EAC Micro-Project
EAC Micro-Project
EAC Micro-Project
Submitted on 2021-2022
Submitted By:-
SUBMITTED BY:-
SUBMITTED BY
2. Course Outcomes:
■ prepare detailed estimate of a civil engineering works.
3. Proposed Methodology:
ACTION PLAN
RESOURCES REQUIRED
Aim of Micro-project
1. To collect the information about detailed estimate.
2. To know the analysis of detailed estimate.
3. To know the detailed estimate.
Literature Review
of the firms have tried to achieve the maximum
Most
sufficiently of cost estimate in bedding stage as well as the success
detailed estimate avoid the firms the failure in the market. Furthermore, the
knowledge of construction cost estimate support the detailed cost
estimate, because this knowledge were ignored and not understood by
most estimators in the field of construction industry in Yemen. Cost is one
of the three main challenges for the construction manager, where the
success of a project is according to the criteria of cost with budget,
schedule on time, and quality .
Resources Required:-
S. Name Specifications Qty. Remark
No. of
Resour
ce
1. 1 Reading
■ PIPE ARCH CULVERT:-Pipe arch culverts means nothing but they looks like half circle shaped
culverts. Pipe arch culverts are suitable for larger water flows but the flow should be stable. Because
of arch shape fishes or sewage in the drainage easily carried to the outlet without stocking at the inlet
or bottom of channel
■ BOX CULVERT:- Box Culverts are used for drainage purposes. They are also used to make
tunnels and used for storage as well as material handling. Some culverts act as bridges. They easily
accommodate both pedestrian and vehicular traffic.
■ ARCH CULVERT:-It defines an arch culvert a: 'The most common form of culvert construction for
river, road, canal, and railway culverts until the mid-19th century. Can be arched, or egg-shaped. For
smaller widths, these may be masonry/brick channel side walls capped with a simply-supported slab
roof.
• Communication skill
• Presentation skill
• Preparation of report
22503
2. Literature
review/informati
on collection
3. Completion of
the target as
per project
proposal
4 Analysis of data
and
representation
5 Quality of
prototype/mod
el
6. Report
preparation
7. Presentation
8. Viva
Dated signature: