National Sales Company: Drawing Index Location Map Symbols Abbreviations Code Plan
National Sales Company: Drawing Index Location Map Symbols Abbreviations Code Plan
National Sales Company: Drawing Index Location Map Symbols Abbreviations Code Plan
CONSTRUCTION DOCUMENTS
STUDENT: Charles Hartman
1 3D View
A1.1 SCALE:
1
30' - 4 7
- 0"
-21' - 0"
A1.2
/8
CK
SETBA "
-22'
-20' - 0"
-19' - 0"
0"
- 0"
-
-18' - 0"
8'
-23'
-1
-18' - 0"
"
0" -
'-0
7'
-1
-24
0"
0" -
6'
-1
-25' -
SCALE:
- 0"
6'
-2
0"
7'-
0"
0"
-2
'-
8'-
- 15
-2
- 0"
9'
-2
-2
"
SITE PLAN
9'
-
-30
0"
'-0 ' - -00"
78' - 6"
0"
"
-3-209'
1" = 30'-0"
0"
'-
- 14
-30' -
-30' - 0"
-29' - 0"
-28' - 0"
-31' - 0"
-28' - 0"
0" -
3'
-1
-30' - 0"
-29' -
0"
0" -
3'
-2
-29' - 0"
0" -
2'
-2
0"
-22' -
-28' - 0"
0"
0"
-
8'
-2
-23' -
W
0"
-24' -
S
N
0"
'-
-27
TRUE NORTH
E
0"
'-
-24
0"
W
'-
-26
S
"
-0
5'
-2
E
0"
-23' - "
-0
BUILDING NORTH
4'
-2
"
-0
3'
-2
- 0"
-22'
0"
'-
-22
- 0"
-21'
"
-0 '
-21
- 0"
-20' - 0" -20'
"
'-0
-12
"
-0
9'
-1
-11' - 0"
"
'-0
-24
"
'-0
-23
"
'-0
-22
-9' - 0"
-21'
- 0"
0" -
7'
-1
-19
'-0
"
0"
-20' -
0"
-16' -
-18' -
-19' - 0" 0"
-18' - 0"
-17' - 0"
-17' - 0"
-16' - 0"
-16' - 0"
0"
-15' -
"
-0
5'
-1 -15' - 0"
"
-0
-14' - 0" 4'
-1
"
-13' - 0"
-0
3'
-1
-12' - 0"
-14' - 0"
"
-0
2'
-1
-11' - 0"
-10' - 0"
"
-0
1'
-1
-13' - 0"
"
-0 '
-9
"
'-0
-10
-12' - 0"
'- 0"
-10
29' - 0
7/8"
-11' - 0"
'- 0"
-11
22' - 3
SETB 1/8"
4' - 0" ACK
0" - SE
-10'
T
30 BA
554'
' - CK
0"
50' - 0
"
30' -
-9'
-6
'
-0
-0
"
"
-7'
SETB 0"
- 0"
ACK
-8'
-7'
-6'
-
-0
-0
0"
"
"
-8' - 0"
THESE DOCUMENTS ARE FOR STUDENT: STEVEN VOLLENWEIDER NEW CONSTRUCTION FOR
DATE:
SHEET NO:
CONSTRUCTION DOCUMENTS
1.1 2 2.9 3 4 4.9 5 6 6.9 7
1 8 9 9.1 10 10.9 11 12 12.9 13 14 15
16 16.1 16.2 17 18
L
12"X12" COLUMN FOOTINGS
FOR EMERGENCY EXIT STAIRS
30' - 0"
AND OVER 5" CRUCHED ROCK
INSTALL CONTROL JOINTS @ 30'-0" O.C.
30' - 0"
CONSTRUCTION DOCUMENTS
UNSUPPORTING WALL FOR
24"X24" CONCRETE FIRE PROTECTION
30' - 0"
FOOTING FOR STEEL
1.2 1.3 COLUMNS
H
15' - 11 1/2"
F
F 1
D A1.19
2' - 0"
12"THICK CONCRETE FONDATION WALL
E
E
19' - 5 1/4"
C
1
3
A1.18
15' - 4 1/4"
29' - 10 7/8" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0"
60' - 0" 2
A1.19
60' - 0" 60' - 0" 60' - 0" 60' - 0" 60' - 0" 60' - 0"
510' - 11"
1 FONDATION WALLS
A1.3 SCALE: 1" = 20'-0" N
W E
S
S:\Architecture\New Folder\NSCWH9.rvt
8/27/2010 2:30:19 PM
DATE: 03/22/09
DRWN BY:
CHARLES HARTMAN
SHEET TITLE:
FONDATION WALLS
SHEET NO:
A1.3
3
A1.12
1.
A1.6 1. 1.
A1.7 A1.8
L L
43 90 91 42
105E
104A 103A 102A 101A
105D
100A
UP
CONSTRUCTION DOCUMENTS
105B
106A
1
A1.23
J J
107A
159' - 10 3/4"
106C
105C
108A
87
82 106B 109A
I 88 I
81
B 70
71
53 64 54 55 56 57 65 58 59 60 61 67 62
C
A 1.2 1.3 A
17 18
13
1 1.1 2 2.9 3 4 4.9 5 6 6.9 7 8 9 9.1 10 10.9 11 12 12.9 14 15 16 16.1 16.2 2
A1.19
151' - 10 7/8"
S
1. 1.
1. A1.10 A1.11
A1.9
8/27/2010 2:30:23 PM
DATE: 03/22/09
SHEET TITLE:
FIRST FLOOR
WAREHOUSE
SHEET NO:
A1.4
S:\Architecture\New Folder\NSCWH9.rvt
8/27/2010 2:30:27 PM
I
J
L
A
B
K
C
D
H
1
A1.5
1
SCALE:
1.1
1" = 20'-0"
2
2
2.9
2.9 3
W
4
4
S
N
E
4.9
4.9 5
5
6
6
6.9
6.9 7
7
8
8
9
9 9.1
9.1
10
10
10.9 11
10.9 11
12
12
12.9 13
12.9 13
14
14
15
15
E
2
A1.23
DN
5
A1.26
16 16.1 16.2
16 16.1 16.2
17
17
11' - 2"
11' - 2"
2
1
A1.19
A1.23
DN
A1.26
18
18
I
J
L
E
K
A
C
D
1
3
1
A1.18
A1.19
THESE DOCUMENTS ARE FOR STUDENT: STEVEN VOLLENWEIDER NEW CONSTRUCTION FOR
DATE:
SHEET NO:
THE CONTENTS WITHIN ARE PROPERTY ARC:220 - DESIGN AND PRODUCTION III
SHEET TITLE:
A1.5
CONSTRUCTION DOCUMENTS
S:\Architecture\New Folder\NSCWH9.rvt
8/27/2010 2:30:29 PM
I
L
G
J
K
2' - 0 1/4"
2' - 2"
30' - 0" 30' - 0" 30' - 0" 30' - 0" 0' - 10 3/4"
2' - 10 7/8"
72
1' - 0"
1.1
1.2
1.1 1.2
5.
