Bfdeo 2021 Q4

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

MATERIALS SOURCE MAP

BENGUET FIRST DISTRICT ENGINEERING OFFICE


N AS OF OCTOBER 2021

1 16°20'47.12"N 120°36'57.17"E
SOURCE NO. 1 : M.L. CARANTES DEV'T & GENERAL CONSTRUCTION
LOCATION: Right of Camp 6 Bridge along Kennon Road Camp 4,Tuba, Benguet.
1 2 3 4
CONDITION OF ROAD : Concrete Pavement (Good Condition)
SD
TAINC
TO
H
N
EEARE
B
D
S
R
TG
IE : 400 lm. from Camp 6 Bridge (K0237+011).
HAULING DISTANCE TO OFFICE : Approx. 22 Kms.
AREA: 5,311 sq.m. QUANTITY : 3,824 cu.m
MATERIALS : APPPROXIMATE USABLE VOLUME PERCENTAGE
SAND : 1,568 cu.m. 41.00%
GRAVEL : 2,103 cu.m. 55.00%
M.L. CARANTES DEV'T & GENERAL
WASTE : 153 cu.m. 4.00 % BUED RIVER (CAMP 4) BUED RIVER (CAMP 1) MCG AGGREGATES & CRUSHING PLANT
POTENTIAL USE/S : Item 311: Fine and Coarse Aggregates for Concrete Mix and; CONSTRUCTION
Fine and Coarse Aggregates for Bituminous Mix.
ACCESSIBLITY :
ROAD CONDITION FROM SOURCE Gravel Road
Road is accessible to any type of vehicle. 5 6 7 8
TO NATIONAL ROAD:
REMARKS : · Proper processing of raw materials to meet the specific standard of
the proposed items of work prior to use.
· Proper blending of aggregates before use.
· ECC issued by the EMB-CAR is attached.
· Test results attached passed the specifications as per items of
work specified in the corresponding Potential Use/s.
· Permit to operate business is on process.
ITOGON RIVER ADUNOT RIVER AGNO RIVER KALING RIVER
2 16°20'22"N 120°37'8"E
SOURCE NO. 2 : BUED RIVER
LOCATION : Downstream of Camp 5 Bridge No. 1 along Kennon Road, BRGY.
9
Camp 4, Tuba, Benguet.
CONDITION OF ROAD: Concrete Pavement (Good Condition)
DISTANCE TO THE NEAREST BRIDGE: 100 lm. from Camp 5 Bridge No. 1 (K0235+314).
HAULING DISTANCE TO OFFICE : Approx. 23 Kms
AREA : 170 SQ.M. QTY : 83 CU.M.
MATERIALS : APPROX. USABLE VOLUME PERCENTAGE BUGUIAS
BOULDER :
WASTE :
58 CU.M.
25 CU.M.
70.00 %
30.00%
TINOC
POTENTIAL USE/S : Borrow/Fill/Selected Fill, Item 104, Item 505, and Item 506. GOLDRICH CONSTRUCTION AND TRADING KIBUNGAN
ACCESSIBLITY : Accessible to heavy equipment only. (Concrete Batching Plant)

.
ROAD CONDITION FROM SOURCE

s Rd
Gravel Road
TO NATIONAL ROAD:
BENGUET KABAYAN

uguia
REMARKS : Accessible to heavy equipment only.
3 16°14'19.92"N 120°31'37.81"E
SECOND DEO

an-B
SOURCE NO. 3 : BUED RIVER ATOK
LOCATION : Upstream & Downstream of Camp 1 Bridge along Kennon Road,

t
-Aba
Brgy. Camp 1 , Tuba, Benguet.
CONDITION OF ROAD : Concrete Pavement (Good Condition)
KAPANGAN

n
baya
SD
TAINC
TO
H
N
EEARE
B
D
S
R
TG
IE : 200 lm. from Camp 1 Bridge (K0216+120).
HAULING DISTANCE TO OFFICE : Approx. 42 Kms

