SD - GRP Pipes Revised - 27062022021358
SD - GRP Pipes Revised - 27062022021358
SD - GRP Pipes Revised - 27062022021358
op V1
18.1.2 Related Documents
A. The following sections of the specification shall b
be read
ad in conjunction with this
C -
section.
y
C
Section 01300-Submittals
tals
C
Section 01400 -Quality
Quality
y Control
Section 01600
0 --Material
00 equipment
Material and eq
quipment
ipm
Q
Section 02223-Backfilling
kf
18.1.3 Standards
A. All activities relating to this section of the standard specification shall comply
with the following or approved equal standards
ASTM D2584 Standard test method for ignition loss of cured reinforced
resins.
PAGE 89
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
BS EN 1092-2 Circular flanges for pipes, valves and fittings (PN designated).
Steel, cast iron and copper alloy flanges. Specification for cast
iron flanges.
op V1
without pressure. Glass
s reinforced-thermosetting
lass reinforced plastics
(GRP) based on
n unsaturated
unsatur polyester resin (UP).
Specification for
or pipes and fittings
fittin
C -
BS 5840 Specification
on rreinforced
n for glass fibre reinforc
orced plastic (GRP) pipes and
ed pla
plast
y
ISO 9000
C fittings for use for water
management
Quality man
manage
wate supply
s
mentt systems.
y or sewerag
sewerage.
C
ISO 10468 -Glass-
Gla - Reinforced thermosetting
Plastic Piping Systems -Glass
Plastic (GRP)) pipes.
stic (G
(GR pip
Q
PAGE 90
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
op V1
e–Reinforced
Reinforced
“Fiberglass(Glass–Fibre–Reinforced Thermosetting-Resin)
Pipe in a Deflected Condition
C -
of the longitudinal
gitudinal
udinal shea strength
shear stre pipe fittings
ngth of type B p
y
ASTM D2992 C Standard
dard Practice fo
Design
esign
gn Basis
for Obtaining
for
fo
or
Hydrostatic or Pressure
taining Hydrosta
Hydro
“Fiberglass” (Glass-Fibre-Reinforced
(G
C
Thermosetting-Resin)
Thermosetting-R
Thermosetting Resin)
Resin) Pipe and Fittin
Fittings
Fitting
18.1.4 Submittals
als
s
Q
ii. Should any details, including materials of the pipes and fittings be
altered in any way during manufacture from those proposed and
approved by the Engineer, submit for the Engineer's approval the
PAGE 91
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
revised details and test results, including Type Test results [in case of
altering of material (Long Term 10,000hrs tests.)]
iii. Submit to the Engineer the results of all standard quality control tests
carried out on the manufactured pipes and fittings as soon as
practicable after testing as and in any case not later than the time of
delivery of the relevant pipes and fittings to the site.
iv. Pipe manufacturer’s guarantee that the pipe and its materials are
suitable for its intended use and
nd application.
pplication.
y
be governed by the relevant manufacturing
m
maanufacturing standard.
acturing standa
standard
op
Table 18-1:
8-1: Product
P Information
In
Inform
mation Pi and
n for GRP Pipe a Fittings
C
Product Information
formation Units
Q
C
Manufacturing
acturing D
acturi Details
Name of manufacturer -
Joint type -
PAGE 92
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
op V1
Inner liner Resin** Type %
Glass* Type %
C -
y
ThicknessC mm
C
Structural wall Resin** Type %
Aggregate** Type %
Thickness mm
Glass***Type %
Thickness mm
PAGE 93
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
* By weight of liner.
op V1
** By weight of structural wall.
C -
y
A. The Contractor shall submit
mit method sta
statem
statements
mentss to the Enginee
Engi
Engineer for approval, 4-
C
8 weeks in advance of commencing the
01300 of the specification.
ation. These
cification.
the site activity in accordance
Thes shall
accor
acco with Section
shall comprise but not necessarily be limited
C
to:
Q
i. Procedures
cedures for handling,
ocedures ha
h installation of pipes.
ng, storage and in
ii. Hydrostatic
atic testing procedures
ures for GRP non pressure pipelines
18.1.4.3 Drawings
A. The Contractor shall submit drawings to the Engineer for approval well in
advance of commencing the site activity in accordance with Section 01300 of
the specification. These shall comprise but not necessarily be limited to:
i. Drawings of the pipes, fittings, joints, pipe specials and the assembly
thereof.
ii. Pipe laying diagram and schedule showing location, length, design
designation and designation by number of each pipe section and pipe
special to be furnished and installed.
iii. All data on curve and bends for both horizontal and vertical alignment.
