB4 ESDB-MOI-GF-01 150.14 9.62 160.07 9.93
77 CPC07A Meter QB5 EDB-OOR-GF-01 39.81 2.43 42.73 2.92
78 CPC07A Meter QB6 UPS -MOI-GF-01 47.30 3.61 51.49 4.19

Page 19 of 75
REF. NO. FORM QHSE-OPS-12B
VERSION 00
ELECTRICAL METER READINGS as of 31st March 2021 DATE 17.12.2019
DOWNSTREAM PAGE 1 of 1

Upstream Downstream

FEB-21 MAR-21
Feb-21 Mar-21
S.No Package Kahramaa Outgoing Feeder Outgoing Feeder
Substation Consumption Consumption LV panel No Source Building Total Total
Meter No No: Building / location Consumption Consumption
(MWH) (MWH) Meter reading Consumption Meter reading Consumption Remarks
(MWH) (MWH)
LVP(MWH) LVP(MWH)
79 CPC07A Meter QB7 ESDB-IDC-GF-02 431.50 29.05 463.93 32.43

LOAD BANK ONLY AS


80 CPC07A Meter QB8 OFF OFF
PER TIA REQUIREMENTS

81 CPC07A Meter QB9 UPS-MOI-GF-01 0.13 0.00 0.13 0.00


82 CPC07A Meter QB10 UPS-MOI-GF-02 0.10 0.00 0.10 0.00 Previous month UOM was
wrong
83 CPC07A Meter QB11 UPS-MOI-GF-02 0.04 0.42 0.46 0.42
BARRACKS 6B19 EMSB-
84 CPC07A Meter C2-1 6B19 151.10 9.97 162.29 11.19
GA-6B19
BARRACKS 6B19 EMSB-
85 CPC07A Meter C2-2 6B19 184.17 10.77 195.05 10.88
GB-6B19
86 CPC07A Meter C2-3 EDB-GH1 6G1 6G1 0.00 0.00 0.00 0.00
BARRACKS 6B19 MSB-
87 CPC07A Meter C6-1 6B19 321.32 17.08 346.26 24.94
GA-6B19
BARRACKS 6B19 RISER-
88 CPC07A Meter C6-2 6B19 309.34 14.88 326.72 17.38
GA-6B19
6J 1348556 136.71 147.23 LVP-0001 117.98 136.54
BARRACKS 6B19 MSB-GB-
89 CPC07A Meter C7-1 6B19 331.10 21.04 354.86 23.76
6B19
BARRACKS 6B19 RISER-
90 CPC07A Meter C7-2 6B19 346.78 16.20 365.63 18.85
GB-6B19
91 CPC07A Meter C7-3 MCC-6J 6J 250.75 2.70 253.16 2.41

92 CPC07A Meter C7-4 CP2,CPC7A PARADE 6D1 6D1 192.28 9.86 203.24 10.96
BARRACK 6B19 MSB-GF-
93 CPC07A Meter C8-1 6B19 129.81 15.48 145.98 16.17
6B19
EMSB-HQ8-1(6I-LVP-
94 CPC07A Meter C3-1 6I 135.69 0.00 135.69 0.00
002,Q4)
BARRACKS 6B6 EMSB-
95 CPC07A Meter C3-2 6B6 181.12 9.15 191.09 9.97
GA-6B6
BARRACKS 6B5 EMSB-GB-
96 CPC07A Meter C3-3 6B6 181.12 7.94 190.40 9.28
6B6
MSB-HQ8-2(6I-LVP-
97 CPC07A Meter C4-1 6I 148.30 0.00 148.30 0.00
1348557 95.47 106.12 LVP-0001 003,Q4) 40.43 44.30
BARRACKS 6B11 EMSB-
98 CPC07A Meter C4-2 6B11 189.28 10.68 200.37 11.09
GA-6B11
BARRACKS 6B11 EMSB-
99 CPC07A Meter C4-3 6B11 176.47 10.72 188.32 11.85
GB-6B11
100 CPC07A Meter C5-2 EMSB-EQP=HQ8-6A 6A 0.00 0.00 0.00 0.00
101 CPC07A Meter C5-3 EMSB-GS1 6C5 6C5 24.86 1.94 26.97 2.11
BARRACKS 6B6 MSB-GA-
102 CPC07A Meter C2-1 6B6 316.10 8.79 325.21 9.11
6B6
BARRACKS 6B6 RISER -
103 CPC07A Meter C2-2 6B6 350.23 11.30 363.21 12.98
GB-6B6
104 CPC07A Meter C2-3 MCC-6i1A 6I 380.89 5.51 387.91 7.02
6i BARRACK 6B6 MSB-GB-
105 CPC07A Meter C3-1 6B6 422.64 16.40 438.14 15.50
1348558 97.64 97.73 LVP-0002 6B6 94.63 94.27
BARRACK 6B6 RISER -GA-
106 CPC07A Meter C3-2 6B6 317.80 9.23 327.37 9.57
6B6
107 CPC07A Meter C3-3 SMB-GS1 6C5 6C5 240.87 12.72 251.61 10.74
108 CPC07A Meter C3-4 CP-3, CPC7A 208.74 12.13 221.85 13.11
BARRACK 6B6 MSB-GF-
109 CPC07A Meter C4-1 6B6 231.05 18.55 247.29 16.24
6B6

Page 20 of 75
REF. NO. FORM QHSE-OPS-12B
VERSION 00
ELECTRICAL METER READINGS as of 31st March 2021 DATE 17.12.2019
DOWNSTREAM PAGE 1 of 1

Upstream Downstream

FEB-21 MAR-21
Feb-21 Mar-21
S.No Package Kahramaa Outgoing Feeder Outgoing Feeder
Substation Consumption Consumption LV panel No Source Building Total Total
Meter No No: Building / location Consumption Consumption
(MWH) (MWH) Meter reading Consumption Meter reading Consumption Remarks
(MWH) (MWH)
LVP(MWH) LVP(MWH)
BARRACKS 6B11 MSB-GB-
110 CPC07A Meter C2-1 6B11 405.28 23.64 430.00 24.72
6B11
BARRACKS 6B11 MSB-
111 CPC07A Meter C2-2 6B11 407.23 21.03 421.98 14.75
GA-6B11
112 CPC07A Meter C2-3 CP-4,CPC7A 0.00 0.00 0.00 0.00
BARRACKS 6B11 RISER-
113 CPC07A 1348559 96.33 93.26 LVP-0003 Meter C3-1 6B11 337.47 15.09 92.58 355.30 17.83 89.13
GB-6B11
BARRACKS 6B11 RISER -
114 CPC07A Meter C3-2 6B11 334.79 14.47 350.34 15.55
GA-6B11
115 CPC07A Meter C3-3 MCC-6i1B 6I 468.97 3.49 473.08 4.11
BARRACK 6B11 MSB-GF-
116 CPC07A Meter C4-1 6B11 143.08 14.86 155.25 12.17
6B11
BARRACKS 6B12 EMSB-
117 CPC07A Meter C1-1 6B12 188.61 9.82 199.40 10.79
GB-6B12
BARRACKS 6B13 EMSB-
118 CPC07A Meter C1-2 6B13 185.13 10.65 196.84 11.71
GA-6B13
BARRACKS 6B14 EMSB-
119 CPC07A Meter C1-3 6B14 178.69 10.61 190.25 11.56
GA-6B14
120 CPC07A Meter C1-4 EDB-UGH 0.00 0.00 0.00 0.00
BARRACKS 6B12 EMSB-
121 CPC07A 1348560 109.96 116.01 LVP-0001 Meter C2-1 6B12 184.10 10.52 102.07 195.73 11.63 107.27
GA-6B12
BARRACK 6B13 EMSB-
122 CPC07A Meter C2-2 6B13 185.95 10.25 196.93 10.98
GB-6B13
BARRACKS 6B14 EMSB-
123 CPC07A Meter C2-3 6B14 185.26 11.40 196.73 11.47
GB-6B14
BARRACKS 6B13 RISER-
124 CPC07A Meter C6-1 6B13 337.40 13.85 354.22 16.82
GB-6B13
BARRACKS 6B13 MSB-GF-
125 CPC07A Meter C7-1 6B13 218.89 24.97 241.20 22.31
6B13
BARRACK 6B12 MSB-GA-
126 CPC07A Meter C2-1 6B12 372.52 22.73 397.34 24.82
6B12
BARRACK 6B12 RISER-GB-
127 CPC07A Meter C2-2 6B12 347.27 15.63 365.40 18.13
6B12
128 CPC07A
6n - L
Meter C2-3 MCC-6nA 6N 195.45 2.22 198.27 2.82
(6N1) BARRACK 6B12 MSB-GB-
129 CPC07A 1348561 95.10 116.64 LVP-0002 Meter C3-1 6B12 392.81 21.54 94.21 416.40 23.59 103.72
6B12
BARRACK 6B12 RISER-GA-
130 CPC07A Meter C3-2 6B12 327.25 14.01 343.24 15.99
6B12
131 CPC07A Meter C3-3 MCC-6nB 6N 357.19 2.90 360.73 3.54
BARRACK 6B12 MSB-GF-
132 CPC07A Meter C4-2 6B12 134.48 15.18 149.31 14.83
6B12
BARRACK 6B13 MSB-GA-
133 CPC07A Meter C2-1 6B13 345.60 15.07 369.27 23.67
6B13
BARRACK 6B13 MSB-GB-
134 CPC07A Meter C2-2 6B13 398.37 23.84 426.05 27.68
6B13
BARRACK 6B13 RISER-GA-
135 CPC07A Meter C2-3 6B13 322.71 15.09 339.80 17.09
6B13
BARRACK 6B14 RISER-GB-
136 CPC07A Meter C2-4 6B14 326.86 15.24 343.84 16.98
6B14
1348562 134.47 170.24 LVP-0003 126.10 155.37
BARRACK 6B14 MSB-GA-
137 CPC07A Meter C3-1 6B14 364.15 16.92 390.90 26.75
6B14
BARRACK 6B14 MSB-GB-
138 CPC07A Meter C3-2 6B14 237.06 14.65 253.70 16.64
6B14
BARRACK 6B14 RISER-GA-
139 CPC07A Meter C3-3 6B14 296.95 14.21 312.93 15.98
6B14
BARRACK 6B14 MSB-GF-
140 CPC07A Meter C4-1 6B14 102.84 11.08 113.42 10.58
6B14

Page 21 of 75
REF. NO. FORM QHSE-OPS-12B
VERSION 00
ELECTRICAL METER READINGS as of 31st March 2021 DATE 17.12.2019
DOWNSTREAM PAGE 1 of 1

Upstream Downstream

FEB-21 MAR-21
Feb-21 Mar-21
S.No Package Kahramaa Outgoing Feeder Outgoing Feeder
Substation Consumption Consumption LV panel No Source Building Total Total
Meter No No: Building / location Consumption Consumption
(MWH) (MWH) Meter reading Consumption Meter reading Consumption Remarks
(MWH) (MWH)
LVP(MWH) LVP(MWH)
BARRACK 6B10 EMSB-
141 CPC07A Meter C1-1 6B10 311.94 21.39 335.49 23.55
GA-6B10
BARRACK 6B18 EMSB-
142 CPC07A Meter C1-2 6B18 153.75 9.91 164.62 10.87
GA-6B18
BARRACK 6B10 EMSB-
143 CPC07A Meter C1-3 6B10 116.27 9.72 126.74 10.47
NTR-6B10
144 CPC07A Meter C1-4 ESMB-GS1 6C3 6C3 36.14 2.05 38.32 2.18
1348563 76.37 83.29 LVP-0001 66.33 72.40
BARRACK 6B10 EMSB-
145 CPC07A Meter C2-1 6B10 189.32 11.69 202.17 12.85
GB-6B10
BARRACK 6B18 EMSB-
146 CPC07A Meter C2-2 6B18 167.23 9.79 177.72 10.49
GB-6B18
147 CPC07A Meter C2-3 ESMB-GS1 6C4 6C4 28.55 1.78 30.54 1.99
148 CPC07A Meter C2-4 ESMB-UFO 6H5 6H5 OFF OFF
BARRACK 6B10 MSB-GA-
149 CPC07A Meter C2-1 6B10 318.20 15.05 339.74 21.54
6B10
BARRACK 6B10 RISER-GA-
150 CPC07A Meter C2-2 6B10 269.68 11.72 283.43 13.75
6B10
BARRACK 6B10 MSB-GB-
151 CPC07A Meter C3-1 6B10 365.32 21.14 390.96 25.64
6n - R 1348564 92.24 112.97 LVP-0002 6B10 81.97 102.44
(6N2) BARRACK 6B10 RISER -
152 CPC07A Meter C3-2 6B10 310.18 14.15 326.67 16.49
GB-6B10
153 CPC07A Meter C3-3 CP-2, CPC7a 25.02 0.00 25.02 0.00
BARRACK 6B10 MSB-GF-
154 CPC07A Meter C4-2 6B10 161.30 19.91 186.32 25.02
6B10
BARRACK 6B18 MSB-GA-
155 CPC07A Meter C2-1 6B18 335.24 13.25 358.88 23.64
6B18
BARRACK 6B18 RISER -
156 CPC07A Meter C2-2 6B18 285.59 13.89 300.14 14.55
GA-6B18
157 CPC07A Meter C2-3 SMB-GS1 181.25 15.32 199.21 17.96
BARRACK 6B18 MSB-GB-
158 CPC07A Meter C3-1 6B18 318.49 14.51 335.46 16.97
1348565 99.76 123.68 LVP-0003 6B18 100.21 124.30
BARRACK 6B18 RISER-CB-
159 CPC07A Meter C3-2 6B18 306.46 14.51 322.34 15.88
6B18
160 CPC07A Meter C3-3 MCC-6nC 6N 142.27 2.09 144.73 2.46
161 CPC07A Meter C3-4 SMB-GS1a 189.72 9.95 201.53 11.81
BARRACKS 6B18 MSB-GF-
162 CPC07A Meter C4-1 6B18 153.46 16.69 174.49 21.03
6B18
163 CPC07A Meter C1-1 3.07 0.24 3.31 0.24
BARRACKS 4B1 EMSB-
164 CPC07A Meter C2-1 4B1 3.44 0.25 3.68 0.24
GA-4B1
BARRACKS 4B1 EMSB-GB-
165 CPC07A Meter C2-2 4B1 2.06 0.13 2.18 0.12
4B1
166 CPC07A Meter C2-3 EMSB-GS1 6C5 6C5 0.77 0.07 0.83 0.06
Previous month UOM was
167 CPC07A Meter C2-4 SMB-UFO 4G 17.30 1.11 18.00 0.70
1348566 98.69 94.37 LVP-0001 22.82 27.81 wrong
168 CPC07A Meter C2-5 DB-UGH 4F 208.74 6.58 223.74 15.00
169 CPC07A Meter C7-2 MCC-4e(ETS) 4E OFF OFF
170 CPC07A 4E Meter C7-3 SMB-GS1-4C 4C 159.75 14.44 171.20 11.45
171 CPC07A Meter C7-4 CP-1 (ZONE 4) Z4 OFF OFF
172 CPC07A Meter C7-5 CP-2( ZONE 4) Z4 OFF OFF

Page 22 of 75
REF. NO. FORM QHSE-OPS-12B
VERSION 00
ELECTRICAL METER READINGS as of 31st March 2021 DATE 17.12.2019
DOWNSTREAM PAGE 1 of 1

