SAIC-P-3003 Rev 7 Final
SAIC-P-3003 Rev 7 Final
SAIC-P-3003 Rev 7 Final
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A. Document Review
Schedule Q
A1 Documentation for traceability reviewed and implemented.
Att. IV Sec. 4
B. Material Inspection
Schedule G
B1 Equipment and Materials shall be new and unused.
Sec. 2
C. Installation Inspection
Check that the equipment to be installed has the approved type of SAES-P-100
C1
enclosure. (NEC 110.2) Sec. 5.2
Check for secure mounting and adequate ventilation space for SAES-P-100
C3
equipment. (NEC 110.13) Sec. 5.2
Page 1 of 7
Outdoor padmounted electrical equipment shall be placed on a level SAES-P-116
C9
concrete pad elevated a minimum of 100 mm above natural grade. Sec. 7.2.5
Page 2 of 7
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff -March 2013) REV 7 31-Mar-13
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Cable shall not be used to extend the main bus of switchgear, SAES-P-116
C11
controlgear, switchboards, switchracks and panelboards. Sec. 7.3
SAES-P-116
C13 Panelboards shall not be installed within the controlgear.
Sec. 15.5
SAES-P-103
C15 Battery room walls and floor shall be made of concrete construction.
Sec. 6.2.1
Battery rooms shall be provided with enclosed and gasketed (i.e., vapor SAES-P-103
C16
tight) corrosion resistant lighting fixtures as specified in SAES-P-123. Sec. 6.2.3
SAES-P-103
C17 Emergency eye wash facilities shall be provided as per SAES-B-069.
Sec. 6.2.9
SAES-P-103
C18 Temperature in a room that contains batteries shall not exceed 25°C.
Sec. 6.3.6
SAES-P-103
C19 Return air-conditioning ducts from battery rooms shall be prohibited.
Sec. 6.3.7
False ceilings shall not be permitted in battery rooms and ceilings shall SAES-P-103
C20
be finished to avoid trapped pockets of hydrogen. Sec. 6.3.8
Lighting fixtures shall be installed at least 300 mm below the finished SAES-P-103
C21
ceiling. Sec. 6.3.9
Exterior illumination shall consist of HID high pressure sodium type SAES-P-119
C24
fixtures controlled by a photo cell. Sec. 6.7
Page 3 of 7
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff -March 2013) REV 7 31-Mar-13
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Duplex, 3-wire, 20 A, 120 VAC (NEMA 5-20R) convenience outlets shall SAES-P-119
C27
be mounted 1 m above the floor throughout the substation building. Sec. 6.10
A minimum of one outlet shall be provided for each 6 m of wall space. A SAES-P-119
C28
minimum of two outlets per substation shall be provided. Sec. 6.10
Substation roof drainage shall not be to the transformer yard side of the SAES-P-119
C29
substation building. Sec. 6.12
The concrete floor in front of switchgear shall be flush with the roller level
of lower breaker carriage rack and have a smooth surface to facilitate SAES-P-119
C30
removal and rolling of breaker. This floor shall be surface hardened for Sec. 6.14
rolling stock.
Leveling steel beams or channels shall be provided for all switchgear and SAES-P-119
C31
controlgear. Sec. 6.15.1
For transformer containing 7570 liters and less of insulated oil: Clearance SAES-P-119
C33
shall be per Sec 7.1 (SAES-P-119) Sec. 7.2.1
Oil containment and/or oil drainage systems shall be provided for oil filled SAES-P-119
C37
equipment containing more than 2,500 liters of oil. Sec. 7.3.2
Page 4 of 7
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff -March 2013) REV 7 31-Mar-13
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Work space and dedicated space shall not be used for storage. SAES-P-100
C38
(NEC 110.26 B) Sec. 5.2
At least one entrance of sufficient area shall be provided to give access SAES-P-100
C39
to working space. [NEC 110.26 C(1)] Sec. 5.2
REMARKS:
REFERENCE DOCUMENTS:
1. Schedule G Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), March 2006
2. Schedule Q Quality Requirements (Pro Forma Contract), February 2008
3. SAES-P-100 Basic Power System Design Criteria, 18 Septemeper 2012
4. SAES-P-103 UPS and DC Systems, 11 July 2012
5. SAES-P-116 Switchgear and Control Equipment, 22 May 2012
6. SAES-P-119 Onshore Substations, 05 November 2012
7. NFPA 70 National Electrical Code (NEC), 2011 Edition
8. SAES-P-123 Lighting, 02 March 2011
NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products or
services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing states
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified purpose.
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
concerned with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the
manufacturer indicates compliance with appropriate standards or performance in a specified manner.
Page 5 of 7
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff -March 2013) REV 7 31-Mar-13