Hall Level-Piping
Hall Level-Piping
Hall Level-Piping
BFV
3# DX type Hi - wall unit (Stand-by)
BFV
(Stand-by) 1.0 Tr. / 400 cfm Ø50 mm drain ENGINEERING CONSULTANT
(ODU on terrace) Ø20 2.0 Tr. / 800 cfm each
5) Thermal Insulation (ODU on terrace)
5.1) 25 mm thick Supply,Return & TFA ducts exposed to Ø32 TECHFOUR ENGINEERING SOLUTIONS PVT. LTD.
sun/Ambient as per detailed BOQ specification . Cassette unit Cassette unit
2.95 Tr. / 1200 cfm Ø25 0.85 Tr. / 300 cfm
5.2) 13 mm thick Supply,Return & TFA ducts inside false ceiling UNIT- 121 & 122,
DX type Hi - wall unit (Stand-by) US COMPLEX, JASOLA
5.3) 9 mm thick Return air ducts exposed to air conditioning 2# Cassette unit Ø32 Ø40 1.5 Tr. /600 cfm each ENGINEERING . TECHNOLOGY
area inside Audi's upto false ceiling level +0.5 Mtrs above Ø20 CHWS/R NEW DELHI-110076
2.95 Tr. / 1200 cfm each (ODU on terrace)
Ø32 mm drain Ø25 mm drain (2.04 GPM) Tel. +91-11-26397250
False ceiling level shall be Nitrile Rubber (Black in colour) .
There should be an overlap of 0.5 Mtrs.
J1.9 www.techfoursolutions.com
Ø50 CHWS/R Ø32 CHWS/R
6) Acoustic Insulation (21.24 GPM) (8.16 GPM)
BOP @2500lvl. Cassette unit Ø20 mm drain Ø20 mm drain
6.1) Acoustic Insulation for Audi's - In supply air duct 0.85 Tr. / 300 cfm
(Complete plenum + Exposed ducts on terrace+SA Cassette unit Ø25 mm Cassette unit Ø25 mm drain Ø32 mm drain
duct up to Audi's entrance.) J1.3 VIP 3 0.85 Tr. / 300 cfm 0.85 Tr. / 300 cfm
6.2) Acoustic Insulation for lobby - In supply air duct Ø80 CHWS/R
BFV
BFV
(Complete plenum + 3 Mtrs of Supply duct ) J1.1 Ø20 mm drain Ø25 CHWS/R Ø20 mm drain Ø32 CHWS/R (87.0 GPM)
form projection lvl. (4.08 GPM) (10.2 GPM) FM - AHU
7) All smoke Extraction / Makeup air ducts shall have 45° BOP @2500lvl. 32 Tr. / 10000 cfm
Cassette unit Ø80 CHWS/R
cowl with birdscreen / wiremesh on terrace. (76.8 GPM) Size: 2650x2200x1525H
J'1 0.85 Tr. / 300 cfm Ø40 mm drain
8) All chilled water supply, return and drain pipes shall
be insulated as per specification.
Ø20 mm drain
form projection lvl.
Ø25 CHWS/R
(4.08 GPM)
G1.7
Cassette unit
0.85 Tr. / 300 cfm
AUDI 5 AUDI 6 AUDI 7
VIP 1
450 cfm
200x250
G'1
1000 cfm
400x250
6000 cfm
750x600
Ø20 mm drain
Ø20 CHWS/R form projection lvl.
(2.04 GPM)
Ø40 mm drain
F'1
Cassette unit
0.85 Tr. / 300 cfm
Ø50 mm drain
pipe vertical
HALL LEVEL
HALL LEVEL
103