PROJECT QUALITY PLAN DOC.NO:PQP-00
CONTENTS
1. Introduction
2. Quality policy and Objectives
2.1 Management Responsibility
2.2 Quality Policy
2.3 Quality Objectives
2.4 Performance Monitoring
2.5 Project Quality Policy
3. Organization Chart
3.1 Organization-Project
4. Quality System
4.1 Quality Manual And Procedures
5. Quality Procedure
6. Competency Matrix
7. Quality Audit
9. Engineering
1.0 Introduction
Scope
The quality plan is written for the manufacture of structural steelwork for the CTRLS
in accordance with the technical offer, Project specification and National Structural
Steelwork Specification for building Construction Edition 5.
All proposed amendments shall be subject to the same review and approval cycle as
the original prior to their incorporation by the JSSL quality manager.
PROJECT QUALITY PLAN DOC.NO:PQP-00
All project personnel shall be responsible for reporting to the contract manager any
deficiencies or problems resulting from use to the quality plan and associated
procedures.
It is the policy of JSSL to pursue high standards of quality as an integral part of the
efficient management of the business and to ensure that decisions about other
priorities take proper account of quality requirements.
In order to achieve this objective, the company has established and maintains as
effective quality management system in accordance with the requirements of BS EN
ISO 9001-2015 and the contract specifications.
Also Health & Safety and Environmental systems according to OHSAS 1800,ISO
14001 and 45001.
Compliance with the quality system and the supporting procedures is mandatory and
shall be adhered to by all personnel employed by the company to achieve a common
approach to quality assurance.
PROJECT QUALITY PLAN DOC. NO: PQP-00
3 Organization Chart-Projects
Refer ANNEXURE-II
Each area of the company has primary overall responsibility for the quality of work it
actually performs.
PROJECT QUALITY PLAN DOC.NO:PQP-00
Within each area, the responsibility for quality rests initially with that areas
management, but also with the individuals actually performing the work. It is actively
recognized that quality is not the exclusive responsibility of quality assurance/control
personnel but is the responsibility of all.
Managers are responsible for providing the procedures and work instruction, as
needed, to adequately control those quality activities relevant to their scope of work.
Vice President
Has overall responsibility for all the activities of the company
Head of Projects
Responsible to the VP for all activities related to project management.
who, irrespective of other responsibilities, have the responsibility to ensure that the
requirements of the company’s quality system are established, implemented and,
maintained. He is responsible for compiling Quality inspection and test plans, quality
plan, maintenance of all the approved supplier list and quality auditing.
Project manager
The project manager is responsible to the Head of projects and will co-ordinate both
the engineering and project requirements within the company from award of contract
through to completion, including on site erection and records. The project manager is
the central source of liaison within the company and with the client. In addition, the
project manager is responsible for the financial control of the project.
Production Manager
Responsible to the Head of Operation for production control, planning and progress
in accordance with the manufacturing programme, specification and quality
requirements.
Shop Supervisors
Responsible to the production manager for the control of work within his area. Also
responsible for shop safety, and manufacture of products to the required standard in
accordance with all applicable specifications. He is also responsible for instigating
dimensional checks, either personally or by others, and for liaison with the quality
control manager on quality issues.
PROJECT QUALITY PLAN DOC.NO:PQP-00
Other Responsibilities
Specific responsibilities of these and other employee are defined in the separate
quality procedures or work instructions for particular activities.
The quality manual and quality procedures are approved for compliance with the
standard by the quality manager and department heads.
5. Competency Matrix
All personnel employed by the company shall be deemed competent to undertake the
individual tasks assigned to them. Competency shall be assessed on an ongoing basis
by the individuals line manager by means of verification of the activity by review,
inspection and /or test and undertaking additional training as deemed necessary for
improvement.
8. Engineering
The Engineering team will consider the programme requirements and assign
personnel to the activities so as to meet these requirements. The design planning will
include the provision of design reviews throughout the process the stages of review
will be identified as required. Consideration will also be given for the design
verification and validation activities
PROJECT QUALITY PLAN DOC.NO:PQP-00