Ieee 1106-Ni-Cd-Mtn
Ieee 1106-Ni-Cd-Mtn
Ieee 1106-Ni-Cd-Mtn
IEEE
3 Park Avenue IEEE Std 1106™-2005
New York, NY 10016-5997, USA (Revision of
IEEE Std 1106-1995)
23 December 2005
Sponsor
Stationary Battery Committee
of the
IEEE Power Engineering Society
Abstract: This recommended practice provides recommendations for installation design and for
installation, maintenance, and testing procedures that can be used to optimize the life and
performance of vented nickel-cadmium batteries used in stationary standby applications.
Keywords: battery tests, capacity test methods, stationary applications, vented nickel-cadmium
batteries
IEEE is a registered trademark in the U.S. Patent & Trademark Office, owned by the Institute of Electrical and Electronics
Engineers, Incorporated.
No part of this publication may be reproduced in any form, in an electronic retrieval system or otherwise, without the prior
written permission of the publisher.
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
Use of an IEEE Standard is wholly voluntary. The IEEE disclaims liability for any personal injury, property or other dam-
age, of any nature whatsoever, whether special, indirect, consequential, or compensatory, directly or indirectly resulting
from the publication, use of, or reliance upon this, or any other IEEE Standard document.
The IEEE does not warrant or represent the accuracy or content of the material contained herein, and expressly disclaims
any express or implied warranty, including any implied warranty of merchantability or fitness for a specific purpose, or that
the use of the material contained herein is free from patent infringement. IEEE Standards documents are supplied “AS IS.”
The existence of an IEEE Standard does not imply that there are no other ways to produce, test, measure, purchase, market,
or provide other goods and services related to the scope of the IEEE Standard. Furthermore, the viewpoint expressed at the
time a standard is approved and issued is subject to change brought about through developments in the state of the art and
comments received from users of the standard. Every IEEE Standard is subjected to review at least every five years for
revision or reaffirmation. When a document is more than five years old and has not been reaffirmed, it is reasonable to
conclude that its contents, although still of some value, do not wholly reflect the present state of the art. Users are cautioned
to check to determine that they have the latest edition of any IEEE Standard.
In publishing and making this document available, the IEEE is not suggesting or rendering professional or other services
for, or on behalf of, any person or entity. Nor is the IEEE undertaking to perform any duty owed by any other person or
entity to another. Any person utilizing this, and any other IEEE Standards document, should rely upon the advice of a com-
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
petent professional in determining the exercise of reasonable care in any given circumstances.
Interpretations: Occasionally questions may arise regarding the meaning of portions of standards as they relate to specific
applications. When the need for interpretations is brought to the attention of IEEE, the Institute will initiate action to prepare
appropriate responses. Since IEEE Standards represent a consensus of concerned interests, it is important to ensure that any
interpretation has also received the concurrence of a balance of interests. For this reason, IEEE and the members of its soci-
eties and Standards Coordinating Committees are not able to provide an instant response to interpretation requests except in
those cases where the matter has previously received formal consideration. At lectures, symposia, seminars, or educational
courses, an individual presenting information on IEEE standards shall make it clear that his or her views should be considered
the personal views of that individual rather than the formal position, explanation, or interpretation of the IEEE.
Comments for revision of IEEE Standards are welcome from any interested party, regardless of membership affiliation with
IEEE. Suggestions for changes in documents should be in the form of a proposed change of text, together with appropriate
supporting comments. Comments on standards and requests for interpretations should be addressed to:
Secretary, IEEE-SA Standards Board
445 Hoes Lane
Piscataway, NJ 08854
USA
NOTE−Attention is called to the possibility that implementation of this standard may require use of subject
matter covered by patent rights. By publication of this standard, no position is taken with respect to the
existence or validity of any patent rights in connection therewith. The IEEE shall not be responsible for
identifying patents for which a license may be required by an IEEE standard or for conducting inquiries into the
legal validity or scope of those patents that are brought to its attention.
Authorization to photocopy portions of any individual standard for internal or personal use is granted by the Institute of
Electrical and Electronics Engineers, Inc., provided that the appropriate fee is paid to Copyright Clearance Center. To
arrange for payment of licensing fee, please contact Copyright Clearance Center, Customer Service, 222 Rosewood Drive,
Danvers, MA 01923 USA; +1 978 750 8400. Permission to photocopy portions of any individual standard for educational
classroom use can also be obtained through the Copyright Clearance Center.
(This introduction is not part of IEEE Std 1106-2005, IEEE Recommended Practice for Installation, Maintenance,
Testing, and Replacement of Vented Nickel-Cadmium Batteries for Stationary Applications.)
Today, stationary storage batteries play an ever-increasing role in industry by providing normal control and
instrumentation power and backup energy for emergencies. This recommended practice fulfills the need
within the industry to provide common or standard practices of installation, maintenance, testing, and
replacement of vented nickel-cadmium batteries. The methods described are applicable to all installations
and battery sizes for stationary standby applications.
The installations considered herein are designed for continuous-float operation with a battery charger
serving to maintain the battery in a charged condition and to supply the normal dc load. Applications
wherein the battery is not fully recharged after every discharge (e.g., alternative energy applications) are
beyond the scope of this recommended practice.
Notice to users
Errata
Errata, if any, for this and all other standards can be accessed at the following URL: http://
standards.ieee.org/reading/ieee/updates/errata/index.html. Users are encouraged to check this URL for
errata periodically.
Interpretations
Patents
Attention is called to the possibility that implementation of this standard may require use of subject matter
covered by patent rights. By publication of this standard, no position is taken with respect to the existence or
validity of any patent rights in connection therewith. The IEEE shall not be responsible for identifying
patents or patent applications for which a license may be required to implement an IEEE standard or for
conducting inquiries into the legal validity or scope of those patents that are brought to its attention.
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
Copyright © 2005 IEEE. All rights reserved. iii
The following is a list of participants in the Ni-Cd Maintenance & Testing Working Group.
Jim McDowall, Chair
Ramesh Desai, Vice Chair
William Cantor Peter DeMar Kim Mosley
Mark S. Clark Wayne Johnson Edward Rafter
Tom Croda William McCoy Ed Stallings
Eddie Davis Dan McMenamin Lesley D. Varga
Jerry Meyers
The following members of the individual balloting committee voted on this standard. Balloters may have
voted for approval, disapproval, or abstention.