10.
11' - 2"
5.
6.
1.3
1.3
29' - 10 7/8"
5.
2.
1
A1.6
1.
2
2
SCALE:
5' - 4 3/4"
NORTH 1
1.
1/8" = 1'-0"
43
30' - 0"
W
3' - 0" 3' - 0"
S
N
DN
18' - 0"
E
2.9
2.9
1' - 10 7/8"
8' - 7 1/8"
3
3
2' - 4"
2.
1.
30' - 0"
1.
4
4
3.
1.
30' - 0"
4.9
4.9
1' - 10 7/8"
5
5
2.
30' - 0"
5.
6
6
3.
1.
4
30' - 0"
KEYPLAN WEST
5' - 11 1/2"
90
6.9
6.9
1' - 10 7/8"
7
7
10' - 6 5/8"
3' - 6 1/2"
I
J
L
THESE DOCUMENTS ARE FOR STUDENT: STEVEN VOLLENWEIDER NEW CONSTRUCTION FOR
DATE:
SHEET NO:
CONJUNCTION WITH NATIONAL SALES COMPANY ST. LOUIS COMMUNITY COLLEGE @ MERAMEC
A1.6
CONSTRUCTION DOCUMENTS
Keynote Legend
Key Value Keynote Text
1. Structural Columns
2. Structural columns for over head crane
3. Finish floor 6" thick
4 Typical metal stud ½ dry wall
5. Concrete tilt up wall brick veneer
6. Docking area for trucks
7. Overhead docking doors
8. Soffit & Fascia
9. HVAC equipment
10. MTL Guardrail
11. Standing seem Roof
12. Gutters
13. Louvers
15. Curtain wall
16. Over head fire rated door
17. Lockers
18. Sprinklers
19. Canester light
20. sprikler line
23. Aero turbine
24. Ductwork
25. Countertop
26. Pendant light
28. 18' Curse fan
29. Air Duct
8 9 9.1 10 10.9 11
Keynote Legend
Key Value Keynote Text
30' - 0" 30' - 0" 30' - 0"
30. Ceiling Panels
31. LH Bar Joist
1' - 10 7/8" 1' - 10 7/8" 32. 5'Curse fan
33. Air space between Cealing Panels and
L L Wall
34. Exit signs
35. Precast column
36. Round HSS column
5.
37. Sun shade oning
38. Expansion Joint
39. Crane system
40. MTL Decking
30' - 0"
41. Concrete Filled metal pan stairs
3. 42. Light fixture
CONSTRUCTION DOCUMENTS
J J
3.
30' - 0"
4
8' - 3 7/8"
1.
82
2' - 0"
I 81
I
0' - 4 3/8"
6' - 8 3/4"
0' - 4 7/8"
2' - 0"
30' - 0"
1.
H H
S:\Architecture\New Folder\NSCWH9.rvt
G G
2' - 0 1/4"
2.
2.
8/27/2010 2:30:31 PM
DATE: 04/05/09
DRWN BY:
CHARLES HARTMAN
SHEET TITLE:
8 9 9.1 10 10.9 11
NORTH 2
1 NORTH 2 N
KEYPLAN MID NORTH
A1.7 SCALE: 1/8" = 1'-0"
1.
W E
SHEET NO:
S
A1.7
S:\Architecture\New Folder\NSCWH9.rvt
8/27/2010 2:30:34 PM
1
A1.8
I
J
L
SCALE:
NORTH 3
1/8" = 1'-0"
W
12
12
S
N
E
30' - 0"
1' - 10 7/8"
12.9 13
12.9 13
30' - 0"
14
14
1.
13' - 6"
42
3' - 0"
30' - 0"
2.
13' - 6"
1.
1.
15
15
11' - 5 3/4"
2' - 3 1/2"
1' - 9 1/4" 0' - 9"
5' - 3"
15.
30' - 0"
78
2' - 2 3/4"
4
88
87
12' - 0 1/4"
15.
16
6
10' - 5 5/8"
1' - 0 1/8"
17. A1.26
1' - 5"
105E
111C
106C
105A
16.1
16 16.1 16.2
1' - 0 1/8"
5
UP
105D
A1.26
3' - 0"
16.2
110A
1' - 5 3/4"
104A
3.
30' - 0"
106B
111B
2
22' - 0"
5.
A1.25
24' - 1 3/8"
16.
4
4
103A
3
A1.25
2' - 8 7/8"
17
17
109A
108A
107A
106A
1.
7' - 2"
105C
102A
111A
5' - 8"
5.
101A
30' - 0"
28' - 9 3/4"
2
4
A1.19
A1.26
100A
1.
1
A1.23
UP
111D
111F
5.
3
A1.26
38
18
18
105B
1' - 2 3/8"
KEYPLAN NORTH
0' - 7"
5' - 8" 6' - 10" 0' - 7" 0' - 7" 1' - 4 5/8"
0' - 7"
0' - 7"
2' - 0" 1' - 8" 1' - 8" 0' - 7" 0' - 7"
30' - 0"
11' - 11 1/4" 2' - 0 1/4" 30' - 0" 12' - 7 1/8" 17' - 4 7/8" 30' - 0"
I
J
L
E
K
1
A1.19
THESE DOCUMENTS ARE FOR STUDENT: STEVEN VOLLENWEIDER NEW CONSTRUCTION FOR
DATE:
SHEET NO:
CONJUNCTION WITH NATIONAL SALES COMPANY ST. LOUIS COMMUNITY COLLEGE @ MERAMEC
A1.8
CONSTRUCTION DOCUMENTS
S:\Architecture\New Folder\NSCWH9.rvt
8/27/2010 2:30:36 PM
I
J
A
B
C
D
H
G
2' - 2 1/2"
1
A1.9
12' - 7 1/2" 33' - 2 1/4" 30' - 0" 30' - 0"
SCALE:
SOUTH 1
1/8" = 1'-0"
1
73
72
1' - 0 1/4"
1
1.2
5.
6.
1.1
1.1 1.2
11' - 2"
2.
10.
10.
DN
1.3
1.3
W
29' - 10 7/8"
2' - 2"
S
N
4' - 2"
E
15' - 10"
14' - 11"
2
2
30' - 0"
50
2.9
2.9
3
3
1.
0' - 11
"
8' - 0"
30' - 0"
3.
58' - 7
5/8"
4
4
5.
1.
30' - 0"
2.
7.
48
4.9
4.9
3' - 8
5
7
49
5
/8"
10.
0' - 11
"
UP
1.
30' - 0"
6
3/4"
6
30' - 0"
46
6.9
6.9
47
7
7
10.
I
J
A
C
D
H
THESE DOCUMENTS ARE FOR STUDENT: STEVEN VOLLENWEIDER NEW CONSTRUCTION FOR
DATE:
SOUTH1
SHEET NO:
CONJUNCTION WITH NATIONAL SALES COMPANY ST. LOUIS COMMUNITY COLLEGE @ MERAMEC
A1.9
CONSTRUCTION DOCUMENTS
S:\Architecture\New Folder\NSCWH9.rvt
8/27/2010 2:30:38 PM
I
J
A
C
D
H
G
15' - 4 1/4" 2' - 2 1/2" 31' - 2" 2' - 0 1/4" 30' - 0" 30' - 0"
UP
4
3.
6' - 8 3/4"
81
8
8
1' - 9 1/4"
0' - 7 5/8"
1
8' - 3 7/8"
A1.10
82
5.
0' - 1 5/8"
SCALE:
7' - 8 3/4"
30' - 0"
SOUTH 2
1' - 0"
2' - 2 3/4"
1/8" = 1'-0"
8' - 0"
1' - 10 7/8"
W
9
9
44
S
N
45
E
9.1
9.1
2.
2' - 3"
1.
7.
10.
3' - 0"
UP
30' - 0"
3' - 6"
10
10
54' - 4
1/4"
5.
1.
30' - 0"
1' - 10 7/8"
10.9 11
10.9 11
I
J
A
C
D
H
1.
3
A1.18
THESE DOCUMENTS ARE FOR STUDENT: STEVEN VOLLENWEIDER NEW CONSTRUCTION FOR
DATE:
SHEET NO:
CONJUNCTION WITH NATIONAL SALES COMPANY ST. LOUIS COMMUNITY COLLEGE @ MERAMEC
11333 BIG BEND RD. ST LOUIS, MO 63122
A1.10
CHARLES HARTMAN
CONSTRUCTION DOCUMENTS
12 12.9 13 14 15 16 16.1 16.2 17 18
5
A1.26
105B
106A
17.
12' - 7 1/8"
1
A1.23
0' - 7"
J J
1.
5' - 2 3/4"
107A
30' - 0"
106C 3
A1.25
4' - 11 1/2"
4
105C
108A
2' - 3 1/2"
3' - 5 3/8"
87
1' - 0"
106B
5' - 5 1/2"
CONSTRUCTION DOCUMENTS
11' - 4"
110A
0' - 9"
5' - 3 3/8"
10' - 5 5/8"
111C 111D
10' - 3 1/8"
15.
3
4 A1.26
18' - 8"
111F
8' - 3 1/4"
14' - 3"
4' - 5 1/2"
1. 38
H H
15.
2' - 0 1/4"
G G
9' - 2 3/4"
1' - 0 1/8" 4 A1.19 F
F 2' - 0 1/4"
A1.26
2' - 0"
78 111B 111A
E
3.
25. 16.
E 15.
11' - 5 7/8" 22' - 0" 7' - 2" 5' - 8" 5.
17' - 2 3/4"
2' - 0"
1' - 0 1/8" 2' - 8 7/8"
4' - 3 1/8"
2. 1' - 0 1/8"
3
D A1.18
D
C 3' - 0" C
2' - 2 1/2"
3' - 8" 1' - 10"
1' - 10 7/8" 3' - 0" 3' - 0" 1' - 10"
68 7. 3' - 8" 8' - 0" 8' - 0"
8' - 0" 1' - 10" 1' - 10" 8' - 0" 3' - 8" 3' - 8" 8' - 0" 6' - 8" 8' - 0" 3' - 8" 3' - 8" 8' - 0" 1' - 10" 1' - 10" 8' - 0" 7' - 4" 8' - 0" 6' - 8" 8' - 0" 3' - 8"
15' - 4 1/4"
69
8' - 0"
7.
4' - 6" 7.
70
8' - 0"
S:\Architecture\New Folder\NSCWH9.rvt
7.
4' - 6"
71
8' - 0"
4' - 6" 53 64 54 55 56 57 65 58 59 60 61 67 62
8' - 0"
A 7' - 9
5
A
/8"
30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0"
2
1' - 0 1/8" 1' - 0 1/8" A1.19
17 18
8/27/2010 2:30:41 PM
1' - 10 7/8"
DATE: 04/04/09
W E SOUTH 3
SHEET NO:
KEYPLAN EAST
1.