d-Ka
AREA : 2,458 SQ.M. QTY : 2187 CU.M. Naguilian
MATERIALS : APPROX. USABLE VOLUME PERCENTAGE Bauang
Bauang Baguio Rd

o
SAND : 842 CU.M. 38.50 % TUBLAY

l-Bok
GRAVEL: 361 CU.M. 16.50 % Rd
BOULDER: 437 CU.M. 20.00 % SABLAN on toc
oB

Gure
Ba
WASTE: 547 CU.M. 25.00%
gu Ba gui
POTENTIAL USE/S : Borrow/Fill/Selected Fill, Item 104, Item 200, Item 201, Item 300, io
Item 311, Item 505, Item 506, Fine & Coarse aggregates for Ba .
ua LA TRINIDAD Rd
Bituminous Mix and Fine & Coarse aggregates for Concrete mix.
ng caya
Viz

Shilan
ACCESSIBILITY : Road is Accessible to any kind of vehicle. Rd
uev
a BOKOD

Tawan
ROAD CONDITION FROM SOURCE Gravel Road

B
Pico Lamtang Rd

eckel
TO NATIONAL ROAD : et N
ngu

g-A

Rd
Caba Asin N
Be

mbiong
REMARKS : · Proper processing of raw materials to meet the specific standard an
of the proposed items of work prior to use. LA UNION San P galisan Bag
ascual,

Rd.
a·repoP
.esuerofebsetagerga fognidnelbdnasredluob fognihsw r Tuba uio
BAGUIO
· Test results attached passed the specs as per items of work
specified in the corresponding Potential Use/s.
· Permit filed at the Office of the Provincial Governor of Benguet is 9
Aringay
CITY Loakan
Itog
on
Rd BENGUET
y Airport

4
on process.

gh
wa FIRST DEO To
Hi
16°13'57"N 120°30'56"E
to

Itog nuel B
Ka
s it S d
SOURCE NO. 4 : MCG AGGREGATES & CRUSHING PLANT
1 Tubao

Ma
y
rco im roa ap

on
Agoo- Baguio City Road l a
Ma
LOCATION : Camp 1, Tuba, Benguet.
ty s
Ci ma

Da . Rd.
CONDITION OF ROAD : Concrete Pavement (Good Condition)
To

lup
Agoo
2 Pugo

d
SD
TAINC
TO
H
N
EEARE
B
D
S
R
TG
IE : 50 l.m. from Dungon Bridge (K0217+680).

irip
Man

HAULING DISTANCE TO OFFICE : Approx. 43 Kms.


TUBA
Rosa

Sn
QUANTITY:18,056 CU. M.
AREA : 16,121 SQ. M.
LA UNION
Rd
ila-N

MATERIALS : APPROX. USABLE VOLUME PERCENTAGE


3 ad
r

SAND : 41.00%
io-Pu

7,403 CU. M.
orth

o
nR ITOGON
GRAVEL: 10,292 CU. M. 57.00%
o
R

WASTE: 361 CU. M. 2.00%


go

nn
d

POTENTIAL USE/S : Borrow/Fill/Selected Fill, Item 104, Item 200, Item 201, Item 300, and
4 Ke
Pan

Item 311 - Fine & Coarse aggregates for Concrete and Bituminous mix. Man
ila-N
g

ACCESSIBILITY : Road is Accessible to any kind of vehicle.


asin

ROAD CONDITION FROM SOURCE Gravel Road


orth Rosario
Rd
an L

TO NATIONAL ROAD :
REMARKS : · Proper processing of raw materials to meet the specific standard
a un

of the propose item prior to use


8
ion

· Proper washing and blending of aggregates prior to use.


· Permit to operate business is hereto attached.
Inte

· Test results attached passed the specs as per items of work


Sison
7
r pro

specified in the corresponding Potential Use/s.