Samuel Aguirre Keith Chow John Kopera
Ali Al Awazi Garth Corey Daniel Levin
Curtis Ashton Matthew Davis William McCoy
Robert Beavers Jerry DiSciullo James McDowall
Thomas Blair Neal Dowling G. Michel
William Bloethe James Edmonds David Smith
Richard T. Bolgeo Gary Engmann Harold Taylor
William Cantor Joseph Greco James Wilson
Thomas Carpenter Randall Groves Donald W. Zipse
Jay Chamberlin David Ittner Ahmed Zobaa
Alan Jensen
When the IEEE-SA Standards Board approved this standard on 9 June 2005, it had the following
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
membership:
Steve M. Mills, Chair
Richard H. Hulett, Vice Chair
Don Wright, Past Chair
Judith Gorman, Secretary
Mark D. Bowman Raymond Hapeman Glenn Parsons
Dennis B. Brophy William B. Hopf Ronald C. Petersen
Joseph Bruder Lowell G. Johnson Gary S. Robinson
Richard Cox Hermann Koch Frank Stone
Bob Davis Joseph L. Koepfinger* Malcolm V. Thaden
Julian Forster* David J. Law Richard L. Townsend
Joanna N. Guenin Daleep C. Mohla Joe D. Watson
Mark S. Halpin Paul Nikolich Howard L. Wolfman
T. W. Olsen
*Member Emeritus
Also included are the following nonvoting IEEE-SA Standards Board liaisons:
Michael D. Fisher
IEEE Standards Project Editor
1.1 Scope............................................................................................................................................ 1
1.2 Purpose......................................................................................................................................... 1
3. Definitions ........................................................................................................................................... 2
4. Safety ................................................................................................................................................... 2
4.1 General......................................................................................................................................... 2
4.2 Methods ....................................................................................................................................... 3
4.3 Protective equipment ................................................................................................................... 3
4.4 Precautions................................................................................................................................... 3
5.1 General......................................................................................................................................... 4
5.2 Location ....................................................................................................................................... 4
5.3 Mounting...................................................................................................................................... 5
5.4 Seismic......................................................................................................................................... 5
5.5 Ventilation ................................................................................................................................... 5
5.6 Instrumentation and alarms.......................................................................................................... 6
6.1 General......................................................................................................................................... 6
6.2 Receiving and storage .................................................................................................................. 6
6.3 Assembly ..................................................................................................................................... 7
6.4 Initial charge ................................................................................................................................ 7
7. Maintenance......................................................................................................................................... 8
7.1 General......................................................................................................................................... 8
7.2 Inspections ................................................................................................................................... 8
7.3 Corrective actions ........................................................................................................................ 9
8. Test schedule...................................................................................................................................... 10
8.1 General....................................................................................................................................... 10
8.2 Acceptance................................................................................................................................. 10
8.3 Performance ............................................................................................................................... 11
8.4 Service ....................................................................................................................................... 11
8.5 Modified performance ............................................................................................................... 11
9.1 General....................................................................................................................................... 12
9.2 Initial conditions ........................................................................................................................ 12
9.3 Test length and discharge rate ................................................................................................... 12
12.1 General....................................................................................................................................... 16
12.2 Reapplication ............................................................................................................................. 17
12.3 Recycling ................................................................................................................................... 17
1. Overview
1.1 Scope
This recommended practice is applicable to all stationary standby applications. However, specific
applications, such as emergency lighting units and semiportable equipment, may have other appropriate
practices and are beyond the scope of this recommended practice. Stationary cycling applications, such as
those found in alternative energy applications, are also beyond the scope of this document.
Sizing, qualification, and other battery types are beyond the scope of this recommended practice.
This recommended practice does not include any other component of the dc system, nor does it include
inspection and testing of the overall dc system. Preoperational and periodic dc system tests of chargers and
other dc components may require that the battery be connected to the system. Details for these tests will
depend on the requirements of the dc system and are beyond the scope of this recommended practice.
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
1.2 Purpose
This recommended practice provides recommendations for installation design and for installation,
maintenance, and testing procedures that can be used to optimize the life and performance of vented nickel-
cadmium batteries used in stationary standby applications. This recommended practice also provides
guidance for determining when these batteries should be replaced.
2. Normative references
The following referenced documents are indispensable for the application of this recommended practice. For
dated references, only the edition cited applies. For undated references, the latest edition of the referenced
document (including any amendments or corrigenda) applies.
IEEE Std 1115TM, IEEE Recommended Practice for Sizing Nickel-Cadmium Batteries for Stationary
Applications.1
3. Definitions
For the purposes of this recommended practice, the following terms and definitions apply. The Authoritative
Dictionary of IEEE Standards Terms [B2]2 should be referenced for terms not defined in this clause.
3.1 acceptance test: A constant-current or constant-power capacity test made on a new battery to determine
that it meets specifications or manufacturer’s ratings.
3.2 capacity test: A discharge of a battery at a constant current or constant power to a specified terminal
voltage.
3.3 float charge: A constant potential normally applied to a battery to maintain it in a charged condition.
3.4 high-rate charge: The application of a constant-potential charge, at a higher level than the float charge,
to a partially or fully discharged battery to recharge it.
3.5 performance test: A constant-current or constant-power capacity test, made on a battery after being in
service, to detect any change in the capacity.
3.6 service test: A special test of a battery’s capability, in an “as found” condition, to satisfy the battery duty
cycle.
3.7 standby operation (battery): Operation with a battery charger serving to maintain a battery in a
charged condition and to supply the normal dc load. Syn: continuous-float operation.
3.8 vented cell: A cell in which the products of electrolysis and evaporation are allowed to escape to the
atmosphere as they are generated. Syn: flooded cell.
4. Safety
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
4.1 General
The safety precautions listed herein are considered to be mandatory and shall be followed in all battery
installation and maintenance activities. Work on batteries shall be performed only by knowledgeable
personnel with proper, safe tools and protective equipment.
1IEEE publications are available from the Institute of Electrical and Electronics Engineers, Inc., 445 Hoes Lane, Piscataway, NJ 08854,
USA (http://standards.ieee.org/).
2
The numbers in brackets correspond to those in the bibliography in Annex H.
4.2 Methods
Work performed on a battery in service shall use methods to preclude arcing in the vicinity of the battery.
The following protective equipment for safe handling of the battery and protection of personnel shall be
available:
a) Goggles and face shields.
b) Chemical-resistant gloves.
c) Protective aprons and overshoes.
d) Portable or stationary water facilities for rinsing eyes and skin in case of contact with alkaline
electrolyte. The use of pH buffered neutralizing eyewash solution is recommended.
e) Spill absorbing/neutralizing materials, or other suitable neutralizing agent recommended by the
manufacturer for alkaline electrolyte spillage.3
f) Class C fire extinguisher.4
g) Adequately insulated tools.
h) Lifting devices of adequate capacity, when required.
4.4 Precautions
The following protective procedures shall be observed during installation and maintenance:
a) Ensure that metal racks are connected to ground in accordance with applicable codes.
b) Inspect all lifting equipment for functional adequacy.
c) Restrict all unauthorized personnel from the battery area.
d) Prohibit the use of acid-contaminated tools and equipment such as hydrometers and thermometers in
or on the battery.
e) Provide signs prohibiting smoking and open flames and avoiding arcing in the immediate vicinity of
the battery.
f) Keep the top of the battery clear of all tools and other foreign objects.
g) Ensure that illumination requirements are met.
h) Ensure unobstructed egress from the battery area.
i) Ensure that the battery area is adequately ventilated.
j) Avoid wearing metallic objects, such as jewelry, while working on the battery.
k) Avoid excessive tilting of the cells to prevent spillage.
l) Neutralize static buildup just before working on the battery by contacting the nearest effectively
grounded surface.
m) Ensure that load test leads are connected with a length of cable sufficient to prevent accidental
arcing in the vicinity of the battery.
n) Ensure that all connections to load test equipment include short-circuit protection.
3
The removal and/or neutralization of an alkali spill may result in production of a hazardous waste. The user should comply with all
applicable codes and regulations.
4Some battery manufacturers do not recommend the use of CO -type fire extinguishers due to the potential for thermal shock on the
2
battery cases.