A1.11
16 16.1 16.2 17 18
16 16.1 16.2 17 18
2' - 11"
105A
0' - 7"
L L L L
OFFICE OFFICE OFFICE
11' - 0 7/8"
5' - 0" 10' - 4 7/8" 10' - 4 7/8" 10' - 4 7/8" 10' - 4 7/8"
12' - 3"
OFFICE 203 202 201
OFFICE
16' - 3 1/4"
OFFICE OFFICE OFFICE OFFICE
100 10' - 6" 16' - 11 5/8" 16' - 1 7/8"
104 103 102 101 200 Room Finish Schedule
Room Finish
2'
202A 201A
Numb Ceiling
-
104A 103A 102A 101A 100A
9
8"
3/
3/ er Room Name Floor Finish N E S W Ceiling Hight
5' - 8"
4"
105E 8' - 7 3/8" 10' - 4 7/8" 10' - 4 7/8" 10' - 4 7/8" 4' - 0"
203A -5 200A
30' - 0"
6' STAIR A CONCRETE TILT UP TILTUP TILT UP TILT UP PT 12' - 8"
6' - 10"
1'
STAIR B CONCRETE TILT UP TILTUP TILT UP TILT UP PT 12' - 8"
-
11
219B
3/
3' - 7"
100 OFFICE CONCRETE TILT UP TILTUP GYP PT GYP PT CLG TILE 10' - 2"
4"
10' - 10 3/4"
105D 101 OFFICE CONCRETE TILT UP GYP PT GYP PT GYP PT CLG TILE 10' - 2"
13' - 11 1/2"
5' - 8"
15' - 4 7/8"
OFFICE 102 OFFICE CONCRETE TILT UP GYP PT GYP PT GYP PT CLG TILE 10' - 2"
221B CONFERENCE OFFICE
11' - 3 1/4"
DN
105 103 OFFICE CONCRETE TILT UP GYP PT GYP PT GYP PT CLG TILE 10' - 2"
10' - 4"
3' - 0"
UP
219 218
104 OFFICE CONCRETE TILT UP GYP PT GYP PT GYP PT CLG TILE 10' - 2"
2' - 0"
0' - 7"
STAIR B 106 MEETING CONCRETE GYP PT TILTUP GYP PT GYP PT CLG TILE 10' - 2"
K K K 219A K ROOM
2' - 0"
22' - 3 3/4"
107 MECHANICAL CONCRETE GYP PT GYP PT GYP PT GYP PT PT 12' - 8"
10' - 9 1/4"
6 6 108 RESTROOM TILE GYP PT TILE TILE GYP PT CLG TILE 10' - 2"
20' - 11 1/2"
A1.26 A1.26 109 RESTROOM TILE TILE TILE GYP PT GYP PT CLG TILE 10' - 2"
17' - 4 7/8"
8' - 1 3/8"
17' - 9 1/8"
8' - 6 1/4"
2' - 0"
2 OFFICE
30' - 0" A1.26 204A 111 SHOW ROOM CONCRETE GYP PT TILTUP GYP PT GYP PT PT 12' - 8"
5 Room 5
217
A1.26 A1.26
200 OFFICE CPT TILT UP GYP PT GYP PT TILT UP CLG TILE 13' - 8"
204
30' - 0"
201 OFFICE CPT TILT UP GYP PT GYP PT GYP PT CLG TILE 13' - 8"
217A 202 OFFICE CPT TILT UP GYP PT GYP PT GYP PT CLG TILE 13' - 8"
2' - 0"
105B
205A 203 OFFICE CPT TILT UP GYP PT TILT UP TILT UP CLG TILE 13' - 8"
106A
204 Room CPT TILT UP GYP PT GYP PT TILT UP CLG TILE 13' - 8"
MEETING ROOM Room
0' - 10 1/4"
206 Room CPT GYP PT GYP PT GYP PT TILT UP CLG TILE 13' - 8"
CONSTRUCTION DOCUMENTS
216 208 Room CPT GYP PT GYP PT GYP PT TILT UP CLG TILE 13' - 8"
209 Room TILE GYP PT GYP PT GYP PT TILT UP CLG TILE 13' - 8"
J J J J
2' - 0"
206A 210 Room TILE GYP PT GYP PT GYP PT TILT UP CLG TILE 13' - 8"
216A
2 2 211 CONFERENCE CPT GYP PT GYP PT TILT UP TILT UP CLG TILE 13' - 8"
11' - 11 3/8"
Room
A1.23 A1.23 212 OFFICE CPT GYP PT GYP PT TILT UP GYP PT CLG TILE 13' - 8"
14' - 1"
206 213 OFFICE CPT GYP PT GYP PT TILT UP GYP PT CLG TILE 13' - 8"
214 OFFICE CPT GYP PT TILTUP TILT UP GYP PT CLG TILE 13' - 8"
3' - 8"
14' - 3 1/8"
OFFICE
MECHANICAL107A 215 OFFICE CPT GYP PT TILTUP GYP PT GYP PT CLG TILE 13' - 8"
215
9' - 8"
216 OFFICE CPT GYP PT TILTUP GYP PT GYP PT CLG TILE 13' - 8"
2' - 0"
107 207A
106C 10' - 7 7/8"3 217 OFFICE CPT GYP PT TILTUP GYP PT GYP PT CLG TILE 13' - 8"
0' - 10 7/8"
A1.25 Room 215A 218 OFFICE CPT GYP PT TILTUP GYP PT GYP PT CLG TILE 13' - 8"
13' - 2 1/2"
ALL DOORS ARE .2' O.C. Room 221
105C 219 CONFERENCE CPT GYP PT GYP PT GYP PT GYP PT PT 12' - 8"
FROM NEAREST WALL
3' - 2 7/8"
6' - 8 1/2"
6' - 7 1/2"
6' - 6 3/8"
UNLESS NOTED 207 220 COAT ROOM CPT GYP PT GYP PT GYP PT GYP PT CLG TILE 13' - 8"
RESTROOM
108A 221 Room CONCRETE GYP PT GYP PT GYP PT GYP PT PT 12' - 8"
ELV
0' - 10 1/2"
108
2 208A
JANITORAL
3' - 5"
110
11' - 1 3/4"
Room
110A
208 4 6' - 11 3/4"
6
12' - 7 3/8" 6' - 8 7/8" A1.25
22' - 8"
111C 111D 111E
Room 209A
209 11' - 11 5/8"
1' - 6"
COAT ROOM 220A
0' - 6 1/8"
111
10' - 7"
Room 220
8' - 3"
111F
STAIR A 5 210 210A 2' - 6" 221A
38 A1.25 6' - 5 1/2"
3' - 0"
H
33' - 0"
3' - 10"
2' - 4 1/4"
H H 213A
214A DN
H
UP 211A
2' - 6"
G G G G
22' - 5 1/2"
20' - 5 3/4" 212A
221A OFFICE
16' - 3 5/8"
16' - 3 5/8"
3 HOUR METAL DOOR 10' - 0" 214
CONFERENCE OFFICE
OVER COUNTERTOP 5' - 3" OFFICE
211 EQ EQ 213 1
212 A1.26 1
S:\Architecture\New Folder\NSCWH9.rvt
13' - 8 7/8"
18 DATE: 03/22/09
16 16.1 16.2 17
DRWN BY:
CHARLES HARTMAN
2 2
16 16.1 16.2 17 A1.19 18 A1.19
SHEET TITLE:
OFFICE SPACES
N
3
KEYPLAN OFFICE AREA A1.12
AEROTURBINES
2
A1.19
1 1.1 1.2 1.3 2 2.9 3 4 4.9 5 6 6.9 7 8 9 9.1 10 10.9 11 12 12.9 13 14 15 16 16.1 16.2 17 18 RIDGE HT.