PAGE 94
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
A. Prior to dispatch of any product and/or material from source the Contractor shall
notify the Engineer in writing in sufficient time
m to allow the Engineer the
im
opportunity to inspect and test the productt and/or material prior to delivery in
accordance with Section 01400 of the specification.
pecification.
fica
y
Engineer a minimum off 48 hours notice of rrying out the following
o carrying fo
follo activities on
site:
i. Installation
ation of pipeline.
op
C
ii. Hydrostatic
ostatic testing of pipeline.
rostatic ipeline.
pelin
b) Pipes and fittings shall not come in contact with any sharp projections that
may cause damage to the pipes and fittings during transportation loading
and unloading. Ensure that pipes and fittings are well secured during
transit and adequately supported along their length. Cover pipes and
fittings of plastic materials during transportation. Do not allow pipe to
overhang the end of a vehicle during transportation.
c) Ensure that pipes and fittings are lifted using nylon or large diameter rope
slings positioned at a quarter of the pipe length from each end. Do not allow
the use of wire rope chains or unpadded forks or clamps on forklifts to lift
pipes.
PAGE 95
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
d) Store pipes and fittings on a flat level area as recommended by the pipe
manufacturer. Ensure that pipes and fittings supplied either on pallets or
crated, remain on the pallets or in their crates until required.
ii. Stack spigot and socket pipes so that successive pipe layers have
sockets protruding at opposite ends of th
the stack.
op V1
iv. Do not allow stacked pipes to
o exceed 2 height or as recommended
2m in he
by the supplier whichever is the lesser.
esser.
C -
y
all times. Maintain a free ow of air around
ee flow ar nd the
aroun e pipes at all times.
a tim
f)
C
Store rubber joint
nt rings in a well
well-ventilated
tilated place free from exposure to
we ventilated
C
sunlight and in packing
n their original pack
pa king needed.
ing until they are n
nee
g) The Contractor
tractor visually
actor shall visua
vi ly inspect all products
produc upon delivery to site and
pro
Q
i. Any products
cts damaged during
ng delivery,
de storage and handling shall be
marked by the Contractor and set aside.
iii. Any damaged products deemed unsuitable for repair by the Engineer
shall be removed from the site and replaced, with an equal.
PAGE 96
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
i. For gravity pipelines in buried installation with cover depths less than 6m
shall be 5000 N/m2.
ii. For gravity pipelines in buried installation with cover depth more than 6m
shall be 10,000 N/m2
op V1
installation, burial depths, deflection
flection limits,
l buckling
b and vacuum
requirements or others which necessitates
ates increasing
ecessitates inc sing the stiffness (SN) value
increa
of GRP pipe shall be governed Manufacturer’s
ned by the Manufa
M cturer’s
sddesign.
de
C -
y
c) Pressure mains shall be designed as per the requirement
requiremen of Table 15 of
requirem
C
BS/DIN EN 14364.
C
d) GRP pipe length
ngth concrete
gth used in concr
con rete surround
ete bed and surroun
surro shall be 3.0m unless
otherwise specified
pecified in the drawings.
the d
dra
awings.
win
Q
General
PAGE 97
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
e) Both internal and external surfaces shall be free from irregularities, which
would impair the ability of the component to conform to the requirements of
European Standard BS/DIN EN 14364.
op V1
filaments, strands or roving, mats or fabric,
abric, synthetic veils,
vve and polyester/ vinyl
ester resin without fillers and if applicable
able additives
plicable additiv necessary
n to impart specific
properties to the resin. The pipe
e as whole and the
pe tthe part
rt of
o pipe used for fittings
C -
may also incorporate aggregates.
ates. All the
egates. th raw materials
erials used
u shall be from the
y
I.
C
approved list of suppliers.
s.
b) Additives.
PAGE 98
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
Note: Filled pipes and fittings shall only be allowed on a project once the
satisfactory Long Term test results are in hand & all conditions as stipulated
above are met in advance.
op V1
d) Wall construction
- Liner layer
C -
approximate thickness
kness of 2.5
hickness 2 mmm comprising
omprising an innermost layer
y
C (i.e., that in contact with the
1.5mm in thickness inc
he liquid)
th
incorporating
orporating
quid) of approximately
appro
approxim
rating two layers
l
1.0mm to
of "C” glass. The
C
remainder
mainder of the liner consist of at least two layers
line construction shall co
con
power
of 450 g/m2 powe
p er bound "E" glass chopped strand mat having a
glas ch
Q
ii. The resin used in this inner liner layer must conform to requirements
given in BS/ DIN EN 14364 and to stipulation of section “a” as above.