5.1 General
Considerations that should be included in the design of the battery installation depend on the requirements or
function of the system of which the battery is a part. The general installation design criteria for all nickel-
cadmium batteries are given in 5.2 – 5.6. Other applicable codes should also be observed as appropriate to
the installation.
5.2 Location
a) Space and floor supports allocated for the battery and associated equipment should allow for present
and future needs. Calculations should be performed to ensure that floor loading capabilities are not
exceeded.
b) The general battery area selected should be clean, dry, and ventilated and should provide adequate
space and illumination for inspection, maintenance, testing, and cell replacement. Space should also
be provided above the cells to allow for operation of lifting equipment, addition of water, and taking
of measurements (e.g., voltages, temperature, etc.).
c) The battery should be protected against natural phenomena such as earthquakes, winds, and
flooding, as well as induced phenomena such as fire, explosion, missiles, pipe whips, discharging
fluids, CO2 discharge, and other hazards.
d) The optimum range for cell electrolyte temperature is 20 °C to 25 °C, and it is the basis for rated
performance. A location where this temperature can be maintained will contribute to optimum
battery life, performance, and cost of operation. Although nickel-cadmium batteries are tolerant of
extreme temperatures, low temperatures will decrease battery capacity, whereas prolonged high
temperatures will shorten battery life (see A.4). Installation in a location with an ambient
temperature below the optimum operating temperature will affect sizing. Refer to IEEE Std 1115.5
e) The location and arrangement of cells should result in no greater than a 5 °C temperature differential
between cells at a given time. Avoid conditions that result in spot heating or cooling, as temperature
variation will cause the battery to become electrically unbalanced.
f) The battery location should be such that direct sunlight on the cells is avoided, as this may damage
plastic cell cases and create localized heating.
g) For personnel safety in the event of electrolyte spillage, portable or stationary water facilities shall
be provided. Provisions for neutralizing, containing, and/or safely disposing of electrolyte should be
included. The floor surface should be alkali-resistant.
h) The charger and main power distribution center should be as close as practical to the battery,
consistent with item j).
i) Illumination in the battery area should equal or exceed the interior lighting recommendations in
Figure 11-1 of the Lighting Handbook [B5].
j) Nearby equipment with arcing contacts shall be located in such a manner as to avoid those areas
where hydrogen pockets could form.
5
For information on references, see Clause 2.
5.3 Mounting
The most common practice is to mount cells on a steel rack with chemical-resistant insulation between the
cells and the steel of the rack. Metal racks should be connected solidly to the grounding system in
accordance with applicable codes. The cells may also be mounted on adequately insulated supports secured
to a floor or base.
The number of tiers or steps selected should result in a minimum temperature differential between cells
[see 5.2, item e)] and allow for adequate maintenance.
5.4 Seismic
Where applicable building codes require seismic protection, the racks, cabinets, anchors, and installation
thereof shall be able to withstand the calculated seismic forces. For utility substations, IEEE Std 693TM-1997
[B4] provides guidance for seismic installation design and seismic qualification of battery racks. To
minimize the effect of seismic forces, the battery should be located at as low an elevation as practical. The
following criteria should be observed regarding mounting:
a) All cells should be restrained. Using side and end rails is one method that can be used to prevent loss
of function due to a seismic event.
b) Where more than one rack section is used, the rack sections should be rigidly joined, or the adjacent
end cells in each rack should be connected with flexible connectors as provided by or recommended
by the manufacturer. Connections between cells at different levels of the same rack should also be
flexible.
c) Racks shall be firmly connected to the building structure in accordance with applicable codes by
using approved fastening techniques such as embedded anchor bolts or racks welded to structural
steel faceplates (sized to accommodate a range of battery rack sizes).
CAUTION
Anchoring a rack to both the floor and the wall may cause stress due to conflicting modes of vibration.
5.5 Ventilation
The battery area shall be ventilated, either by a natural or mechanical ventilation system, to prevent
accumulation of hydrogen. The ventilation system should limit hydrogen accumulation to less than 2% of
the total volume of the battery area and should be sufficient to prevent the formation of local pockets of
hydrogen external to the battery that exceed this limit. The maximum hydrogen evolution rate at standard
temperature and pressure6 is
–7 3
1.27 × 10 × I charge × n m /s
where
Icharge is the charge current in amperes
n is the number of cells per battery string
6The phrase “standard temperature and pressure” in this recommended practice is defined as referring to the values 0 °C and
101.325 kPa.
The worst-case condition exists when maximum current is forced into a fully charged battery. At a
minimum, the above ventilation calculation should be based on the maximum current that will be forced into
the battery based on the high-rate charge (see Definition 3.4) or the initial charge (see 6.3).
A battery area that meets the above ventilation requirements should not be considered a classified
(hazardous) location; thus, special electrical equipment enclosures to prevent fire or explosion should not be
necessary.
The following general recommendations for instrumentation and alarms apply to the battery installation
only. Requirements for the charger, dc system design, and so on, are beyond the scope of this recommended
practice.
Each battery installation should include the following instrumentation and alarms:
a) Voltmeter
b) High- and low-battery-voltage alarm
c) Ground detector (for ungrounded systems)
d) Ammeter
6. Installation procedures
6.1 General
Upon receipt, and at the time of actual unloading, each package should be inspected visually for apparent
damage and electrolyte leakage. If either damage or leakage is evident, a more detailed inspection of the
entire shipment should be conducted, and results should be noted on the bill of lading. Cell repair or
replacement should be instituted as required. Record receipt date and inspection data.
6.2.2 Unpacking
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
6.2.3 Storage
Cells should be stored indoors in a clean, level, dry, and cool location; localized sources of heat should be
avoided. In most cases, a period of at least 12 months storage is allowable. Contact the battery manufacturer
for specific instructions for longer storage periods.
6.3 Assembly
The assembly of the rack should be in accordance with the manufacturer’s recommended procedure.
An initial charge should be applied after installation. Filled and charged nickel-cadmium cells require
recharging to compensate for self-discharge losses during shipment and storage. Cells shipped in a
discharged condition have to be given a complete charge.
WARNING
The initial charge may cause a significant amount of hydrogen to be generated. Ensure that the room
is ventilated in accordance with 5.5 using the maximum current possible for this activity.
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
7. Maintenance
7.1 General
Proper maintenance will prolong the life of a battery and will aid in ensuring that it is capable of satisfying
its design requirements. A good battery-maintenance program will also serve as a valuable aid in
determining the need for battery replacement. Battery maintenance shall be performed by personnel
knowledgeable about nickel-cadmium batteries and the safety precautions involved.
7.2 Inspections
7.2.1 General
All inspections should be made under normal float conditions. Refer to the annexes for more information.
Inspection of the battery should be performed on a regularly scheduled basis (at least once per quarter). The
interval should be selected depending on site conditions, charging equipment, and monitoring devices
providing remote indications of abnormal operations. This inspection should include checking and recording
the following:
a) Float voltage measured at the battery terminals
b) General appearance and cleanliness of the battery, the battery rack, and the battery rack area
c) Charger output current and voltage
d) Electrolyte levels
e) Cracks in cells or leakage of electrolyte
f) Any evidence of corrosion at terminals, connectors, or rack
g) Adequacy of ventilation
h) Pilot-cell electrolyte temperature
7.2.2 Semiannually
At least once every six months a general inspection should be augmented by checking and recording the
voltage of each cell.
