DANA Complete TE 27-32
DANA Complete TE 27-32
DANA Complete TE 27-32
NOTE!
Internal Thermo shuttle valve, opens at 72°C
Service Training DANA TE27 / TE32
Model Designation
1X.X T E 32 4 X X – XX
Transmission input
rating x 100Nm
Service Training DANA TE27 / 32
Technical Data
Pump flow:
System flow, At 2200 RPM 108 - 128 L/min
Lube pump flow, At 2200 RPM 80 – 95 L/min
Service Training DANA TE27 / TE32
Additional signals
• Speed sensors
- Engine speed combined
with oil temperature pick up located at pump gear
- Turbine speed located on input gear forward
- Drum speed located on low drum
- Output speed located on output gear
2 pin connectors
3 pin connector
Operation of Transmission:
The transmission is controlled by an APC200 box. This unit has a microprocessor that receives certain inputs
(gear selector position, speed sensors,……), which are processed and will give output signals to the control valve.
Directional selection:
When a direction (forward or reverse) is selected , total neutral solenoid is activated and the required directional
VFS will provide a pressure rise from 0 to 6 bar.
The directional clutch is then fed with modulated pressure supplied through the pressure intensifier.
Service Training DANA TE27 / TE32
Transmission Operation
Range selection:
When 1st clutch is selected, the 3rd/1st and 4th/2nd solenoids are activated.
The 1st/3rd VFS will provide a pressure curve from 0 to 6 bar.
The pressure intensifier will multiply this pressure and will feed 1st clutch via the activated 3rd/1st spool.
Neutral selection:
When neutral is selected (1st, 2nd, 3rd or 4th), the total neutral solenoid is activated and the VFS’s for forward
and reverse are fed by a 1000mA current, which will result in a 0 bar output, thus providing 0 bar pressure to the
forward and reverse clutch.
The range clutches 1, 2, 3 or 4 remain activated by their respective VFS.
When total neutral is selected, the total neutral solenoid is not activated and as a result no pressure is supplied to
the pressure intensifiers.
Service Training DANA TE27 / TE32
Transmission Operation
Pressure switch:
The control valve also has a pressure switch installed between the total neutral shift spool and the pressure
intensifiers supply.
It will verify if only 1 direction clutch and 1 range clutch is activated when the shift is finalized.
If detection is made that 2 direction clutches 2 range clutches are hydraulically activated it will provide an input
signal to the APC200 which will put the transmission in total neutral which causes a shutdown.
Service Training DANA TE27 / 32
Transmission Operation
• Neutral
VFS 2/4 VFS 1/3
Service Training DANA TE27 / 32
Transmission Operation
• FORWARD 1st
Service Training DANA TE27 / 32
Transmission Operation
• FORWARD 2nd
Service Training DANA TE27 / 32
Transmission Operation
• FORWARD 3rd
Service Training DANA TE27 / 32
Transmission Operation
• FORWARD 4th
Service Training DANA TE27 / 32
Transmission Operation
• REVERSE 1st
Service Training DANA TE27 / 32
Check Ports
Service Training DANA TE27 / 32
Check Ports
RIGHT VIEW
Service Training DANA TE27 / 32
Check Ports
LEFT VIEW
Service Training DANA TE27 / 32
Check Ports
REAR VIEW
Service Training DANA TE27 / 32
Check Ports
FRONT VIEW
Service Training DANA TE27 / 32
Check Ports on control valve
Service Training DANA TE27 / 32
Control valve installation instruction
1.Make sure that the area around the valve is clean 1. Unscrew the 4hexbolts (marked pink on drawing)
and that no dirt can fall into the valve during the until all tension is out of the bolt.
disassembly procedure. Do not remove them!
2. Unscrew the 4 hex bolts (marked pink on drawing) 2. Using aligning studs, install valve and a new gaskets.
until you feel that the tension is out of the bolt.
Do not remove them! 3.Hand tighten all bolts (21) according to the sequence
you find on the drawing.
3. Unscrew the 15 other bolts
(marked blue on drawing) some turns. 4.Torque all bolts in the same sequence as on drawing to
When all bolts are loose, you should be able to move a torque of 25Nm.
the valve a bit.
6.Wait 15-30 minutes before, re-torque all bolts to 25Nm
4. Remove 2 bolts (marked blue on drawing) and again to the sequences as shown on drawing.
replace with aligning studs.
7.Recalibrate the transmission
5. Remove the remaining bolts (marked blue on
drawing) and remove the valve.
Service Training DANA TE27 / 32
Control valve installation instruction