- Structural layer
PAGE 99
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
- Outer layer
i. Pipes shall be provided with an external vinyl ester resin rich layer,
with C- glass Veil.
op V1
4364 shall h
accordance to BS/DIN EN 14364 have a Glass Transition
st 75 °C. In addition
temperature of at least additio
a a sample shall be tested
for HDT in accordance DIN EN ISO 75 - 2.
ance with Method A of DI
C -
iii. The use of special
pecial
cial constructions
construction
constru ns is permitted
permitte when
w the pipe is
y
C expected
ground
d to be exposed to extreme
conditions, for example
nd conditions
climatic environmental or
xtreme climatic,
provision for the inclusion of
ample provis
C
pigments inhibitors
igments or inhib
inhibi climatic conditions or fire
tors for extreme clim
cl
retardation, upo
upon
u n the
he approval of the
t E Engineer.
Q
e) Wall thickness
ss
ii. Use pipes with wall thickness that achieve a minimum hoop
flexural modulus of 15.0 GN/m2 over the whole pipe wall thickness
for pipes of 350mm diameter and above, and 12.0 GN/m2 for
pipes of less than 350mm diameter. This shall be demonstrated
by the application of the equation S = (EI)/D3 to show that the
hoop flexural modulus of a pipe is not less than the required
minimum figure where S is the stiffness of the manufactured pipe,
D is the mean diameter of the manufactured pipe, E the required
hoop flexural modulus and “I “being given by t3/12 where t is the
whole wall thickness of the manufactured pipe.
f) Fittings
PAGE 100
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
a) Resin
i. Vinyl ester shall be used in the internal resin rich liner of the pipe
and fittings. Isophthalic or vinyl ester shall be used in the structural
wall of the pipes and fittings, as per the design application
requirements. All resins shall be tested
te in accordance with ASTM
C-581or applicable standard. Provide resin systems to the
d. Provid
op V1
requirements of BS 3532 type-
type-B
-B or to applicable
app
appl standard.
C -
temperature of at least 75 °C. In addition
ition a sample
ssam shall be tested
y
iii.
C for HDT in accordance wit
Resins
with Method
of the manufacturer’s
o
C
recommended Barcol
ecommended Ba col hardness value and may be tested by
Barc
laboratories
external labo
laborat ies for their authenticity
ories a
authe of type by random
Q
during the
sampling, d
du e project.
he
b) Additives.
iii. Note: Filled pipes and fittings shall only be allowed on a project
once the satisfactory Long Term test results are in hand & all
conditions as stipulated above are met in advance.
d) Wall construction
PAGE 101
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
- Liner layer
i. The inner liner layer shall comprise minimum 1.5 mm thick pure
Vinyl ester Resin without Glass reinforcement and sand aggregates.
ii. The pure resin used in this inner liner layer must conform to
requirements given in BS/DIN EN 14364 and to stipulation of
section “a” as above.
op V1
ness value.
recommended Barcol hardness va
- Structural layer
C -
y
thermosetting
g isopathalic polyester
pathalic polyes
po ster resin with sand
sa a aggregates.
ii.
C
Aggregates
ates
es can be use
used
d as per the manuf
manufacturing techniques
C
applied, ensure
ed, however ensu becomes embedded in the
en re no aggregate b
bec
internal
nter nal resin rich liliner.
ternal ner.
er.
Q
- Outer layer
ayer
yer
i. This layer
aye shall be formed
ed of mortar in vinyl ester resin with sand
aggregates and without reinforcement of glass or synthetic
filaments.
ii. The resin used in the outer layer will be Vinyl ester and in
accordance to BS/DIN EN 14364 shall have a Glass Transition
temperature of at least 75 °C. In addition a sample shall be tested
for HDT in accordance with Method A of DIN EN ISO 75 - 2.
iii. The outer protective layer shall have a sand content with a minimum
percentage of 65 % of sand for corrosion protection.
e) Wall thickness
PAGE 102
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
i. The minimum total wall thickness, including the liner and outer
protective layer shall be declared by the manufacturer, which shall
be complying to the standard performance criteria.