7.2.3 Yearly
At least once each year a semiannual inspection should be augmented by checking and recording the
following:
a) Integrity of the battery rack
b) Intercell connection torque
c) Condition and resistance of cable connections [see 6.3.2, item g)]
Intercell connection torque should be checked at least once after the initial installation. In vibration-free
environments, subsequent checks may be performed in accordance with the manufacturer’s
recommendations. Intercell connection resistance readings may be substituted for connection torque checks,
if the cell design allows. Consult the manufacturer of the battery and/or test equipment for details.
If the battery has experienced an abnormal condition (e.g., a severe discharge or severe overcharge), an
inspection should be made to ensure that the battery has not been damaged. Include the requirements of
7.2.1 and 7.2.2.
The following items indicate conditions that should be corrected before the next general inspection. Major
deviations in any of these items may necessitate immediate action:
a) When any cell electrolyte reaches the low-level line, distilled or other approved-quality water should
be added to bring all cells to the high-level line. Water quality should be in accordance with the
manufacturer’s instructions.
b) When the float voltage, measured at the battery terminals, is outside of its recommended operating
range, the charger voltage should be adjusted.
c) If the voltage of an individual cell in a floating battery is found to be below the minimum limit
(see C.1), apply a high-rate charge. Applying the high-rate charge to the individual cell concerned is
generally more effective.
d) When corrosion, excessive dirt, or potassium carbonate (gray-white deposits) are noted on cells or
connectors, wipe the cells with a wet cloth, wipe dry, and then coat metal parts with corrosion
inhibitor as recommended by the manufacturer. Avoid the use of hydrocarbon-type cleaning agents
(oil distillates), which may cause containers and covers to crack or craze.
e) When a bolted connection is found loose (more than half a turn to reach full torque), disassemble,
clean, reassemble, and retorque the connection. The reassembly should be made using corrosion
inhibitor and following the instructions of the manufacturer.
See Annex C for a more detailed discussion of these abnormalities and the urgency of corrective actions.
8. Test schedule
8.1 General
a) Determine whether the battery meets its specification or the manufacturer’s rating, or both.
b) Periodically determine whether the performance of the battery, as found, is within acceptable limits.
c) Determine, if required, whether the battery, as found, meets the design requirements of the system to
which it is connected.
8.2 Acceptance
8.2.1 General
An acceptance test of the battery capacity (see 9.5) should be made, as determined by the user, either at the
factory or in the field after installation.
Factory acceptance tests should be performed in accordance with IEC 60623 [B1]. This standard is used by
most nickel-cadmium battery manufacturers to demonstrate compliance with factory standards and
specifications. The results of such a test are not appropriate as a baseline for future capacity tests. See
Annex G for an outline of the IEC capacity test.
In nickel-cadmium batteries, approximately 12 weeks is needed after a previous discharge for the “float
effect” to reach its full extent (see Annex D). Therefore, results of capacity tests that are carried out after less
than 12 weeks has elapsed will not be representative of normal operation with prolonged float charging. This
condition makes performing a factory acceptance test that accurately reflects operation in float charging
mode impractical.
Acceptance tests may be carried out in the field, preferably after the battery has been on float charge for at
least 12 weeks without discharging. Although a field acceptance test carried out after less than 12 weeks on
float charge will confirm that a battery has adequate capacity, the acceptance test results cannot easily be
compared with future performance test results because of the float effect (see Annex D for further
discussion). Field tests should be made at a specific discharge rate and for a duration relating to the
manufacturer’s rating or to the purchase specification’s requirements. For a stationary standby application,
published data based on prolonged constant-potential charging should be used (see 9.3.2).
If a field acceptance test is used to verify conformance to the manufacturer’s published data, the rate
adjustment method of 9.4.2 should be used, except the rate should not be adjusted for the end-of-life
condition, i.e., at the full published rate adjusted for temperature only. If the test is to establish a baseline for
future testing, all requirements of 9.4.2 should be observed, and the battery preferably should have been on
float charge for at least 12 weeks without discharging.
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
8.3 Performance
a) A performance test of battery capacity (see 9.5) should be made within the first two years of service.
For comparison purposes, having the performance test be similar in duration to the battery duty
cycle is desirable.
b) Additional performance tests should be made at five-year intervals until the battery shows signs of
excessive capacity loss. Excessive capacity loss is indicated when the battery capacity drops more
than an average of 1.5% per year of rated capacity from its capacity on the previous performance
test.
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
c) Annual performance tests of battery capacity should be made on any battery that shows signs of
excessive capacity loss.
d) If performance testing is to be used to reflect baseline capacity of the battery, then perform 9.2, step
a) through step g). If performance testing is to be used to reflect maintenance practices as well as
trending, then omit 9.2, step a) and step b); perform 9.2, step c) but take no corrective action; and
perform 9.2, step d) through step g). If on a performance test that is used to reflect maintenance
practices, the battery does not deliver its expected capacity, then the test should be repeated after
9.2, step a) through step c), have been completed.
8.4 Service
A service test of battery capability (see 9.6) may be required by the user to meet a specific application
requirement upon completion of the installation, and periodically thereafter. This is a test of the battery’s
ability, as found, to satisfy the battery duty cycle. When a service test is being used on a regular basis, it will
reflect maintenance practices. If the system design changes, sizing will have to be reviewed, and the service
test may have to be repeated.
A modified performance test is a test of the battery capacity and its ability to provide a high-rate, short-
duration load (usually the highest rate of the duty cycle). This test will often confirm the battery’s ability to
meet the critical period of the load duty cycle, in addition to determining its percentage of rated capacity.
Initial conditions for the modified performance test should be identical to those specified for the service test.
A modified performance test can be used in lieu of a service test or performance test at any time. A full
discussion of modified performance tests is included in IEEE Std 450TM-2002 [B3].
A modified performance test may be performed if the test’s discharge rate envelopes the duty cycle of the
service test. The system designer and the battery manufacturer should review the design load requirements
to determine if the modified performance test is applicable and to determine the test procedure. The
acceptance criteria for this test should be determined by the system design. Typically this test is a simulated
duty cycle consisting of just two rates: a short-duration, high rate as published for the battery, or the largest
current load of the duty cycle, followed by the test rate employed for the performance test. If the ampere-
hours removed by the high-rate discharge represent a very small portion of the battery’s capacity, the test
rate can be changed to that rate for the performance test without compromising the results of the
performance test.
9.1 General
This procedure describes the recommended practice for testing by discharging the battery. All testing should
follow the safety requirements listed in Clause 4.
For an accurate representation of the battery’s capability in float service, having the battery on float charge
for at least 12 weeks since its last discharge is desirable. See Annex D for details.
The initial procedures for all battery tests, except as otherwise noted, are as follows:
a) Verify that the battery has had a high-rate charge completed more than 1 day and less than 30 days
before the start of the test.
b) Check all battery connections to make sure that they are correctly torqued, or that the connection
resistance is within range (see 7.2.3). Check all connections for corrosion, and correct if there is
evidence that the connection integrity has been compromised.
c) Read and record the float voltage of each cell just before the test. Take action as necessary to correct
any low-voltage cells (see C.1).
d) Read and record the temperature of the battery electrolyte to determine an average temperature
(every tenth cell is suggested).
g) Take adequate precautions (such as isolating the battery to be tested from other batteries and critical
loads) to ensure that a failure will not jeopardize other systems or equipment.