Upstream Downstream

FEB-21 MAR-21
Feb-21 Mar-21
S.No Package Kahramaa Outgoing Feeder Outgoing Feeder
Substation Consumption Consumption LV panel No Source Building Total Total
Meter No No: Building / location Consumption Consumption
(MWH) (MWH) Meter reading Consumption Meter reading Consumption Remarks
(MWH) (MWH)
LVP(MWH) LVP(MWH)
BARRACK 4B1 MSB-GA-
173 CPC07A Meter C2-1 4B1 329.39 23.69 352.90 23.51
4B1
BARRACK 4B1 RISER-GA-
174 CPC07A Meter C2-2 4B1 320.59 25.21 339.87 19.28
4B1
BARRACKS 4B1 MSB-GB-
175 CPC07A 1348567 104.75 96.48 LVP-0002 Meter C3-1 4B1 318.88 14.83 168.61 334.29 15.41 90.64
4B1
BARRACK 4B1 RISER -GB-
176 CPC07A Meter C3-2 4B1 297.19 14.53 312.32 15.13
4B1
BARRACKS 4B1 MSB-GF-
177 CPC07A Meter C4-2 4B1 140.14 19.02 157.45 17.31
4B1
178 CPC07B Meter PMUA Incomer-BMS Meter 3e 592.63 38.62 632.16 39.53
179 Meter PMUQA 0.00 0.00 74.55 Meter was OFF previously.
BARRACK 3b1 EMSB-GA-
180 Meter PMUQB-1 3B1 159.53 11.50 170.06 10.53
3b1
181 CPC07B Meter PMUQB-2 SPARE OFF OFF
182 CPC07B Meter PMUQB-3 ESMB-ACP4 19.26 1.70 20.81 1.55
183 CPC07B Meter PMUQB-4 SPARE OFF OFF
184 CPC07B Meter PMUQB-5 EDB-MV-3E 3E 11.71 1.28 12.52 0.81
1361160 38.63 39.53 LVP-0001
SPARE FOR STREET
185 CPC07B Meter PMUQB-6 OFF 32.71 OFF 32.81
LIGHTING
186 CPC07B Meter PMUQB-7 ESMB-GB-3B1 3B1 158.65 9.93 168.03 9.38
187 CPC07B Meter PMUQB-8 SPARE OFF OFF
188 CPC07B Meter PMUQB-9 SMB-UFO EM UFO 4G 47.91 2.01 51.73 3.82
189 CPC07B Meter PMUQB-10 DB-UGH 4F 21.15 0.43 21.52 0.37
190 CPC07B Meter PMUQB-11 EDB-LV-3E 3E 4.21 0.16 4.35 0.14
191 CPC07B Meter PMUQB-12 MECH LOAD IN S/S 3E 3E 22.58 5.70 28.79 6.21
192 CPC07B Meter PMUA Incomer-BMS Meter LVP-002 901.86 125.15 1,014.39 112.53
193 Meter PMU-1 MSB-GA-3B1 3B1 220.86 14.62 234.90 14.04
194 CPC07B 3E Meter PMU-2 SPARE OFF OFF
195 CPC07B Meter PMU-3 SPARE OFF OFF
196 CPC07B Meter PMU-4 SPARE OFF OFF
197 CPC07B Meter PMU-5 SPARE OFF OFF
MSB-GB-3b1 BARRACK
198 CPC07B Meter PMU-6 3B1 204.66 12.97 216.67 12.01
3b1
RISER -GA-3b1 BARRACK
199 CPC07B Meter PMU-7 3B1 223.15 15.45 237.30 14.15
3b1
200 CPC07B Meter PMU-8 MCC-3e ETS 3E 3E 536.64 6.33 544.44 7.80
1361161 125.06 112.44 LVP-0002
201 CPC07B Meter PMU-9 SPARE OFF 127.68 OFF 114.41
202 CPC07B Meter PMU-10 SPARE OFF OFF
MSB-GF-3b1 BARRACK
203 CPC07B Meter PMU-11 3B1 416.77 45.67 455.17 38.40
3b1
RISER -GB-3b1 BARRACK
204 CPC07B Meter PMU-12 3B1 252.05 16.75 266.77 14.72
3b1
205 CPC07B Meter PMU-13 MSB-ACP4 3j 3J 96.34 5.14 101.27 4.93
206 CPC07B Meter PMU-14 LCC1- ( CPC7b - ZONE 3) CPC7b 70.67 7.77 76.48 5.81

207 CPC07B Meter PMU-15 LCC2-( CPC7b - ZONE 3) CPC7b 29.90 2.98 32.45 2.55

Page 23 of 75
REF. NO. FORM QHSE-OPS-12B
VERSION 00
ELECTRICAL METER READINGS as of 31st March 2021 DATE 17.12.2019
DOWNSTREAM PAGE 1 of 1

Upstream Downstream

FEB-21 MAR-21
Feb-21 Mar-21
S.No Package Kahramaa Outgoing Feeder Outgoing Feeder
Substation Consumption Consumption LV panel No Source Building Total Total
Meter No No: Building / location Consumption Consumption
(MWH) (MWH) Meter reading Consumption Meter reading Consumption Remarks
(MWH) (MWH)
LVP(MWH) LVP(MWH)
208 CPC07B Meter PMU-16 SPARE OFF
209 CPC07B Meter PMU-17 SPARE OFF
210 CPC07B LVP-0001 Meter PMUA Incomer-BMS Meter LVP-001 2,287.52 174.37 2,438.16 150.64
MSB-GB-3b4 BARRACK
211 Meter PMUQA-1 3B4 171.59 11.59 182.51 10.92
3b4
MSB-GA-3b4 BARRACK
212 CPC07B Meter PMUQA-2 3B4 194.70 13.87 207.30 12.60
3b4
213 CPC07B Meter PMUQA-3 SPARE 0.00 0.00 0.00
BARRACK 3b2 EMSB-GA-
214 CPC07B Meter PMUQB-1 3B2 73.66 5.03 78.15 4.49
3b2
BARRACK 3b3 EMSB-GB-
215 CPC07B Meter PMUQB-2 3B3 211.65 16.06 226.05 14.40
3b3
BARRACK 3b2 EMSB-GB-
216 CPC07B Meter PMUQB-3 3B2 151.16 10.43 160.83 9.67
3b2
217 CPC07B Meter PMUQB-4 EDB-MV-3e2 3E2 12.90 1.20 13.91 1.01
218 CPC07B 1361162 20.64 17.90 Meter PMUQB-5 STREET LIGHTING 71.42 6.73 73.59 2.17
LVP-001 140.80 120.92
219 CPC07B Meter PMUQB-6 UGP4 EMSB-UGP4 4J 200.83 26.91 221.52 20.69
BARRACK 3b4 EMSB-GB-
220 CPC07B Meter PMUQB-7 3B4 134.21 8.64 141.81 7.60
3b4
BARRACK 3b3 EMSB-GA-
221 CPC07B Meter PMUQB-8 3B3 230.08 18.14 246.11 16.03
3b3
222 CPC07B Meter PMUQB-9 MCP EMSB-MCP 24.53 1.79 26.10 1.57
223 CPC07B Meter PMUQB-10 EDB-LV-3e2 3E2 71.84 2.91 74.30 2.46
BARRACK 3b4 EMSB-GA-
224 CPC07B Meter PMUQB-11 3B4 156.01 11.48 166.13 10.12
3b4
225 CPC07B Meter PMUQB-12 DB-UGH 4F 20.04 0.76 21.45 1.41

226 CPC07B Meter PMUQB-13 MECH-LOAD IN S/S 3e2 3E2 118.08 5.26 123.86 5.78

227 CPC07B LVP-0002 Meter PMUA Incomer-BMS Meter 2,296.42 141.09 2,414.19 117.77
RISER -GA-3b2 BARRACK
228 Meter PMUQ-1 3B2 205.70 11.77 216.57 10.87
3b2
229 CPC07B Meter PMUQ-2 MCC-3e2 ETS 3e2 3E2 745.84 27.50 766.43 20.59
230 CPC07B Meter PMUQ-3 UGP4 3p 3P 134.58 5.27 139.69 5.11
3E2
231 CPC07B Meter PMUQ-4 MSB-MCP MCP 3i 3I 80.60 4.31 84.89 4.29
232 CPC07B Meter PMUQ-5 LCC IBW-ZONE 3 Z3 30.03 3.57 32.87 2.84
MSB-GF-3b2 BARRACK
233 CPC07B Meter PMUQ-6 3B2 385.12 48.02 422.06 36.94
3b2
1361163 11.47 9.56
RISER -GB-3b2 BARRACK
234 CPC07B LVP-002 Meter PMUQ-7 3B2 224.39 12.48 141.14 235.75 11.36 117.72
3b2
235 CPC07B Meter PMUQ-8 MSB2 -UGP4 UGP 3p 3P 129.15 5.15 133.92 4.77
236 CPC07B Meter PMUQ-9 SPARE OFF OFF
237 CPC07B Meter PMUQ-10 SPARE OFF OFF
MSB-GA-3b2 BARRACK
238 CPC07B Meter PMUQ-11 3B2 191.57 12.44 202.85 11.28
3b2
MSB-GB-3b2 BARRACK
239 CPC07B Meter PMUQ-12 3B2 170.00 10.63 179.67 9.67
3b2
240 CPC07B Meter PMUQ-13 SPARE OFF 0.00

Page 24 of 75
REF. NO. FORM QHSE-OPS-12B
VERSION 00
ELECTRICAL METER READINGS as of 31st March 2021 DATE 17.12.2019
DOWNSTREAM PAGE 1 of 1

Upstream Downstream

FEB-21 MAR-21
Feb-21 Mar-21
S.No Package Kahramaa Outgoing Feeder Outgoing Feeder
Substation Consumption Consumption LV panel No Source Building Total Total
Meter No No: Building / location Consumption Consumption
(MWH) (MWH) Meter reading Consumption Meter reading Consumption Remarks
(MWH) (MWH)
LVP(MWH) LVP(MWH)
241 CPC07B LVP-0003 Meter PMUA Incomer-BMS Meter LVP-002 1,918.38 157.77 2,060.92 142.54
MSB-GF-3b3 BARRACK
242 CPC07B Meter PMUQ-1 3B3 916.38 77.50 987.95 71.57
3b3
RISER -GB-3b3 BARRACK
243 CPC07B Meter PMUQ-2 3B3 244.18 17.30 259.86 15.68
3b3
MSB-GA-3b3 BARRACK
244 CPC07B Meter PMUQ-3 3B3 168.62 11.29 179.39 10.77
3b3
RISER -GA-3b3 BARRACK
245 CPC07B Meter PMUQ-4 3B3 218.84 14.83 232.91 14.07
3b3
246 CPC07B 1361164 31.13 28.30 Meter PMUQ-5 SPARE OFF 0.00
LVP-003 200.06
247 CPC07B Meter PMUQ-6 MSB-GF-3b4 3B4 352.73 41.43 390.02 37.29
RISER -GB-3b4 BARRACK
248 CPC07B Meter PMUQ-7 3B4 246.03 15.36 260.40 14.37
3b4
MSB-GB-3b3 BARRACK
249 CPC07B Meter PMUQ-8 3B3 129.65 7.64 135.39 5.74
3b3
RISER -GA-3b4 BARRACK
250 CPC07B Meter PMUQ-9 3B4 221.46 14.71 234.91 13.45
3b4
251 CPC07B Meter PMUQ-10 SPARE OFF 0.00
252 CPC07B Meter PMUA Incomer-BMS Meter LVP-001 958.92 133.56 1,081.84 122.93
253 CPC07B Meter PMUQA-1 MCC-5H1 ETS 5H1 5H1 508.39 6.22 515.38 6.99
254 CPC07B Meter PMUQA-2 MSB-GS3 -GF 358.58 26.90 383.45 24.87
255 CPC07B Meter PMUQA-3 SPARE OFF 7.28 7.28

256 CPC07B Meter PMUQA-4 SERVICE BLOCK MSB-SB 57.89 3.72 60.58 2.69
257 CPC07B Meter PMUQA-5 SPARE OFF OFF
258 CPC07B Meter PMUQB-1 GS2 EMSB-GS2 79.36 4.12 83.56 4.20
259 CPC07B Meter PMUQB-2 GS3 EMSB-GS3-GF 67.37 4.29 71.32 3.95
260 CPC07B Meter PMUQB-3 WS1 EMSB-WS1 68.70 5.26 73.67 4.97
261 CPC07B Meter PMUQB-4 SPARE OFF OFF
1361156 133.67 123.02 LVP-0001
262 CPC07B Meter PMUQB-5 DB-MV-5H1 5H1 9.31 0.73 133.66 9.93 0.62 130.71
263 CPC07B Meter PMUQB-6 SHOP1 MSB-SH1 5H1 735.21 70.09 797.87 62.66
264 CPC07B Meter PMUQB-7 ACP2 EMSB-ACP2 28.80 2.54 30.80 2.00
265 CPC07B Meter PMUQB-8 MOSQUE EMSB-MOS 16C 47.23 2.97 50.23 3.00
266 CPC07B Meter PMUQB-9 DB-LV-5H1 59.07 2.02 61.04 1.97
267 CPC07B Meter PMUQB-10 MECH LOAD IN S/S 5H1 5H1 106.12 4.80 111.63 5.51

268 CPC07B Meter PMUQB-11 SPARE OFF 0.00


269 CPC07B 5H1 Meter PMUQB-12 SPARE OFF 0.00

270 CPC07B Meter PMUQB-13 LCC2/( CPC7B-ZONE-5) Z5 OFF 0.00

271 CPC07B Meter PMUQB-14 SPARE OFF 0.00

Page 25 of 75
REF. NO. FORM QHSE-OPS-12B
VERSION 00
ELECTRICAL METER READINGS as of 31st March 2021 DATE 17.12.2019
DOWNSTREAM PAGE 1 of 1

Upstream Downstream

FEB-21 MAR-21
Feb-21 Mar-21
S.No Package Kahramaa Outgoing Feeder Outgoing Feeder
Substation Consumption Consumption LV panel No Source Building Total Total
Meter No No: Building / location Consumption Consumption
(MWH) (MWH) Meter reading Consumption Meter reading Consumption Remarks
(MWH) (MWH)
LVP(MWH) LVP(MWH)
272 CPC07B Meter PMUA Incomer-BMS Meter LVP-002 1,843.30 105.43 1,936.14 92.84
MOSQUE MSB1 GF-
273 Meter PMU-1 16C 525.84 10.96 535.98 10.14
MOSQUE
274 CPC07B Meter PMU-2 GS2 MSB-GS2-GPA 377.19 24.40 396.86 19.67
275 CPC07B Meter PMU-3 SPARE OFF 0.00
276 CPC07B Meter PMU-4 SPARE OFF 0.00
277 CPC07B Meter PMU-5 SPARE OFF 0.00
278 CPC07B Meter PMU-6 SPARE OFF 0.00
1361157 105.56 92.94 LVP-002
MOSQUE MSB2- 111.92 97.95
279 CPC07B Meter PMU-7 16C 365.14 31.89 392.16 27.02
MOSQUE
280 CPC07B Meter PMU-8 WS1 MSB-WS1 317.63 20.93 338.58 20.95
281 CPC07B Meter PMU-9 ACP2 MSB-ACP2 127.03 6.91 133.68 6.65
282 CPC07B Meter PMU-10 GS2 MSB-GS2-GFB 41.64 1.75 42.99 1.35
283 CPC07B Meter PMU-11 SPARE OFF 0.00
284 CPC07B Meter PMU-12 LCC1/ ( CPC7b-ZONE 16) Z16 75.45 6.27 80.34 4.89

285 Meter PMUQB-13 LCC2/( CPC7B-ZONE-5) Z5 79.09 8.81 86.37 7.28


286 CPC07B Meter PMU Incomer-BMS Meter LVP-001 1,824.14 130.10 1,929.86 105.72
287 Meter PMUQA-1 MSB-GF-5B1 5B1 348.57 41.58 376.95 28.38
288 CPC07B Meter PMUQA-2 MCC-5H1 ETS 5H2 5H2 394.28 15.15 406.32 12.04
289 CPC07B Meter PMUQA-3 SPARE 0.00
290 CPC07B Meter PMUQA-4 SPARE 0.00
BARRACK 5b1 EMSB-GB-
291 CPC07B Meter PMUQB-1 5B1 171.38 11.40 181.25 9.87
5b1
BARRACK 5b1 EMSB-GA-
292 CPC07B Meter PMUQB-2 5B1 226.16 15.59 239.93 13.77
5b1
293 CPC07B 1361158 29.37 23.75 LVP-001 Meter PMUQB-3 SMB-UFO-EM 39.84 3.35 43.58 3.74
130.32 105.90
294 CPC07B Meter PMUQB-4 DB-UGH 4G 12.63 0.32 12.99 0.36
295 CPC07B Meter PMUQB-5 DB-MV-5H2 5H2 12.05 0.84 12.72 0.67
296 CPC07B Meter PMUQB-6 EMSB-UGP3 5J 141.77 13.55 153.68 11.91
297 CPC07B Meter PMUQB-7 DB-LV-5H1 5H1 72.62 1.99 74.19 1.57
298 CPC07B Meter PMUQB-8 DB-GEN-3e 3E 38.60 0.00 38.60 0.00
299 CPC07B Meter PMUQB-9 SPARE OFF 0.00
5H2
300 CPC07B Meter PMUQB-10 EMSB-HQ3-5a 370.34 26.55 393.93 23.59

Page 26 of 75
REF. NO. FORM QHSE-OPS-12B
VERSION 00
ELECTRICAL METER READINGS as of 31st March 2021 DATE 17.12.2019
DOWNSTREAM PAGE 1 of 1

Upstream Downstream

FEB-21 MAR-21
Feb-21 Mar-21
S.No Package Kahramaa Outgoing Feeder Outgoing Feeder
Substation Consumption Consumption LV panel No Source Building Total Total
Meter No No: Building / location Consumption Consumption
(MWH) (MWH) Meter reading Consumption Meter reading Consumption Remarks
(MWH) (MWH)
LVP(MWH) LVP(MWH)
301 CPC07B Meter PMU LVP-002 1,108.34 65.41 1,169.59 61.25
302 Meter PMU-1 RISER GA-5b1 5B1 235.13 14.47 248.04 12.91
303 CPC07B Meter PMU-2 RISER GB-5b1 5B1 254.44 15.80 269.37 14.93
304 CPC07B Meter PMU-3 SPARE OFF 0.00
305 CPC07B Meter PMU-4 SPARE OFF 0.00
306 CPC07B Meter PMU-5 SPARE OFF 0.00
307 CPC07B
1361159 6.08 5.65 LVP-0002
Meter PMU-6 SPARE OFF 0.00
66.91 62.55
308 CPC07B Meter PMU-7 MSB-GA-5B1 5B1 224.12 13.76 237.33 13.21
BARRACK 5b1 MSB-GB-
309 CPC07B Meter PMU-8 5B1 154.98 9.39 163.58 8.60
5b1
310 CPC07B Meter PMU-9 UGP 5g MSB-UGP3 5J 197.42 8.13 205.79 8.37
311 CPC07B Meter PMU-10 SPARE OFF 0.00
312 CPC07B Meter PMU-11 LCC1/ (CPC7b-ZONE -5) Z5 51.49 5.36 56.02 4.53

313 CPC07B Meter PMU-12 SPARE OFF 0.00


314 CPC02 1271098 10.36 34.52 LVP-001 Meter PMU Incomer-BMS Meter LVP-001 221.24 10.36 255.68 34.44
315 CPC02 1271099 1.49 7.92 LVP-002 Meter PMU Incomer-BMS Meter LVP-002 51.21 4.01 76.75 25.54
8h
316 CPC02 1271100 3.07 16.31 LVP-003 Meter PMU Incomer-BMS Meter LVP-003 169.67 2.54 185.50 15.83
317 CPC02 1271101 59.32 69.68 LVP-004 Meter PMU Incomer-BMS Meter LVP-004 1,544.70 59.40 1,614.40 69.70
318 CPC02 Meter PMU Incomer-BMS Meter LVP-001 1,076.30 44.40 1,113.70 37.40
27b 1371648 44.56 81.49 LVP-001
319 CPC02 Meter C3-3 NO feeder detail 0.00 0.00 0.00

320 CPC02 1349315 189.01 218.82 LVP-001 Meter PMU Incomer-BMS Meter LVP-001 3,037.60 188.70 3,255.00 217.40

321 CPC02 1m 1349316 71.44 78.05 LVP-002 Meter PMU Incomer-BMS Meter LVP-002 1,302.50 71.30 1,380.40 77.90 Upstream PMU meters

322 CPC02 1349317 36.68 43.04 LVP-003 Meter PMU Incomer-BMS Meter LVP-003 791.30 36.52 834.21 42.91
323 CPC07d 1366178 155.55 141.15 LVP-001 Meter PMU Incomer-BMS Meter LVP-001 2,040.50 155.60 2,181.16 140.66
324 CPC07d 21a 1366179 111.61 75.56 LVP-002 Meter PMU Incomer-BMS Meter LVP-002 1,303.40 111.90 1,379.00 75.60 Upstream PMU meters

325 CPC07d 1366180 168.60 155.51 LVP-003 Meter PMU Incomer-BMS Meter LVP-003 2,267.00 168.90 2,422.80 155.80
326 CPC08a LVP-001 Meter PMU Incomer-BMS Meter LVP-001 436.87 37.42 470.77 33.90
327 CPC08a Meter Q4.1 CAPACITOR BANK 0.00 0.00 0.00

328 CPC08a Meter Q5.1 CB-1(Q5.1) 0.00 0.00 0.00

329 CPC08a Meter Q5.2 SPARE 0.00 0.00 0.00

330 CPC08a Meter Q5.3 MSB-GS6 9B8 91.89 8.75 101.01 9.12
331 CPC08a Meter Q5.4 MSB1-WS4 9B4 0.00 0.00 0.00

332 CPC08a Meter Q6.1 MSB-ADM4 9R 83.61 83.61 0.00 Meter showing error value.

333 CPC08a Meter Q6.2 SPARE 0.00 0.00 0.00


334 CPC08a Meter Q6.3 MSB1-WS4 9B4 0.00 0.00 0.00

335 CPC08a Meter Q7.1 EMSB-GF 9B7 19.09 3.50 22.31 3.22
336 CPC08a Meter Q7.2 EMSB-GF-G-08 9B5 19.25 2.85 21.40 2.15

Page 27 of 75
REF. NO. FORM QHSE-OPS-12B
VERSION 00
ELECTRICAL METER READINGS as of 31st March 2021 DATE 17.12.2019
DOWNSTREAM PAGE 1 of 1

Upstream Downstream

FEB-21 MAR-21
Feb-21 Mar-21
S.No Package Kahramaa Outgoing Feeder Outgoing Feeder
Substation Consumption Consumption LV panel No Source Building Total Total
Meter No No: Building / location Consumption Consumption
(MWH) (MWH) Meter reading Consumption Meter reading Consumption Remarks
(MWH) (MWH)
LVP(MWH) LVP(MWH)
337 CPC08a Meter Q7.3 EMSB-WS4 9B4 0.00 0.00 0.00
1364780 37.64 34.11
338 CPC08a LVP-001 Meter Q8.1 SPARE 0.00 0.00 106.28 0.00 20.84

339 CPC08a Meter Q8.2 SPARE-4 0.00 0.00 0.00

340 CPC08a Meter Q8.3 EMSB-GS6 9B8 6.91 0.50 7.12 0.21
341 CPC08a Meter Q8.4 SPARE-3 0.00 0.00 0.00

342 CPC08a Meter Q8.5 EXT TO 9E 9E 0.00 0.00 0.00

343 CPC08a Meter Q9.1 EDB-GF-L/P-01 9F2 1.55 0.00 0.00

344 CPC08a 9f2 Meter Q9.2 EDB-GF-L/P-02 9F2 11.28 3.50 16.12 4.84
345 CPC08a Meter Q9.3 PACK-GF-01 9F2 66.49 2.23 66.49 0.00
346 CPC08a Meter Q9.4 EMSB-GF-G-02 9R 13.66 1.16 14.83 1.17
347 CPC08a Meter Q9.5 EMSB-GF-G-01 9C2 0.58 0.18 0.72 0.14
348 CPC08a Meter Q9.6 CB-3 0.00 0.00 0.00

349 CPC08a Meter Q9.7 SPARE-2 0.00 0.00

350 CPC08a LVP-002 Meter PMU Incomer-BMS Meter LVP-002 20.71 1.47 22.17 1.47
351 CPC08a Meter Q2.1 MCC-GF-02 9B7 2.80 0.45 3.22 0.41
352 CPC08a Meter Q3.1 MSB7-GF-G-01 9B7 155.20 26.52 187.47 32.27
353 CPC08a Meter Q4.1 CAPACITOR BANK 0.00 0.00 0.00 0.00
354 CPC08a Meter Q5.1 MCC-9F2-ETS1 ETS 2.31 54.00 51.69
355 CPC08a Meter Q5.2 SPARE 0.00 0.00 0.00
356 CPC08a Meter Q6.1 MCC-9F2-ETS2 ETS 330.43 330.43 342.58 12.15
357 CPC08a 1364781 74.16 73.72 Meter Q6.2 SPARE 0.00 0.00 0.00
LVP-002 415.38 121.21
358 CPC08a Meter Q7.1 MSB1-WS4 9B5 256.29 21.22 274.05 17.75
359 CPC08a Meter Q7.2 9B5-MSB-GF-G-02 9B5 6.27 1.41 7.87 1.60
360 CPC08a Meter Q8.1 LCC1 9F2 29.29 29.29 6.14
361 CPC08a Meter Q8.2 LCC1-ZONE9-IBL 9F2 20.37 3.45 22.95 2.58
362 CPC08a Meter Q8.3 SPARE 0.00 0.00 0.00
363 CPC08a Meter Q8.4 SPARE-2 0.00 0.00 0.00
364 CPC08a Meter Q8.5 LCC2 9F2 8.66 2.59 11.40 2.75
365 CPC08a LVP-001 Meter PMU Incomer-BMS Meter LVP-001 368.88 33.60 404.49 35.62
MSB-GF-G-01
366 CPC08a Meter Q4.1 9K 0.61 -0.06 1.80 1.19
(9100004)
CAPACITOR BANK
367 CPC08a Meter Q5.1 0.00 0.00 0.00
(9100013)
SPARE-2
368 CPC08a Meter Q6.1 0.00 0.00 0.00
(50000509)
SPARE-6
369 CPC08a Meter Q6.2 0.00 0.00 0.00
(5000510)
SPARE-4
370 Meter Q6.5 0.00 0.00 0.00

371 CPC08a Meter Q7.1 9B3-EMSB-GF-G-01 17.31 5.09 21.52 4.21


372 CPC08a Meter Q8.1 SPARE 0.00 0.00 0.00

373 CPC08a Meter Q8.2 PACKAGE AC 20E 59.02 2.19 62.87 3.86

Page 28 of 75
REF. NO. FORM QHSE-OPS-12B
VERSION 00
ELECTRICAL METER READINGS as of 31st March 2021 DATE 17.12.2019
DOWNSTREAM PAGE 1 of 1

Upstream Downstream

FEB-21 MAR-21
Feb-21 Mar-21
S.No Package Kahramaa Outgoing Feeder Outgoing Feeder
Substation Consumption Consumption LV panel No Source Building Total Total
Meter No No: Building / location Consumption Consumption
(MWH) (MWH) Meter reading Consumption Meter reading Consumption Remarks
(MWH) (MWH)
LVP(MWH) LVP(MWH)
374 CPC08a Meter Q8.3 EMSB-GS12(FUTURE) 0.00 0.00 0.00

375 CPC08a Meter Q8.4 EMSB-GS1A-20B 1.99 0.00 1.99 0.00


1364782 33.68 35.71
376 CPC08a LVP-001 Meter Q8.5 SPARE 0.00 0.00 220.75 0.00 43.15
SPARE(TEMPORARY
377 CPC08a Meter Q9.1 0.69 0.00 0.69 0.00
OFFICE)
378 CPC08a Meter Q9.2 20E-EDB-LV-GF-02 2.13 0.00 2.13 0.00
379 CPC08a Meter Q9.3 20A-EMSB-GF-G-01 20E 223.18 201.73 239.95 16.77
380 CPC08a Meter Q9.4 9K-EMSB-GF-G-01 9K 9.91 2.06 11.78 1.87
381 CPC08a Meter Q9.5 DB-MV-20E 20E 24.59 7.74 30.95 6.36
382 CPC08a Meter Q10.1 SPARE 0.03 0.00 0.03 0.00
383 CPC08a Meter Q10.2 EMSB-GSIB 20K 0.22 0.22 7.65 7.43
384 CPC08a Meter Q10.3 EDB-GH1 6G1 20C 7.65 e 7.67 0.01
20e
385 CPC08a Meter Q11.1 EMSB-GS9 20G 0.00 0.00 0.00

386 CPC08a Meter Q11.2 9D-EMSB-GF-G-01 9D 0.00 0.00 0.00

387 CPC08a Meter Q11.3 EMSB 20L 8.44 1.78 9.88 1.44
388 CPC08a LVP-002 Meter PMU Incomer-BMS Meter LVP-002 5.34 0.09 5.43 0.09
Q5.1
389 CPC08a Meter 20J-MSB-GS-12 Future 0.00 0.00 0.00
1903250005000
Q2.1
390 CPC08a Meter MSB-GF-01 9B3 9.54 3.76 12.35 2.80
190409100008
Q6.1
391 CPC08a Meter MSB-GF-G-01 20K 8.34 -52.31 109.80 101.46
190409100678
Q3.1
392 CPC08a Meter MSG-GF-02 9B3 384.11 40.21 419.25 35.14
190409100012
Q4.1
393 CPC08a Meter APFC 0.00 0.00 0.00
1904091000009
Q5.2
394 CPC08a Meter MSB-WS10 20A 42.75 6.46 58.53 15.78
190401000677
Q6.2
395 CPC08a Meter MSB-GS-G-01 20G 0.00 0.00 0.00
190401000675
1364783 103.04 105.05
Q7.4
396 CPC08a LVP-02 Meter LCC1(ZONE 20) ZONE 20 2.89 1.64 26.41 4.82 1.93 188.63
190325000452
Q7.4
397 CPC08a Meter LCC01(IBW- ZONE20) ZONE 20 0.00 0.02 0.02
190325000456
Q8.4
398 CPC08a Meter MSB-GF-G-01 20E 49.42 7.92 55.44 6.02
141250000022
Q8.1
399 CPC08a Meter SPARE-2 0.00 0.00 0.00
190326000388
Q8.3
400 CPC08a Meter MSB-GF-G-01 20B 52.18 7.81 70.03 17.85
190325000498
Q7.3
401 CPC08a Meter SPARE 36.66 0.00 36.66 0.00
190325000501
Q8.2
402 CPC08a Meter SPARE 26.60 0.00 26.60 0.00
190325000512
Q7.2
403 CPC08a Meter MSG-GF-G-01 20I 51.97 10.92 59.61 7.65
19040700032

Page 29 of 75
REF. NO. FORM QHSE-OPS-12B
VERSION 00
ELECTRICAL METER READINGS as of 31st March 2021 DATE 17.12.2019
DOWNSTREAM PAGE 1 of 1

Upstream Downstream

FEB-21 MAR-21
Feb-21 Mar-21
S.No Package Kahramaa Outgoing Feeder Outgoing Feeder
Substation Consumption Consumption LV panel No Source Building Total Total
Meter No No: Building / location Consumption Consumption
(MWH) (MWH) Meter reading Consumption Meter reading Consumption Remarks
(MWH) (MWH)
LVP(MWH) LVP(MWH)
404 CPC08a LVP-001 Meter PMU Incomer-BMS Meter LVP-001 109.21 11.96 119.50 10.28

405 CPC08a Meter Q4.1 SPARE 0.00 0.00 0.00

406 CPC08a Meter Q4.2 MSB-ST6 9O 0.00 0.00 0.00

407 CPC08a Meter Q4.3 MSB-ST5 9M 0.00 0.00 0.00

408 Meter Q4.4 PF CORRECTION 0.00 0.00 0.00

409 CPC08a Meter Q4.5 SPARE 0.00 0.00 0.00

410 CPC08a Meter Q5.1 SPARE-1 0.00 0.00 0.00

411 CPC08a Meter Q5.2 GSM BACKSTATION 0.00 0.00 0.00

412 CPC08a Meter Q5.3 EMSB-GA-9J(FUTURE) 9J 0.00 0.00 0.00

413 CPC08a 1364784 11.98 10.29 Meter Q5.4 SPARE-3 0.00 0.00 0.00
LVP-001 7.94 6.94
414 CPC08a Meter Q6.1 EMSB-WS-5 0.00 0.00 0.00

415 CPC08a Meter Q6.2 EMSB-TC1 9E 87.16 7.94 94.11 6.94


416 CPC08a Meter Q6.3 EMSB-GB-9J(FUTURE) 9J 0.00 0.00 0.00

417 CPC08a Meter Q6.4 SPARE-2 0.00 0.00 0.00

418 CPC08a Meter Q7.1 EMSB-ST5(FUTURE) 9M 0.00 0.00 0.00

419 CPC08a Meter Q7.2 EMSB-ST5(FUTURE) 9o 0.00 0.00 0.00

420 CPC08a 9e Meter Q7.3 SPARE 0.00 0.00 0.00

421 CPC08a Meter Q7.4 DB-MV 2.83 0.00 2.83 0.00


422 CPC08a Meter Q7.5 DB-LV 0.00 0.00 0.00

423 CPC08a LVP-002 Meter PMU Incomer-BMS Meter LVP-002 237.86 26.08 262.41 24.55
424 CPC08a Meter Q2.1 MSB-GF-9J(FUTURE) 9J 0.85 0.00 0.00
425 CPC08a Meter Q3.1 RISER GA-9J(FUTURE) 9J 0.00 0.00 0.00
426 CPC08a Meter Q3.2 RISER BG-9J(FUTURE) 9J 0.00 0.00 0.00
427 CPC08a Meter Q3.3 CAPACITOR BANK 0.00 0.00 0.00
428 CPC08a Meter Q4.1 MSB-GA-9J(FUTURE) 9J 0.00 0.00 0.00
429 CPC08a Meter Q4.2 MSB-GA-9J(FUTURE) 9J 0.00 0.00 0.00
1364785 26.30 24.74
430 CPC08a LVP-002 Meter Q5.1 MSB-TC1 239.61 192.10 194.08 260.51 20.90 22.73
431 CPC08a Meter Q5.2 SPARE 0.00 0.00
432 CPC08a Meter Q6.1 SPARE 0.00 0.00 0.00
433 CPC08a Meter Q6.2 GSM BASE STATION 0.00 0.00 0.00
434 CPC08a Meter Q6.3 SPARE 0.00 0.00 0.00
435 CPC08a Meter Q7.1 MSB-WS5 9B6 12.53 1.98 14.36 1.83
436 CPC08a Meter Q7.2 SPARE 0.00 0.00 0.00

Page 30 of 75
REF. NO. FORM QHSE-OPS-12B
VERSION 00
ELECTRICAL METER READINGS as of 31st March 2021 DATE 17.12.2019
DOWNSTREAM PAGE 1 of 1

Upstream Downstream

FEB-21 MAR-21
Feb-21 Mar-21
S.No Package Kahramaa Outgoing Feeder Outgoing Feeder
Substation Consumption Consumption LV panel No Source Building Total Total
Meter No No: Building / location Consumption Consumption
(MWH) (MWH) Meter reading Consumption Meter reading Consumption Remarks
(MWH) (MWH)
LVP(MWH) LVP(MWH)
437 CPC08a Meter PMUQA Incomer-BMS Meter 44.30 44.30
275KVAR CAPACITOR
438 CPC08a Meter QA1 13Z2 0.04 0.04
BANK
439 CPC08a Meter QA2 FUTURE LOAD OFF
440 CPC08a Meter QA3 SPACE OFF
441 CPC08a Meter QA4 Z13-LCC-01 Zone-13 7.90 7.90
442 CPC08a Meter QA5 SPARE OFF
443 CPC08a Meter QA6 FUTURE LOAD OFF
444 CPC08a Meter QA7 FUTURE LOAD OFF
445 CPC08a Meter QA9 13B14-SMDB-GF-01 13B14 0.04 0.04
446 CPC08a Meter QA10 Z13-LCC-03 Zone-13 12.90 12.90
447 CPC08a Meter QB1 SPARE OFF
448 CPC08a Meter QB2 13N EXISTING GATE 13N OFF
449 CPC08a 13z2 1388601 1.75 42.72 LVP-001 Meter QB3 13S EXISTING GATE 13S OFF
22.10
450 CPC08a Meter QB4 Z13-LCC-02 Zone-13 0.22 0.22
451 CPC08a Meter QB5 13Z2-EDB-GF-01 13Z2 0.12 0.12
452 CPC08a Meter QB6 13Z2-EDB-GF-02 13Z2 0.21 0.21
453 CPC08a Meter QB7 SPARE OFF
454 CPC08a Meter QB8 13B1-ESMDB-GF-01 13B1 0.06 0.06
13i- EXISTING RO
455 CPC08a Meter QB9 13i OFF
BUILDING
456 CPC08a Meter QB10 13Z2-HVA-PAC-RF-01 13Z2 0.07 0.07
457 CPC08a Meter QB11 13Z2-HVA-PAC-RF-02 13Z3 0.50 0.50
458 CPC08a Meter QB12 13B4-DB-GF-P-01 13B4 0.04 0.04
459 CPC08a Meter QB13 SPARE OFF
460 CPC08a Meter QB14 13B14-UPS-GF-01 13B14 OFF
461 CPC08a Meter QB15 SPARE OFF

Page 31 of 75
2.7 Downstream Potable Water Meters (All buildings)

Page 32 of 75
REF. NO. FORM QHSE-OPS-12D
VERSION 00
DATE 17.12.2019
ISF CAMP - AL DUHAIL POTABLE WATER METER READINGS as of 31 Mar'2021(Buildings) PAGE 1 of 1

Feb-21 Mar-21
SL.NO Package Building Description Tag No Remarks
Source Reading(m³) Consumption(m³) Source Reading(m³) Consumption(m³)

1. Main Water Meter

1A CPC02 29c Outgoing- After Potable tank 29c-SCA-GF-41-FIT-01 SCADA 622,376.00 32,460.00 SCADA 654,336.80 31,960.80

2. DCP

2A CPC02 26g DCP-Potable makeup water SCADA 210,776.88 819.88 SCADA 210,789.61 12.73

2B CPC02 DCP Potable Water - Utility 26g-SCA-MK-3-FIT-20001 SCADA 2,917.35 36.13 SCADA 2,933.31 15.95

3. CPC08C

3A CPC8c Main Incoming meter Meter 104.93 Meter 1,554.00 1,449.07

4. All Buildings
BARRACKS TYPE-1(Human
1 CPC07a 6B1 6B1-PLM-GF-DWM-1 IBMS 3,920.93 381.23 IBMS 4,187.09 266.16
Resources)
BARRACKS TYPE-1(Finance &
2 CPC07a 6B2 6B2-PLM-GF-DWM-1 IBMS 8,201.30 641.20 IBMS 8,845.00 643.70
Procurement)
BARRACKS TYPE 2(Courses &
3 CPC07a 6B3 6B03-PLM-GF-DWM-01 IBMS 3,798.60 792.60 IBMS 4,384.80 586.20
Training 1)
BARRACKS TYPE-1(Courses &
4 CPC07a 6B4 6B04-PLM-GF-DWM-01 IBMS 9,478.50 1,263.10 IBMS 10,455.00 976.50
Training 2)
5 CPC07a 6B5 BARRACKS (TYPE-1) 6B05-PLM-GF-DWM-01 IBMS 5,097.60 429.40 IBMS 5,513.40 415.80
BARRACKS TYPE-2(Legal &
6 CPC07a 6B6 6B06-PLM-GF-DWM-01 IBMS 5,824.10 262.80 IBMS 6,028.80 204.70
Public Relations)
7 CPC07a 6B7 BARRACKS TYPE-1 (Logistics) 6B07-PLM-GF-DWM-01 IBMS 3,571.10 304.90 IBMS 3,880.80 309.70

8 CPC07a 6B8 BARRACKS (TYPE-1) 6B08-PLM-GF-DWM-01 IBMS 5,381.90 735.10 IBMS 5,818.80 436.90
9 CPC07a 6B10 BARRACKS (TYPE-11D) 6B10-PLM-GF-DWM-1 IBMS 5,786.80 441.80 IBMS 6,278.70 491.90
10 CPC07a 6B11 BARRACKS (TYPE-1) 6B11-PLM-GF-DWM-01 IBMS 11,828.00 901.00 IBMS 12,728.40 900.40
11 CPC07a 6B12 BARRACKS (TYPE-1) 6B12-PLM-GF-DWM-01 IBMS 10,406.60 774.90 IBMS 11,614.00 1,207.40
12 CPC07a 6B13 BARRACKS (TYPE-11C) 6B13-PLM-GF-DWM-1 IBMS 8,869.90 599.30 IBMS 9,557.00 687.10

13 CPC07a 6B14 BARRACKS (TYPE-1) 6B14-PLM-GF-DWM-1 IBMS 70.40 0.50 IBMS 9,557.00 9,486.60
BARRACKS TYPE-1D(IT &
14 CPC07a 6B15 6B15-PLM-GF-DWM-1 IBMS 6,969.70 550.30 IBMS 7,476.90 507.20
communications)
15 CPC07a 6B18 BARRACKS (TYPE-11A) 6B18-PLM-GF-DWM-1 IBMS 7,387.50 638.50 IBMS 7,904.80 517.30

16 CPC07a 6B19 BARRACKS (TYPE-1A) 6B19-PLM-GF-DWM-1 IBMS 6,894.20 448.80 IBMS 7,406.20 512.00

17 CPC07a 6A HEADQUARTER (TYPE-8) 6A-PLM-GF-DWM-1 IBMS 1,132.70 54.70 IBMS 1,183.30 50.60

18 CPC07a 4B1 BARRACKS (TYPE-1B) 4B1-PLM-GF-DWM-1 IBMS 4,492.10 236.10 IBMS 4,703.30 211.20

Page 33 of 75
REF. NO. FORM QHSE-OPS-12D
VERSION 00
DATE 17.12.2019
ISF CAMP - AL DUHAIL POTABLE WATER METER READINGS as of 31 Mar'2021(Buildings) PAGE 1 of 1

Feb-21 Mar-21
SL.NO Package Building Description Tag No Remarks
Source Reading(m³) Consumption(m³) Source Reading(m³) Consumption(m³)

19 CPC07a 4C UNIT GENERAL STORE 4C-PLM-GF-DWM-1 IBMS 242.20 62.40 IBMS 270.50 28.30 IBMS & BMS no Communication

20 CPC07a 4G UNIT FORCE OFFICES 4G-PLM-GF-DWM-1 Meter 60.50 9.04 Meter 116.00 55.50

21 CPC07a 4A HEADQUARTER (TYPE-2) 4A-PLM-GF-DWM-1 IBMS 445.30 36.69 IBMS 465.24 19.94

UNIT GENERAL STORE WITH


22 CPC07a 6C1 6C1-PLM-GF-DWM-1 IBMS 209.90 17.70 IBMS 229.00 19.10
MAIN IT

23 CPC07a 6C2 UNIT GENERAL STORE 6C2-PLM-GF-DWM-1 IBMS 291.40 71.20 IBMS 342.80 51.40
UNIT GENERAL STORE WITH
24 CPC07a 6C3 6C3-PLM-GF-DWM-1 IBMS 45.60 0.10 IBMS 51.10 5.50
MAIN IT
25 CPC07a 6C4 UNIT GENERAL STORE 6C4-PLM-GF-DWM-1 IBMS 51.50 - IBMS 51.60 0.10
UNIT GENERAL STORE WITH
26 CPC07a 6C5 6C5-PLM-GF-DWM-1 Meter 55.19 0.00 Meter 55.19 -
MAIN IT
27 CPC07a 6H4 UNIT FORCE OFFICES 6H4-PLM-GF-DWM-1 Meter 451.00 40.30 Meter 472.03 21.03 Last month meter reading issue

28 CPC02/CPC07a 6F1 SUB-STATION TYPE-A 6f1-PLM-GF-WM-01 IBMS 20.82 2.24 IBMS 21.44 0.62

29 CPC02/CPC07a 6F2 SUB-STATION TYPE-A 6f2-PLM-GF-WM-01 IBMS 9.50 0.71 IBMS 10.59 1.09

30 CPC02/CPC07a 6F3 SUB-STATION TYPE-A 6f2-PLM-GF-WM-01 IBMS 72.06 1.22 IBMS 73.40 1.34

31 CPC02/CPC07a 6F4 SUB-STATION TYPE-A 6f3-PLM-GF-WM-01 IBMS 16.01 0.73 IBMS 17.02 1.01

32 CPC02/CPC07a 6I SUB-STATION TYPE-C1 6I-PLM-GF-WM-01 IBMS 89.80 2.42 IBMS 91.91 2.11

33 CPC02/CPC07a 6J SUB-STATION TYPE-B 6j-PLM-GF-WM-01 BMS 34.70 0.19 IBMS 36.42 1.72

34 CPC02/CPC07a 4e SUB-STATION TYPE-A 4e-PLM-GF-WM-01 Meter 165.22 2.60 Meter 168.14 2.92

35 CPC02/CPC07a 6NL SUB-STATION TYPE-F 6N-PLM-GF-WM-01 Meter 76.92 0.09 Meter 78.58 1.66

36 CPC02/CPC07a 6NR SUB-STATION TYPE-F 6N-PLM-GF-WM-01 Meter 70.83 - Meter 77.76 6.93

37 CPC07b 3a HEADQUARTER (TYPE-2) 3A-PLM-RF-DWM-01 IBMS 428.13 37.86 IBMS 464.75 36.62

38 CPC07b 3b1 BARRACKS (TYPE-9A) 3B01-PLM-GF-DWM-01 Meter Meter 18,517.00 2,425.55 Avg for past 2 months

39 CPC07b 3b2 BARRACKS (TYPE-8) 3B02-PLM-GF-DWM-01 Meter 7,511.10 629.10 Meter 8,131.70 620.60

40 CPC07b 3b3 BARRACKS (TYPE-2) 3B03-PLM-GF-DWM-01 Meter 9,353.10 676.90 Meter 10,011.60 658.50 IBMS no Communication

41 CPC07b 3b4 BARRACKS (TYPE-2) 3B04-PLM-GF-DWM-01 Meter 16,882.00 745.00 Meter 17,986.70 1,104.70 IBMS no Communication

42 CPC07b 3g UNIT FORCE OFFICES 3G-PLM-RF-DWM-01 Meter 120.30 19.60 Meter 142.00 21.70
MOTORCYCLE PARKING AND
43 CPC07b 3i 3i-PLM-RF-DWM-01 Meter 184.90 9.70 Meter 196.40 11.50 IBMS reading incorrect.
SERVICE
44 CPC07b 3j INDOOR PARKING 3J-PLM-RF-DWM-01 IBMS 102.16 8.26 IBMS 111.17 9.01
UNDER GROUND PARKING
45 CPC07b 3p 3P-PLM-GF-DWM-01 Meter 281.49 15.69 Meter 301.00 19.51 IBMS no Communication
AND PARADE AREA

Page 34 of 75
REF. NO. FORM QHSE-OPS-12D
VERSION 00
DATE 17.12.2019
ISF CAMP - AL DUHAIL POTABLE WATER METER READINGS as of 31 Mar'2021(Buildings) PAGE 1 of 1

Feb-21 Mar-21
SL.NO Package Building Description Tag No Remarks
Source Reading(m³) Consumption(m³) Source Reading(m³) Consumption(m³)

46 CPC07b 3f1 UNIT GUARDHOUSE 3F1-PLM-GF-DWM-01 Meter 1.76 - Meter 1.76 - IBMS no Communication

47 CPC07b 3f2 UNIT GUARDHOUSE 3F2-PLM-GF-DWM-01 Meter 14.37 1.01 Meter 15.14 0.77 IBMS no Communication

48 CPC07b 5a HEADQUARTER (TYPE-3) 5A-PLM-RF-DWM-01 Meter 556.52 28.60 Meter 587.57 31.05 IBMS no Communication

49 CPC07b 5b1 BARRACKS (TYPE-1B) 5B01-PLM-GF-DWM-01 Meter 8,832.90 1,057.50 Meter 9,953.50 1,120.60

50 CPC07b 5c WORKSHOPS 5C-PLM-GF-DWM-01 IBMS 438.70 14.70 IBMS 452.69 13.99


INSPECTION EQUIPMENT
51 CPC07b 5d IBMS 350.90 24.80 IBMS 383.40 32.50
GENERAL STORE
52 CPC07b 5e GENERAL STORE -1 5E-PLM-GF-DWM-01 IBMS 271.00 10.70 IBMS 280.80 9.80
UNDER GROUND PARKING
53 CPC07b 5g 5G-PLM-GF-DWM-01 Meter 491.00 164.90 Meter 694.70 203.70 IBMS BMS no Communication
AND PARADE AREA
AIR CONDITION CAR
54 CPC07b 5i 5I-PLM-RF-DWM-01 Meter 80.36 10.10 Meter 91.20 10.84 IBMS no Communication
PARKING
55 CPC07b 5j UNIT GUARDHOUSE Meter 738.39 215.09 Meter 976.80 238.41 IBMS no Communication