44' - 2"
RIDGE HT. 3
RIDGE HT
5
44' - 2" A1.26
42' - 8"
A1.26
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
MAIN BEAM MAIN BEAM
33' - 11" 33' - 11"
PLATE HT. PLATE HT.
26' - 8" FLOOR
SECOND 26' - 8"
OFFICE SECOND FLOOR
13' - 4" OFFICE
FIRST FLOOR 13' - 4"
FIRST FLOOR
OFFICE 49 47 45 OFFICE
68 69 70 71 53 64 54 55 56 57 65 58 59 60 61 67 62
0' - 0" 0' - 0"
DOCKING LEVEL
FONDATION -4' - 0"
WALLS
FONDATION
-13' - 0"
WALLS
-13' - 0"
BASE OF FOOTING
-14' - 0" LOUVERED WINDOW SYSTEM BASE OF FOOTING
-14' - 0"
1.
A1.15
1. 2.1
1 SOUTHWEST ELEVATION A1.14 A1.14
1
3 1
CONSTRUCTION DOCUMENTS
A1.23 A1.23
L K J I H G F E D C B A
2 1
A1.23 A1.23
2
A1.19
18 17 16.2 16.1 16 15 14 13 12.9 12 11 10.9 10 9.1 9 8 7 6.9 6 5 4.9 4 3 2.9 2 1.3 1.2 1.1 1
RIDGE HT.
44' - 2"
3 RIDGE HT.
RIDGE HT 5
42' - 8"
A1.26 44' - 2"
A1.26
MAIN BEAM MAIN BEAM
33' - 11" 33' - 11"
PLATE HT. PLATE HT.
26' - 8" 26' - 8"
SECOND FLOOR SECOND FLOOR
S:\Architecture\New Folder\NSCWH9.rvt
OFFICE OFFICE
13' - 4" 13' - 4"
FIRST FLOOR FIRST FLOOR
OFFICE OFFICE
0' - 0" 0' - 0"
FONDATION FONDATION
WALLS WALLS
8/27/2010 2:31:17 PM
SHEET NO:
A1.13
1 1.1 1.2 1.3 2 2.9 3 4 4.9 5 6 6.9 7 23.
8
23.
8.
RIDGE HT. 8.
44' - 2"
RIDGE HT.
RIDGE HT RIDGE
44' -HT
2"
42' - 8" 42' - 8"
20 20 20 20 20 20 20 20 20
SECOND FLOOR
5.
49 10. 47
35.
FIRST FLOOR FIRST FLOOR
OFFICE OFFICE
0' - 0" 0' - 0"
DOCKING LEVEL DOCKING LEVEL
-4' - 0" -4' - 0"
CONSTRUCTION DOCUMENTS
FONDATION
WALLS
FONDATION
-13' - 0"
WALLS
-13' - 0"
BASE OF FOOTING
-14' - 0" BASE OF FOOTING
-14' - 0"
1 SOUTHWEST ELEVATION 1
A1.14 SCALE: 1/8" = 1'-0" KEYPLAN SOUTH ELV1
1.
23.
4.9 5 6 6.9 7 8 9 9.1 10 10.9 11 12
23.
SECOND FLOOR
OFFICE SECOND FLOOR
13' - 4" OFFICE
13' - 4"
36.
7.
15.
35.
5.
S:\Architecture\New Folder\NSCWH9.rvt
68 69
49 10. 47 35. 45 FIRST FLOOR
FIRST FLOOR OFFICE
OFFICE 0' - 0"
0' - 0"
DOCKING LEVEL DOCKING LEVEL
-4' - 0" -4' - 0"
8/27/2010 2:31:54 PM
DATE: 04/05/09
DRWN BY:
FONDATION CHARLES HARTMAN
WALLS
FONDATION
-13' - 0" SHEET TITLE:
WALLS
-13' - 0"
1/8 SOUTH
BASE OF FOOTING
BASE OF FOOTING ELEVATIONS
-14' - 0"
2 SOUTHWEST ELEVATION 2 -14' - 0"
A1.14 SCALE: 1/8" = 1'-0" SHEET NO:
2.1
KEYPLAN SOUTH ELV2 A1.14
12 12.9 13 14 15 16 16.1 16.2 17 18
23.
2
A1.19
RIDGE HT.
44' - 2" RIDGE HT.
44' - 2"
RIDGE HT 6 RIDGE HT
42' - 8" 3 42' - 8"
A1.25
A1.26
5
20 20 20 A1.26
8.
12.
PLATE HT. PLATE HT.
26' - 8" 26' - 8"
37.
70 71 53 54 55 56 57 58 59 60 61 62
64 65 67 38 FIRST FLOOR
FIRST FLOOR OFFICE
OFFICE 0' - 0"
0' - 0"
CONSTRUCTION DOCUMENTS
-13' - 0" WALLS
BASE OF FOOTING -13' - 0"
-14' - 0"
BASE OF FOOTING
-14' - 0"
1 SOUTHWEST ELEVATION 3
A1.15 SCALE: 1/8" = 1'-0"
15. 15.
13.
2
SECOND FLOOR SECOND FLOOR
A1.25
OFFICE OFFICE
37.
13' - 4" 13' - 4"
37.
S:\Architecture\New Folder\NSCWH9.rvt
13.
10.
DRWN BY:
FONDATION WALLS
WALLS -13' - 0" SHEET TITLE:
-13' - 0"
1/8 SOUTH & EAST
ELEVATIONS
BASE OF FOOTING
BASE OF FOOTING -14' - 0"
-14' - 0"
2 SOUTHEAST ELEVATION 1 SHEET NO:
A1.15 SCALE: 1/8" = 1'-0"
A1.15
2
18 A1.19 17 16.2 16.1 16 15 14 13 12.9 12 11 10.9
8.