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
9.3.1 Test length
Field acceptance, performance, and modified performance tests are all tests of a battery’s capacity. The
service and modified performance tests verify the battery’s ability to meet its duty cycle.
a) Procedures for field acceptance and performance tests are described in 9.5, and the duration is
recommended to be approximately the same as the duty cycle. For trending purposes, the same test
length should be used throughout the battery’s life. These tests may not confirm the ability of the
battery to meet its duty cycle, particularly if very high-rate, short-duration loads determine the
battery size. However, the results of these tests can be used to compare battery capacity to
manufacturer’s data. These results would also be used to predict the end of battery life.
b) Procedures for the modified performance test are described in 9.5, and the recommended duration is
the duty cycle duration multiplied by the aging factor used in sizing the battery.
The discharge rate depends on the type of test selected. For the field acceptance test or performance test, the
discharge rate should be a constant-current or constant-power load based on the manufacturer’s rating of the
battery for the selected test. The charging method used as a basis for published data is an important factor.
For a stationary float application, data based on prolonged constant-potential charging should be used. If
constant-current charging has been used to establish the published data, appropriate float-charging
correction factors should be obtained from the manufacturer. See 9.4 for information on determining the
discharge rate for capacity tests.
9.4.1 General
Two basic methods for capacity testing are described. The recommended method is the rate adjustment
method in 9.4.2, which gives accurate results for all test lengths. The time adjustment method in 9.4.3 was
the basis for capacity tests in previous versions of this document. The time adjustment method should be
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
used only for tests of longer duration. The applicability of this alternative method for a particular test length
varies according to the cell design and end-of-discharge voltage. Consult with the manufacturer for the
applicability of this method.
This method is recommended for performance and acceptance tests. See Annex F for a discussion on the rate
adjustment and alternative methods. Battery capacity for the rate adjustment method is determined in
accordance with 9.4.2.2.
When testing a relatively new battery using this method, the actual test time may be considerably longer
than the nominal time. For trending purposes having the test always run to the final voltage is important
[see 9.5, item c)].
For test times of longer than one hour, perform the test at the full published rate. The test rate is not adjusted
before the test except in the case of extremely low temperatures (<10 °C). For lower temperatures, adjust the
discharge rate for the initial battery temperature as described in the following paragraph.
For test times of one hour or less, the published rating for the selected test length is derated to simulate the
end-of-life condition. The derating factor is based on the aging factor used in the sizing calculation (see
IEEE Std 1115) or, if this is not known, on the accepted end-of-life capacity for the battery. In no case will
the test discharge rate be less than the continuous load current for the application. The test discharge rate is
the manufacturer’s published rating multiplied by the derating factor. For an end-of-life capacity of 80%, the
test rate will be 80% of the published rate. The test rate is further adjusted for initial battery temperature. The
final test discharge rate is equal to the calculated discharge rate (after adjusting for the end-of-life condition)
divided by the temperature correction factor for the initial electrolyte temperature. Above 25 °C there is no
meaningful increase in capacity. Consult the manufacturer for correction factors for the battery to be tested.
Also refer to A.4.
To calculate capacity for this test method, consulting the manufacturer’s data to determine the published
rating for the actual time of the test to the specified terminal voltage is necessary. The battery capacity is
then calculated using the following formula:
Xa × Kc
% capacity at 25°C = ------------------ + 100
Xt
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
where
Xa is the actual rate used for the test
Xt is the published rating for time t
t is the time of test to specified terminal voltage [see 9.5, step d)]
Kc is the temperature correction factor
Rates can be in either amperes or watts. See Annex F for an example of this method.
This method is used for tests of longer duration only. Consult with the manufacturer for applicability and
refer to 9.4 and Annex F for additional discussion.
When using this method, no correction is applied for the initial temperature or end-of-life capacity. The test
rate is the full published rate for the time and end-of-discharge voltage chosen. The temperature correction
factor (Kc) used in the capacity calculation of 9.4.3.2 is the same as in 9.4.2.2. This rate correction factor
technically should not be applied to the discharge time, but limiting this method to tests where the initial
battery temperature is greater than or equal to 10 °C minimizes any errors that might result. Above 25 °C
there is no meaningful increase in capacity. Consult the manufacturer for correction factors for the battery to
be tested. Also refer to A.4.
The following equation is used to calculate the battery capacity for a time-adjusted test:
t a × Kc
% capacity at 25°C = ---------------- + 100
ts
where
ta is the actual time of test to specified terminal voltage
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
Perform the following procedures for field acceptance, performance, and modified performance tests:
a) Set up a load and the necessary instrumentation to maintain the test discharge rate determined in 9.4.
b) Disconnect the charging source, connect the load to the battery, start the timing, and continue to
maintain the selected discharge rate. If the charging source cannot be disconnected, the current
being drawn by the load has to be increased to compensate for the current being supplied by the
charging source to the battery.
c) Read and record the individual cell voltages and the battery terminal voltage. The readings should be
taken while the load is applied at the beginning and at the completion of the test, and at specified
intervals. There should be a minimum of three sets of readings. Individual cell voltage readings
should be taken between respective posts of like polarity of adjacent cells, so as to include the
voltage drop of the intercell connectors.
d) Maintain the discharge rate, and record the elapsed time at the point when the battery terminal
voltage decreases to a value equal to the minimum average voltage per cell as specified by the
design of the installation (e.g., 1.10 V) times the number of cells per string. If the battery does not
pass the normal criteria for capacity testing, additional data may be beneficial for evaluation or for
determining corrective action. If installation conditions permit, the testing should be continued to
the original test time or a lower final voltage (e.g., 95% of the specified minimum) to acquire this
information. Nickel-cadmium cells are generally not damaged as a result of cell reversal, so no
provisions are required for bypassing weak cells.
e) If one or more cells are approaching reversal of their polarity (0.5 V or less), and the test is at 90–95%
of the expected completion time, continue the test until the specified terminal voltage is reached.
f) If earlier in the test one or more cells are approaching reversal of their polarity, the test may be
continued so as to determine the capacity of the remainder of the battery. Bypassing of cells is not
recommended. Because the reversed cell(s) will be making a negative contribution to the overall
battery voltage, adjust the minimum terminal voltage to compensate. The new minimum terminal
voltage will be the minimum cell voltage multiplied by the number of non-reversed cells, plus the
negative voltage of the reversed cell(s). If a modified performance test is being performed in lieu of
a service test, the minimum terminal voltage should not be recalculated.
For example, a 95-cell battery is being tested to a minimum terminal voltage of 105 V (1.10 V per
cell). During the discharge, two weak cells go into reversal and stabilize at –0.30 V The new
minimum terminal voltage is 93 cells × 1.10 V/cell – (2 × 0.3) = 101.7 V.
g) Observe the battery for abnormal intercell connector heating.
h) At the conclusion of the test, determine the battery capacity according to the procedure outlined in
9.4.