ii. Use pipes with wall thickness that achieve a minimum hoop flexural
modulus of 15.0 GN/m2 over the reinforced wall thickness for pipes
of 350mm diameter and above, and 12.0 GN/m2 for pipes of less
than 350mm diameter. This shall
hall be demonstrated by the
application of the equation S = (EI)/D3 to show that the hoop
op V1
pe is not less than
flexural modulus of a pipe tha the required minimum
e stiffness
figure where S is the ess of the
th manufactured
m
man pipe, D is the
mean diameter of the manufactured
manufacturred pipe,
manu pe, E the required hoop
C -
flexural modulus
lus and I bein given
being giv y t3/12 where
en by wh t is the reinforced
y
f) Fittings
C
wall thickness manufactured
ness of the manuf
manufa ed pipe.
ctured
C
i. Fittings
ttings shall be m
manufactured
anufactured similar
sim tto the pipe construction or
Q
etter thereof
better thereo ass per the existing
exis standard manufacturing
techniques,
hnique complying
hniques g with applicable
app standards on performance
and testing.
The pipe class for a specific application shall depend on the required diameter
(DN), the pressure rating (PN) necessary for the application, and the pipe
stiffness (SN) derived from the structural analysis depending on site conditions
(soil, installation, compaction, loads etc.).
PAGE 103
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
op V1
that the seal at the joints is not affected.
ed.
C -
as protruding fibres, pits,
s, cracks, blisters
bli tackiness
ness and
an embedded foreign
y
C
matter. The core of the
de-bonding.
he pipe wall shall
sha be free bubbles, vvoids, cracks and
ee of bubble
C
h) All bends shall
hall be long radiu
rad
radius
us bends unless oth
otherwise approved by the
Engineer..
Q
Joints
General
PAGE 104
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
c) For pipes up to and including 600mm nominal internal diameter joints shall be
capable of withstanding a deflection of not less than one and a half degrees
in any direction and remaining watertight. For pipes over 600mm nominal
internal diameter joints shall be capable of withstanding a deflection of half
degree in any direction and remaining watertight.
d) Joints shall be capable of withstanding a draw of 13mm over and above the
initial jointing allowance and remaining watertight. The initial jointing
g wat
allowance is the gap between the spigot
got and the shoulder of the socket
pigot
op V1
measured parallel to the centre line
e of the pipeline
pi and must not be less than
an
6mm or greater than 13mm or as recommended b tthe pipe manufacturer.
mmende by
C -
y
pressure equivalent to
o 10
0 m head of water
er without leakage
leak in both the
C
straight and deflected
ted
ed positions.
C
f) Joint couplers
s may be used ad
adja
adjacent
cent to structures or
o special
s fittings.
g) When a pipe
pe is cut or tur
turned
ned
d down in ord
order tto form a joint fully seal the
Q
exposed surfaces
rfaces with a continuous
urfaces coating of
nuous coa o vinyl ester resin.
PAGE 105
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
op V1
Marking
C -
y
i. The manufacturer's name,
ame, initials, or identification
identification
ation mark.
ii.
C
The nominal internal
nal mm.
al diameter in mm
mm.
C
iii. The length in
n m.
vi. A stamp to show that they meet the required inspection requirements and
hydraulic tests (where applicable) at the point of manufacturer.
vii. Stencil in legible letters the pipe identification number on the inside and
outside at each end. Ensure that the same number appears on all record
sheets and documents relating to the manufacture delivery and testing of that
pipe.
Exposed pipe and fittings shall be manufactured in the same manner and with
the same materials as buried pipe, along with the following requirements unless
otherwise approved by the Engineer.
PAGE 106
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
iii. Design of the outer layer of the pipes shall be formed of an vinyl ester resin
with or without sand aggregates and with or without reinforcement of glass.
The outer protective layer shall have a minimum
in
n thickness of 1 mm and
protect the structural layer against extraneous
extraneo causes (atmospheric
op V1
conditions, mechanical damage, UV and
d chemical sstress). For Centrifugally
Cast GRP Pipe the outer protective
ve layer shall
tive sh have
ha a sand content with a
minimum percentage of 65 % of sand against ult
ultra
ra – violet
v influences.
C -
iv. Use flanged joints for all exposed pipes
pip and
and fittings inside treatment plants,
tings in
y
C
process structures, pumping
v. Flanges shall be
e filament
lament wo
stations, and
umping stations
wound, tape
and valve
alve chamber
chambers.
e wound, contact
con moulded, hot or cold
C
pressed with epoxy or vinyl ester
es er resins only.
est
i. Carry out the quality control tests listed below at the frequency stated.