56 CPC07b 5k UNIT FORCE OFFICES 5K-PLM-GF-DWM-01 Meter 82.85 82.85 Meter 114.90 32.05

57 CPC07b 16a SHOPS 16A-PLM-GF-DWM-01 Meter 2,808.03 335.79 Meter 3,246.50 438.47 IBMS no Communication

58 CPC07b 16c SERVICE BLOCK 16C-PLM-GF-DWM-01 Meter 197.00 - Meter 205.00 8.00

59 CPC02/CPC07b 3e SUB-STATION TYPE-D 3E-PLM-GF-DWM-01 Meter 19.76 4.44 Meter 21.70 1.94

60 CPC02/CPC07b 3e2 SUB-STATION TYPE-C 3E2-PLM-GF-DWM-01 Meter 75.82 3.97 Meter 76.19 0.37

61 CPC02/CPC07b 5h1 SUB-STATION TYPE-D 5H1-PLM-GF-DWM-01 Meter 16.50 7.63 Meter 16.76 0.26

62 CPC02/CPC07b 5h2 SUB-STATION TYPE-D 5H2-PLM-GF-DWM-01 Meter 20.84 7.74 Meter 25.25 4.41

63 CPC07d NCO SOLDIER AND NCO CLUB 21a-PLM-GF-DWM-01 IBMS 29,604.00 2,927.00 IBMS 30,457.00 853.00

64 CPC07d NCO SOLDIER AND NCO CLUB 21a-PLM-GF-DWM-02 IBMS 22,241.00 2,337.00 IBMS 23,449.00 1,208.00

65 CPC08a 9c2 GATE HOUSE 9C2-PLM-GF-DWM-1 Meter 11.40 1.50 Meter 13.00 1.60

66 CPC08a 9F2 SUBSTATION TYPE C1 9F2-PLM-GF-DWM-01 Meter 10.90 3.40 Meter 11.40 0.50

67 CPC08a 9e TRAINING CENTER 9E-PLM-GF-DWM-01 Meter 295.10 36.40 Meter 330.20 35.10

DRIVERS ADMINISTRATION
68 CPC08a 9r 9R-PLM-GF-DWM-01 IBMS 331.70 37.60 IBMS 370.20 38.50
BUILDING

69 CPC08a 9b3 9b3-PLM-GF-DWM-01 Meter 282.30 32.70 Meter 305.20 22.90

70 CPC08a 9b7 SMALL CARS WORKSHOP 9B7-PLM-GF-DWM-01 IBMS 349.60 50.60 IBMS 387.30 37.70

71 CPC08a 9b8 GENERAL STORE 9B8-PLM-GF-DWM-01 Meter 40.30 4.20 Meter 45.30 5.00

72 CPC08a 9b5 METAL WORKSHOP 9B5-PLM-GF-DWM-01 IBMS 140.50 19.50 IBMS 159.30 18.80

Page 35 of 75
REF. NO. FORM QHSE-OPS-12D
VERSION 00
DATE 17.12.2019
ISF CAMP - AL DUHAIL POTABLE WATER METER READINGS as of 31 Mar'2021(Buildings) PAGE 1 of 1

Feb-21 Mar-21
SL.NO Package Building Description Tag No Remarks
Source Reading(m³) Consumption(m³) Source Reading(m³) Consumption(m³)

73 CPC08a 9k METAL WORKSHOP 9K-PLM-GF-DWM-01 Meter 71.70 10.70 Meter 84.90 13.20

74 CPC08a 20a UNIT GENERAL STORE 20a-PLM-RF-DWM-01 Meter 22.90 5.40 Meter 34.40 11.50

75 CPC08a 20C 20c-PLM-RF-DWM-01 Meter 1.00 0.70 Meter 1.00 -

76 CPC08a 20I METAL WORKSHOP 20IPLM-GF-DWM-01 Meter 5.70 1.60 Meter 12.20 6.50

77 CPC08a 20k UNIT GENERAL STORE 20K-PLM-GF-DWM-01 Meter 44.00 17.00 Meter 71.50 27.50
UNIT GENERAL STORE WITH
78 CPC08a 20b 20b-PLM-RF-DWM-01 Meter 23.50 1.50 Meter 23.60 0.10
MAIN IT
79 CPC8c C-STORE Meter 268.24 34.90 Meter 299.69 31.45
HEAVY VEHICLE LUBE
80 CPC8c Meter 1,961.10 275.62 Meter 2,011.00 49.90
CHANGE & VACUUM No tag On the meter.
LIGHT VEHICLE VACUUM,
81 CPC8c LUBE, REPARE AND TYRE Meter 8,349.00 1,201.45 Meter 9,856.40 1,507.40
CHANGE
82 CPC14 1A MAIN GATE 1a-PLM-GF-WM-01 IBMS 1,335.30 85.67 IBMS 1,430.41 95.11

83 CPC14 1b1 EMERGENCY GATE TYPE-1 1b1-PLM-RF-WM-01 IBMS 1,469.90 217.40 IBMS 1,643.12 173.22

84 CPC14 1b2 EMERGENCY GATE TYPE-1 1b2-PLM-RF-WM-01 IBMS 2,313.54 191.70 IBMS 2,497.30 183.76

85 CPC14 1j1 CHECK POINT TYPE-4 1j1-PLM-RF-WM-01 IBMS 4,819.40 344.36 IBMS 5,078.63 259.23

86 CPC14 1j2 CHECK POINT TYPE-4 1j2-PLM-RF-WM-01 IBMS 3,249.15 202.96 IBMS 3,473.40 224.25

87 CPC14 1j3 CHECK POINT TYPE-4 1j3-PLM-RF-WM-01 IBMS 4,371.96 331.77 IBMS 4,714.40 342.44

88 CPC14 1j4 CHECK POINT TYPE-4 1j4-PLM-RF-WM-01 IBMS 47.53 0.42 IBMS 49.21 1.68

89 CPC14 1j5 CHECK POINT TYPE-4 1j5-PLM-RF-WM-01 IBMS 4,889.60 371.01 IBMS 5,274.37 384.77

90 CPC14 1j6 CHECK POINT TYPE-4 1j6-PLM-RF-WM-01 IBMS 4,213.88 323.40 IBMS 4,546.17 332.29

91 CPC14 1j7 CHECK POINT TYPE-4 1j7-PLM-RF-WM-01 IBMS 1,785.60 64.60 IBMS 1,841.38 55.78

92 CPC14 1f Checkpoint1 1f-PLM-RF-WM-01 IBMS 605.81 2.63 IBMS 612.09 6.28

93 CPC14 1m Substation 1m-PLM-GF-WM-01 BMS 2.55 1.06 BMS 2.55 -

94 CPC02 29d IRRIGATION PUMP STATION 29g-PLM-BM-DWM-01 Meter 29.30 0.50 Meter 29.30 -
POTABLE & FIRE WATER
95 CPC02 29c 29h-PLM-BM-DWM-01 Meter 52.40 11.00 Meter 67.56 15.16
TANK
96 CPC02 8b WIND TUNNEL BUILDING 8b-PLM-GF-WM-01 IBMS 594.10 33.10 IBMS 610.00 15.90

97 CPC02 8g SERVICE BLOCK TYPE-2 8g-PLM-GF-WM-01 IBMS 26.10 1.78 Meter 26.97 0.87

98 CPC02 8H SUB-STATION TYPE-E 8h-PLM-GF-WM-01 IBMS 7.80 2.40 IBMS 8.40 0.60

99 CPC02 8i SECONDARY GATE 8i-PLM-GF-WM-01 IBMS 10.64 0.02 IBMS 10.64 -

Page 36 of 75
REF. NO. FORM QHSE-OPS-12D
VERSION 00
DATE 17.12.2019
ISF CAMP - AL DUHAIL POTABLE WATER METER READINGS as of 31 Mar'2021(Buildings) PAGE 1 of 1

Feb-21 Mar-21
SL.NO Package Building Description Tag No Remarks
Source Reading(m³) Consumption(m³) Source Reading(m³) Consumption(m³)
INTERNAL SECONDARY GATE
100 CPC02 8j 8j-PLM-RF-WM-01 Meter 6.11 0.11 Meter 6.11 -
TYPE-1
101 CPC02 27b SHADED STAGE 27b-PLM-RF-WM-01 Meter 158.00 45.86 Meter 164.24 6.24

102 CPC02 13ac WATCH TOWER 13ac-PLM-GF-WM-01 IBMS 8.71 - IBMS 8.71 -

103 CPC02 13i RECRUITMENT OFFICE 13i-PLM-GF-WM-01 Meter 58.10 5.60 Meter 62.30 4.20

104 CPC02 13n SECONDARY GATE 13n-PLM-GF-WM-01 Meter 15.11 0.17 Meter 15.20 0.09

105 CPC02 13p GUARDHOUSE 13p-PLM-GF-WM-01 Meter 13.18 1.29 Meter 14.83 1.65
SECONDARY GATE TYPE-3
106 CPC02 24a 24a-PLM-RF-WM-01 Meter 721.80 272.35 Meter 1,025.41 303.61
(EQUESTRIAN MAIN GATE)
107 CPC02 26b EMERGENCY GATE 26b-PLM-RF-WM-01 IBMS 3,395.62 - IBMS 3,395.62 -

108 CPC02 9p EMERGENCY GATE 9p-PLM-GF-WM-01 Meter 63.71 8.81 Meter 69.20 5.49

109 CPC02 29a SECONDARY GATE 29a-PLM-GF-WM-01 Meter 104.10 - Meter 104.85 0.75

110 CPC02 22I SECONDARY GATE 22l-PLM-GF-WM-01 IBMS 6.36 6.27 IBMS 11.43 5.07

111 CPC02 10d1 WATCH TOWER 10d1-PLM-GF-WM-01 IBMS 0.00 - IBMS 0.00 -

112 CPC02 26l WATCH TOWER 26l-PLM-GF-WM-01 IBMS 0.00 - IBMS 0.00 -

113 CPC02 28 e1 WATCH TOWER 28e1-PLM-GF-WM-01 IBMS 0.87 - IBMS 0.87 -

114 CPC02 28e2 WATCH TOWER 28e2-PLM-GF-WM-01 IBMS 14.39 - IBMS 14.39 -

115 CPC02 23b1 WATCH TOWER 23b1-PLM-GF-WM-01 IBMS 0.00 - IBMS 0.00 -

116 CPC02 24aa WATCH TOWER 24aa-PLM-GF-WM-01 Meter 0.00 - Meter -

117 CPC02 22a WATCH TOWER 22a-PLM-GF-WM-01 IBMS 0.00 - IBMS 0.00 -

118 CPC02 24m1 EMERGENCY GATE 24m1-PLM-GF-WM-01 IBMS 998.30 9.62 IBMS 999.37 1.07

119 CPC02 24m2 EMERGENCY GATE 24m2-PLM-GF-WM-01 IBMS 1,482.90 0.52 IBMS 1,487.88 4.98

120 CPC02 13s EMERGENCY GATE 13s-PLM-RF-WM-01 IBMS 22.08 - IBMS 22.08 -

121 CPC02 18b VIP main Gate 18b-PLM-RF-WM-01 IBMS 462.60 4.10 IBMS 467.10 4.50

122 CPC02 18c EMERGENCY GATE 18c-PLM-RF-WM-01 IBMS 119.85 11.19 IBMS 129.74 9.89

123 CPC02 Zone-2 Zone-2 DB-L/P-Z-02-01 Meter 20.70 3.50 Meter - Meter is Powered OFF

124 CPC02 Zone-7 Zone-7 DB-L/P-Z-07-07 Meter Meter 62.40 12.20 Meter Powered OFF
CSO pump
125 CPC02 CSO Offices Meter 0.00 - Meter 0.00 - Meter showing zero reading.
room

Page 37 of 75
REF. NO. FORM QHSE-OPS-12D
VERSION 00
DATE 17.12.2019
ISF CAMP - AL DUHAIL POTABLE WATER METER READINGS as of 31 Mar'2021(Buildings) PAGE 1 of 1

Feb-21 Mar-21
SL.NO Package Building Description Tag No Remarks
Source Reading(m³) Consumption(m³) Source Reading(m³) Consumption(m³)

for Hospital
126 CPC06 22E-PLM-GF-WM-01 Meter 856.99 380.46 Meter 1,191.80 334.81 Meter newly added to list
Building

For External
127 CPC06 Meter 2.95 Meter 25.27 22.32 Meter replaced due to old meter faulty.
buildings

128 CPC08Q 30J Meter 206.17 206.17 Meter replaced due to old meter faulty.

TOTAL CONSUMPTION FOR BUILDINGS(4A) 22,238.21 30,980.76 m³

Notes :
1. Sum of Buildings consumption(4A) is equal to the After tank Water meter(1A).
2. CPC8c Incoming Kahramma meter(3A) = sum of sl No 79+80+81

Comparision :
Remarks Justification

1A Outgoing- After Potable tank 31,960.80

TOTAL CONSUMPTION m³
4A 30,980.76
( Buildings)

Comparision : WOQOD(CPC08C)
Remarks Justification
3A Main Incoming meter(m³) 1,449.07
Meter reading taken on different dates
HV wash + LV Wash + C store 1,588.75 due to non availability of keys

Page 38 of 75
2.8 Downstream BTU Meters Consumption (All buildings)

Page 39 of 75
REF. NO. FORM QHSE-OPS-12F
VERSION 00
ISF CAMP - AL DUHAIL DATE 17.12.2019
BTU WATER METER READINGS 31 MAR'2021 PAGE 1 of 1
(Downstream-Buildings)

Feb-21 Mar-21
Location/
Item ETS name February-21 March-21 Description Source Consumption ETS Tot Consumption ETS Tot Remarks
Building Meter reading Source Meter reading
(MWH) Consumption (MWH) Consumption
CPC07a
1 6B1 Barracks (Type-1) IBMS 4,351.60 64.80 IBMS 4,438.30 86.70
IBMS Meter reading same for 2
2 6B2 Barracks (Type-1) Meter 3,420.70 148.70 Meter 3,563.60 142.90
ETS 6F1 194.49 302.39 234.94 258.12 months.Checked Physically
Unit General Store With
3 6C1 BMS 1,141.26 21.44 BMS 1,169.78 28.52
Main It
4 6h4 Unit Force Offices meter 0.00 0.00 meter 0.00 Meter defective

5 6B3 Barracks (Type-11) IBMS 2,753.40 68.00 IBMS 2,854.50 101.10

6 ETS 6F2 176.84 292.87 6B4 Barracks (Type-1) IBMS 3,686.90 74.70 155.26 IBMS 3,803.40 116.50 250.67

7 6C2 Unit General Store BMS 207.06 12.56 BMS 240.13 33.07

8 6B5 Barracks (Type-1) IBMS 2,889.70 57.80 IBMS 3,012.90 123.20


ETS 6F3 147.38 187.66 131.30 228.10
9 6B7 Barracks (Type-1) IBMS 2,982.40 73.50 IBMS 3,087.30 104.90

10 ETS 6F4 117.83 187.66 6B15 Barracks (Type-1D) IBMS 3,756.80 108.40 108.40 IBMS 3,917.80 161.00 161.00

11 6B6 Barracks (Type-11) BMS 7,539.00 407.70 BMS 8,044.00 505.00

12 ETS 6N1(A) 117.01 202.12 6B8 Barracks (Type-1) IBMS 3,719.00 103.40 512.23 IBMS 3,853.40 134.40 645.84

13 6C5 Unit General Store Meter 194.80 1.13 Meter 201.24 6.44

14 ETS 6N1(B) 192.31 308.73 6B10 Barracks (Type-11D) IBMS 42,761.00 3,333.90 3,333.90 IBMS 48,988.60 6,227.60 6,227.60
IBMS Meter reading same for 2
15 6B18 Barracks (Type-11A) Meter 44,463.70 5,401.63 Meter 50,367.40 5,903.70 months.cosidered Average
ETS 6N2 99.29 189.69 5,423.83 5,881.39 consumption
16 6C3 Unit General Store IBMS 248.20 22.20 Meter 225.89 -22.31 Last month reading was from IBMS

17 6B11 Barracks (Type-1) Meter 0.00 0.00 Meter 0.00 0.00 Meter showing zero reading

18 ETS 6I(1) 117.01 362.21 6B13 Barracks(TYPE-11C) 3,698.70 103.90 103.90 Meter 3,857.00 158.30 158.30

19 6A Headquarters(Type-8) 0.00 Meter 0.00 0.00 Meter defective

20 6B12 Barracks (Type-1) Meter 54.30 54.30 Meter 525.70 471.40


ETS 6I1(2) 215.70 395.63 221.60 747.30
21 6B14 Barracks (Type-1) IBMS 1,978.20 167.30 IBMS 2,254.10 275.90

22 6B19 Barracks (Type-1A) Meter 0.00 Meter 0.00 0.00 Meter showing zero reading.
ETS 6J 142.39 238.70 0.00 0.00
23 6C4 Unit General Store IBMS 71.60 0.00 IBMS 71.60 0.00
Meter showing unusal high
24 4B1 Barracks (Type-1B) IBMS 44,834.00 3,064.10 IBMS 50,482.60 5,648.60
consumption
25 ETS 4E 140.55 255.32 4A Headquarters(Type-2) BMS 622.37 20.20 3,104.20 Meter 667.54 45.17 5,731.87