A service test is a special battery test that may be required to determine whether the battery will meet the
battery duty cycle (see 8.4). The system designer should establish the test procedure and acceptance criteria
before the test. The battery should be tested in its “as found” condition, and the test discharge rate should not
be corrected for temperature or age. If the battery was sized in accordance with IEEE Std 1115, the margins
added for temperature, load growth, and aging will provide adequate battery capacity to meet the battery
duty cycle throughout its service life. Trending battery voltage during the critical periods of the load cycle
will provide the user with a means of predicting when the battery will no longer meet the duty cycle. If the
system design changes, sizing (IEEE Std 1115) has to be reviewed, and the service test will have to be
modified accordingly. Successful test results can be used to evaluate battery performance and degradation.
9.7 Restoration
Disconnect all test apparatus. High-rate charge the battery and return it to normal service.
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
The timing of battery replacement is a function of the sizing criteria used and the capacity margin available,
compared with the load requirements (see Annex E). Whenever replacement is required, the recommended
maximum time for replacement is one year. Other factors, such as unsatisfactory battery service test results
(see 8.4), require battery replacement, unless a satisfactory service test can be obtained following corrective
actions.
Replacement cells, if used, should be compatible with existing cells and should be tested before installation.
Replacement cells are not usually recommended as the battery nears the end of its life.
Failure to hold a charge, as shown by cell voltage, is a good indicator for further investigation into the need
for replacement.
11. Records
The analysis of data obtained from inspections and corrective actions is important to the operation and life of
the batteries. Data such as indicated in Clause 6 should be recorded at the time of receiving and installation
and as specified in 7.2 during each inspection. Records should also contain reports on corrective actions
(see 7.3) and on tests indicating discharge rates, their duration, and results.
Preparing forms to record all data in an orderly fashion and in such a way that comparison with past data is
convenient is recommended. A meaningful comparison will require that all data be converted to a standard
base in accordance with the manufacturer’s recommendations.
12.1 General
All batteries have a useful life and eventually have to be either repaired or recycled. The constituents of the
nickel-cadmium cell, such as the corrosive potassium hydroxide electrolyte and the toxic cadmium metal,
are hazardous. Therefore, a nickel-cadmium battery that is not of any use or value should be recycled in a
proper fashion.
12.2 Reapplication
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
Nickel-cadmium batteries retain their ability for service, albeit at a lower capacity level, for many years
(see Annex E). Therefore, when nickel-cadmium batteries reach the end-of-service life in a particular
application, they may be used in another application whose requirements are met by the lower capacity.
Pocket-plate batteries may require replacement of the electrolyte at this time.
12.3 Recycling
Nickel-cadmium batteries that cannot be reapplied must be recycled. Seek advice from the battery
manufacturer on how to proceed with battery recycling. All applicable governmental regulations should be
followed.
Annex A
(informative)
Nickel-cadmium battery
A.1 Construction
The nickel-positive active materials and the cadmium-negative active materials are firmly contained in
plates of alternate polarity, insulated by separators, and formed into plate groups. Plate groups are assembled
into cells with either plastic or steel containers. One or more cells connected together constitute a battery.
A.2 Electrolyte
Specific gravity readings are not required as part of the normal maintenance routine for nickel-cadmium
batteries.
The nominal specific gravity of electrolyte furnished by the manufacturers may vary slightly (1.180–1.210).
The specific gravity also varies with temperature and electrolyte level. Each manufacturer publishes specific
gravity correction factors for temperature.
In most stationary battery applications, the electrolyte will retain its effectiveness for the life of the battery.
However, under special battery service conditions, such as high temperature or frequent cycling, potassium
carbonate buildup in the electrolyte may reach a level that will influence battery performance. If the
electrolyte is found to be carbonated (using the manufacturer’s test kit), battery performance can be
improved by replacing the electrolyte.
The nominal voltage for the nickel-cadmium cell is 1.2 V per cell. The manufacturers of nickel-cadmium
batteries provide charging recommendations for each battery type. These recommendations typically fall
within the following ranges:
1.40 V to 1.47 V per cell: Float voltage per cell. Charged batteries will be maintained in a charged condition
with low water consumption.
1.45 V to 1.55 V per cell: High-rate charge voltage per cell. A practical voltage to be used in recharging a
partially or fully discharged battery without exceeding system limitations.
1.56 V to 1.74 V per cell: Maximum high-rate charge voltage per cell for most rapid recharge of a partially
or fully discharged battery. This voltage should be used for all installations where the connected equipment
is not affected by the resultant high overall voltage or where voltage-sensitive equipment can be either
disconnected during recharge, or isolated by a voltage-regulating device. Do not exceed system voltage
limits.
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
18 Copyright © 2005 IEEE. All rights reserved.
Copyright The Institute of Electrical and Electronics Engineers, Inc.
Provided by IHS under license with IEEE Licensee=SAUDI ELECTRICITY COMPANY/5902168001
No reproduction or networking permitted without license from IHS Not for Resale, 04/25/2006 04:26:10 MDT
IEEE
REPLACEMENT OF VENTED NICKEL-CADMIUM BATTERIES FOR STATIONARY APPLICATIONS Std 1106-2005
A.4 Temperature
Nickel-cadmium batteries can operate over a temperature range of –55 °C to +60 °C; however, the typical
operating range is –20 °C to +45 °C. At temperatures lower than +20 °C, the battery’s capacity is reduced.
High-density electrolyte is required for operation at temperatures below –20 °C. The typical high-
temperature operating limit is +45 °C, but the battery will operate if subjected to intermittent higher
temperatures of up to +60 °C. At temperatures higher than +25 °C, there is no meaningful increase in
capacity, but the life may be shortened. The rule of thumb for high-temperature operation is that the life of a
nickel-cadmium battery is reduced 20% for each 10 °C increase in the average operating temperature above
25 °C.
For battery testing purposes, the temperature correction factor for +20 °C to +45 °C is 1.0. The reduction in
capacity below 20 °C depends on the plate design and discharge rate. Contact the manufacturer for specific
values.
Annex B
(informative)
Continue the high-rate charge, if required, until such time as the charge current is essentially the same as the
current recorded in step a); normally no longer than 72 hours is required. At completion of high-rate
charging, return the charger to float voltage.
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
Annex C
(informative)
Corrective actions
If the voltage of an individual cell in a floating battery is found to be below the minimum limit, apply a high-
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
rate charge. Applying the high-rate charge to the individual cell concerned is generally more effective.
The minimum limit is typically 1.35 V but can vary according to the cell design. For example, some
manufacturers of cells with sintered positive plates and plastic-bonded negatives specify 1.32 V as the
minimum limit. Consult the battery manufacturer for the appropriate voltage limit.
Unusual water consumption is an indication of excessive charge voltage. When adding water becomes
necessary, fill all cells to the maximum level with distilled or other approved-quality water. Check the
charger voltage setting at the battery terminals.
If the level of electrolyte has dropped so low as to expose plates, add water immediately. If visual inspection
shows no evidence of leakage, then charge the battery and test it in accordance with the manufacturer’s
recommendations.
If the total battery float voltage is found to be less than the manufacturer’s recommended minimum value,
the battery is not being charged properly. At 1.30 V per cell, the battery is in a discharging state. Follow the
instructions in Annex B to determine the state of charge and take corrective action.
