DRAWING REVIEW BY:

KP-4 BLOCK - 961A VOLUME (m3) 1.053


Surbana Jurong Consultants Pte Ltd
KP-4-1 FOR 2ND STY ONLY WEIGHT (ton) 2.632 (Architect)
This shop drawing or sample has been reviewed for general
compliance with Contract Documents. Design Intent and the
Relevant Authorities' Requirement's. The Architect/Designer does
not warrant or represent the information contrained in this drawing is
either accurate or complete. Sole responsibility for correctness of
PRECAST COLUMN the dimensions, details, installation method and structural integrity
shall remain with the Contractor. This shop drawing is returned

50
subject to the following:

85120

85120
1. This is checked with regards to architectural works only.
2. This comment is based on the limits of information
120 2916 available in this submittal
14 3036
3. This does not release the contractor and their
sub-contractors/applicators from :
3050 LENGTH a) Their contractual obligations to ensure that the installation
is constructed for fitness of purpose and ensure compliance to
this contract in its entirely.
TOP VIEW A
b) Ensuring accurate dimensioning through thorough site
verification of measurement.
c) To highlight any deviation on site from the workshop
drawings, if any.
d) Coordinating amongst other works.
e) Other implied responsibility as the builder under this
1H10(04) 120
contract such as to design, suitability, quality works, best
Ø30x100 DEEP SLOT HOLE 1H10(04)
performances of this work comply with safety measures,
1 materials, goods as specified under this contract, and the
prevailing standards and codes of practices.
f) Ensuring proposal is procured under the prevailing HDB's
Material/Supplier List.
4. Architect/SO Representative reserve the right to effect
changes to this proposal if they are found unsatisfactory
1H10(05) 1H10(05) after sample/field implementation.
Consent Consent subject to Engr's Approval
Consent with Comments - No Resubmission Required
Revise and resubmit
H10-250(06)

H10-250(06)
Checked by RTO/Date:
2336

Checked and confirmed by AR-in charge/Date:


Endorsed by QP/Date:
2786

( b) (C&S Engineer)
B8
W WB8(a) Approved with No Comment
35
Approved with Comments - No Resubmission Required
Revise and resubmit
2 2
Revise and No Resubmission Required
250 845 845 846 250 165 Date: Review by:
TYP STY H10-200(03) 85
(M&E Engineer)
150

150
CORRIDOR SFL

260 140 50

25 25
Approved with No Comment

90
Approved with Comments - No Resubmission Required
450

350
4H13(02) Revise and resubmit
1H10(01) Revise and No Resubmission Required

100
Date: Review by:
1H10(01) 4H13(02) H16(07)
MESH SCHEDULE TABLE
IONAL ENG
4xH16(07) FOR KP-4 ONLY
BAR MARK BAR SIZE MESH SHAPE QTY. SS

I NE
PROF
15xH10-200(03) SECTION 1-1

ER
170 170 2975 CIVIL
a WB8 LENGTH=2715 1
3036 (SHOWING REINFORCEMENT) LI JUN
5046
1

E
IN

S
GA P OR
I HEREBY CERTIFY THAT I HAVE CHECKED THE EXTRACTION OF THE
VIEW - A BAR SCHEDULE TABLE EXHIBITED DESIGN DETAILS FROM THE APPROVED DRAWINGS AND
REPRESENTED THE SAME ACCORDING TO THE DESIGN CONSULTANT'S

(SHOWING REINFORCEMENT) BAR MARK BAR SIZE SHAPE SPACING QTY. D ES I GN I N TE N T I N TH I S SH OP D R A WI N G FO R C ON S TR U C TI ON .

01 H10 2975 - 1

A LIFTING ANCHOR UPDATED 7/2/2022 ZYL

02 H13 2975 - 4 REVISION DESCRIPTION DRAWN CHECK

OWNER / APPLICANT

400
320 HOUSING &

90
03 H10 200 17 DEVELOPMENT
BOARD

400
HDB Hub 480 Lorong 6 Toa Payoh
2975 Singapore 310480

200

200
04 H10 - 1 ARCHITECT/ C&S/ M&E CONSULTANT

05 H10 2715 - 2
3036 Surbana Jurong Consultants Pte. Ltd.
168 Jalan Bukit Merah #01-01 Connection One, Singapore 150168
45 06 H10 250 15
1H10(05) WB8(a) 1H10(05)
Tel : 6248 1288 Fax: 6273 9090 www. surbanajurong.com
MAIN CONTRACTOR
50
120

120

07 H16 450 - 5 Welltech Construction Pte Ltd


61 Ubi Avenue 1
UB Point, #05-16 TEL : 6299 2858
Singapore 408941 FAX : 6299 2821
H10-250(06) H10-250(06)
PROJECT TITLE
120 2916 TAMPINES SOUTH N9 C13 / C14 & PARK - PROPOSED
PUBLIC HOUSING DEVELOPMENT COMPRISING 5 BLOCKS
OF 10 / 12 / 13 / 14 / 17-STOREY RESIDENTIAL BUILDINGS
SECTION 2-2 (TOTAL 750 UNITS) WITH MULTI - STOREY CAR PARK, ESS,
PRECINCT PAVILION, SOCIAL COMMUNAL FACILITIES &
PARK AT TAMPINES STREET 96 / BEDOK RESERVOIR ROAD
SUB-CONTRACTOR:

JIN SHENG PTE. LTD.


金 圣 私 人 有 限 公 司

DRAWING TITLE: ( EST. BLK.


BLK 961A )

PRECAST PARAPET WALL AT CORRIDOR


KP-4 / KP-4-1
A 15/08/22 REVISED AS CLOUD SCALE DRAWN CHECKED DATE
1 : 20 ZX ZYL 20-02-2022

REV DATE DESCRIPTION DRAWING NO


TPN9C13-14/PC/KP/004
REV
A

You might also like