23.
RIDGE HT. 7' - 9" 7' - 9" 7' - 9" 7' - 9" 7' - 9" 7' - 9" 7' - 6" 7' - 6" 7' - 7"
7' - 5" 7' - 6" 7' - 6" 7' - 7" 7' - 6" 7' - 6"
44' - 2" . . . . . .
RIDGE HT.
RIDGE HT 6 44' - 2"
42' - 8" 3
A1.25
A1.26
5
19 19 19 19 19 19 19
A1.26 19 19 19 19 19 19 19 19 19
7' - 4"
5' 10"
13. .
15. 5.
3
SECOND FLOOR SECOND FLOOR
3' - 0"
7' - 4"
105A 42
FIRST FLOOR FIRST FLOOR
3' - 0"
OFFICE OFFICE
0' - 0" 0' - 0"
CONSTRUCTION DOCUMENTS
BASE OF FOOTING
BASE OF FOOTING -14' - 0"
-14' - 0"
1 NORTHEAST ELEVATION 1
A1.16 SCALE: 1/8" = 1'-0"
11.
MAIN BEAM MAIN BEAM
33' - 11" 33' - 11"
9.
11.
5.
5.
S:\Architecture\New Folder\NSCWH9.rvt
DATE: 04/06/09
FONDATION FONDATION
WALLS WALLS
-13' - 0" -13' - 0" DRWN BY:
CHARLES HARTMAN
BASE OF FOOTING
-14' - 0"
BASE OF FOOTING SHEET TITLE:
-14' - 0"
1/8 NORTH
ELEVATIONS
2 NORTHEAST ELEVATION 2
SHEET NO:
A1.16 SCALE: 1/8" = 1'-0"
KEYPLAN NORTH ELV2
2. A1.16
7 6.9 6 5 4.9 23.
4 3 2.9 2 1.3 1.2 1.1 1
8.
7' - 0 3/4" 7' - 0 3/4" 7' - 0 3/4" 7' - 0 3/4" 7' - 0 3/4" 8' - 7 7/8"
7' - 0 3/4" 7' - 0 3/4" 7' - 0 3/4" 7' - 0 3/4" 7' - 0 3/4" 5' - 7 7/8"
8.
RIDGE HT. RIDGE HT.
44' - 2" 44' - 2"
RIDGE HT RIDGE HT
42' - 8" 9. 42' - 8"
20 20 20 20 20 20 20 20 20 20 20 20
8' - 0"
11.
MAIN BEAM MAIN BEAM
33' - 11" 33' - 11"
9. 11. 12. 11.
5.
10.
43
FIRST FLOOR FIRST FLOOR
OFFICE OFFICE
0' - 0" 0' - 0"
1.
CONSTRUCTION DOCUMENTS
BASE OF FOOTING
BASE OF FOOTING -14' - 0"
-14' - 0"
L K J 8. I H G F E D C B A
8.
PLATE HT. PLATE HT.
26' - 8" 26' - 8"
5. 15.
6. 35.
FIRST FLOOR
FIRST FLOOR 72 OFFICE
OFFICE 0' - 0"
0' - 0" 73
10. 35.
DOCKING LEVEL DOCKING LEVEL
8/27/2010 2:33:21 PM
DRWN BY:
FONDATION
WALLS FONDATION CHARLES HARTMAN
-13' - 0" WALLS
-13' - 0"
SHEET TITLE:
BASE OF FOOTING BASE OF FOOTING
-14' - 0" -14' - 0" 1/8 NORTH & WEST
ELEVATIONS
SHEET NO:
2 NORTHWEST ELEVATION 1
A1.17 SCALE: 1/8" = 1'-0" A1.17
1 1.1 1.2 1.3 2 2.9 3 4 4.9 5 6 6.9 7
23.
RIDGE HT. 8.
RIDGE HT.
44' - 2" 44' - 2"
RIDGE HT RIDGE HT
42' - 8" 42' - 8"
11.
39.
31.
39. 39.
37.
SECOND FLOOR SECOND FLOOR
OFFICE 1.
OFFICE
13' - 4" 13' - 4"
5. 1.
CONSTRUCTION DOCUMENTS
FONDATION FONDATION
WALLS WALLS
-13' - 0" -13' - 0"
BASE OF FOOTING
-14' - 0"
BASE OF FOOTING
-14' - 0"
23.
8 9 9.1 10 10.9 11 23. 12 12.9 13 14
11.
39.
1.
5.
S:\Architecture\New Folder\NSCWH9.rvt
FIRST FLOOR
FIRST FLOOR OFFICE
OFFICE 0' - 0"
0' - 0"
DOCKING LEVEL DOCKING LEVEL
8/27/2010 2:33:29 PM
DRWN BY:
FONDATION FONDATION CHARLES HARTMAN
WALLS WALLS
-13' - 0" BASE OF FOOTING
-13' - 0"
BASE OF FOOTING -14' - 0" SHEET TITLE:
-14' - 0"
SECTION CUTS
RIDGE HT 6 RIDGE HT
42' - 8" 3 42' - 8"
A1.25
A1.26
5
11.
A1.26
26.
18. 31.
34.
13.
24. 25.
26. FIRST FLOOR
5.
FIRST FLOOR OFFICE
OFFICE 0' - 0"
0' - 0"
CONSTRUCTION DOCUMENTS
FONDATION FONDATION
WALLS WALLS
-13' - 0" BASE OF FOOTING
-13' - 0"
BASE OF FOOTING -14' - 0"
-14' - 0"
3
23.
A1.18
A B C D E F G H I J K L
2
A1.23 6
MAIN BEAM MAIN BEAM
33' - 11" A1.26 33' - 11"
31.
8. 28.
26.
PLATE HT. PLATE HT.
26' - 8" 31. 26' - 8"
19.
12.
18.
OFFICE 18.
220A 209A 24.
214 1.
10.
24. Room 34.
36.
214A 208A 221 207A 206A 205A 204A 219B 203A OFFICE
2
SECOND FLOOR 200 SECOND FLOOR
A1.25
OFFICE OFFICE
13' - 4" 7.
13' - 4"
26.