5 16°22'5"N 120°41'7"E
v Rd

SOURCE NO. 5 : ITOGON RIVER Ma


LOCATION : 250 Meters left of Baguio-Bua-Itogon Road, Brgy. Poblacion, Itogon,
Benguet 7 16°28'31"N
San Fabian
120°47'40"E
nil
a -N
6
CONDITION OF ROAD : Concrete Pavement (Good Condition) SOURCE NO. 7 : AGNO RIVER
ort
Pozorubio hR
SD
TAINC
TO
H
N
EEARE
B
D
S
R
TG
IE :
HAULING DISTANCE TO OFFICE :
500 lm. from Liang Bridge (K0265+887)
Approx. 24.50 Kms. LOCATION
ian
.
Rd: Benguet
d
300 Mtrs. left of Taal Bridge along Benguet Vizcaya Road, Bokod, 5
AREA : 2574 SQ. M. QUANTITY: 669 CU. M.
abROAD
MATERIALS : CONDITION OF F : Concrete Pavement (Good Condition)
APPROX. USABLE VOLUME PERCENTAGE
SD
TAINC
TO
H
N
EEARE
B
D
S
R
TG
IE an
n S TO OFFICE : Approx. 55 Kms
BOULDER: 468 CU.M. 70.00% : 300 lm from Taal Bridge (K0297+792) LEGEND:
WASTE: 201 CU.M. 30.00% n u
HAULING DISTANCEa San Jacinto
B u AREA : 58,157 SQ.M. QTY : 12,212.9 CU.M.
POTENTIAL USE/S : Item 505: Riprap, and Item 506: Masonry
an ROAD SURFACE TYPE
ACCESSIBILITY : Road is Accessible to any kind of vehicle. gu p MATERIALS : APPROX. USABLE VOLUME PERCENTAGE
ROAD CONDITION FROM SOURCE Gravel Road D a SAND : 2,833 Mangaldan-Manaoag-B
CU. M. 23.20%
inalonan Rd Concrete/Asphalt Pavement
Pa Lingayen GRAVEL: 4,250 CU. M. 34.80%
TO NATIONAL ROAD :
REMARKS : · Proper washing nofgaboulders prior to use.
Dagupan BOULDER: 1,954 CU. M.
Mapandan
16.00% Gravel Road
sin and Item 506aypasses adorfor Class A.
brspecs Rd. WASTE: 3,175 CU. M. 26.00%
· Test result for Item 505
an of Li ng en lathe Asphalt/Gravel
San

· Permit issued by the Office POTENTIAL USE/S : Borrow/Fill/Selected Fill, Item 104, Item 200, Item 201, Item 300, Item
Z the Provincial Governor of Benguet is
am 311, ItemU rdan
505, Item 506 , Fine/Coarse aggregates for Bituminous mix.
eta Dagupan
hereto attached.
Car

ba Lingayen Rd
ACCESSIBILITY : Road is Accessible to any kind of vehicle.
6 le PANGASINAN
los C

120°43'45"E s R
Cam

16°25'42"N
d
ROAD CONDITION FROM SOURCE
TO NATIONAL ROAD :
Gravel Road 9 16°23'24"N 120°33'41"E
Urdaneta
Vill

SOURCE NO. 6 : ADUNOT RIVER


iling
alas

REMARKS : · Proper processing of raw materials to meet the specific standard of SOURCE NO. 9 : GOLDRICH CONSTRUCTION AND TRADING
asi

LOCATION : 600 Meters Downstream of Adunot Bridge along Benguet -Nueva


io

the proposed items of works prior to use. (Concrete Batching Plant)


Waw

sM

PANGASINAN Bugallon
Rd.