26 4C Unit General Store IBMS 250.90 19.90 IBMS 289.00 38.10

Page 40 of 75
REF. NO. FORM QHSE-OPS-12F
VERSION 00
ISF CAMP - AL DUHAIL DATE 17.12.2019
BTU WATER METER READINGS 31 MAR'2021 PAGE 1 of 1
(Downstream-Buildings)

Feb-21 Mar-21
Location/
Item ETS name February-21 March-21 Description Source Consumption ETS Tot Consumption ETS Tot Remarks
Building Meter reading Source Meter reading
(MWH) Consumption (MWH) Consumption
CPC07b
1 3b1 BARRACKS (TYPE-9A) Meter 0.00 0.00 Meter 0.00 0.00 Meter not working

2 ETS 3E 147.60 279.13 3b4 BARRACKS (TYPE-2) Meter 127.80 7.72 34.12 Meter 137.60 9.80 44.70

3 3a HEADQUARTER (TYPE-2) IBMS 834.90 26.40 IBMS 869.80 34.90


Meter showing unusal less
4 3b2 BARRACKS (TYPE-8) Meter 127.50 7.43 Meter 135.80 8.30
consumption
5 3b3 BARRACKS (TYPE-2) Meter 96.00 8.40 Meter 107.20 11.20
Car Parking Building -
6 ETS 3E2 321.53 507.44 3j IBMS 734.90 12.10 28.48 IBMS 762.90 28.00 51.99
Patrol Department
Motorcycle Parking And
7 3i Meter 540.55 0.55 Meter 0.00 Meter showing Zero reading
Service
8 3g UNIT FORCE OFFICES Meter 116.00 0.00 Meter 120.49 4.49

9 5c WORKSHOPS IBMS 1,496.80 26.50 IBMS 1,551.60 54.80


Equipment General
10 5d IBMS 1,719.48 29.68 IBMS 1,767.50 48.02
Store - Explosive Unit
General Store -
11 5e IBMS 1,576.20 25.00 IBMS 1,649.60 73.40
ETS 5H1 206.67 385.22 Explosive Unit 215.18 426.37
Car Parking Building -
12 5i IBMS 1,149.40 36.20 Meter 1,216.95 67.55
Explosive Unit
13 16b MOSQUE IBMS 1,792.40 37.40 Meter 1,885.00 92.60

14 16a SHOPS IBMS 1,253.60 60.40 Meter 1,343.60 90.00

15 5b1 BARRACKS (TYPE-1B) IBMS 237.20 7.90 Meter 249.00 11.80

16 ETS 5H2 144.68 227.25 5a HEADQUARTER (TYPE-3) Meter 819.40 20.21 31.93 Meter 853.58 34.18 50.14

17 5k UNIT FORCE OFFICES Meter 84.04 3.82 Meter 88.20 4.16


CPC08a
1 9c2 GATE HOUSE IBMS 0.00 0.00 IBMS 0.00 Meter showing Zero reading

2 9r Drivers Administration IBMS 33.00 13.82 IBMS 135.40 102.40

3 9b3 Multi Section Workshop Meter 1,142.00 44.40 Meter 1,211.60 69.60
Heavy Vehicles
4 9b5 Meter 938.03 33.80 Meter 994.01 55.98
54.91 138.54 Workshop 185.61 374.19
9F2
Light Vehicles
5 9b7 Meter 1,095.17 27.69 Meter 1,161.49 66.32
Workshop
6 9b8 General Store 1 Meter 0.00 0.00 Meter 0.00 0.00
Workshops & Transport
7 9e Meter 56.97 56.92 Meter 110.41 53.44
Headquarter
8 9k Metal Workshop 1 Meter 22.96 8.98 Meter 49.41 26.45

Page 41 of 75
REF. NO. FORM QHSE-OPS-12F
VERSION 00
ISF CAMP - AL DUHAIL DATE 17.12.2019
BTU WATER METER READINGS 31 MAR'2021 PAGE 1 of 1
(Downstream-Buildings)

Feb-21 Mar-21
Location/
Item ETS name February-21 March-21 Description Source Consumption ETS Tot Consumption ETS Tot Remarks
Building Meter reading Source Meter reading
(MWH) Consumption (MWH) Consumption
9 20a Engineering Workshop Meter 171.93 11.74 Meter 227.40 55.47
10 20b General Store 2 Meter 77.42 77.42 Meter 119.30 41.88
20E 73.48 185.23 134.86 199.68
11 20k General Store 3 Meter 290.13 35.19 Meter 374.06 83.93
12 20I Metal Workshop 2 Meter 19.47 10.51 Meter 37.87 18.40

Page 42 of 75
2.9 Fuel Tank levels and consumption

Page 43 of 75
REF. NO. FORM QHSE-OPS-12I
VERSION 00
DATE 17.12.2019
ISF CAMP - AL DUHAIL PAGE 1 of 1
GENERATOR DIESEL TANK READINGS as of 31 MAR 2021

BulkTank Day Tank


Remarks
Feb-21 Mar-21 Feb-21 Mar-21
S.No Package Building No Unit rate Cost Total Cost @ 1.3 QAR
Total Main Capacity Total Fuel Capacity
(Liters) Actual Fuel Total consumption Actual Fuel Total consumption (Liters) Actual Remaining Total consumption Actual Remaining Total consumption
Remaining in Main for the month Remaining in Main for the month Fuel Day Tank for the month Fuel Day Tank for the month Bulk Tank Remarks Day Tank Remarks
Bulk Tank (Liters) (Liters) Bulk Tank (Liters) (Liters) (Liters) (Liters) (Liters) (Liters)

(A) SUBSTATIONS

1 CPC07a 6F1 20,000 3179.4 16,821 722.935 19,277 2,200 1,900 300 1,900 300 1.30 25,450

2 CPC07a 6F2 20,000 3512.48 16,488 1033.305 18,967 2,200 1,900 300 1,900 300 1.30 25,047

3 CPC07a 6F3 30,000 6116.56 23,883 9027.225 20,973 2,700 1,100 1,600 400 2,300 1.30 30,255

4 2,200 400 1,800 400 1,800


CPC07a 6F4 20,000 2604.08 17,396 2,604 17,396 1.30 24954.696
5 3,000 0 0 0 Fuel Tank Empty

6 CPC07a 6J 20,000 4871.295 15,129 2388.335 17,612 2,200 600 1,600 600 1,600 1.30 24,975

7 CPC07a 6i1 30,000 514.76 29,485 0 30,000 2,700 2,700 0 2,700 0 1.30 39,000

6NL
8 CPC07a 20,000 348.22 19,652 348.22 19,652 2,700 950 1,750 950 1,750 1.30 27,822
(6N1)
6NR
9 CPC07a 55,000 862.98 54,137 866.765 54,133 2,700 550 2,150 550 2,150 1.30 73,168
(6N2)
Level Marking on the Tank/measuring pipe not
10 CPC07a 4e 20,000 348.22 19,652 6896.27 13,104 1,700 900 800 0 1,700 1.30 19,245
available
11 CPC07b 5h1 30,000 Panel Off 0 1,700 600 1,100 600 1,100 1.30 1,430 Fuel Tank Panel OFF

12 CPC07b 5h2 30,000 Panel Off 0 1,700 900 800 900 800 1.30 1,040 Fuel Tank Panel OFF

13 CPC07b 3e 55,000 Panel Off 0 Inbuilt tank 90% Filled 90% Filled 1.30 0 Fuel Tank Panel OFF Tank capicity to be verifed

14 CPC07b 3e 2 30,000 Panel Off 0 2,700 1,300 1,400 1,300 1,400 1.30 1,820 Fuel Tank Panel OFF

15 CPC07d 21a 30,000 389.855 29,610 2,200 Empty 1.30 38,493 Need to install Fuel level gauge

16 CPC08c 9d3 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Level numeric Marking on the Tank pipe not
17 CPC8a 9f2 20,000 Panel Off 0 1,700 1,600 100 1,600 100 1.30 130 Fuel Tank Panel OFF
available
Level numeric Marking on the Tank pipe not
18 CPC8a 20e 30,000 Panel Off 0 3,000 1,200 1,800 1,200 1,800 1.30 2,340 Fuel Tank Panel OFF
available
Level numeric Marking on the Tank pipe not
19 CPC8a 9e 20,000 Panel Off 0 1,700 Empty 1.30 0 Fuel Tank Panel OFF
available
20 CPC02-27b 27b 5,000 4000 1,000 4,000 1,000 760 608.00 152 1.30 1,300

21 CPC02-WT 8h 10,000 6271.745 3,728 6271.745 3,728 850 680.00 170 680 170 1.30 5,068
1.Showing Low level Alarm in the
Panel. 2.Contractor to install a
22 CPC02-USS USS 2,500 Empty 0 418 167.20 251 188 230 1.30 299
transparent pipe for Bulk Tank fuel
level guage
24 30,000 Panel Off 0 3,200 Empty 1,600 1,600 Fuel Tank Panel OFF
CPC02-CSO 24h 1.30 4,160
25 30,000 Panel Off 0 3,200 Empty 1,600 1,600 Fuel Tank Panel OFF

26 30,000 7766 22,234 2,800 No level guage 1.30 28,904 Need to install Fuel level gauge

27 CPC14 1m 2,800 No level guage Need to install Fuel level gauge


30,000 5863 24,137 1.30 31,378
28 2,800 No level guage Need to install Fuel level gauge

29 CPC-06 20,000 3852 16,148 2,000 2,000 0 No level guage 1.30 20,992 Need to install Fuel level gauge

(B) DCP

1 CPC02-DCP 26g N/A 0 0 0 0 2,000 1,800 200 1,800 200 1.30 260

Total DIESEL Consumption(C)=(A+B) 427,531.21 QAR

Page 44 of 75
Section 3 – MONTHLY TRENDS:
3.1 ELECTRICAL METERS (FEB vs MAR):

a. Substations:

Page 45 of 75
b. DCP LV PANELS:

c. DCP CHILLERS:

Page 46 of 75
d. TOTAL COST:

Page 47 of 75
3.2 POTABLE WATER METERS (FEB vs MAR):

3.3 TSE WATER METERS (FEB vs MAR):

Page 48 of 75
3.4 BTU METERS (FEB vs MAR):

3.5 LGP METERS (FEB vs MAR):

Page 49 of 75
4.2 Building wise consumption Annual trend

Page 50 of 75
REF. NO. FORM QHSE-OPS-12L
VERSION 00
BUILDING WISE ANNUAL CONSUMPTION TREND DATE 17.12.2019
PAGE 1 of 1

COMPARISION
Feb-21 Mar-21 DEC/2020 vs JAN/2021
Building
+ Building Name
No.
Electrical BTU Potable Electrical BTU Potable Electrical BTU Potable
(MWH) (MWH) Water (m³) (MWH) (MWH) Water (m³) (MWH) (MWH) Water (m³)

CPC-07a
V.I.P. Guard Department
1
Barracks (Type-1B)
4b1 97.66 3064 236.1 91 5648.6 211.2 -6.66 2584.6 -24.9

V.I.P. Guard Department


2
- Unit General Store
4c 14.4 19.9 62.4 11.45 38.1 28.3 -2.95 18.2 -34.1

V.I.P. Guard Department


3
- Unit Guardhouse
4f 7.77 N/A N/A 16.78 N/A N/A 9.01

V.I.P. Guard Department


4
- Unit Force Offices
4g 3.44 N/A 0 4.88 N/A 55.5 1.44 55.5

5 4j 26.91 N/A N/A 20.69 N/A N/A -6.22

Special Operation
6 Department - 6a 0 0 54.7 0 0 50.6 0 0 -4.1
Headquarter (Type-8)
Special Operation
7 Department - Barracks 6b1 72.15 64.8 381.23 67.64 86.7 266.16 -4.51 21.9 -115.07
(Type-1)
Special Operation
8 Department - Barracks 6b2 75 0 641.2 85.83 -3.1 643.7 10.83 -3.1 2.5
(Type-1)
Special Operation
9 Department - Barracks 6b3 42.14 68 792.6 39.89 101.1 586.2 -2.25 33.1 -206.4
(Type-11)
Special Operation
10 Department - Barracks 6b4 13.74 74.7 1263.1 15.95 116.5 976.5 2.21 41.8 -286.6
(Type-1)
Special Operation
11 Department - Barracks 6b5 82.88 57.8 429.4 109.45 153.2 415.8 26.57 95.4 -13.6
(Type-1)
Special Operation
12 Department - Barracks 6b6 81.36 407.7 262.8 82.65 505 204.7 1.29 97.3 -58.1
(Type-11)
Special Operation
13 Department - Barracks 6b7 82.282 73.5 304.9 60.61 114.9 309.7 -21.672 41.4 4.8
(Type-1)
Special Operation
14 Department - Barracks 6b8 121.01 103.4 735.1 118.03 134.4 436.9 -2.98 31 -298.2
(Type-1)
Special Operation
15 Department - Barracks 6b10 124.77 3333.9 441.8 149.31 6227.6 491.9 24.54 2893.7 50.1
(Type-11D)
Special Operation
16 Department - Barracks 6b11 110.49 0 901 107.96 0 900.4 -2.53 0 -0.6
(Type-1)
Special Operation
17 Department - Barracks 6b12 109.43 54.3 774.9 119.78 -54.3 1207.4 10.35 -108.6 432.5
(Type-1)
Special Operation
18 Department - 6b13 113.72 103.9 599.3 130.26 -3698.7 687.1 16.54 -3802.6 87.8
Barracks(TYPE-11C)
Special Operation
19 Department - Barracks 6b14 94.11 167.3 0.5 109.96 275.9 9486.6 15.85 108.6 9486.1
(Type-1)
Special Operation
20 Department - Barracks 6b15 118.2 108.4 550.3 131.79 161 507.2 13.59 52.6 -43.1
(Type-1D)

Page 51 of 75
REF. NO. FORM QHSE-OPS-12L
VERSION 00
BUILDING WISE ANNUAL CONSUMPTION TREND DATE 17.12.2019
PAGE 1 of 1

COMPARISION
Feb-21 Mar-21 DEC/2020 vs JAN/2021
Building
+ Building Name
No.
Electrical BTU Potable Electrical BTU Potable Electrical BTU Potable
(MWH) (MWH) Water (m³) (MWH) (MWH) Water (m³) (MWH) (MWH) Water (m³)

Special Operation CPC-07a


21 Department - Barracks 6b18 92.55 0 638.5 113.43 -128.2 517.3 20.88 -128.2 -121.2
(Type-11A)
Special Operation
22 Department - Barracks 6b19 105.42 0 448.8 123.17 0 512 17.75 0 63.2
(Type-1A)
Special Operation
Department - Unit
23
General Store With Main
6c1 26.47 21.44 17.7 31.12 28.52 19.1 4.65 7.08 1.4

It
Special Operation
24 Department - Unit 6c2 0.07 12.56 71.2 0.06 33.07 51.4 -0.01 20.51 -19.8
General Store
Special Operation
25 Department - Unit 6c3 2.05 22.2 0.1 2.18 -248.2 0 0.13 -270.4 -0.1
General Store
Special Operation
26 Department - Unit 6c4 1.78 0 0 1.99 0 0.1 0.21 0 0.1
General Store
Special Operation
27 Department - Unit 6c5 80.21 1.13 -755.81 6.44 0 -836.02 5.31 0
General Store
28 Substation Type-A 6f1 2.37 N/A 2.24 2.7 N/A 0.62 0.33 -1.62

Substation Type-A 6f2 NA N/A N/A N/A 1.09 #VALUE! 1.09

29 Substation Type-C 6f3 6.03 N/A 1.22 7.48 N/A 1.34 1.45 0.12

30 Substation Type-B 6f4 2.39 N/A 0.73 2.7 N/A 1.01 0.31 0.28

Special Operation
31 Department - Unit Force 6h4 32 N/A 40 4.62 N/A -27.38 -40
Offices
32 Substation Type-C1 6i1 9 N/A 2.42 11.13 N/A 2.11 2.13 -0.31

33 Substation Type-B 6j 2.7 N/A 0.19 2.41 N/A 1.72 -0.29 1.53

34 Substation Type-F 6n 7.21 N/A 0.09 8.82 N/A 1.66 1.61 1.57

CPC-07b
Patrol Department -
1
Headquarter (Type-2)
3a N/A 26.4 37.86 N/A 34.9 36.62 8.5 -1.24