PAGE 107
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
ii. Ensure that records of all tests and inspections are maintained by the
manufacturer.
iii. Provide the Engineer with two copies of all test certificates and reports.
i. Inspect all raw materials to ensure that they comply with the relevant
standard.
op V1
Do not use any resins deviating
ating from the manufacturer's
iating m published
figures.
C -
y
content and purity.
y.
C
iv. All resin type authenticity in external
e may be tested for quality and auth
C
laboratories
ies deemed
es as and when de Engineer.
eemed fit by the Eng
Engin
c) Hydraulic relevant
c Test as per releva
re testing standard
antt manufacturing & te
Q
b) Apply 1.5 times the pipe design pressure or surge pressure, whichever is
greater for all pressure pipes. Apply the test pressure for a minimum period of
5 minutes without signs of leakage.
i. Maintain at test pressure the first pipe and thereafter every 360 meter of
pressure pipe of each diameter produced for a minimum of 4 hours
without signs of leakage.
ii. Perform an internal low pressure air test for every pipe fitting at the
manufacturer's works prior to delivery. Apply a test pressure of 0.1 bars
for a minimum period of 5 minutes without signs of leakage or distress.
Manufacture fittings which are of mitred construction from pipe which has
successfully passed the tests defined above.
PAGE 108
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
b) Burst pressure shall be more than 4 times the pressure rating of the Pipe.
Testing is to be carried out as per relevant standard.
op V1
without signs of leakage.
C -
for a minimum period minutes w
od of 5 minut without leakage or distress.
ithoutt signs of lea
y
C
Manufacture fittings
ngs which are of mitred
successfully passed
ssed the te
m d construction ffro
defined
tests d ed above.
efined
from pipe which has
C
iii. For all gravity pipes app y a test pressure of 15m
apply 1 water head (1.5 bars)
for pressure
ssure pipes a
ressure apply
ply 1.5
y 1 me the design pressure or working
.5 times
Q
d) Wall Thickness.
i. Measure the wall thickness for each pipe and fitting. Maintain the total
thickness of nowhere less than the minimum or greater than the
maximum quoted by the manufacturer's specification relating to initial
stiffness. However, minimum is governed by section 5.1.2 of
BS/EN/14364.
e) Stiffness.
i. Test a minimum of one pipe, for every 360 m pipe length manufactured or
any pipe length supplied for a project, whichever comes first to determine
the initial specific stiffness in accordance with the test method detailed in
BS/DIN EN 14364.
ii. Test a minimum of one pipe of each class and diameter of pipe.
iii. Ensure that no test specimen has an initial specific stiffness of less than
as defined in section 2.1.
iv. In addition.
PAGE 109
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
op V1
Table 18-3: GRP Quality Control
Co Tests
Te
C -
y
C
No visible damage
surface cracks
age in liner lay
layer as evidenced b
of:
ks at a deflection of:
by 9%
C
f)
No structural
uctural damage at a deflection of: 15%
Q
L
ongitudinal Tensile Strength.
ensile S
g) Cure.
h) Loss on Ignition.
Test in accordance with ASTM D2584 a minimum of one pipe, for every 360
m pipe length manufactured or any pipe length supplied for a project,
whichever comes first for each class and diameter, as per applied standard.
i) Joint Tests.
Test in accordance with the requirements of ASTM D4161 or, DIN EN 1119 a
minimum of two jointed pipes in every 1200 meter of pipes manufactured with
the following additions.
PAGE 110
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
- Conduct the negative pressure test to determine the adequacy of the joint
design against infiltration. Apply an external test pressure of 2.0 bar
(gauge) to two sections of pipe assembled with a deflected joint for non-
pressure pipe system and twice the rating pressure for pressure pipe
system in accordance with ASTM D1161.96 Article 7 Laboratory
Performance Requirement Item 7.1.1
op V1
j) Initial Circumferential Tensile strength.
h.
C -
k) Rejection
y
i. C
Proceed as stipulated
pulated
quality control
any
ulated below if any pipe or fitting which fails any one of the
ests as per thiss section
trol tests tion 2.3.
C
ii. In the event of a pipe failing
ailing any of the
th tests
te outlined, carry out the
Q
relevant
ntt test on a further
fur
fu meters of pipes
r 120 meter p of that class and diameter
as follows:
- If any one of these test on 120 meters of length fails, cease the
manufacturing of pipes of that class and diameter. Discussions will be
held between the Contractor and the Engineer to establish the
significance of the failures. The suitability of manufactured pipes for
the proposed installation conditions will be determined in the light of
the test failures and the Engineer reserves the right to reject all the
pipes of that class and diameter.
Use the results of appropriate type tests to the proposed pipes and fittings to
determine the properties of pipes. Carry out each type test on representative
samples of the pipes. If the manufacturer does not have results of these tests
available or if alterations are proposed to the method of manufacture, pipe design
or laminate structure, carry out all the type tests required by the Engineer to prove
the adequacy of the proposed pipes. Conduct the type tests as stipulated in Table
18-4 in accordance with the requirements of the mentioned standards and that
PAGE 111
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
the tests will be conducted at 23 +/-2ºC ambient temperature except for strain
corrosion & long term failure pressure which will be tested at 40ºC +/- 2ºC.Table
18-4 – GRP Type Tests (Long Term Tests for a minimum of 10,000 hrs)
Table 18-4:: GRP Type of Tests (Long Term Tests for a minimum of 10,000
hrs)
op V1
Long term specific stiffness and ISO 10468,
468, ISO 1482
14828, IS
ISO 10471, DIN 53769 the
creep factor under wet and test results shall b extrapolated
be extrapo
ap to 60 years.
C -
deflected condition.(min 18 Section 5.2.2 of BS/EN/DIN
ection 5.2. /EN/DIN 14364 shall be
y
samples)
C
Long term resistance to strain
ain ASTM
TM D
governing.
D3681,
3681, DIN 53769,
53769 DIN
D EN 1120, the test
C
corrosion .(min 18 samples)
ples) results
resu s to be extrapolated tto 60 years. Section 5.2.8
result
o BS/EN/DIN
of /EN/DIN 14364
1 shall
s be governing. However,
Q
the 95%
% lower confidence
con limit failure strain must
not be less than 0.85%,
Long term failure pressure.(min ASTM D2992, DIN EN 1447, DIN 53769-2 the test
18 samples) results shall be extrapolated to 60 years Section
5.2.7 of BS/EN/DIN 14364 shall be governing.
PAGE 112
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
op V1
iii. The Contractor shall provide the Engineer
er copies of all instructions advice or
gineer
reports given by the manufacturer's
er's technical
rer's technic expert
exp to him. The technical
expert shall immediately inform
rm the Engineer omission, variations and
ngineer of any o
detractions from the approved handling and installation
oved handlin allation sspecification.
C -
y
C.
C
Install bedding, surround
specification and shown
own
nd and backfill as
drawings.
wn on the drawin
drawing
s specified
gs.
Section 02223 of the
ecified in Sectio
Se
C
D. Lay pipes from downstream to up
upstream socket end at the upstream
stream with the sock
so
end of each pipe.
pe
Q
E. The pipeline shall be within 20mm
mm specified
m of the specifie
s line and the invert level shall
be within 6mm of the specified
sp
s value
ue and shall
sha be such that there is no back fall
at any point on a gravity pipeline.
F. Obtain satisfactory initial deflection test results for sections of pipeline laid
between consecutive manholes or chambers prior to commencement of pipe
laying in further sections.
G. When cut pipe is required, ensure that the cutting is done by a machine, leaving
a smooth cut at right angles to the axis of the pipe.
H. When installing pipes, ensure the joint is cleaned and lubricated and that the
rubber gasket is inserted in the groove of the socket end of the pipe. Align the
spigot and insert home in the socket end. Use a metal feeler to check that the
rubber gasket is correctly located. Spigot and socket flexible joints shall have
the annular space between the pipe and socket sealed with an approved joint
sealant to prevent the ingress of loose material or concrete. This sealing shall
be carried out immediately on completion of a satisfactory initial hydraulic test
prior to concreting or backfilling.
I. Ensure that all pipes and fittings are sound and clean before laying. When pipe
laying is not in progress, ensure that the pipe ends are at all times fitted with
watertight plugs or caps. The plugs or caps shall only be removed for the
PAGE 113
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
purposes of making a connection of the pipe end or testing the pipeline. The
plugs or cap shall be replaced immediately on completion of the test.
J. Protect bolted connections by an approved heat shrunk PVC sheath. Wrap the
PVC sheath with a protective wrapping tape prior to backfilling in accordance
with the specification.
K. Excavation for or laying of GRP shall not proceed until an approved device for
gauging pipe deflections is on site.
op V1
forgauging pipe deflections.
s. Maintain
Mainta devices for gauging pipe
devi
deflections in good working
ng order.
er. Submit calibration certificates before
Subm ccalib
every period of use.