Vizcaya Road, Bokod, Benguet. · Proper washing of boulders and screening/processing of aggregates
LOCATION : Marcos Highway, Central Poblacion,Tuba, Benguet.
ala

CONDITION OF ROAD : Concrete Pavement (Good Condition) prior to use.


a Ba
Pa

siq

SD
TAINC
TO
H
N
EEARE
B
D
S
R
TG
IE : 600 lm. from Adunot Bridge (K0275+536). · Test results attached passes the specs of the items mentioned above. CONDITION OF ROAD : Concrete Pavement (Good Condition)
ng

u
yam

HAULING DISTANCE TO OFFICE : APPROX. 34 Kms. SAN CARLOS CITY · Permit issued by the Office of the Provincial Governor of Benguet is DISTANCE TO THE NEAREST BRIDGE: 2.04 kms.from Badiwan Bridge.
iS
as

AREA : 5,079 SQ.M. QTY : 4,215 CU.M. hereto attached.


an

HAULING DISTANCE TO OFFICE : Approx. 14 Kms


ina

ban

MATERIALS : APPROX. USABLE VOLUME PERCENTAGE


8 PRODUCT : Concrete Mix
nT

Ca

16°34'3"N 120°50'20"E
gM

SAND : 1,467 CU. M. 34.80% Road is accessible to any type of vehicle.


rlos

ACCESSIBLITY :
arl

SOURCE NO. 8 : KALING RIVER


ac

GRAVEL: 978 CU. M. 23.20% PRODUCTION OUTPUT : 200-300 cu.m.


alas

Rd
Rd

BOULDER: 674 CU. M. 16.00% LOCATION : 250 Meters Upstream of Kaling Bridge along Gurel-Bokod ROAD CONDITION FROM SOURCE Concrete Pavement
.
iqui

WASTE: 1,096 CU. M. 26.00% Kabayan Road, Kabayan, Benguet. TO NATIONAL ROAD :
POTENTIAL USE/S : Borrow/Fill/Selected Fill, Item 104, Item 200, Item 201, Item 300, Item CONDITION OF ROAD : Concrete Pavement (Good Condition) REMARKS : Approved of accreditation from DPWH-BRS is hereto attached.
Rd.

311, Item 505, Item 506, Fine & Coarse aggregates for Bituminous SD
TAINC
TO
H
N
EEARE
B
D
S
R
TG
IE : 250 lm. from Kaling Bridge (K0322+383 )
Mix, Fine & Coarse aggregates for Concrete mix. HAULING DISTANCE TO OFFICE : Approx. 81 Kms
ACCESSIBLITY : Road is accessible to any type of vehicle.
ROAD CONDITION FROM SOURCE TO MATERIALS : APPROX. USABLE VOLUME
PANGASINAN
AREA : 1,011 SQ. M. QTY : 712.27 CU. M.
PERCENTAGE NOTES:
Gravel Road BOULDER: 501 CU. M. Sources of materials outside Benguet 1st District
NATIONAL ROAD : 70.00%
WASTE: Bayambang
217 CU. M. 30.00% Engineering Office jurisdiction were not included because of
REMARKS : · Proper processing of raw materials to meet the specific standard the travel restriction due to the implementation of General
of the proposed items of work prior to use. POTENTIAL USE/S : Borrow/Fill/ Selected Fill, Item 104, Item 505, and Item 506.
· Proper washing of boulders and screening/processing of Community Quarantine (GCQ).
ACCESSIBILITY : Road is Accessible to any kind of vehicle.
aggregates prior to use. ROAD CONDITION FROM SOURCE
· Test results attached passed the specs as per items of work Gravel Road This is to certify that the Materials Source Quarry Sites
TO NATIONAL ROAD : & Quantities were verified and updated during the time of
specified in the corresponding Potential Use/s.
· Permit filed at the Office of the Provincial Governor of Benguet is REMARKS : · Proper washing of boulders prior to use. validation, as per attached Field Data Sheet.
on process. · Test result for Item 505 and Item 506 passes the specs for Class A.

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY:

CESAR L. BACANI EDGARDO G. ENRIQUEZ BENEDICTA C. MENDOZA


Chief, Quality Assurance Section OIC-Assistant District Engineer OIC- District Engineer