Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

CPM FMR 22 002

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

FLANGE MANAGEMENT REPORT

CLIENT : SHIFT WORK ORDER NO. : 84542983


PROJECT : EMS-ITMS REPORT NO. : CPM-FMR-22-002
TAG NO. : Z-2803 HYDRAULIC CYLINDER (INBOARD/OUTBOARD) SHEET NO. : 1 OF 1
AREA/UNIT : Jetty 3 DATE : September 12, 2022

Flange Joint Number F1 F2 F3 F4

Z-2803 INBOARD

Z-2803 INBOARD

OUTBOARD

OUTBOARD
FLANGE 1

FLANGE 2

FLANGE 2

FLANGE 2
Z-2803

Z-2803
DESCRIPTION

Flange Size (NPS) N.A N.A N.A N.A


Flange Rating (#) N.A N.A N.A N.A

Flange Face Clean and No Damage P P P P

Flange Alligned and Parallel (Note 1)


● Radial Misalignment ( mm ) D1 0 0 0 0
D2 0 0 0 0
● Lateral Misalignment ( mm ) D 0 0 0 0
Bolt Holes Alligned / Parallel P P P P
Bolt Pre-Install (free-running) P P P P
Type of Gasket N.A N.A N.A N.A
Type of Bolts M16 M16 M16 M16
Type of Nuts B7 B7 B7 B7
Type of Bolt Lubricant Used N.A N.A N.A N.A
Bolt Size (in) 5/8 5/8 5/8 5/8
Torque Value (ft-lb 1st Pass) 26 26 26 26
Torque Value (ft-lb 2nd Pass) 53 53 53 53
Torque Value (ft-lb 3rd Pass) 81 81 81 81

Hydraulic Pump Pressure Final / Torque Head N.A N.A N.A N.A

Tightening Complete YES YES YES YES


Notes: ACC ACC ACC ACC

SUPERVISOR / FOREMAN / LEADMAN


Notes:
1.) Misalignment (lateral<3.0mm, radial<1mm in 200mm) 2.) Gasket in good condition, marking match on flange, centralized on the studs.
3.) Legend: (used for the identification of Gasket/Bolts & Nuts Used)
GASKET BOLTS NUTS
SW Spiral wound gasket B7 ASTM A193 - Grade B7 2H ASTM A194 - Grade 2H
CNAF Compressed Non-Abestos Fiber Gasket L7 ASTM A320 - Grade L7 4L ASTM A194 - Grade 4L
KP KammProfile Gasket B16 ASTM A193 - Grade B16 4L ASTM A194 - Grade 4L
R Rubber Gasket SS Stainless Steel SS Stainless Steel
DJ Double Jacketed Gasket LUBRICANT NC Nickel Compound

Dimension (D) Dimension 1 (D1)

Signature
CPM QA/QC SHIFT

Dimension 2 (D2) Name : M. MACATANGAY Name :


LATERAL MISALIGNMENT RADIAL MISALIGNMENT Date : SEPTEMBER 12, 2022 Date :

Form No. : ITRF-FMR-01 (Rev. 0) CPM Construction and General Services, Inc.

You might also like