Patrol Department
2
Barracks (Type-9A)
3b1 126.89 0 113.23 0 2425.55 -13.66 0 2425.55

Patrol Department
3
Barracks (Type-8)
3b2 110.83 7.43 629.1 94.28 8.3 620.6 -16.55 0.87 -8.5

Patrol Department
4
Barracks (Type-2)
3b3 162.76 8.4 676.9 148.26 11.2 658.5 -14.5 2.8 -18.4

Patrol Department
5
Barracks (Type-2)
3b4 117.08 7.72 745 106.35 9.8 1104.7 -10.73 2.08 359.7

6 Substation Type-D 3e 13.47 N/A 1.09 54.49 N/A N/A 41.02 #VALUE!

7 Substation Type-C 3e 2 36 N/A 0.72 29.84 N/A N/A -6.16 #VALUE!

Patrol Department - Unit


8
Force Offices
3g N/A 0 19.6 N/A 4.49 21.7 4.49 2.1

Patrol Department -
9 Motorcycle Parking & 3i 4.31 0.55 9.7 4.29 0 11.5 -0.02 -0.55 1.8
Service
Patrol Department -
10
Indoor Parking
3j 5.14 12.1 8.26 4.93 28 9.01 -0.21 15.9 0.75

Patrol Department -
11 Under Ground Parking & 3p 10.42 NA 15.69 9.88 NA 19.51 -0.54 3.82
Parade Area

Page 52 of 75
REF. NO. FORM QHSE-OPS-12L
VERSION 00
BUILDING WISE ANNUAL CONSUMPTION TREND DATE 17.12.2019
PAGE 1 of 1

COMPARISION
Feb-21 Mar-21 DEC/2020 vs JAN/2021
Building
+ Building Name
No.
Electrical BTU Potable Electrical BTU Potable Electrical BTU Potable
(MWH) (MWH) Water (m³) (MWH) (MWH) Water (m³) (MWH) (MWH) Water (m³)

Explosives Group CPC-07a


12 Department - 5a N/A 20.21 28.6 N/A 34.18 31.05 13.97 2.45
Headquarter (Type-3)
Explosives Group
13 Department - Barracks 5b1 121.99 7.9 1057.5 101.67 11.8 1120.6 -20.32 3.9 63.1
(Type-1B)
Explosives Group
14 Department - 5c N/A 26.5 14.7 N/A 54.8 13.99 28.3 -0.71
Workshops
Explosives Group
Department - Inspection
15
Equipment General
5d N/A 29.68 24.8 N/A 48.02 32.5 18.34 7.7

Store

Explosives Group
16 Department - General 5e N/A 25 10.7 N/A 73.4 9.8 48.4 -0.9
Store-1
Explosives Group
Department - Under
17
Ground Parking &
5g N/A N/A 164.9 N/A N/A 203.7 38.8

Parade Area

18 Substation Type-D 5h1 83.83 N/A 7.63 77.35 N/A 0.26 -6.48 -7.37

19 Substation Type-D 5h2 15.99 N/A 7.74 12.71 N/A 4.41 -3.28 -3.33

Explosives Group
20 Department - Air 5i N/A 36.2 10.1 N/A N/A 10.84 0.74
Condition Car Parking
Explosives Group
21 Department - Unit Guard 5j 21.68 N/A 215.09 20.28 N/A 238.41 -1.4 23.32
House
Explosives Group
22 Department - Unit Force 5k N/A 3.82 82.85 N/A 4.16 32.05 0.34 -50.8
Offices

23 Mosque Area - Shops 16a N/A 60.4 335.79 N/A -1253.6 438.47 -1314 102.68

24 Mosque Area - Mosque 16b N/A 37.4 N/A N/A -1792.4 N/A -1829.8

Mosque Area - Service


25
Block
16c 45.82 NA 0 40.16 NA 8 -5.66 8

CPC-08a
WORKSHOPS AND
1 TRANSPORT 9b3 43.97 44.4 282.3 37.94 69.6 22.9 -6.03 25.2 -259.4
DEPARTMENT
WORKSHOPS AND
2 TRANSPORT 9b5 25.48 33.8 19.5 214.08 55.98 18.8 188.6 22.18 -0.7
DEPARTMENT
WORKSHOPS AND
3 TRANSPORT 9b7 30.47 27.69 50.6 35.9 -1095.17 37.7 5.43 -1122.86 -12.9
DEPARTMENT
WORKSHOPS AND
4 TRANSPORT 9b8 9.25 0 4.2 0.21 0 5 -9.04 0 0.8
DEPARTMENT
WORKSHOPS AND
5 TRANSPORT 9c2 0.18 0 1.5 0.14 0 0 -0.04 0 -1.5
DEPARTMENT
WORKSHOPS AND
6 TRANSPORT 9e 7.94 56.91 36.4 6.94 53.44 35.1 -1 -3.47 -1.3
DEPARTMENT

Page 53 of 75
REF. NO. FORM QHSE-OPS-12L
VERSION 00
BUILDING WISE ANNUAL CONSUMPTION TREND DATE 17.12.2019
PAGE 1 of 1

COMPARISION
Feb-21 Mar-21 DEC/2020 vs JAN/2021
Building
+ Building Name
No.
Electrical BTU Potable Electrical BTU Potable Electrical BTU Potable
(MWH) (MWH) Water (m³) (MWH) (MWH) Water (m³) (MWH) (MWH) Water (m³)

WORKSHOPS AND CPC-07a


7 TRANSPORT 9f2 35.33 N/A 3.4 86.72 N/A 0.5 51.39 -2.9
DEPARTMENT
WORKSHOPS AND
8 TRANSPORT 9k 2.06 8.98 10.7 3.06 -22.96 13.2 1 -31.94 2.5
DEPARTMENT
WORKSHOPS AND
11 TRANSPORT 9r 84.78 13.82 37.6 1.17 102.4 38.5 -83.61 88.58 0.9
DEPARTMENT
MAINTENANCE
14
WORKSHOP AREA
20a 6.46 11.74 5.4 542.78 -171.93 11.5 536.32 -183.67 6.1

MAINTENANCE
15
WORKSHOP AREA
20b 7.81 77.42 1.5 17.85 -77.42 0.1 10.04 -154.84 -1.4

MAINTENANCE
16
WORKSHOP AREA
20c 0.06 N/A 0.7 0.1 N/A 0 0.04 -0.7

MAINTENANCE
17
WORKSHOP AREA
20e 219.58 N/A 33.01 N/A -186.57 0

MAINTENANCE
18
WORKSHOP AREA
20k 0.22 35.19 17 108.89 83.93 27.5 108.67 48.74 10.5

MAINTENANCE
19
WORKSHOP AREA
20L 1.78 10.51 1.6 1.44 20.4 6.5 -0.34 9.89 4.9

MAINTENANCE
20
WORKSHOP AREA
20i 10.92 N/A N/A 7.65 N/A N/A -3.27

Page 54 of 75
REF. NO. FORM QHSE-OPS-12L
VERSION 00
BUILDING WISE ANNUAL CONSUMPTION TREND DATE 17.12.2019
PAGE 1 of 1

3a ANNUAL TREND 3B1 ANNUAL TREND


150 8000

6000
100
4000
50
2000

0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

3B2 ANNUAL TREND 3B3 ANNUAL TREND


10000 1000
800
5000
600
0 400
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 200
-5000
0
-10000 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

3b4 ANNUAL TREND 3e ANNUAL TREND


3000 80
60
2000 40

1000 20
0
0 -20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
-1000 -40

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

3e2 ANNUAL TREND 3g ANNUAL TREND


100 150
80
60 100

40
50
20
0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

3i ANNUAL TREND 3j ANNUAL TREND


80 500
400
60
300
40
200
20 100

0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

Page 55 of 75
REF. NO. FORM QHSE-OPS-12L
VERSION 00
BUILDING WISE ANNUAL CONSUMPTION TREND DATE 17.12.2019
PAGE 1 of 1

3p ANNUAL TREND 5a ANNUAL TREND


200 150
150
100
100
50
50

0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

5d ANNUAL TREND 5e ANNUAL TREND


300 500
400
200
300
200
100
100
0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

5g ANNUAL TREND 5b1 ANNUAL TREND


250 1500
200
150 1000

100 500
50
0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
-50 -500
Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

5h1 ANNUAL TREND 5c ANNUAL TREND


150 1500

100 1000

50 500

0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Electrical Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH)

5h2 ANNUAL TREND 5i ANNUAL TREND


20 60

15
40
10
20
5

0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical Potable Water (m³) Electrical BTU Potable Water (m³)


(MWH) (MWH) (MWH)

Page 56 of 75
REF. NO. FORM QHSE-OPS-12L
VERSION 00
BUILDING WISE ANNUAL CONSUMPTION TREND DATE 17.12.2019
PAGE 1 of 1

5j ANNUAL TREND 5k ANNUAL TREND


300 100
80
200 60
40
100
20
0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

16a ANNUAL TREND 16b ANNUAL TREND


500 500
400 400
300 300
200 200
100 100
0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

16c ANNUAL TREND 4b1 ANNUAL TREND


3000 20000

15000
2000
10000
1000 5000

0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

4c ANNUAL TREND 4f ANNUAL TREND


500 50
400 40
300 30
200 20
100 10
0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

4g ANNUAL TREND 4b1 ANNUAL TREND


60 20000

15000
40
10000
20
5000

0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

Page 57 of 75
REF. NO. FORM QHSE-OPS-12L
VERSION 00
BUILDING WISE ANNUAL CONSUMPTION TREND DATE 17.12.2019
PAGE 1 of 1

4j ANNUAL TREND 6a ANNUAL TREND


40 150
30
100
20
50
10
0
0 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 -50
Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

6b1 ANNUAL TREND 6b2 ANNUAL TREND


800 3000
600
2000
400
1000
200
0
0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 -1000
Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

6b3 ANNUAL TREND 6b4 ANNUAL TREND


1000 2000
800
1500
600
1000
400
200 500
0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

6b5 ANNUAL TREND 6b6 ANNUAL TREND


2500
600
2000
400 1500
1000
200
500
0
0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

6b7 ANNUAL TREND 6b8 ANNUAL TREND


1000 800

500 600

400
0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 200
-500
0
-1000 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

Page 58 of 75
REF. NO. FORM QHSE-OPS-12L
VERSION 00
BUILDING WISE ANNUAL CONSUMPTION TREND DATE 17.12.2019
PAGE 1 of 1

6b10 ANNUAL TREND 6b11 ANNUAL TREND


20000 1500

15000
1000
10000
500
5000

0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

6b12 ANNUAL TREND 6b13 ANNUAL TREND


1500
1500
1000
1000

500 500

0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

6b14 ANNUAL TREND 6b15 ANNUAL TREND


10000 800
8000
600
6000
400
4000
2000 200
0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

6b18 ANNUAL TREND 6b19 ANNUAL TREND


20000 800
15000 600
10000 400
5000 200
0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

6c1 ANNUAL TREND 6c2 ANNUAL TREND


100
2500
80
2000
1500 60

1000 40
500 20
0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

Page 59 of 75
REF. NO. FORM QHSE-OPS-12L
VERSION 00
BUILDING WISE ANNUAL CONSUMPTION TREND DATE 17.12.2019
PAGE 1 of 1

6c3 ANNUAL TREND 6c4 ANNUAL TREND


200 80
100 60
0 40
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
-100
20
-200
0
-300 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

6c5 ANNUAL TREND 6f1 ANNUAL TREND


150 30

100
20
50
10
0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 0
-50 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

6f3 ANNUAL TREND 6f4 ANNUAL TREND


10
40
8
30
6
20
4
10
2
0
0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

6h4 ANNUAL TREND 6i1 ANNUAL TREND


250 400

200 300
150
200
100
100
50
0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
-50
Electrical BTU Potable Water (m³) Electrical Potable Water (m³)
(MWH) (MWH) (MWH)

6j ANNUAL TREND 6n ANNUAL TREND


15 60

10 40

5 20

0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

Page 60 of 75
REF. NO. FORM QHSE-OPS-12L
VERSION 00
BUILDING WISE ANNUAL CONSUMPTION TREND DATE 17.12.2019
PAGE 1 of 1

9b3 ANNUAL TREND 9b5 ANNUAL TREND


400
250
300 200

200 150
100
100
50
0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

9b7 ANNUAL TREND 9b8 ANNUAL TREND


300 60

200 40

100 20

0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

9c2 ANNUAL TREND 9k ANNUAL TREND


3 300

2 200

100
1
0
0 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 -100

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

9r ANNUAL TREND 9f2 ANNUAL TREND


200 100
150 80

100 60
40
50
20
0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Electrical BTU Potable Water (m³)
Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

Page 61 of 75
REF. NO. FORM QHSE-OPS-12L
VERSION 00
BUILDING WISE ANNUAL CONSUMPTION TREND DATE 17.12.2019
PAGE 1 of 1

20a ANNUAL TREND 20b ANNUAL TREND


600 100
80
400 60
40
200
20
0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

20c ANNUAL TREND 20e ANNUAL TREND


8 250

6 200
150
4
100
2 50
0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

20k ANNUAL TREND 20L ANNUAL TREND


25
150
20

100 15
10
50
5

0 0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³) Electrical BTU Potable Water (m³)
(MWH) (MWH) (MWH) (MWH)

20i ANNUAL TREND


35
30
25
20
15
10
5
0
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

Electrical BTU Potable Water (m³)


(MWH) (MWH)

Page 62 of 75
Section 5 – ENERGY MANAGEMENT and OPTIMIZATION

5.1 EMS Log

Page 63 of 75
06/04/21

ENERGY MANAGEMENT
History Record Log

06/04/21
Building Applied via
Sl no Action taken Reason of action Applied date Remarks
No Name (Field /BMS/IBMS)
Changed AHU operation timing in the Ground
1 16b Mosque Building As requested by End user 28-Aug-2020 IBMS * need to be rechecked after one month
floor to match the prayer timing.
AHU scheduling done based on Priority. As part of Energy management
2 21a NCO 28-Sep-2020 BMS
Priority-1 Equipment's are Scheduled. Plan
Return Air setpoint for 21A-HVA-GF-AHU-18 As requested by End user(New
3 21a NCO 12-Oct-2020 BMS
changed to 23° C Rest).
HVAC & lighting equipment scheduling done As part of Energy management
4 21a NCO 25-Oct-2020 BMS
for Priority-2. Plan
Changed AHU operation timing to match the As part of Energy management
5 16b Mosque Building 26-Oct-2020 IBMS
prayer timing. Plan
Return Air setpoint for 21A-HVA-GF-AHU-16 As part of Energy management
6 21a NCO 23-Sep-2020 BMS
changed to 25° C(Appling design conditions) Plan

Return setpoints changed for all AHU & FCU. As part of Energy management 09/11/2020
7 21a NCO BMS
(Appling design conditions) Plan 10/11/2020
Return Air setpoint for 21A-HVA-GF-AHU-18 As requested by End user(New
8 21a NCO 14-Nov-2020 BMS
changed to 23° C Rest).
Return Air setpoint for 6b4-HVA-3F-AHU-02
9 6b4 BARRACKS (TYPE-1) As requested by End user 15-Nov-2020 BMS
changed from 19° C to 23° C
Changed AHU's operation timing as per the As part of Energy management need to be rechecked after one month for
10 16b Mosque Building 19-Nov-2020 IBMS
new schedule. Plan the updated prayer timings.
Return Air setpoint for 21A-HVA-GF-AHU-02
11 21a NCO As request by the End user 24-Nov-2020 BMS
changed to 23.5° C
Changed AHU's operation timing as per the As part of Energy management
12 27b Shaded Stage 24-Nov-2020 BMS
new schedule. Plan
Changed AHU's operation timing as per the As part of Energy management
13 18b Vip main Gate 9-Dec-2020 BMS
new schedule. Plan
AHU serving Mosque operation schedule As part of Energy management
14 6b12 BARRACKS 1-Dec-2020 BMS
implemented as per the prayer timings. Plan
Return Air setpoint for 21A-HVA-GF-AHU-02
15 21a NCO As request by the End user 2-Dec-2020 BMS
changed to 21.5° C
Changed AHU's operation timing as per the As part of Energy management
16 6C1 General Stores 2-Dec-2020 BMS
new schedule. Plan
Changed AHU's operation timing as per the As part of Energy management
17 6C2 General Stores 2-Dec-2020 BMS
new schedule. Plan
Changed AHU's operation timing as per the As part of Energy management
18 6C3 General Stores 2-Dec-2020 BMS
new schedule. Plan

Page 64 of 75
06/04/21

ENERGY MANAGEMENT
History Record Log

06/04/21
Building Applied via
Sl no Action taken Reason of action Applied date Remarks
No Name (Field /BMS/IBMS)
1 out of 3 FCU made Operational with 25° C
setpoint and the other 2 FCU are switched
As part of Energy management
19 28e1 & 28e2 Watch towers OFF. 2-Dec-2020 Manually
Plan
Installed Posters for Awareness of Energy
Saving.
1 out of 3 FCU made Operational with 25° C
setpoint and the other 2 FCU are switched
As part of Energy management
20 26I Watch towers OFF. 6-Dec-2020 Manually
Plan
Installed Posters for Awareness of Energy
Saving.

occupied & furnished side, only 1 FCU (at the


furnished area) made operational at 25 °C.
Secondary Gate Type- As part of Energy management
21 13n None occupied side all units switched off. 6-Dec-2020 Manually
2 Plan
Installed Posters for Awareness of Energy
Saving.

occupied & furnished side, only 1 FCU (at the


furnished area) made operational at 25 °C.
Secondary Gate Type- As part of Energy management
22 22l None occupied side all units switched off. 6-Dec-2020 Manually
4 Plan
Installed Posters for Awareness of Energy
Saving.

occupied & furnished side, only 1 FCU (at the


furnished area) made operational at 25 °C.
Secondary Gate Type- As part of Energy management
23 29a None occupied side all units switched off. 7-Dec-2020 Manually
2 Plan
Installed Posters for Awareness of Energy
Saving.