67
71 70 69 68 111 105 32. FIRST FLOOR
111A 111C 109A 105C
108A 106A 105E
FIRST FLOOR OFFICE
OFFICE 0' - 0"
0' - 0"
DOCKING LEVEL DOCKING LEVEL
-4' - 0" -4' - 0"
8/27/2010 2:33:40 PM
DATE: 04/18/09
FONDATION
WALLS DRWN BY:
FONDATION
-13' - 0" WALLS CHARLES HARTMAN
BASE OF FOOTING -13' - 0"
-14' - 0"
BASE OF FOOTING SHEET TITLE:
-14' - 0"
SECTION CUTS
SOUTHEAST SECTION CUT 1 3
2 A1.20
SHEET NO:
A1.19
8.
L 11.
2 CALLOUT OF SOUTH WALL SECTION CUT. 1
A1.19
8. A1.20 SCALE: 1/2" = 1'-0"
1
A1.28
E F
15.
PLATE HT. PLATE HT.
26' - 8" 3' - 11 7/8" 26' - 8" 8.
12.
31.
48.
Keynote Legend
Key Value Keynote Text
1. Structural Columns 20.
2. Structural columns for over head crane
31.
3. Finish floor 6" thick
13' - 4"
4 Typical metal stud ½ dry wall
15. 5. Concrete tilt up wall brick veneer 31.
6. Docking area for trucks
CONSTRUCTION DOCUMENTS
5. 26. Pendant light
28. 18' Curse fan
29. Air Duct 34.
18.
19. 15. Keynote Legend
Key Value Keynote Text
30.
30. Ceiling Panels 31.
31. LH Bar Joist 26. 24.
4' - 0" 2' - 6 7/8"
13' - 4" 32. 5'Curse fan 18.
45. 45.
S:\Architecture\New Folder\NSCWH9.rvt
47.
8/27/2010 2:33:43 PM
L L L L
19.
29. 18.
Keynote Legend
19.
Key Value Keynote Text
1. Structural Columns
2. Structural columns for over head crane
34. 3. Finish floor 6" thick
4
4 Typical metal stud ½ dry wall 19.
6
15. Curtain wall 6 20.
16. Over head fire rated door 4
A1.26 33. A1.26
18.
17. Lockers
26. 33.
18. Sprinklers
19. Canester light
32. 20. sprikler line 19. 26.
23. Aero turbine
32.
24. Ductwork
CONSTRUCTION DOCUMENTS
1 1
29. Air Duct 29.
19. 30. A1.23 A1.23
33. 18.
J Keynote Legend
J Key Value Keynote Text J J
30.
30. Ceiling Panels
33. 31. LH Bar Joist
19. 30.
18.
32. 5'Curse fan
33. Air space between Cealing Panels and
Wall
30. 18.
33. 34. Exit signs
24.
33. 35. Precast column
3
34.
A1.25 34. 36. Round HSS column 20.
29.
37. Sun shade oning
38. Expansion Joint 18. 26.
26.
28.
18.
3. 30.
26.
5 34. 5
A1.25 A1.25 34.
H
H 24. 18. 1. 5. H
H
26.
G G G
30.
G
S:\Architecture\New Folder\NSCWH9.rvt
19.
26. 26.
16.
34. 18.
A1.26
4
F 4
A1.26
F F F
E
8/27/2010 2:33:48 PM
E E E DATE: 05/16/09
DRWN BY:
CHARLES HARTMAN
16 16.1 16.2 17 18
16 16.1 16.2 17 18 SHEET TITLE:
N
CEALING PLANS
FIRST FLOOR OFFICE SECOND FLOOR OFFICE
1 W E 2
S
SHEET NO:
A1.21
S:\Architecture\New Folder\NSCWH9.rvt
8/27/2010 2:33:52 PM
I
J
L
A
B
K
C
D
H
1
1
RIDGE HT.
1.1
1.2 1.3
1/12
2
3/12
2.9
3
HVAC UNITS
3/12
KEPT SHADED
1/12
4.9
5
1/12
6
3/12
3/12
8
1/12
10
3/12
10.9
11
3/12
12
1/12
ON METAL DECK
STEEL TRUSS INSULATION
12.9 13
14
ELEMENT
SEPARATE STRUCTURAL
15
1/12
2/12
16 16.1 16.2
17
2
A1.19
18
E
ELEMENT
SEPARATE
STRUCTURAL
1
3
1
A1.18
A1.19
THESE DOCUMENTS ARE FOR STUDENT: STEVEN VOLLENWEIDER NEW CONSTRUCTION FOR
DATE:
SHEET NO:
THE CONTENTS WITHIN ARE PROPERTY ARC:220 - DESIGN AND PRODUCTION III
SHEET TITLE:
CONSTRUCTION DOCUMENTS
3
18 16 16.1 16.2 A1.28
3
11.
A1.26
MAIN BEAM MAIN BEAM
11.
33' - 11" 33' - 11"
13.
54.
Keynote Legend
11. Key Value Keynote Text
1. Structural Columns
2. Structural columns for over head crane
3. Finish floor 6" thick
4 Typical metal stud ½ dry wall
31. 5. Concrete tilt up wall brick veneer
6. Docking area for trucks
29. 7. Overhead docking doors
19. 8. Soffit & Fascia
9. HVAC equipment
CONSTRUCTION DOCUMENTS
51.
Keynote Legend
9' - 2 7/8"
13' - 2"
1.
35. Precast column
40. 36. Round HSS column
1.
37. Sun shade oning
3' - 4"
3' - 1 1/4"
10' - 5 1/8"
9' - 0 3/4"
26.
10' - 5"
15. 33.
51.
S:\Architecture\New Folder\NSCWH9.rvt
19.
3.
3' - 4"
3' - 0 1/2"
8/27/2010 2:33:55 PM
5.
DATE: 05/04/09
DRWN BY:
FIRST FLOOR FIRST FLOOR
OFFICE OFFICE CHARLES HARTMAN
18.
0' - 0" 0' - 0"
SHEET TITLE:
17.
WALL SECTION
DETAILES
30.