Annex D
(informative)
Battery manufacturers account for the float effect in their cell performance specifications with a derating
factor or separate specifications (non-float corrected and float corrected). Cell performance specifications
that are designated as the capacity “after prolonged float charging” have accounted for the float effect. Cell
performance specifications that are designated as the “fully charged” or “IEC 60623” [B1] capacity have not
accounted for the float effect. Figure D.1 shows the effect of prolonged float charging on a medium-rate cell
discharged at 0.1C5 (10 A per 100 Ah of rated capacity).7 The curves show that float charging actually
generates a higher capacity, but that the average voltage on discharge is reduced.
1.35
1.30
1.25
IEC 60623
1.20
Float
1.15
Volts
1.10
1.05
1.00
0.95
0.90
0 2 4 6 8 10 12
Time (hours)
7Byconvention in the nickel-cadmium battery industry, charge and discharge currents are often expressed as multiples of the rated
ampere-hour capacity. C5 is a current that is numerically equivalent to the rated capacity at the 5-hour rate.
For such long discharges, the “knee” of the discharge curve is well above the end-of-discharge voltage.
However, when the discharge rate is increased the knee of the curve may be reduced below the end-of-
discharge voltage and the available capacity may be reduced. This condition is shown in Figure D.2, which
shows the same medium-rate cell discharged at 0.5C5 (50 A per 100 Ah of rated capacity).
1.25
1.20
1.10
Float
Volts
1.05
1.00
0.95
0.90
0.85
0 20 40 60 80 100 120
Time (minutes)
The increased capacity due to float charging can still be observed, but the crossover point between the two
curves is below 1.0 V; so the extra capacity cannot be realized at this rate. At most typical end-of-discharge
voltages, the available capacity is reduced. For an end-of-discharge voltage of 1.10 V/cell, for example, the
discharge time is reduced from about 101 minutes to 75 minutes.
With regard to battery capacity testing, the float effect should be considered as follows:
a) A capacity test should be based on the appropriate cell performance specifications, depending on
whether the float effect has had time to develop.
c) Although a field acceptance test carried out after less than 12 weeks on float charge (see 8.2.3) will
confirm that a battery has adequate capacity, the acceptance test results cannot easily be compared to
future performance test results because of the float effect. For this reason, completing the first field
performance test after 12 weeks on float charge to provide a separate baseline for subsequent
trending is recommended.
Discharging a battery tends to remove the float effect. The degree to which the float effect is removed
depends on the depth of discharge. The active material that is converted to nickel hydroxide during
discharge will have the float effect temporarily removed, and the active material that has not converted will
still have the float effect. Upon recharge, the float effect again fully returns over the next few weeks or
months, depending on the amount of active material converted during the discharge. For this reason, a
performance test should not be conducted for some period of time after the battery has been discharged and
subsequently recharged; the battery could perform better than would really be expected for prolonged float
charging. Furthermore, there is no practical method of scaling between float-corrected and non-float-
corrected data.
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
Annex E
(informative)
110
100
90
% of Rating
80
70
60
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
50
0 5 10 15 20 25
Time (years)
Clause 10 provides guidance on replacement criteria. In many cases, replacement is based on application-
specific parameters, such as cranking time in an engine starting duty or reserve time at normal load in a
telecommunications application. Under such circumstances, discharge test data may not be interpreted based
on sizing calculations or set percentage criteria as discussed in Annex F, but simply on the continued ability
of the battery to support the load as it currently exists.
When a nickel-cadmium battery is no longer capable of supporting its connected loads as required, it may be
reapplied in another duty (see 12.1).
Depending on battery design and charging parameters, the available capacity of a nickel-cadmium battery
may be reduced when it is subjected to repetitive deep discharges. This capacity loss is temporary. Capacity
can be recovered to its original level by applying a reconditioning charge as recommended by the battery
manufacturer.
Annex F
(informative)
F.1 General
Capacity testing (acceptance, performance, and modified performance tests) is used to trend battery aging.
The result of a capacity test is a calculation of the capacity of the battery. The calculated capacity is also
used to determine whether the battery requires replacement (see Clause 10). Subclause 9.4 describes two
methods for calculating capacity, and the purpose of this annex is to discuss their applicability and to
provide example calculations.
Clause 10 provides criteria for battery replacement. Although there is no fixed capacity at which a nickel-
cadmium battery should be replaced (see Annex E), the following discussion will be based on an end-of-life
condition at 80% of rated capacity. For a range of cells in which the capacity rating factors are constant,
published ratings are proportional to the rated capacity. Thus, 80% of rated capacity also corresponds to
80% of the published rating for a given time. For example, if the published rating for a cell is 100 A for
300 minutes, the end-of-life capability will be 80 A for 300 minutes. This is the basis of the rate-adjusted
performance test method.
As demonstrated in F.3, a calculation of battery capacity using the rate-adjusted method can be somewhat
complex. However, because the rate-adjusted method gives correct results for all test times, it is the basis for
this recommended practice. For longer test times, using the simpler time-adjusted method that was included
in earlier versions of this recommended practice may be possible. In the time-adjusted method, the capacity
is calculated using 100% of published current. Thus, a cell rated at 100 A for 300 minutes would have an
end-of-life capability of 100 A for 300 min × 0.8 = 240 min. The calculation of capacity is a simple ratio of
the test time to the published time (ignoring temperature adjustments).
The time-adjusted method, however, does not take into account changes in battery efficiency with discharge
time. Data from a hypothetical medium-rate cell will be used to illustrate this point. Table F.1 shows the
float-corrected performance of the KM438P cell type from the ABC Company, based on an end-of-
discharge voltage of 1.10 V/cell. These data are plotted in Figure F.1.
Table F.1—KM438P cell performance to 1.10 V/cell after prolonged float charging
KM438P 438 1041 743 396 315 246 198 164 127 85 54
1000
900
800
700
600
500
400
Current (A)
300
200
100
90
80
70
60
50
1 10 100
Time (min)
For an 8-hour discharge, the cell rating is 54 × 8 = 432 Ah. The 80% point in a time-adjusted test
corresponds to 6.4 hours (80% of 8 hours). An analysis of the graph shows that in a 6.4-hour discharge (or
384 minutes), a new battery gives about 66.7 A, for a discharged capacity of 427 Ah or 99% of its 8-hour
capacity. This 1% reduction is due to a loss of battery efficiency at the shorter discharge time. The loss of
efficiency is expected to be approximately the same for a battery at end-of-design life (80%). Thus, when a
KM438P battery is discharged at the 8-hour rate of 54 A, and gives 6.4 hours, almost all of the shortfall is
due to battery degradation.
This performance is not the case as the discharge time becomes shorter. For a 30-minute test, for example,
the 80% point by the time-adjusted method would be 24 minutes. However, a rate-adjusted capacity
calculation for the same discharge (see F.3.3) shows that the actual capacity at this point is 94%. The 14%
difference between the two calculations is simply due to the lower efficiency of the battery at the 24-minute
rate.
As the loss of capacity in a nickel-cadmium battery operating under moderate temperature conditions
averages around 1% per year, the use of the time-adjusted method in the example of an 8-hour test above
would mean that the battery would be replaced one year sooner than necessary. For the 30-minute example,
the 14% loss in efficiency at 24 minutes would result in the battery being replaced 14 years earlier than
necessary when the time-adjusted method is used.