C -
y
For pipes of less
ess than 600mm
600 diameter: Diametric dimensional
ameter: Dia
Diame
C
measurementt of the pipe, both vertically
and recorded.
rded.. Each deflection
deflect
def
horizontally shall be made
ally and horizon
horizo
ion measurement taken
tak along the length of
C
the pipeline
peline shall be ide
identified
ntified and recorded. Provide a continuous print
out orr a visual dis
display
displ measurements on a remote monitor. The
y of the mea
measureme
Q
PAGE 114
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
op V1
is otherwise advised. However a project
ct delay clause may be applied on
ay penalty ccl
the main Contractor as per the rules nd regulations
s and regulati set
s by Client.
C -
y
18.3.3.1 General.
A.
C
Submit for the Engineer's
gineer's
neer's approval
approva details
ails of the propo
proposed methods and
C
program for testing,
sting, including d details equipment. Arrange for all
etails of test equ
equip
tests to be witnessed by th the
e Engineer or other
ot person appointed by the
Q
Engineer. Provide
rovide everything
every
ever ng necessary fo
g necessa for carrying out testing and
ding wa
cleaning including ss, gau
water, pumps, gauges
gauges, piped connections, stop ends
En
and all other temporary works. Ensure that pipelines are properly
completed and supported before being put under test except as
hereinafter detailed.
i. No testing will be permitted until seven days after thrust blocks and other
holding down works have been completed.
ii. In addition to any tests of individual joints or other interim tests, which may
be specified elsewhere, submit all parts of the pipelines to a final test.
iii. Notwithstanding the foregoing, carry out at any stage of construction other
tests that the Engineer considers desirable to check materials and
workmanship on the pipeline. Ensure that the obligations to perform
successful tests under the Contract are achieved.
PAGE 115
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
D. Use properly designed fittings for the purpose of temporarily closing the
openings in pipelines to be tested. Use fittings adequately strutted to
withstand the pressure specified.
E. Ensure that the arrangement for testing a pipeline includes provision for
the purging of air from the pipeline prior to a water test.
F. Where multiple pipelines are laid in common
on trench, test only one line at
any one time.
op V1
G. Ensure that gauges used for testing elines have a dial diameter of not
g pipelines
less than 100mm and a full scale calee reading not greater than twice the
specified test pressure. Before any gauge ga ge is used, arrange for
gau
C -
independent laboratory to o check the accuracy
accuracy y of the
th gauge.
g Provide a
y
H.
C
dated certificate of its accuracy/calibration
The Contractor must
accuracy/calib ion to
accuracy/calibrat
st make his own arrangement
o the Engine
arrangeme for
Engineer.
Engineer
f the supply and
C
disposal of water
ater used for testing
testing which must be o
tes obtained from a source
accepted byy the Engineer.
Enginee
Q
B. Before pressure testing is started, re-check the pipes and the valves for
cleanliness, and re-check the operation of all valves. Cap off the open ends of
the pipeline (or sections thereof) with blank flanges or cap ends additionally
secured where necessary with temporary struts and wedges. Complete all
anchor and thrust blocks and fasten securely all pipe straps and other devices
intended to prevent the movement of pipes.
PAGE 116
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
C. Apply test pressure to the entire pipeline or section being tested to 1.5 times
working pressure or 1.5 times the surge pressure whichever is greater.
Immediately prior to commissioning, complete the pipeline and test the entire
pipeline.
i. Fill each pipeline or section with water and displace all free air from the
pipeline.
op V1
working pressure/surge pressure is attained in the lowest part of the
section.
C -
less than 24 hours.
y
iv. C
Monitor the pipeline
peline over a p
pressurization..
period
eriod hours without further
d of 24 hou
C
v. At the end
nd measure
d of this period, measure the reduced pressure
p in the pipeline, the
original
al test pressure restored
estored
tored by pumping
p and the loss measured by
Q
vi. Ensure that the loss does not exceed 0.02 liter per millimeter of pipe
diameter per kilometer of pipe per day for each bar of head applied.
vii. If the pipeline fails the test, locate the faults, repair the repairable or
replace with equivalent and retest the pipeline until it passes.
viii. Visually inspect all exposed pipe, fittings, valves and joints during the
tests.
ix. After satisfactory completion of the 24 hour period test, bring the pipeline
to test pressure and maintain it at this pressure, by pumping if necessary,
for one hour. Disconnect the pumping and no water is allowed to enter the
pipeline for a further period of two hours.
x. At the end of the two hours period, restore the original test pressure by
pumping water into the pipeline. Determine the volume of makeup water
required to achieve the test pressure specified and deemed to represent
the cumulative loss during the two hour period of test.