Page 65 of 75
06/04/21

ENERGY MANAGEMENT
History Record Log

06/04/21
Building Applied via
Sl no Action taken Reason of action Applied date Remarks
No Name (Field /BMS/IBMS)
1 out of 3 FCU made Operational with 25° C
setpoint and the other 2 FCU are switched
Internal Secondary As part of Energy management
24 8i & 8J OFF. 8-Dec-2020 Manually
Gate Plan
Installed Posters for Awareness of Energy
Saving.
1 out of 3 FCU made Operational with 25° C As part of Energy management
25 13ac,22a &23b1 Watch towers 7-Dec-2020 Manually
setpoint and the other 2 FCU are switched Plan
As request by the End
Return Air setpoint for 21A-HVA-GF-AHU-13
26 21a NCO user(Newrest Complained pantry 3-Dec-2020 BMS
changed from 24.5 to 22.5° C
area is Hot)
As request by the End
Return Air setpoint for 21A-HVA-GF-AHU-13
27 21a NCO user(Newrest Complained pantry 3-Dec-2020 BMS
changed from 24.5 to 22.5° C
area is Hot)
As request by the End
Return Air setpoint for 21A-HVA-GF-AHU-07
28 21a NCO user(Newrest Complained pantry 3-Dec-2020 BMS
changed from 22 to 20° C
area is Hot)
Changed AHU's operation timing as per the As part of Energy management
29 27b Shaded Stage 9-Dec-2020 BMS
new schedule. Plan
Changed AHU's operation timing as per the As part of Energy management
30 6C4 General Stores 9-Dec-2020 BMS
new schedule. Plan
Changed AHU's operation timing as per the As part of Energy management
31 6C5 General Stores 9-Dec-2020 BMS
new schedule. Plan
Changed AHU's operation timing as per the As part of Energy management
32 4c General Stores 9-Dec-2020 BMS
new schedule. Plan
Changed AHU and FCU'S Setpoint to 27°C for As part of Energy management
33 Substations CPC07A Feeding SS 9-Dec-2020 BMS
ETS and LV Room. Plan
Changed the AHU's 09,10 time schedule to As part of Energy management
34 21a NCO 10-Dec-2020 BMS
match the operating run hours. Plan

Changed all the barracks Prayer Room feeding


As part of Energy management
35 All barracks All barracks AHU's Operating timing as per the schedule of 13-Dec-2020 IBMS
Plan
Prayer timing(Similar to Mosque-16b)

Page 66 of 75
06/04/21

ENERGY MANAGEMENT
History Record Log

06/04/21
Building Applied via
Sl no Action taken Reason of action Applied date Remarks
No Name (Field /BMS/IBMS)
AHU & FCU temperature setpoints changed to
24° and switched OFF the IDU in store room. As part of Energy management
36 4G Guard house 15-Dec-2020 IBMS
Energy awareness posters installed inside Plan
building.
1 out of 2 IDU made Operational with 25° C
setpoint. As part of Energy management
37 4F Guard house 15-Dec-2020 Manually
Energy awareness posters installed inside Plan
building.
Energy awareness posters installed inside As part of Energy management
38 5J Guard house 15-Dec-2020 Manually
building. Plan
Energy awareness posters installed inside As part of Energy management
39 5K Unit Force office 15-Dec-2020 Manually
building. Plan
1 out of 2 FCU made Operational with 25° C
setpoint and the other FCU switched OFF. As part of Energy management
40 3F1 & 3F2 Unit guard house 23-Dec-2020 Manually
Energy awareness posters installed inside Plan
building.
As part of Energy management
41 3I Motorcycle Parking All FCU setpoints are changed to 24° C 24-Dec-2020 IBMS
Plan
As part of Energy management
42 3J Car park All FCU setpoints are changed to 24° C 24-Dec-2020 IBMS
Plan
IDU made Operational with 25° C setpoint.
As part of Energy management
43 3P Car park Energy awareness posters installed inside 24-Dec-2020 Manually
Plan
building.
Changed all the AHU/FCU setpoint as per the As part of Energy management
45 8b Wind Tunnel 28-Dec-2020 IBMS
design conditions. Plan
Construction As part of Energy management
46 Street lights to be Switched OFF 28-Dec-2020 Manually
area Plan
During the visit it was observed that the
1 out of 2 FCU made Operational with 22° C
As part of Energy management 20/01/2020 Rooms are hot as only 1 Fcu is
47 Watch towers Watch towers setpoint and the other FCU switched OFF. Manually
Plan 21/01/2020 Operational, and the Setpoint was
changed to 22° C.
All Substation Outside and Roof Lights to be As part of Energy management
37 All substations All substations 28-Dec-2020 Manually
switched OFF Plan

Page 67 of 75
06/04/21

ENERGY MANAGEMENT
History Record Log

06/04/21
Building Applied via
Sl no Action taken Reason of action Applied date Remarks
No Name (Field /BMS/IBMS)
All buildings All buildings Roof Lights to be switched OFF As part of Energy management
39 25-Dec-2020 Manually
Plan
Changed AHU's operation timing as per the need to be rechecked after one month for
40 16b Mosque Building Updated Prayer timings 4-Mar-2021 IBMS
prayer timing. the updated prayer timings.
Changed all the barracks Prayer Room feeding
As part of Energy management
41 All barracks Prayer Rm AHU's AHU's Operating timing as per the schedule of 16-Mar-2021 IBMS
Plan
Prayer timing(Similar to Mosque-16b)
Changed AHU's operation timing as per the need to be rechecked after one month for
42 16b Mosque Building As request by the End user 22-Mar-2021 IBMS
prayer timing. the updated prayer timings.
Changed AHU's operation timing as per the need to be rechecked after one month for
43 16b Mosque Building Updated Prayer timings 28-Mar-2021 IBMS
End user request. the updated prayer timings.
Changed AHU's operation timing for 1a-HVA-
44 1A Main Gate As request by the End user 4-Apr-2021 IBMS
2F-AHU-02 to 24/7.

Page 68 of 75
5.2 Analysis and justification

Page 69 of 75
REF. NO. FORM QHSE-OPS-PLN-12I
VERSION 00
JUSTIFICATION REPORT OF ENERGY DATE 20.01.2021
CONSUMPTION PAGE 1 of 1

Project: ISF DUHAIL CAMP Substation/Building: ALL BUILDINGS

Engineer Name: Manzoor Ahmed Date Inspected: 06-04-2021

Finding/Observation:
In many of the Substations it has been observed that the Electrical meter consumption has slightly gone
higher.

Reasons/Justifications the variation:

The increase in the Electrical meter consumption is


due to the climate change. The end user usage of AC
has increased which is understood from the BTU
consumption for the ETS rooms. This gradual increase
is consumption is expected for the next 2,3 months
until Peak of summer is reached before it gets
constant for a certain period before decreasing trend
starts.

Recommendation/Action Taken: Implementing the Energy saving strategies to help reduce the Consumption.

Prepared By: Approved By:

Kashif Kazim Alaa Elrub

Date: 09-03-2021 Date:

Page 70 of 75
5.3 MFMS Recommendation

In view of End user comfort MFMS recommend changing the winter mode of Operation for HVAC
equipment to Summer Mode as the outside climate change is happening.

Section 6 – Issues & Concerns


 During the meter reading collection, it was found that many of the BTU meters were having
discrepancies in the upstream and downstream readings.
 Few PMU meters in 6f1 LV panel having negative reading as compared to previous readings.
 Many of the Water meters (Approx. 50 Nos out of 120) are found to be not communicating with the
iBMS & BMS. Observation reports raised last are yet to be closed by Package Contractors
 Below is the list of Observation s raised for the issues related to Meter reading collection till date

a. List of Meters with Issues or Faults

Page 71 of 75
ENERGY MANAGEMENT
ISSUES/CONCERNS

06/04/21
Building
Sl no Issues/Concerns Actions by MFMS Date Remarks
No Name
The downstream PMU reading taken are
6b2 ESMB-UFO-6H4
showing less readings when compared to last Observation has been raised by
1 month readings. Due to which the readings for MFMS to clarify the issue with 14-Feb-2021
the month of january are showing negative QDSBG. MFMS-OBS-OPS-0451
6h4 BARRACKS 6B2 MSB-GA6B2
values.
The downstream PMU reading taken are
showing less readings when compared to last Observation has been raised by
As disscussed with AKG Engr. It was
2 CPc/8a LCC1 month readings. Due to which the readings for MFMS to clarify the issue with 14-Feb-2021
informed that the PMU was reconfigured.
the month of january are showing negative AKG. MFMS-OBS-OPS-0452
values.
ETS6n1(A)/6b6 Barracks (Type-11) The downstream sum of BTU meter reading Observation has been raised by
3 ETS6n1(A)/6b8 Barracks (Type-1) consumption are higher than that of upstream MFMS to clarify the issue with 10-Feb-2021
ETS6n1(A)/6c5 Unit General Store BTU meter reading. QDSBG. MFMS-OBS-OPS-0453

The downstream BTU meter reading is Observation has been raised by


4 ETS 6n1(B)/6b10 Barracks (Type-11D) showing a very high consumption whereas the MFMS to clarify the issue with 10-Feb-2021
upstream BTU meter reading is very less. QDSBG. MFMS-OBS-OPS-0453

The upstream BTU meter reading is showing


ETS 6n2/6B18 Barracks (Type-11A) Observation has been raised by
high consumption whereas the sum of
5 MFMS to clarify the issue with 10-Feb-2021
downstream readings are showing less
ETS 6n2/6c3 Unit General Store QDSBG. MFMS-OBS-OPS-0453
consumption.
ETS 6i1/6b11 Barracks (Type-1) The upstream BTU meter reading is showing
Observation has been raised by
high consumption whereas the sum of
6 ETS 6i1/6b13 Barracks(TYPE-11C) MFMS to clarify the issue with 10-Feb-2021
downstream readings are showing less
QDSBG. MFMS-OBS-OPS-0444
ETS 6i1/6a Headquarters(Type-8) consumption.

Page 72 of 75
ENERGY MANAGEMENT
ISSUES/CONCERNS

06/04/21
Building
Sl no Issues/Concerns Actions by MFMS Date Remarks
No Name
ETS 3e/3b1 BARRACKS (TYPE-9A) The upstream BTU meter reading is showing
Observation has been raised by
high consumption whereas the sum of
7 ETS 3e/3b4 BARRACKS (TYPE-2) MFMS to clarify the issue with 10-Feb-2021
downstream readings are showing less
QDSBG. MFMS-OBS-OPS-0444
consumption.
ETS 3e/3a HEADQUARTER (TYPE-2)
ETS 3e2/3b2 BARRACKS (TYPE-8)
ETS 3e2/3b3 BARRACKS (TYPE-2) The upstream BTU meter reading is showing
Car Parking Building - Observation has been raised by
ETS 3e2/3j high consumption whereas the sum of
8 Patrol Department MFMS to clarify the issue with 10-Feb-2021
downstream readings are showing less
Motorcycle Parking And QDSBG. MFMS-OBS-OPS-0444
ETS 3e2/3i consumption.
Service
ETS 3e2/3g UNIT FORCE OFFICES
ETS 5h2/5b1 BARRACKS (TYPE-1B) The upstream BTU meter reading is showing
Observation has been raised by
high consumption whereas the sum of
9 ETS 5h2/5a HEADQUARTER (TYPE-3) MFMS to clarify the issue with 10-Feb-2021
downstream readings are showing less
QDSBG. MFMS-OBS-OPS-0445
ETS 5h2/5k UNIT FORCE OFFICES consumption.
ETS 9f2/9c2 GATE HOUSE
ETS 9f2/9r Drivers Administration
ETS 9f2/9c3 Multi Section Workshop
ETS 9f2/9c5 Heavy Vehicles Workshop The downstream sum of BTU meter reading Observation has been raised by
10 ETS 9f2/9c7 Light Vehicles Workshop consumption are higher than that of upstream MFMS to clarify the issue with 10-Feb-2021
ETS 9f2/9c8 General Store 1 BTU meter reading. AKG. MFMS-OBS-OPS-0446
Workshops & Transport
ETS 9f2/9e
Headquarter
ETS 9f2/9k Metal Workshop 1

Page 73 of 75
ENERGY MANAGEMENT
ISSUES/CONCERNS

06/04/21
Building
Sl no Issues/Concerns Actions by MFMS Date Remarks
No Name
6b11 Barracks (Type-1) Observation has been raised by
BTU meters showing zero value
11 6b19 Barracks (Type-1a) MFMS to clarify the issue with 10-Feb-2021
6b12 Barracks (Type-1) BTU meter defective. QDSBG. MFMS-OBS-OPS-0447
Unit General Store With BTU meter showing unusal low
6C1
Main It consumption Observation has been raised by
12 6h4 Unit Force Offices BTU meter showing zero reading MFMS to clarify the issue with 10-Feb-2021
BTU meter showing unusal high QDSBG. MFMS-OBS-OPS-0448
4B1 Barracks (Type-1B)
consumption
9e Substation-9e
Observation has been raised by
Fuel Level tank control panel are in OFF
13 9f2 Substation-9f2 MFMS to clarify the issue with 15-Feb-2021
condition.
AKG. MFMS-OBS-OPS-0455
20e Substation-20e
13i RECRUITMENT OFFICE
13n SECONDARY GATE
13p GUARDHOUSE
24aa WATCH TOWER
29a SECONDARY GATE Observation has been raised by
Water meters showing no communication
14 MFMS to clarify the issue with 17-Feb-2021
8j INTERNAL SECONDARY GATE with iBMS
AJJV. MFMS-OBS-OPS-0456
1b1 EMERGENCY GATE
8g SERVICE BLOCK 2
8h SUBSTATION
27b Shaded Stage

Page 74 of 75
ENERGY MANAGEMENT
ISSUES/CONCERNS

06/04/21
Building
Sl no Issues/Concerns Actions by MFMS Date Remarks
No Name
03I Parking (MCP)
6F4 Substation Type-B
6F2 Substation Type-A
6I1 Substation Type-C1
Unit General Store with Main
6c5
IT
6N Substation Type-F
3B4 Barracks
6F1 Substation Type-A Water meters showing no communication
Observation has been raised by
6J Substation Type-B with iBMS
15 MFMS to clarify the issue with 17/02/21
4e Substation
QDSBG. MFMS-OBS-OPS-0457
3B3 Barracks
5H1 Substation
5H2 Substation
05K Unit Force Office
03G UFO
3E2 Substation
03E Substation
Water Meter configuration is pending. Needs
4f Unit Guard House
to be rectify
9e Training Center (TC1)
Observation has been raised by
9b8 General Store (GS6) Water meter OPC Tags value are showing
16 MFMS to clarify the issue with 17/02/21
20k Unit General Store (GS1B) “Uncertain” . JCI needs to be Rectify
AKG. MFMS-OBS-OPS-0458
20e Sub-Station Type A (SSA)
Main Potable water meter feeding to buildings
17 External Near Pot Pump room reading/Consumption is not matching with Observation to be raised. 06/04/21
kahramaa meter.

Page 75 of 75