The assumption is that 1% capacity differential, or one year, is the upper limit to the degree of conservatism
for battery replacement. On this basis, the lower time limit for the applicability of the time-adjusted method
corresponds to the point at which the available capacity at 80% of a desired test time falls below 99% of the
capacity available at the full test time. In the example above, the lower time limit would be 8 hours, but this
figure will change by manufacturer, cell type (H, M, or L), and end-of-discharge voltage. The use of the
time-adjusted method for high-rate cells discharged to a relatively lo- end voltage, for example, may be valid
for test times of 90 minutes or less.
Because of this variability, the rate-adjusted method is used as the basis for this recommended practice.
Consult the manufacturer for information on the applicability of the time-adjusted method for specific
battery types and conditions.
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
26 Copyright © 2005 IEEE. All rights reserved.
Copyright The Institute of Electrical and Electronics Engineers, Inc.
Provided by IHS under license with IEEE Licensee=SAUDI ELECTRICITY COMPANY/5902168001
No reproduction or networking permitted without license from IHS Not for Resale, 04/25/2006 04:26:10 MDT
IEEE
REPLACEMENT OF VENTED NICKEL-CADMIUM BATTERIES FOR STATIONARY APPLICATIONS Std 1106-2005
F.3.1 General
Application of the formula for rate-adjusted capacity calculation in 9.4.2.2 requires that a published
performance rate be established for the actual test time t. Simple interpolation between published rates for
different times does not yield correct results. Instead, it is best to interpolate on the basis of capacity figures
calculated from the published rates.
Based on the actual test time t, two published data points are chosen for times t1 and t2, which bracket time t.
The published rate for time t is as follows:
t – t1
- ( X t – X1 t 1 ) + X1 t1
-------------
t2 – t1 2 2
X t = --------------------------------------------------------------
t
where
t is the actual test time
t1 is published data point 1
t2 is published data point 2
X1 is the published rate for data point 1
X2 is the published rate for data point 2
Xt is the published rate for time t
This equation can then be combined with the capacity calculation in 9.4.2.2. Figure F.2 shows how this
combination can be done in a spreadsheet program.
A KM438P battery has been installed for a 30-minute duty. The original sizing included a 1.25 aging factor.
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
The discharge rate for the performance test is therefore 80% of the published 30-minute rate of 315 A, or
252 A. (The test temperature is assumed to be 25 °C, so there is no adjustment for temperature.) After
12 years of operation, the performance test duration is 38 minutes.
The 30- and 60-minute published rates are used for the interpolation, and application of the above formula
gives a published rate of 286 A for 38 minutes. The temperature correction factor for 25 °C is 1.00. The
calculated capacity is therefore:
252 × 1.00
------------------------- × 100 = 88.1%
286
From this example, a test time of 30 minutes will result in a calculated capacity of 80%, because the test rate
is 80% of the published 30-minute rate. Therefore, the rate-adjusted performance test method gives results
that are exactly in accordance with the sizing parameters.
F.3.3 Interpretation of data from tests carried out at full published rates
Applying the capacity calculation formula for the rate-adjusted method to other test results, where testing
may have been carried out at the full published discharge rate, is possible. For example, if a test of a
KM438P battery at the full 30-minute rate of 315 A yielded a 24-minute test time (for which the published
current by interpolation is 335 A), the calculated capacity is
315 × 1.00
------------------------- × 100 = 94.0%
335
This calculation demonstrates the large differences between the time-adjusted and rate-adjusted methods for
short duration tests. The time-adjusted method gives a result of 80% capacity (24 minutes as a percentage of
30 minutes), but most of this apparent capacity shortfall is due to the lower efficiency of the battery at the
24-minute rate. Depending on the design of the cell being tested and the chosen test time, the results of a
time-adjusted test may be extremely misleading, as demonstrated in Figure F.3. This graph shows the same
published rating curve for the KM438P cell type (from Figure F.1), along with a curve corresponding to
80% of the published ratings. This represents the end-of-life condition if a 1.25 aging margin has been used.
From the 80% curve in Figure F.3, a test of an 80% battery at the published 15-minute rate of 396 A will
result in a discharge time of just over 6 minutes. Although this result may seem to indicate a severe battery
failure, it is actually a function of the battery’s inherent performance capability and its efficiency for short,
high-rate discharges.
1000
900
800
700
600
500 Published rating curve
400
Current (A)
300
200
80% of published
rating
100
90
80
70
60
50
1 10 100
Time (min)
The preceding examples have assumed that a 1.25 aging factor was used in the sizing calculation
(see IEEE Std 1115). The rate-adjusted method can be equally applied for other aging factors used.
Example 1. If an aging factor of 1.11 was used for sizing a battery for a 15-minute duty, the rate used for the
rate-adjusted test is 90% of the published 15-minute rate. The battery should be replaced when it fails to
supply this rate for the full 15 minutes.
Example 2. If no compensation for aging was included in the sizing calculation, the aging factor is 1.00, and
the rate used for the rate-adjusted method is 100% of rating. The battery should be replaced when it can no
longer provide this rate for the full published time.
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
Annex G
(informative)
These steps are performed at a nominal temperature of 20 °C, and the discharged capacity in step c) forms
the basis for the rated capacity of the cell.
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
30 Copyright © 2005 IEEE. All rights reserved.
Copyright The Institute of Electrical and Electronics Engineers, Inc.
Provided by IHS under license with IEEE Licensee=SAUDI ELECTRICITY COMPANY/5902168001
No reproduction or networking permitted without license from IHS Not for Resale, 04/25/2006 04:26:10 MDT
IEEE
REPLACEMENT OF VENTED NICKEL-CADMIUM BATTERIES FOR STATIONARY APPLICATIONS Std 1106-2005
--```,`,,,``,,`,``,`,`,,,,-`-`,,`,,`,`,,`---
Annex H
(informative)
Bibliography
[B1] IEC 60623 (September 2001), Secondary Cells and Batteries Containing Alkaline or Other Non-Acid
Electrolytes-Vented Nickel-Cadmium Prismatic Rechargeable Single Cells.8
[B2] IEEE 100, The Authoritative Dictionary of IEEE Standards Terms, Seventh Edition.9, 10
[B3] IEEE Std 450TM-2002, IEEE Recommended Practice for Maintenance, Testing, and Replacement of
Vented Lead-Acid Batteries for Stationary Applications.
[B4] IEEE Std 693TM -1997, IEEE Recommended Practice for Seismic Design of Substations.
[B5] Illuminating Engineering Society of North America, Lighting Handbook, Eighth Edition.
8
IEC publications are available from the Sales Department of the International Electrotechnical Commission, Case Postale 131, 3, rue
de Varembé, CH-1211, Genève 20, Switzerland/Suisse (http://www.iec.ch/). IEC publications are also available in the United States
from the Sales Department, American National Standards Institute, 25 West 43rd Street, 4th Floor, New York, NY 10036, USA (http://
www.ansi.org/).
9IEEE standards or products referred to in this clause are trademarks of the Institute of Electrical and Electronics Engineers, Inc.
10 IEEE publications are available from the Institute of Electrical and Electronics Engineers, Inc., 445 Hoes Lane, Piscataway, NJ
08854, USA (http://standards.ieee.org/).