SHEET NO:
38 6 36" x 80"
42 1 36" x 84"
43 1 36" x 84"
44 19 8' x 6'-6"
45 1 36" x 84"
46 19 8' x 6'-6"
47 1 36" x 84"
48 19 8' x 6'-6"
49 1 36" x 84"
50 19 8' x 6'-6"
53 8 8' x 6'-6"
54 8 8' x 6'-6"
55 8 8' x 6'-6"
56 8 8' x 6'-6"
57 8 8' x 6'-6"
CONSTRUCTION DOCUMENTS
81 6 36" x 80"
82 6 36" x 80"
87 6 36" x 80"
88 6 36" x 80"
90 6 36" x 80"
91 6 36" x 80"
100A 6 36" x 80"
101A 6 36" x 80"
102A 6 36" x 80"
103A 6 36" x 80"
104A 6 36" x 80"
105A 6 36" x 80"
105B 6 36" x 80"
105C 6 36" x 80"
105D 6 36" x 80"
SHEET NO:
A1.24
2
3
3
A1.25
17 A1.25
17 I A1.25
LH BAR JOIST .
CANISTER LIGHT
PAPER TOWLE DISPENCE MIRROR SPRINKLER
ADA RAIL. SOAPE DISPECER .
10' - 3"
0' - 10"
6' - 8"
2
A1.25 PAPER TOWLE DISPENCER
3' - 0"
3' - 0"
ADA RAIL
0' - 6"
2' - 4"
FIRST FLOOR FIRST FLOOR
I I OFFICE OFFICE
0' - 0" 0' - 0"
TILE BACKER 3' - 3"
1' - 6" 3' - 10" 1' - 7"
TILE BACKER
17
CONSTRUCTION DOCUMENTS
5
6 6
A1.25
16.1 16.2 A1.25 16.1 16.2 A1.25
LH BAR JOIST.
SPRINKLER
SPRINKLER .
MIRROR
5
A1.25 SOAP DISPENCER .
PAPER TOWLE
ADA RAIL PAPER TOWLE
.
DISPENCER
DISPENCER
0' - 6"
3' - 6"
3' - 0"
3' - 0"
3' - 0"
2' - 4"
SECOND FLOOR SECOND FLOOR
16.1 16.2 OFFICE OFFICE
13' - 4" 13' - 4"
WALL HUNG SINK
.
S:\Architecture\New Folder\NSCWH9.rvt
LH BAR JOIST .
2' - 8"
1' - 6" 4' - 1" 1' - 6"
8/27/2010 2:33:59 PM
4 SECOND FLOOR TOILET ROOM 5 SECOND FLOOR TOILET ROOM SECTION 1 6 SECOND FLOOR TOILET ROOM SECTION 2 DATE: 05/16/09
A1.25 SCALE: 1/4" = 1'-0" A1.25 SCALE: 1/4" = 1'-0" A1.25 SCALE: 1/4" = 1'-0"
DRWN BY:
CHARLES HARTMAN
SHEET TITLE:
SHEET NO:
A1.25
3
STAIR A STAIR B
A1.26 18
16 16.116.2
5.
10.
SECOND FLOOR
OFFICE
H H
13' - 4"
G G
10' - 2"
0' - 7"
43.
10.
43.
K K
0' - 7"
0' - 7"
44.
OFFICE
0' - 0"
0' - 7"
44. 0' - 11" 1' - 0"
6
0' - 1" A1.26 8' - 11"
0' - 11"
0' - 1"
F F
7 CALLOUT OF STAIR A SECTION 8 CALLOUT OF STAIR B SECTION CUT
A1.26 SCALE: 1/2" = 1'-0"
E E A1.26 SCALE: 1/2" = 1'-0"
5
A1.26
18
2 CALLOUT STAIR B PLAN VIEW
CONSTRUCTION DOCUMENTS
A1.26 SCALE: 1/4" = 1'-0"
K
E F 1 G H 16 16.116.2
A1.19
11. 3
4
A1.26
18 5
A1.26 A1.26
6
A1.26
5.
5. 1.
42. 5.
42. 5.
5.
5. 42.
10.
6' - 11"
42.
221A
41.
3' - 9" 42.
SECOND FLOOR 10. STAIR A SECOND FLOOR
OFFICE OFFICE
13' - 4" 13' - 4"
3' - 11 1/2"
3' - 3 1/2"
10.
6' - 11 1/2"
41.
10.
S:\Architecture\New Folder\NSCWH9.rvt
41.
3' - 0"
3' - 0"
10. 3' - 11 5/8"
42.
7
A1.26
42.
42.
6' - 4 1/2"
6' - 4 1/2"
6' - 4 1/2"
41.
8/27/2010 2:34:03 PM
111F 41.
3. 8 DATE: 05/16/09
STAIR A 41.
A1.26
FIRST FLOOR FIRST FLOOR
DRWN BY:
OFFICE OFFICE
0' - 0" 0' - 0" CHARLES HARTMAN
SHEET NO:
3 WEST FACING STAIR (A) SECTION 4 NORTH FACING STARI (A) SECTION 5 WEST FACING STAIR (B) SECTION 6 NORTH FACING STAIR (B) SECTION
A1.26 SCALE: 1/4" = 1'-0" A1.26 SCALE: 1/4" = 1'-0" A1.26 SCALE: 1/4" = 1'-0" A1.26 SCALE: 1/4" = 1'-0"
A1.26
I
E F
23.
8.
8.
8.
39.
54.
MAIN BEAM MAIN BEAM
33' - 11" 33' - 11"
53.
31.
5.
39.
15. 8.
20.
51.
18.
CONSTRUCTION DOCUMENTS
MAIN BEAM
33' - 11"
E F
Keynote Legend
Key Value Keynote Text
1. Structural Columns
1 CALLOUT OF WALL SECTION 2 ROOF TOP CALLOUT 2. Structural columns for over head crane
A1.28 SCALE: 1" = 1'-0" A1.28 SCALE: 1/2" = 1'-0" 3. Finish floor 6" thick
4 Typical metal stud ½ dry wall
5. Concrete tilt up wall brick veneer
6. Docking area for trucks
7. Overhead docking doors
8. Soffit & Fascia
30.
5. Keynote Legend
Key Value Keynote Text
50.
30. Ceiling Panels
31. LH Bar Joist
32. 5'Curse fan
33. Air space between Cealing Panels and
S:\Architecture\New Folder\NSCWH9.rvt
5.
Wall
31. 34. Exit signs
31. 35. Precast column
51. 5.
1.
36. Round HSS column
1.
1. 37. Sun shade oning
38. Expansion Joint
8/27/2010 2:34:06 PM