PAGE 117
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
xi. Ensure the loss does not exceed the limit stated in ‘vi’ above. If the
pipeline fails the test, locate and repair the faults and repeat the test.
D. Ensure that all valves in the pipeline are satisfactorily operating under working
pressure and that the pipelines have been finally cleaned out as specified
hereafter.
op V1
A. Test all non-pressure pipelines up to 1000m
1000mm diame
diameter after completion of
concrete or granular bedding up to the soffit of the pipeline.
pip Clear the bedding
around pipe joints to allow for visual inspection
inspec ffor
or leaks. Ensure that the trench
ks. E
C -
is kept dry. Apply water head
ead
d for testing invert plus 1.0m, or
testin of eitherr depth to inv
y
pipeline.
C
5.0m, whichever is the
e greater. Measure
he Meas re the
Measu he head at the
th lower end of the
C
B. Maintain the water head ove
overr a period of 30 minutes
mi and if necessary,
add water from
om a measuring
measur
meas ng vessel at 10 minute
m intervals. Record the
Q
quantity of water
ater
ter adde
added from the
he measuring
measu vessel.
D. Not more than 7 days prior to handover all pipelines shall be subject to an
infiltration test as follows:
ii. Dewatering shall have been discontinued for at least 3 days prior to test.
iii. Volume of water infiltrating into the pipe shall be accurately measured for a
minimum period of 1 hour.
iv. Maximum infiltration shall not exceed 1 liter per millimeter of pipe diameter
per kilometer of pipe per day.
PAGE 118
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
E. Keep a record of all tests and make them available for inspection. Hand over
test records to the Engineer for approval.
F. Pipes or joints shall not be accepted if any leakage or damage is visible during
an internal inspection.
G. If the result of any test or inspection does not comply with the requirements of
the specification, the Contractor shall investigate
ga the reason and carry out
remedial work to the approval of the Engineer
eer at no cost to ADM The pipeline
neer
shall then be re-tested. This process shall
all be repeated u
until the requirements of
the specification are satisfied.
y
to insert an expanding stopper in the la
lateral purposes.
aterall for testing pur On the
op
satisfactory completion
tion tests,, remove
on of such test
tests temporary fittings from the
move all tempora
lateral. Provide the watertight
he tee with a wate
wa rtight or plug.
i. After the pipe surround material has been placed and compacted to
150mm above the pipe crown. Do not proceed with further pipe laying until
this test has been satisfactorily completed.
ii. On completion of all backfill material up to ground level but before the
dewatering is removed. Take this measurement within one day of the
completion of backfilling.
B. For GRP pipes with concrete surround, carry out the deflection testing as
in stages (i) and (ii) above. For proving the pipes immediately prior to the
issue of the Provisional Acceptance Certificate, draw a pig or ball through
the pipeline, sized so that it will not pass any point in the pipeline which
PAGE 119
DIVISION-02-SECTION 02630 FIRST EDITION -DECEMBER 2016
STORMWATER & SUBSOIL DRAINAGE SYSTEMS VOLUME IV- TECHNICAL SPECIFICATIONS
has been deflected to a greater degree than that permitted in the long
term.
C. For pipes exhibiting any negative deflection in the vertical in excess of 2%
in (i) above and pipes exhibiting any deflection in excess of 4% in (ii)
above, expose the pipe and replace and re-compact the surrounding
bedding material. Replace the pipe should the deflection exceed 5% in
(iii) above. Any pipe to be replaced must be taken
tak away from site and not
be incorporated into the permanent works.
orks.
ks.
op V1
D. Subject pipes exposed for re-compaction
ompaction
mpaction a and pipes
p replaced for other
reasons, to the three deflection
n checkss listed in clause
u 3.4.a above. Carry
n clau
out deflection checks on adjacent pipes
pip for
for 50m either
eith
e side of the re-
C -
y
compacted or replacement
ment pipes.
pi
E.
C
Tabulate the results
ts of the deflection
deflection measurements.
easurements. Submit
Su copies of the
C
results to the Engineer immediately
ngineer immed
immedia tely after each se
ately set o
of measurements has
been taken.
Q
END
ND OF SEC
SECTION
PAGE 120